CN208152540U - Scaffold is used in a kind of construction of railroad bridge - Google Patents

Scaffold is used in a kind of construction of railroad bridge Download PDF

Info

Publication number
CN208152540U
CN208152540U CN201820680261.6U CN201820680261U CN208152540U CN 208152540 U CN208152540 U CN 208152540U CN 201820680261 U CN201820680261 U CN 201820680261U CN 208152540 U CN208152540 U CN 208152540U
Authority
CN
China
Prior art keywords
connector
sleeve
cross bar
upright bar
boss
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820680261.6U
Other languages
Chinese (zh)
Inventor
梁启龙
刘玉欣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liaoning Railway Vocational and Technical College
Original Assignee
Liaoning Railway Vocational and Technical College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Liaoning Railway Vocational and Technical College filed Critical Liaoning Railway Vocational and Technical College
Priority to CN201820680261.6U priority Critical patent/CN208152540U/en
Application granted granted Critical
Publication of CN208152540U publication Critical patent/CN208152540U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model provides a kind of railroad bridge construction scaffold, belongs to railroad bridge technical field of construction, including upright bar and cross bar, and the cross bar is connect by the connector being located in upright bar with upright bar;Multiple annular grooves are equipped in the upright bar from top to bottom, connector is connected on the annular groove, the connector includes the connection ring being socketed on upright bar annular groove, the connection ring periphery is connected with multiple for connecting the hollow sleeve of cross bar by connecting rod, the top of each sleeve is equipped with the fixation hole through sleeve, and the cross bar, which is equipped with, runs through cross bar and limit hole corresponding with fixation hole position;The railroad bridge construction scaffold further includes the fixed disk being socketed in upright bar, and the fixed disk is located at the top of connector, and the fixed disk lower surface and fixation hole position corresponding position are equipped with spacer pin.The scaffold of the utility model stability with higher, and it is easy for assemble or unload.

Description

Scaffold is used in a kind of construction of railroad bridge
Technical field
The utility model belongs to railroad bridge technical field of construction, and in particular to scaffold is used in a kind of construction of railroad bridge.
Background technique
Scaffold is the generic term of architecture field in order to guarantee each work progress is gone on smoothly and is set up workbench, Refer to and be used in exterior wall, interior decoration or the higher place that can not directly construct of layer height on construction site, mainly on construction personnel Lower operation or perimeter security net are gone along with sb. to guard him and high-altitude installation component etc..
Currently, in the construction of railroad bridge, it is often necessary to some high-rise workings are completed by scaffold, it is existing frequently-used Scaffold has door-type scaffold, total sub-semigroup, pulley-clip scaffold etc., and the most commonly used is bowl fastening type feet in bridge construction Hand cradle, total sub-semigroup are a kind of connected steel pipe scaffolds, and cross bar is inserted in lower bowl buckle by when use by crossbar joint, Then it taps bowl buckle downwards by hammer, is embedded in the upper end of crossbar joint in upper bowl buckle, but total sub-semigroup Safety and stability it is then relatively poor.
Utility model content
The utility model provides a kind of railroad bridge construction scaffold, it is desirable to provide a kind of stability is good and is easily installed The scaffold of disassembly, to solve problems of the prior art.
The utility model provides a kind of railroad bridge construction scaffold, including upright bar and cross bar, and the cross bar is by setting Connector in upright bar is connect with upright bar;Multiple annular grooves are equipped in the upright bar from top to bottom, on the annular groove It is connected with connector, the connector includes the connection ring being socketed on upright bar annular groove, and the connection ring periphery passes through company Extension bar is connected with multiple hollow sleeves for being used to connect cross bar, and each sleeve is far from the open at one end of connecting rod, Mei Gesuo The top for stating sleeve is equipped with the fixation hole for running through sleeve, and the cross bar, which is equipped with, runs through cross bar and limit corresponding with fixation hole position Position hole;The railroad bridge construction scaffold further includes the fixed disk being socketed in upright bar, and the fixed disk is located at connector Top, the fixed disk lower surface and fixation hole position corresponding position be equipped with spacer pin, and the spacer pin has and fixation hole phase Matched size.
Preferably, along multiple boss are axially arranged on the sleeve lining, multiple boss uniformly divide around axis annular Cloth, the both ends of the cross bar are equipped with connector, and the connector is structure as a whole with cross bar, and the limit hole is located at connector On, the connector is respectively equipped with the groove to match with boss along axial direction, and the groove has the shape to match with boss And size, in use, cross bar is inserted into sleeve by corresponding lug boss position, boss and groove mutual cooperation can prevent cross bar from turning It is dynamic, improve the stability of scaffold.
It is highly preferred that there are three the boss sets, the longitudinal section of the boss is triangle, the length of the connector with The length of sleeve is identical.
Preferably, the connection ring periphery is affixed there are four sleeve by connecting rod, and four sleeve annulars are uniformly divided Cloth can connect the cross bar of all directions by four sleeves being uniformly arranged, facilitate installation.
The utility model provides a kind of railroad bridge construction scaffold and has the following advantages that compared with prior art:1, The upright bar of the scaffold of the utility model is equipped with connector, and connector is fixed in upright bar, passes through set affixed on connector Cylinder is connect with cross bar, and it is fixed by being located at the fixed disk above connector, in use, making fixed disk lower surface First spacer pin, the second spacer pin, third spacer pin and the 4th spacer pin are inserted into corresponding fixation hole and limit hole, are mentioned The high stability of scaffold;2, on sleeve lining along being axially arranged with multiple boss, cross bar connector along axial direction be respectively equipped with The groove that boss matches, the groove have the shapes and sizes to match with boss, in use, corresponding lug boss position will be horizontal Bar is inserted into sleeve, and boss and groove mutual cooperation can prevent cross bar from rotating, and improves the stability of scaffold.
Detailed description of the invention
Fig. 1 is the structural schematic diagram that scaffold is used in railroad bridge construction in the utility model embodiment;
Fig. 2 is the structural schematic diagram of upright bar in Fig. 1;
Fig. 3 is the top view of connector in Fig. 1;
Fig. 4 is the bottom view of fixed disk in Fig. 1.
Specific embodiment
With reference to the accompanying drawing, a specific embodiment of the utility model is described in detail, it is to be understood that this The protection scope of utility model is not limited by the specific implementation.
As shown in Figs 1-4, a kind of railroad bridge construction scaffold, including upright bar 1 and cross bar 2, the cross bar 2 is by setting Connector in upright bar 1 is connect with upright bar 1.
Multiple annular grooves are equipped in the upright bar 1 from top to bottom, are connected with connector, the company on the annular groove Fitting includes the connection ring 301 being socketed on 1 annular groove of upright bar, and the connection ring 301 is welded on annular groove, the company It connects 301 periphery of ring and passes through the affixed first sleeve 302 there are four for connecting cross bar 2 of connecting rod, second sleeve 303, third set Cylinder 304 and 4th sleeve 305, the first sleeve 302, second sleeve 303,3rd sleeve 304,305 annular of 4th sleeve are Even distribution, the first sleeve 302, second sleeve 303,3rd sleeve 304, the length of 4th sleeve 305 are identical, and described first Sleeve 302, second sleeve 303, the one end of 3rd sleeve 304 and 4th sleeve 305 far from connecting rod are open, the first set The top of cylinder 302 is equipped with the first fixation hole through first sleeve 302, and the top of the second sleeve 303, which is equipped with, runs through second Second fixation hole of sleeve 303, the top of the 3rd sleeve 304 is equipped with the third fixation hole through 3rd sleeve 304, described The top of 4th sleeve 305 is equipped with the 4th fixation hole through 4th sleeve 305, can be connected by four sleeves being uniformly arranged The cross bar for connecing all directions facilitates installation.Edge is axially arranged with three boss, the boss on the inner wall of the first sleeve 302 Longitudinal section be triangle, three boss are uniformly distributed around axis annular, and one end of the cross bar 2 is equipped with the first connector 201, the other end is equipped with the second connector 202, and first connector 201, the second connector 202 are structure as a whole with cross bar 2, The identical and length with sleeve of the length of first connector 201 and the second connector 202 matches, first connector 201 along being axially arranged with the groove to match with boss, and the groove has a shapes and sizes to match with boss, and described first At the top of connector 201 be equipped with through the first connector the first limit hole 203, second connector 202 along be axially arranged with The groove that boss matches, the groove have the shapes and sizes to match with boss, set at the top of second connector 202 There is the second limit hole 204 through the second connector 202, in use, cross bar 2 is inserted into sleeve by corresponding lug boss position, boss It can prevent cross bar 2 from rotating with groove mutual cooperation, improve the stability of scaffold.
The railroad bridge construction scaffold further includes the fixed disk 4 being socketed in upright bar 1, and the fixed disk 4 is located at The top of connector, 4 lower surface of fixed disk and the first fixation hole position corresponding position are equipped with the first spacer pin 401, with second Fixation hole position corresponding position is equipped with the second spacer pin 402, is equipped with third spacer pin 403 with third fixation hole position corresponding position, with 4th fixation hole position corresponding position is equipped with the 4th spacer pin 404, first spacer pin 401, the second spacer pin 402, third limit The size of position pin 403 and the 4th spacer pin 404 and corresponding fixation hole matches, and after cross bar 2 is inserted into sleeve, makes to fix Hole and the corresponding perforation of limit hole, then move down fixed disk 4, make the first spacer pin 401, the second spacer pin 402, third limit Pin 403 and the 4th spacer pin 404 are inserted into corresponding fixation hole and limit hole, and extend to the lower end of sleeve.
Multiple cross bars 2 are inserted into first sleeve 302, second respectively when the utility model is used, first corresponding to lug boss position In sleeve 303,3rd sleeve 304 and 4th sleeve 305, keep limit hole corresponding with corresponding fixation hole, then to moving down Dynamic fixed disk 4, is inserted into the first spacer pin 401, the second spacer pin 402, third spacer pin 403 and the 4th spacer pin 404 respectively In corresponding fixation hole and limit hole, and extend to the lower end of sleeve.The utility model has the advantages of convenient installation, is carried out by fixed disk 4 It is fixed, the stability of scaffold can be improved.
Disclosed above is only a specific embodiment of the utility model, and still, the utility model embodiment is not office It is limited to this, the changes that any person skilled in the art can think of should all fall into the protection scope of the utility model.

Claims (4)

1. a kind of railroad bridge construction scaffold, including upright bar (1) and cross bar (2), the cross bar (2) is by being located at upright bar (1) connector on is connect with upright bar (1), which is characterized in that multiple annular grooves are equipped on the upright bar (1) from top to bottom, Connector is connected on each annular groove, the connector includes the connection being socketed on upright bar (1) annular groove Ring (301), connection ring (301) periphery are connected with multiple hollow sleeves for being used to connect cross bar (2) by connecting rod, each For the sleeve far from the open at one end of connecting rod, the top of each sleeve is equipped with the fixation hole through sleeve, the cross bar (2) it is equipped with and runs through cross bar (2) and limit hole corresponding with fixation hole position;
The railroad bridge construction scaffold further includes the fixed disk (4) being socketed on upright bar (1), fixed disk (4) position In the top of connector, fixed disk (4) lower surface and fixation hole position corresponding position are equipped with spacer pin, and the spacer pin has The size to match with fixation hole.
2. railroad bridge construction scaffold according to claim 1, which is characterized in that edge on each sleeve lining Multiple boss axially are equipped with, multiple boss are uniformly distributed around axis annular, and the both ends of the cross bar (2) are equipped with connection Head (201,202), the connector (201,202) is structure as a whole with cross bar (2), the limit hole be located at connector (201, 202) on, the connector (201,202) is respectively equipped with the groove to match with boss along axial direction, and the groove has and boss The shapes and sizes to match.
3. railroad bridge construction scaffold according to claim 2, which is characterized in that there are three the boss is set, institute The longitudinal section for stating boss is triangle, and the length of the connector (201,202) is identical as the length of sleeve.
4. railroad bridge construction scaffold according to claim 1, which is characterized in that connection ring (301) periphery Affixed there are four sleeve by connecting rod, four sleeve annulars are uniformly distributed.
CN201820680261.6U 2018-05-08 2018-05-08 Scaffold is used in a kind of construction of railroad bridge Expired - Fee Related CN208152540U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820680261.6U CN208152540U (en) 2018-05-08 2018-05-08 Scaffold is used in a kind of construction of railroad bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820680261.6U CN208152540U (en) 2018-05-08 2018-05-08 Scaffold is used in a kind of construction of railroad bridge

Publications (1)

Publication Number Publication Date
CN208152540U true CN208152540U (en) 2018-11-27

Family

ID=64390110

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820680261.6U Expired - Fee Related CN208152540U (en) 2018-05-08 2018-05-08 Scaffold is used in a kind of construction of railroad bridge

Country Status (1)

Country Link
CN (1) CN208152540U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111706068A (en) * 2020-05-07 2020-09-25 中建材创新科技研究院有限公司 Simple to operate's scaffold frame
CN112681719A (en) * 2020-12-20 2021-04-20 斑马找房(武汉)信息科技有限公司 Scaffold fixing device of fast block of ability for building

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111706068A (en) * 2020-05-07 2020-09-25 中建材创新科技研究院有限公司 Simple to operate's scaffold frame
CN112681719A (en) * 2020-12-20 2021-04-20 斑马找房(武汉)信息科技有限公司 Scaffold fixing device of fast block of ability for building

Similar Documents

Publication Publication Date Title
CN208152540U (en) Scaffold is used in a kind of construction of railroad bridge
CN207829456U (en) Clear water hollow concrete column-form system
CN103206074A (en) Elevator shaft template construction method, platform and support
CN205713916U (en) Segment type high-tension pole climbing device
CN104372923B (en) Scaffolding
CN107989365A (en) Clear water hollow concrete column-form system and its construction method
CN205713096U (en) A kind of roofing cantilevered structure form bracing system
CN112211384B (en) Scaffold for building site
CN207513125U (en) Self assembling type steel pipe scaffold
CN206801072U (en) A kind of foundation ditch temporary guard rail
CN206205407U (en) It is a kind of can flexible combination multi-functional scaffold
CN213927556U (en) Hang muscle mounting tool
CN211815775U (en) Portable block pole setting support
CN208650551U (en) A kind of construction and decoration floor tile provision for disengagement
CN207104753U (en) Furred ceiling expansion bolt sleeve
CN202511306U (en) Scaffold for maintaining interior of flue
CN206158214U (en) Prevent that guardrail bar T -shaped connects
CN205502549U (en) Split type scaffold of hanging
CN208534008U (en) A kind of console mode scaffold wall connecting piece improvement device
CN209723551U (en) A kind of metope brushing scaffold
CN214658656U (en) Be applied to variable pitch pole with adjustable multipurpose of construction
CN206693587U (en) Non-solder type aluminium alloy scaffold
CN206529997U (en) A kind of building decoration guardrail
CN205259636U (en) Combined pavilion
CN205894638U (en) Balcony scaffolding structure that encorbelments

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181127