CN208151844U - The construction that a kind of precast pier and prefabricated cushion cap quickly splice - Google Patents

The construction that a kind of precast pier and prefabricated cushion cap quickly splice Download PDF

Info

Publication number
CN208151844U
CN208151844U CN201820622866.XU CN201820622866U CN208151844U CN 208151844 U CN208151844 U CN 208151844U CN 201820622866 U CN201820622866 U CN 201820622866U CN 208151844 U CN208151844 U CN 208151844U
Authority
CN
China
Prior art keywords
steel plate
cushion cap
precast pier
construction
prefabricated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820622866.XU
Other languages
Chinese (zh)
Inventor
林上顺
谢铭勤
王金泽
欧智菁
林文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Rongsheng Municipal Engineering Co., Ltd
Original Assignee
Fujian University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian University of Technology filed Critical Fujian University of Technology
Priority to CN201820622866.XU priority Critical patent/CN208151844U/en
Application granted granted Critical
Publication of CN208151844U publication Critical patent/CN208151844U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to bridge construction technical fields, and in particular to the construction that a kind of precast pier and prefabricated cushion cap quickly splice, including prefabricated cushion cap, precast pier and steel plate component;The prefabricated cushion cap is equipped with the cushion cap groove of opening upwards, and the middle part of the cushion cap groove is equipped with concrete filled steel tube tenon;The precast pier is vertically arranged and is embedded in the precast pier hollow steel pipe being arranged along the vertical direction, and the hollow steel pipe is located at the centre of precast pier and the lower surface of the hollow steel pipe and the lower surface of precast pier flush;The beneficial effects of the utility model are:Structure design is simple, easy for construction, it is only necessary to pour the rear pouring concrete of fraction, improve construction efficiency, the construction period of bridge is shortened, urban traffic environment is influenced when bridge construction has not only been effectively relieved, but also ensure that the intensity of precast pier is not less than the intensity of cast-in-place bridge pier.

Description

The construction that a kind of precast pier and prefabricated cushion cap quickly splice
Technical field
The utility model relates to bridge construction technical fields, and in particular to a kind of precast pier and prefabricated cushion cap quickly splice Construction.
Background technique
It for the construction efficiency for improving bridge substructure, shortens the construction period, reduction bridge construction as far as possible is to urban environment Interference, the pier shaft of some Urban Bridges uses prefabricated in recent years, and carries out concatenation construction with cushion cap at the scene.Common splicing side Fado uses the reserving hole channel in prefabricated pier shaft, and exposed one section of the embedded bar of cushion cap, and the embedded bar of cushion cap is worn when construction After crossing the reserving hole of bridge pier, mud jacking is carried out to hole, prefabricated pier shaft and cushion cap is made to be linked as entirety.
The joining method of traditional precast pier and cushion cap the problem is that:The embedded bar of cushion cap is more, is required to It is passed through from the reserving hole of pier shaft, and the self weight of prefabricated pier shaft is larger, to realize accurate docking between the two, there is certain apply Work difficulty;To the hole progress mud jacking of pier shaft, larger workload, uncertain factor is more.To solve these problems, it proposes The construction and its construction method that a kind of precast pier and prefabricated cushion cap quickly splice.
Utility model content
In order to overcome the defects of the prior art described above, technical problem to be solved in the utility model is:It provides a kind of pre- The construction that bridge pier processed and prefabricated cushion cap quickly splice, can be improved construction efficiency, shorten the construction period of bridge, can not only be effective Urban traffic environment is influenced when alleviating bridge construction, and also ensures the intensity of precast pier not less than cast-in-place bridge pier Intensity.
In order to solve the above-mentioned technical problem, the technical solution adopted in the utility model is:
The construction that a kind of precast pier and prefabricated cushion cap quickly splice, including prefabricated cushion cap, precast pier and steel plate component; The prefabricated cushion cap is equipped with the cushion cap groove of opening upwards, and the middle part of the cushion cap groove is equipped with concrete filled steel tube tenon;Institute It states precast pier and is vertically arranged and is embedded in the precast pier hollow steel pipe being arranged along the vertical direction, the hollow steel pipe Positioned at precast pier centre and the lower surface of the hollow steel pipe and the lower surface of precast pier flush, the precast pier is logical It crosses hollow steel pipe to be set on the concrete filled steel tube tenon of the prefabricated cushion cap, the lower surface of the precast pier and cushion cap groove Horizontal bottom flush;
The steel plate component includes the first steel plate, the second steel plate and third steel plate, and first steel plate is embedded in described pre- in advance In cushion cap processed and be located at the lower section of the cushion cap groove, first steel plate is horizontally disposed and the upper surface of first steel plate and The horizontal bottom of cushion cap groove flushes;Second steel plate is vertically arranged and precast pier is inserted into simultaneously in the side of second steel plate It is connected with hollow steel pipe, second steel plate other side opposite with the side is arranged outside precast pier, second steel The lower surface of plate is connected with the upper surface of the first steel plate;The third steel plate and the first steel plate vertically connect and the third steel plate It is connect with the second steel plate, the third steel plate and the second steel plate are parallel;
Self-compacting concrete is filled between the precast pier and cushion cap groove, the filling of the self-compacting concrete is high The upper surface of degree and prefabricated cushion cap flushes.
Further, the steel plate component is circularly and evenly distributed on cushion cap groove, and the quantity of the steel plate component has Eight groups.
Further, the lower surface of first steel plate is connected with the anchor bar being vertically arranged, and described the of each piece The lower surface of one steel plate is respectively connected with four anchor bars.
Further, second steel plate passes through welding with third steel plate respectively and connects with the first steel plate, the third steel Plate is connected by bolt and the second steel plate.
Further, the faying face of the hollow circular-tube and concrete filled steel tube tenon, the precast pier and cushion cap groove Faying face be coated with epoxy resin mortar.
Further, the height of second upper surface of steel plate is less than the height of hollow steel pipe upper surface, the hollow steel The height of pipe upper surface is less than the depth of cushion cap groove.
Further, the cushion cap groove and the section of precast pier in the horizontal direction are circle.
The beneficial effects of the utility model are:By using the first pre-buried steel between precast pier and prefabricated cushion cap Plate and the second steel plate are attached, and connect the work for playing reinforcing with the first steel plate and the second steel plate respectively by third steel plate With so that speed of application is fast, connection reliability is strong, and after the completion of pre-embedded steel slab component, rear pouring concrete, to steel plate component into Row package, so that later period etching problem is not present in steel plate component;Prefabricated cushion cap does not destroy original bridge pier globality, by will be prefabricated The peripheral structure of cushion cap is designed as trapezium structure, can save the dosage of concrete, has not only acted as the effect of template, Er Qieshi Work is high-efficient;Cooperated by the hollow steel pipe of the concrete filled steel tube tenon and precast pier lower surface that are arranged in cushion cap groove, Play good positioning action;Pass through placing intensity grade the pouring than precast pier between precast pier and cushion cap groove The higher leveled self-compacting concrete of strength grade, plays package action to bridge pier, further enhances precast pier and holds with prefabricated Connection between platform not only increases the globality spliced between precast pier and precast bridge, and also improves prefabricated bridge The anti-shearing and shock resistance of pier.
The structure design of the utility model is simple, easy for construction, it is only necessary to which that the rear pouring concrete for pouring fraction improves Construction efficiency, shortens the construction period of bridge, influences when bridge construction has not only been effectively relieved on urban traffic environment, but also It ensure that the intensity of precast pier is not less than the intensity of cast-in-place bridge pier.
Detailed description of the invention
The knot for the construction that Fig. 1 quickly splices for a kind of precast pier of specific embodiment of the present invention and prefabricated cushion cap Structure front view, wherein section is only limited to groove part;
The knot for the construction that Fig. 2 quickly splices for a kind of precast pier of specific embodiment of the present invention and prefabricated cushion cap Structure top view;
Fig. 3 is the front view of the prefabricated cushion cap of specific embodiment of the present invention;
Fig. 4 is the top view of the prefabricated cushion cap of specific embodiment of the present invention;
Fig. 5 is the top view of the precast pier of specific embodiment of the present invention;
Fig. 6 is the front view of the precast pier of specific embodiment of the present invention;
Label declaration:
1, prefabricated cushion cap;11, cushion cap groove;12, concrete filled steel tube tenon;
2, precast pier;21, hollow steel pipe;
3, steel plate component;31, the first steel plate;32, the second steel plate;33, third steel plate;
4, self-compacting concrete;5, anchor bar;6, bolt.
Specific embodiment
For technology contents, the objects and the effects that the utility model is described in detail, below in conjunction with embodiment and match Attached drawing is closed to be explained.
The design of the utility model most critical is:By using pre-buried steel plate group between precast pier and prefabricated cushion cap Part is attached, and placing intensity grade is higher by one than the placing intensity grade of precast pier between precast pier and cushion cap groove The self-compacting concrete of grade wraps up precast pier.
It please refers to shown in Fig. 1 to Fig. 6, the construction that a kind of precast pier and prefabricated cushion cap quickly splice, including prefabricated cushion cap 1, precast pier 2 and steel plate component 3;
The prefabricated cushion cap 1 is equipped with the cushion cap groove 11 of opening upwards, and the middle part of the cushion cap groove 11 is equipped with steel pipe Concrete tenon 12;
The precast pier 2 is vertically arranged, and is embedded with the hollow steel pipe being arranged along the vertical direction in the precast pier 2 21, the hollow steel pipe 21 is located at the centre of precast pier 2, the lower surface of the hollow steel pipe 21 and the following table of precast pier 2 Face flushes, and the precast pier 2 is set on the concrete filled steel tube tenon 12 of the prefabricated cushion cap 1 by hollow steel pipe 21, institute The horizontal bottom of the lower surface and cushion cap groove 11 of stating precast pier 2 flushes;
The steel plate component 3 includes the first steel plate 31, the second steel plate 32 and third steel plate 33, and first steel plate 31 is pre-buried In in the prefabricated cushion cap 1 and being located at the lower section of the cushion cap groove 11, first steel plate 31 is horizontally disposed and upper surface and The horizontal bottom of cushion cap groove 11 flushes;Second steel plate 32 is vertically arranged, and the side insertion of second steel plate 32 is prefabricated Bridge pier 2 and hollow steel pipe 21 connect, and the other side is arranged outside precast pier 2, the lower surface of second steel plate 32 and the first steel The upper surface of plate 31 connects;The third steel plate 33 and the vertical connection of the first steel plate 31 and the third steel plate 33 and the second steel plate 32 connections, the third steel plate 33 are parallel with the second steel plate 32;
Self-compacting concrete 4 is filled between the precast pier 2 and cushion cap groove 11, the self-compacting concrete 4 The upper surface of packed height and prefabricated cushion cap 1 flushes.
The work progress for the construction that a kind of above-mentioned precast pier and prefabricated cushion cap quickly splice is:
Prefabricated cushion cap 1 is fixed in step 1, passes through the concrete filled steel tube tenon 12 and prefabricated bridge on cushion cap groove 11 The hollow steel pipe 21 of pier 2 carries out nesting, and precast pier 2 is fixed on prefabricated cushion cap 1;
Step 2 welds the second steel plate 32 pre-buried on the first steel plate 31 and precast pier 2 pre-buried on prefabricated cushion cap 1, Third steel plate 33 is welded on the first steel plate 31 pre-buried on prefabricated cushion cap 1, and with the second steel plate pre-buried on precast pier 2 32 are attached by bolt 6;
Step 3, between cushion cap groove 11 and precast pier 2 placing intensity grade than placing intensity of precast pier 2 etc. The higher leveled self-compacting concrete 4 of grade.
The beneficial effect for the construction that a kind of above-mentioned precast pier and prefabricated cushion cap quickly splice is:
By using pre-buried the first steel plate 31 and the second steel plate 32 to be connected between precast pier 2 and prefabricated cushion cap 1 It connects, and connect with the first steel plate 31 and the second steel plate 32 respectively by third steel plate 33 and play the role of reinforcing, so that construction speed Degree is fast, and connection reliability is strong, and after the completion of pre-embedded steel slab component 3, and rear pouring concrete wraps up steel plate component 3, so that Later period etching problem is not present in steel plate component 3;Prefabricated cushion cap 1 does not destroy original bridge pier globality, by by the week of prefabricated cushion cap 1 Side structure is designed as trapezium structure, can save the dosage of concrete, has not only acted as the effect of template, and construction efficiency It is high;Cooperated by the hollow steel pipe 21 of the concrete filled steel tube tenon 12 and 2 lower surface of precast pier that are arranged in cushion cap groove 11, Play good positioning action;By between precast pier 2 and cushion cap groove 11 placing intensity grade than precast pier 2 The higher leveled self-compacting concrete 4 of placing intensity grade, plays package action to bridge pier, further enhance precast pier 2 with Connection between prefabricated cushion cap 1, not only increases the globality spliced between precast pier 2 and precast bridge, but also improve The anti-shearing and shock resistance of precast pier 2.The structure design of the utility model is simple, easy for construction, it is only necessary to pour small Partial rear pouring concrete, improves construction efficiency, shortens the construction period of bridge, when bridge construction has not only been effectively relieved Urban traffic environment is influenced, and ensure that the intensity of precast pier 2 is not less than the intensity of cast-in-place bridge pier.
Further, in the construction that a kind of above-mentioned precast pier and prefabricated cushion cap quickly splice, the steel plate component 3 is in Even circumferential is distributed on cushion cap groove 11, and the quantity of the steel plate component 3 has eight groups.
Seen from the above description, by being circularly and evenly distributed steel plate component 3 on cushion cap groove 11, and steel plate group The quantity of part 3 is preferably eight groups, and the splicing intensity between precast pier 2 and prefabricated cushion cap 1 can be improved.
Further, in the construction that a kind of above-mentioned precast pier and prefabricated cushion cap quickly splice, first steel plate 31 Lower surface be connected with the anchor bar 5 being vertically arranged, the lower surface of each piece of first steel plate 31 is respectively connected with four Anchor bar 5.
Seen from the above description, prefabricated cushion cap is embedded in by the lower surface connection four of the first steel plate 31 at each piece Anchor bar 5 in 1 can reinforce the second steel plate 32 since the first steel plate 31 is connected with second, third steel plate 33 respectively Connection between third steel plate 33 and prefabricated cushion cap 1, and then strengthen the connection between precast pier 2 and prefabricated cushion cap 1.
Further, in the construction that a kind of above-mentioned precast pier and prefabricated cushion cap quickly splice, second steel plate 32 With third steel plate 33 respectively by welding and the connection of the first steel plate 31, the third steel plate 33 passes through bolt 6 and the second steel plate 32 Connection.
Seen from the above description, by using welding and bolt 6 lock mode can effectively improve the first steel plate 31, Second steel plate 32 and third steel plate 33 respectively between bonding strength, may further improve precast bridge and prefabricated cushion cap 1 it Between splicing intensity.
Further, in the construction that a kind of above-mentioned precast pier and prefabricated cushion cap quickly splice, the hollow circular-tube and The faying face of the faying face of concrete filled steel tube tenon 12, the precast pier 2 and cushion cap groove 11 is coated with epoxy resin mortar.
Seen from the above description, by the faying face of hollow circular-tube and concrete filled steel tube tenon 12, precast pier 2 and holding The faying face of platform groove 11 is coated with epoxy resin mortar so that between hollow circular-tube and concrete filled steel tube tenon 12, precast pier 2 Connection between cushion cap groove 11 can more securely, and connection effect is more preferable.
Further, in the construction that a kind of above-mentioned precast pier and prefabricated cushion cap quickly splice, second steel plate 32 The height of upper surface is less than the height of 21 upper surface of hollow steel pipe, and the height of 21 upper surface of hollow steel pipe is less than cushion cap groove 11 depth.
Further, in the construction that a kind of above-mentioned precast pier and prefabricated cushion cap quickly splice, the cushion cap groove 11 It is circle with the section of precast pier 2 in the horizontal direction.
Embodiment one
It please refers to shown in Fig. 1 and Fig. 2, the construction that a kind of precast pier and prefabricated cushion cap quickly splice, including prefabricated cushion cap 1, precast pier 2 and steel plate component 3;The prefabricated cushion cap 1 is equipped with the cushion cap groove 11 of opening upwards, the cushion cap groove 11 Middle part be equipped with concrete filled steel tube tenon 12;The precast pier 2 is vertically arranged and is embedded in the precast pier 2 along vertical The hollow steel pipe 21 of direction setting, the hollow steel pipe 21 are located at the centre of precast pier 2 and the following table of the hollow steel pipe 21 Face and the lower surface of precast pier 2 flush, and the precast pier 2 is set in the steel of the prefabricated cushion cap 1 by hollow steel pipe 21 On pipe concrete tenon 12, the lower surface of the precast pier 2 and the horizontal bottom of cushion cap groove 11 are flushed;
The steel plate component 3 includes the first steel plate 31, the second steel plate 32 and third steel plate 33, and first steel plate 31 is pre-buried In in the prefabricated cushion cap 1 and being located at the lower section of the cushion cap groove 11, first steel plate 31 is horizontally disposed and described first The upper surface of steel plate 31 and the horizontal bottom of cushion cap groove 11 flush;Second steel plate 32 is vertically arranged and second steel plate 32 side insertion precast pier 2 simultaneously connects, second steel plate 32 other side opposite with the side with hollow steel pipe 21 It is arranged outside precast pier 2, the lower surface of second steel plate 32 is connected with the upper surface of the first steel plate 31;The third steel plate 33 and the first vertically connection and third steel plate 33 is connect with the second steel plate 32, the third steel plate 33 and the second steel of steel plate 31 Plate 32 is parallel;
Self-compacting concrete 4 is filled between the precast pier 2 and cushion cap groove 11, the self-compacting concrete 4 The upper surface of packed height and prefabricated cushion cap 1 flushes;
The steel plate component 3 is circularly and evenly distributed on cushion cap groove 11, and the quantity of the steel plate component 3 has eight groups; The lower surface of first steel plate 31 is connected with the anchor bar 5 being vertically arranged, the following table of each piece of first steel plate 31 Face is respectively connected with four anchor bars 5;Second steel plate 32 and third steel plate 33 pass through welding and the first steel plate 31 respectively Connection, the third steel plate 33 are connected by bolt 6 and the second steel plate 32;The hollow circular-tube and concrete filled steel tube tenon 12 The faying face of faying face, the precast pier 2 and cushion cap groove 11 is coated with epoxy resin mortar;Second steel plate, 32 upper surface Height be less than the height of 21 upper surface of hollow steel pipe, the height of 21 upper surface of hollow steel pipe is less than the depth of cushion cap groove 11 Degree;The cushion cap groove 11 and the section of precast pier 2 in the horizontal direction are circle.
In conclusion the construction that a kind of precast pier provided by the utility model and prefabricated cushion cap quickly splice, by It is attached between precast pier and prefabricated cushion cap using pre-buried the first steel plate and the second steel plate, and is distinguished by third steel plate It connect with the first steel plate and the second steel plate and plays the role of reinforcing, so that speed of application is fast, connection reliability is strong, and in pre-buried steel After the completion of board group part, rear pouring concrete wraps up steel plate component, so that later period etching problem is not present in steel plate component;In advance Cushion cap processed does not destroy original bridge pier globality, by the way that the peripheral structure of prefabricated cushion cap is designed as trapezium structure, can save mixed The dosage for coagulating soil has not only acted as the effect of template, and construction efficiency is high;Pass through the steel tube concrete being arranged in cushion cap groove Native tenon and the hollow steel pipe of precast pier lower surface cooperate, and play good positioning action;By precast pier and holding Placing intensity grade self-compacting concrete more higher leveled than the placing intensity grade of precast pier, plays bridge pier between platform groove Package action further enhances the connection between precast pier and prefabricated cushion cap, not only increases precast pier and prefabricated bridge The globality spliced between beam, and also improve the anti-shearing and shock resistance of precast pier.The structure of the utility model is set Meter is simple, easy for construction, it is only necessary to which that the rear pouring concrete for pouring fraction improves construction efficiency, shortens the construction of bridge Period influences urban traffic environment when bridge construction has not only been effectively relieved, but also ensure that the intensity of precast pier is not low In the intensity of cast-in-place bridge pier.
The above description is only the embodiments of the present invention, and therefore it does not limit the scope of the patent of the utility model, all Equivalents made based on the specification and figures of the utility model are applied directly or indirectly in relevant technology neck Domain is also included in the patent protection scope of the utility model.

Claims (7)

1. the construction that a kind of precast pier and prefabricated cushion cap quickly splice, which is characterized in that including prefabricated cushion cap, precast pier and Steel plate component;The prefabricated cushion cap is equipped with the cushion cap groove of opening upwards, and the middle part of the cushion cap groove is equipped with steel tube concrete Native tenon;The precast pier is vertically arranged and is embedded in the precast pier hollow steel pipe being arranged along the vertical direction, institute State that hollow steel pipe is located at the centre of precast pier and the lower surface of the hollow steel pipe and the lower surface of precast pier flush, it is described Precast pier is set on the concrete filled steel tube tenon of the prefabricated cushion cap by hollow steel pipe, the lower surface of the precast pier It is flushed with the horizontal bottom of cushion cap groove;
The steel plate component includes the first steel plate, the second steel plate and third steel plate, and first steel plate is embedded in described prefabricated hold in advance In platform and it is located at the lower section of the cushion cap groove, first steel plate is horizontally disposed and upper surface and the cushion cap of first steel plate The horizontal bottom of groove flushes;Second steel plate is vertically arranged and the side of second steel plate insertion precast pier is simultaneously and empty The connection of heart steel pipe, second steel plate other side opposite with the side are arranged outside precast pier, second steel plate Lower surface is connected with the upper surface of the first steel plate;The third steel plate and the first steel plate vertically connect and the third steel plate and The connection of two steel plates, the third steel plate and the second steel plate are parallel;
Between the precast pier and cushion cap groove be filled with self-compacting concrete, the packed height of the self-compacting concrete and The upper surface of prefabricated cushion cap flushes.
2. the construction that precast pier according to claim 1 and prefabricated cushion cap quickly splice, which is characterized in that the steel plate Component is circularly and evenly distributed on cushion cap groove, and the quantity of the steel plate component has eight groups.
3. the construction that precast pier according to claim 2 and prefabricated cushion cap quickly splice, which is characterized in that described first The lower surface of steel plate is connected with the anchor bar being vertically arranged, and the lower surface of each piece of first steel plate is respectively connected with four Anchor bar.
4. the construction that precast pier according to claim 1 and prefabricated cushion cap quickly splice, which is characterized in that described second Steel plate passes through welding with third steel plate respectively and connects with the first steel plate, and the third steel plate is connected by bolt and the second steel plate.
5. the construction that precast pier according to claim 1 and prefabricated cushion cap quickly splice, which is characterized in that described hollow The faying face of the faying face of steel pipe and concrete filled steel tube tenon, the precast pier and cushion cap groove is coated with epoxy resin mortar.
6. the construction that precast pier according to claim 1 and prefabricated cushion cap quickly splice, which is characterized in that described second The height of upper surface of steel plate is less than the height of hollow steel pipe upper surface, and the height of the hollow steel pipe upper surface is less than cushion cap groove Depth.
7. the construction that precast pier according to claim 1 and prefabricated cushion cap quickly splice, which is characterized in that the cushion cap The section of groove and precast pier in the horizontal direction is circle.
CN201820622866.XU 2018-04-27 2018-04-27 The construction that a kind of precast pier and prefabricated cushion cap quickly splice Active CN208151844U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820622866.XU CN208151844U (en) 2018-04-27 2018-04-27 The construction that a kind of precast pier and prefabricated cushion cap quickly splice

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820622866.XU CN208151844U (en) 2018-04-27 2018-04-27 The construction that a kind of precast pier and prefabricated cushion cap quickly splice

Publications (1)

Publication Number Publication Date
CN208151844U true CN208151844U (en) 2018-11-27

Family

ID=64377001

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820622866.XU Active CN208151844U (en) 2018-04-27 2018-04-27 The construction that a kind of precast pier and prefabricated cushion cap quickly splice

Country Status (1)

Country Link
CN (1) CN208151844U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108442237A (en) * 2018-04-27 2018-08-24 福建工程学院 The construction and its construction method that a kind of precast pier and prefabricated cushion cap quickly splice
CN109555011A (en) * 2019-01-17 2019-04-02 长安大学 The composite construction and manufacture and assembly method of a kind of full precast pier and cushion cap
CN111074923A (en) * 2019-12-27 2020-04-28 清华大学 Connecting structure of prefabricated hollow pier and bearing platform and construction method thereof
CN111851303A (en) * 2020-07-24 2020-10-30 南京林业大学 Method for connecting bearing platform with convex groove and prefabricated bridge pier
CN113202023A (en) * 2020-03-14 2021-08-03 中国国家铁路集团有限公司 Prefabricated assembled hollow pier with concrete vertical splicing seams and construction method
CN113202022A (en) * 2020-03-14 2021-08-03 中国国家铁路集团有限公司 Prefabricated assembled hollow pier with steel-concrete combined vertical splicing seams and construction method

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108442237A (en) * 2018-04-27 2018-08-24 福建工程学院 The construction and its construction method that a kind of precast pier and prefabricated cushion cap quickly splice
CN109555011A (en) * 2019-01-17 2019-04-02 长安大学 The composite construction and manufacture and assembly method of a kind of full precast pier and cushion cap
CN111074923A (en) * 2019-12-27 2020-04-28 清华大学 Connecting structure of prefabricated hollow pier and bearing platform and construction method thereof
CN113202023A (en) * 2020-03-14 2021-08-03 中国国家铁路集团有限公司 Prefabricated assembled hollow pier with concrete vertical splicing seams and construction method
CN113202022A (en) * 2020-03-14 2021-08-03 中国国家铁路集团有限公司 Prefabricated assembled hollow pier with steel-concrete combined vertical splicing seams and construction method
CN111851303A (en) * 2020-07-24 2020-10-30 南京林业大学 Method for connecting bearing platform with convex groove and prefabricated bridge pier

Similar Documents

Publication Publication Date Title
CN208151844U (en) The construction that a kind of precast pier and prefabricated cushion cap quickly splice
CN108442237A (en) The construction and its construction method that a kind of precast pier and prefabricated cushion cap quickly splice
CN205444475U (en) Prefab and basic connected node
CN109457993A (en) A kind of concrete column restoring and fastening method
CN108951886A (en) A kind of prefabricated assembled concrete shock-resistant node
CN108505433A (en) A kind of bridge pier structure and its construction method
CN109083003A (en) A kind of precast pier pier top connection structure and its construction method
CN106401207A (en) Superimposed connection structure for additionally arranging column foundation on existing building and construction method of superimposed connection structure
CN110295669B (en) Reinforced concrete structure and reinforcing method
CN105908977A (en) Joint bar construction structure and method
CN203487664U (en) Suspension type flexible connection for precast concrete infilled wall
CN205444968U (en) Bar planting anchor structure
CN201770942U (en) Support for soft soil foundation cast-in-place concrete continuous beam bridge
CN206408515U (en) Precast pier section assembling structure
CN209669688U (en) A kind of half assembled thin-wall piers
CN105672144A (en) Medium-small span old bridge reinforcement and jointing-widening structure and construction method thereof
CN108487290A (en) It is cast-in-place to land basis and construction method with precast combined portable communication tower
CN105625449B (en) The connecting structure method of concrete open caisson and steel open caisson
CN106759563A (en) A kind of device for pile foundation repairing and reinforcing and the construction method using the device
CN209429263U (en) A kind of prefabricated column connected node fixing templates
CN107366355A (en) Add the bean column node and its construction method of new beam on existing reinforced concrete frame column
CN108867361A (en) A kind of half grout sleeve connection prefabricated assembling type reinforced concrete side crashproof guardrail
CN208266667U (en) A kind of bridge pier structure
CN102912928B (en) Structural member for restraining grouting anchoring connection by using two ends of steel bar and connection method
CN109722984A (en) Half assembled thin-wall piers of one kind and its assembly method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20220107

Address after: 350000 No. 226, Fuxin Middle Road, Fuzhou, Fujian

Patentee after: Fujian Rongsheng Municipal Engineering Co., Ltd

Address before: No.3, Xueyuan Road, new campus of Fuzhou University, Shangjie Town, Minhou County, Fuzhou City, Fujian Province

Patentee before: FUJIAN University OF TECHNOLOGY

TR01 Transfer of patent right