CN208151456U - Extremely frigid zones dump leaching field leachate pipe laying drips leaching system - Google Patents

Extremely frigid zones dump leaching field leachate pipe laying drips leaching system Download PDF

Info

Publication number
CN208151456U
CN208151456U CN201820681911.9U CN201820681911U CN208151456U CN 208151456 U CN208151456 U CN 208151456U CN 201820681911 U CN201820681911 U CN 201820681911U CN 208151456 U CN208151456 U CN 208151456U
Authority
CN
China
Prior art keywords
leaching
drop
dump
field
leachate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820681911.9U
Other languages
Chinese (zh)
Inventor
马平杰
纪强
王凤龙
孙中建
张昊天
甄建军
林松柏
郭斌
王斌
张婧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changchun Gold Design Institute Co Ltd
Original Assignee
Changchun Gold Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changchun Gold Design Institute Co Ltd filed Critical Changchun Gold Design Institute Co Ltd
Priority to CN201820681911.9U priority Critical patent/CN208151456U/en
Application granted granted Critical
Publication of CN208151456U publication Critical patent/CN208151456U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P10/00Technologies related to metal processing
    • Y02P10/20Recycling

Landscapes

  • Processing Of Solid Wastes (AREA)

Abstract

The utility model discloses a kind of extremely frigid zones dump leaching field leachate pipe layings to drip leaching system, including the more mine heap surface drop shower pipe roads below that are laid in, the more drop leaching pipeline connections are summarized in a conveying main line, the buried depth depth on every drop shower pipe road is 1000~3000mm, every drop shower pipe road is provided with multiple drop leaching hole, the aperture in each drop leaching hole is 0.9~1.2mm, the 200~300mm of pitch of holes in drop leaching hole.Extremely frigid zones dump leaching provided by the utility model field leachate pipe laying drips leaching system, has been effectively ensured in cold winter leachate energy smoothly seepage flow to dump leaching field ore, has kept leachate circulation in dump leaching field unimpeded.The volatilization of leachate in summer dump leaching field is avoided simultaneously, reduces the consumption of Cymag, saves great number production application fee, protects that environment and employee's is healthy and safe.

Description

Extremely frigid zones dump leaching field leachate pipe laying drips leaching system
Technical field
The utility model relates to gold selecting and smelting technology fields more particularly to a kind of extremely frigid zones dump leaching field leachate pipe laying to drip Leaching system.
Background technique
Dump leaching process is processing low grade gold ore main technique, and process is simple, and processing cost is low, is widely used.
After ore builds heap, sprayed on mine heap with gold leaching solution (alkaline circulation fluid adds new water and cyanide), leachate Body is in mine heap leaching and permeates downwards, and golden liquid penetrates into dump leaching field bottom, final seepage flow to your liquid pool.Your liquid in your liquid pool It is raised with pump and is sent to golden recovery workshop, the lean solution after mentioning gold adds Cymag to be again fed to the use of mine heap circulating leaching.
Previous dump leaching field design generally only does Anti-seeping technology technique to dump leaching field, is sprayed using bright pipe, is leached in dump leaching field Your liquid pool is liquid stream enter, however, the technology production security is poor, and is limited by region, in extremely frigid zones, due to dump leaching field mine The spray pipeline and top mineral surface leachate being laid on stone can freeze in cold winter, and circulating leaching liquid can not normal seepage flow To inside dump leaching ore, often winter cannot be produced;In the production of summer heap, large-scale dump leaching process mine, dump leaching scene product is all More than hundreds of thousands is flat, soaks field circulation fluid and leaching medicament evaporation consumption is big, bring loss to enterprise.Thus the Technique Popularizing is answered With being restricted.
Utility model content
The purpose of the utility model is to provide a kind of extremely frigid zones dump leaching field leachate pipe layings to drip leaching system, solves dump leaching field It continuously can normally be produced in cold district, guarantee the leaching of circulating leaching drop, infiltration, leachate is enable continuously to recycle in extremely frigid zones It leaches, it is ensured that the safety in production of enterprise's whole year.
To achieve the goals above, the utility model provides the following technical solutions:
Extremely frigid zones dump leaching field leachate pipe laying drips leaching system, including the more mine heap surface drop shower pipes below that are laid in Road, more drops leaching pipeline connections are summarized in a conveying main line, and the every buried depth depth for dripping shower pipe road is 1000~ 3000mm, every drop shower pipe road are provided with multiple drop leaching hole, and the aperture in each drop leaching hole is 0.9~1.2mm, drop leaching hole 200~300mm of pitch of holes.
Further, the drop leaching intensity on the drop shower pipe road is 6~10L/m2.h。
Further, the caliber on the drop shower pipe road is 20mm.
Further, the drop shower pipe road is managed using PE.
Further, the spacing on the drop shower pipe road is 800~1000mm.
Compared with prior art, extremely frigid zones dump leaching provided by the utility model field leachate pipe laying drips leaching system, effectively It ensure that in cold winter leachate energy smoothly seepage flow to dump leaching field ore, keep leachate circulation in dump leaching field unimpeded.It keeps away simultaneously The volatilization for having exempted from leachate in summer dump leaching field, reduces the consumption of Cymag, saves great number production application fee, protects ring Border and employee's is healthy and safe.
Extremely frigid zones dump leaching provided by the utility model field leachate pipe laying drips leaching system, and operating cost is low, is suitable for height The poor value of cold area dump leaching field, substantially increases the utilization rate of resource, has filled up domestic cold district large size dump leaching mine The blank that mountain winter normally produces.Therefore, which is the significant economic benefit of mine and social creativity, society's effect Benefit and environmental benefit.
Detailed description of the invention
In order to illustrate the technical solutions in the embodiments of the present application or in the prior art more clearly, below will be to institute in embodiment Attached drawing to be used is needed to be briefly described, it should be apparent that, the accompanying drawings in the following description is only to record in the utility model Some embodiments be also possible to obtain other drawings based on these drawings for those of ordinary skill in the art.
Fig. 1 is the structural representation that extremely frigid zones dump leaching provided by the embodiment of the utility model field leachate pipe laying drips leaching system Figure;
Fig. 2 is the structural schematic diagram on drop shower pipe road provided by the embodiment of the utility model.
Description of symbols:
1, shower pipe road is dripped;2, drop leaching hole;3, mine heap;4, ore;5, main line is conveyed.
Specific embodiment
In order to make those skilled in the art more fully understand the technical solution of the utility model, below in conjunction with attached drawing pair The utility model is further detailed.
Referring to shown in Fig. 1~2;
A kind of extremely frigid zones dump leaching field provided by the utility model leachate pipe laying drips leaching system, including the more mines that are laid in 3 surface of heap drop shower pipe road 1 below, more drop shower pipe road 1 connections are summarized in a conveying main line 5, and every drips shower pipe road 1 Buried depth depth is 1000~3000mm, and every drop shower pipe road 1 is provided with multiple drop leaching hole 2, and the aperture in each drop leaching hole 2 is equal For 1mm, the pitch of holes 20mm in drop leaching hole 2.
The drop shower pipe road 1 uses caliber to manage for the PE of 20mm.
Specifically, leaching system is dripped using extremely frigid zones dump leaching provided by the utility model field leachate pipe laying in dump leaching field, will The be laid in depth of the following 1000~3000mm of buried depth in 3 surface of mine heap of drop shower pipe road 1 carries out drop leaching, in winter when there is cold-proof function Can, it ensure that the continuity of circulating liquid drop leaching and infiltration, also can be reduced the evaporation capacity of liquid in summer, reduce medicament and disappear Consumption, reduces the cost.
According to dump leaching field site environment situation, the drop leaching intensity on the drop shower pipe road 1 is 6~10L/m2.h.According to dump leaching Field drop leaching work area, determines circulating leaching liquid water supply capacity.After gold ion concentration reaches certain value, leachate is conveyed so far Recovery workshop mentions gold.
According to mine form on dump leaching field, it is a cell that pipe laying, which drips 1 layout design of shower pipe road, 10,000 square meter, the drop leaching The spacing of pipeline 1 is 800~1000mm.It is 80~120m that length, which is arranged, in each drop shower pipe road 1, is arranged according to dump leaching scene product Multiple cells go pipe laying drop leaching to leach ore.
Dump leaching is one of gold selecting and smelting technology method, is suitable for the lower large-scale gold mine of grade.Because exploitative Its lower application of grade is also relatively broad.The work of extremely frigid zones dump leaching provided by the utility model field leachate pipe laying drop leaching system It is as principle:Broken ore 4 is built by heap using automobile and bull-dozer first, after building heap and completing, drop shower pipe road 1 is applied It is located at the depth of the following 1000~3000mm of buried depth in 3 surface of mine heap, drips and is pumped into gold leaching solution (alkaline circulation fluid benefit in shower pipe road 1 Add new water and cyanide) leaching is dripped on mine heap 3, extracted liquid is leached in mine heap 3 and is permeated downwards.Golden liquid penetrates into dump leaching In field heelpiece and collector tube, final seepage flow to your liquid pool, then raised using pump and be sent to golden recovery workshop.Lean solution after mentioning gold adds cyaniding Sodium is again fed to the use of mine heap circulating leaching.
Above-mentioned dump leaching process process is:Mine builds heap -- your liquid receipts of leachate pipe laying drop leaching -- leachate infiltration -- on dump leaching field Collecting water conservancy diversion, -- heap pipe laying drips leaching and is recycled in lean solution for your liquid conveying -- gold recovery processing -- in your liquid pool.Using the utility model The dump leaching process of the extremely frigid zones dump leaching field leachate pipe laying drop leaching system of offer, simple process, operating process are convenient, run at This is low, is suitable for poor value, substantially increases the utilization rate of resource, achieve preferable effect.
Mine dump leaching is effectively protected using extremely frigid zones dump leaching provided by the utility model field leachate pipe laying drop leaching system It has demonstrate,proved in cold winter circulating leaching liquid energy smoothly seepage flow to dump leaching mine heap, has kept leachate circulation in dump leaching field unimpeded, mention significantly The high production efficiency of dump leaching process, while also reducing the labor intensity of worker.
In addition, extremely frigid zones dump leaching field circulating leaching liquid pipe laying drop leaching systematic difference, avoids dump leaching field circulating leaching Liquid volatilization, the consumption for reducing Cymag save great number production application fee, protect that environment and employee's is healthy and safe.
In conclusion the successful application of extremely frigid zones dump leaching field leachate pipe laying drop leaching system, has filled up domestic cold The blank that regional large size dump leaching mine winter normally produces in the drop leaching of dump leaching field pipe laying.The extremely frigid zones dump leaching field leachate pipe laying Drop leaching systematic difference has been mine and social creativity significant economic benefit, social benefit and environmental benefit.
It is above that certain exemplary embodiments of the utility model are only described by way of explanation, undoubtedly, for Those skilled in the art can be with a variety of different without departing from the spirit and scope of the utility model Mode is modified described embodiment.Therefore, above-mentioned attached drawing and description are regarded as illustrative in nature, and should not be construed as Limitation to the utility model claims protection scope.

Claims (5)

1. extremely frigid zones dump leaching field leachate pipe laying drips leaching system, which is characterized in that be laid in below mine heap surface including more Drop shower pipe road, more drops leaching pipeline connections are summarized in a conveying main line, and the every buried depth depth for dripping shower pipe road is equal For 1000~3000mm, every drop shower pipe road is provided with multiple drop leaching hole, and the aperture in each drop leaching hole is 0.9~1.2mm, 200~the 300mm of pitch of holes in drop leaching hole.
2. extremely frigid zones dump leaching as described in claim 1 field leachate pipe laying drips leaching system, which is characterized in that the drop shower pipe The drop leaching intensity on road is 6~10L/m2.h。
3. extremely frigid zones dump leaching as described in claim 1 field leachate pipe laying drips leaching system, which is characterized in that the drop shower pipe The caliber on road is 20mm.
4. extremely frigid zones dump leaching as described in claim 1 field leachate pipe laying drips leaching system, which is characterized in that the drop shower pipe It is managed using PE on road.
5. extremely frigid zones dump leaching as described in claim 1 field leachate pipe laying drips leaching system, which is characterized in that the drop shower pipe The spacing on road is 800~1000mm.
CN201820681911.9U 2018-05-09 2018-05-09 Extremely frigid zones dump leaching field leachate pipe laying drips leaching system Active CN208151456U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820681911.9U CN208151456U (en) 2018-05-09 2018-05-09 Extremely frigid zones dump leaching field leachate pipe laying drips leaching system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820681911.9U CN208151456U (en) 2018-05-09 2018-05-09 Extremely frigid zones dump leaching field leachate pipe laying drips leaching system

Publications (1)

Publication Number Publication Date
CN208151456U true CN208151456U (en) 2018-11-27

Family

ID=64389748

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820681911.9U Active CN208151456U (en) 2018-05-09 2018-05-09 Extremely frigid zones dump leaching field leachate pipe laying drips leaching system

Country Status (1)

Country Link
CN (1) CN208151456U (en)

Similar Documents

Publication Publication Date Title
CN102942231B (en) Purification method of coal mine distribution underground reservoir water resource
CN104711420A (en) In-situ leaching and liquid collecting method for weathered crust leaching-deposited rare-earth ore
CN102926804B (en) Distributed underground reservoir group and transfer method for mine water in distributed underground reservoir group
CN101975087A (en) Mine water overall treatment utilizing technology
CN202337970U (en) Plugging structure for diversion tunnel
CN202596175U (en) Building construction site water recovery system
CN208151456U (en) Extremely frigid zones dump leaching field leachate pipe laying drips leaching system
CN205115570U (en) Integrated ion rare earth hydrometallurgy system
CN106242029B (en) A kind of karez formula underground water pollution repair system
CN102492838B (en) Spray device for heap-leaching field and spray technology therefor
CN105567993B (en) A kind of beneficiation method of low-grade oxidized form mine tailing containing gold and silver
CN108531726A (en) A kind of Tailings Dam Situ Leaching liquid collecting tunnel mining technique and reaction unit
CN106381830A (en) Cascade reservoir combined sediment regulation method
CN206972235U (en) A kind of structure for melting huge talus loose media bottom frost zone
CN107287444B (en) A kind of low grade copper oxide ore dump leaching drop leaching technique
CN208151455U (en) Your cold-proof liquid pool of extremely frigid zones dump leaching field
CN206143737U (en) Novel return system in tailing storehouse
CN1304608C (en) Refuse-dump pipe injection leaching-out method
CN208151458U (en) A kind of dump leaching field heelpiece subregion collection flow guide system
CN203429012U (en) Efficient energy-saving pollution-free dry processing system of bauxite washing tailing pulp
CN208678547U (en) Screening system is crossed in a kind of underground goaf
CN203642578U (en) Water cooling circulation system
CN208151457U (en) Liquid collecting well in a kind of expensive liquid pool in dump leaching field
CN107587517A (en) A kind of deep foundation pit precipitation recycle device and its application method based on BIM
CN217104025U (en) Cold-proof combined collecting tank for leachate of heap leaching field in alpine and high-latitude areas