CN208717929U - A kind of foundation pit construction water circulation utilization system - Google Patents

A kind of foundation pit construction water circulation utilization system Download PDF

Info

Publication number
CN208717929U
CN208717929U CN201721021697.6U CN201721021697U CN208717929U CN 208717929 U CN208717929 U CN 208717929U CN 201721021697 U CN201721021697 U CN 201721021697U CN 208717929 U CN208717929 U CN 208717929U
Authority
CN
China
Prior art keywords
water
filtering ponds
flow pipe
foundation pit
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721021697.6U
Other languages
Chinese (zh)
Inventor
武岳彪
李兴林
孔维鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Coal Jiangnan Construction Development Group Co., Ltd
Original Assignee
GUANGDONG CHINA COAL JIANGNAN FOUNDATION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGDONG CHINA COAL JIANGNAN FOUNDATION ENGINEERING Co Ltd filed Critical GUANGDONG CHINA COAL JIANGNAN FOUNDATION ENGINEERING Co Ltd
Priority to CN201721021697.6U priority Critical patent/CN208717929U/en
Application granted granted Critical
Publication of CN208717929U publication Critical patent/CN208717929U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of foundation pit construction water circulation utilization systems, its structure includes: Guamishi, steel reinforcement cage, well, first water pump, flow pipe, reservoir, first filtering ponds, second filtering ponds, third filtering ponds, tee tube, second water pump, steel reinforcement cage is located at the medial surface of well and is flexibly connected with it, first water pump is fixedly connected by being located at the flow pipe of its front surface with reservoir, a kind of foundation pit construction water circulation utilization system of the utility model, it is general mating more perfect to can achieve periphery, municipal water is plugged into a little less, it can satisfy the needs of engineering construction, municipal water and blowdown expense are lower, site construction water consumption is small, and it is many for construction auxiliary water, condition with recycling, direct blowdown water circulation use then lower-cost purpose can be used.

Description

A kind of foundation pit construction water circulation utilization system
Technical field
The utility model is a kind of foundation pit construction water circulation utilization system, belongs to the realm of building construction.
Background technique
China is the serious country of drought and water shortage, and current water conservation, water conservation have become fundamental policy, face When it is not high to water quality requirement with water when, e.g., car washing water, flushing facility, fugitive dust sprinkling, concrete curing, mud mixing etc. are each Item technique auxiliary water must use tap water or the higher works scope of water quality, domestic water, concrete, mortar, cement slurry Etc. mixings water, with the continuous development and extension of engineering construction, remote districts have entered the high speed development stage, much in region The predicament for directly restricting production and living without real political affairs water water supply supply is faced in first stage of construction to specially design to cope with this situation Water circulation utilization system.
Prior art discloses application No. is a kind of 201420010117.3 construction site water circulation utilization system, packets It includes well group, high-level water storage pond, coagulative precipitation tank, sterilization pool and high-order water tower, the well group and lattice is passed through by collecting conduit It is connected after grid with the water inlet end in the high-level water storage pond;The water outlet in the high-level water storage pond is heavy by gravity filter and coagulation The water inlet end in shallow lake pond is connected;The water outlet of the coagulative precipitation tank is connected with the water inlet end of sterilization pool;The water outlet of the sterilization pool End is connected with high-order water tower.The utility model makes the water resource in engineering obtain the utilization of greatest benefit, saves construction cost, section About water resource, accomplishes real green construction, but prior art periphery is general mating not perfect, municipal water plug into a little compared with It is more, it is difficult to meet the needs of engineering construction, municipal water and blowdown are costly, and site construction water consumption is big, and is much Construction auxiliary water, has the condition recycled, the higher cost if not recycling using rear direct blowdown.
Utility model content
In view of the deficienciess of the prior art, the utility model aim is to provide a kind of foundation pit construction water circulation use system System, general mating not perfect to solve periphery, municipal water is plugged into a little less, is difficult to meet the needs of engineering construction, municipal administration use Water and blowdown are costly, and site construction water consumption is big, and many for construction auxiliary water, the condition with recycling, If not recycled using rear direct blowdown the problem of higher cost.
To achieve the goals above, the utility model is achieved through the following technical solutions: a kind of foundation pit construction water Cyclic utilization system, structure include: Guamishi, steel reinforcement cage, well, the first water pump, flow pipe, reservoir, the first filtering ponds, Second filtering ponds, third filtering ponds, tee tube, the second water pump, the steel reinforcement cage are located at the medial surface of well and connect with its activity It connects, first water pump is fixedly connected by being located at the flow pipe of its front surface with reservoir, the reservoir and the first filtering Pond is parallel to each other and is flexibly connected by flow pipe, and second water pump is set to the inside of reservoir and is firmly connected with it, The tee tube is fixedly mounted on the front surface of flow pipe, and the Guamishi is set to the interior surface of steel reinforcement cage.
Further, second filtering ponds are located at the right of the first filtering ponds and are fixedly connected by flow pipe.
Further, the third filtering ponds are located at the right of the second filtering ponds and are flexibly connected by flow pipe.
Further, first filtering ponds, the second filtering ponds and third filtering ponds are parallel to each other.
Further, second water pump is fixedly connected with flow pipe.
Further, the well is mutually perpendicular to steel reinforcement cage.
Further, the first water pump is made of metal material.
Beneficial effect
A kind of foundation pit construction water circulation utilization system of the utility model can achieve general mating more perfect, the city in periphery Political affairs are plugged into a little less with water, can satisfy the needs of engineering construction, municipal water and blowdown expense are lower, site construction water consumption It is small and many for construction auxiliary water, there is the condition recycled, can be used direct blowdown water circulation use then cost compared with Low purpose.
Detailed description of the invention
Upon reading the detailed description of non-limiting embodiments with reference to the following drawings, other spies of the utility model Sign, objects and advantages will become more apparent upon:
Fig. 1 is a kind of structural schematic diagram of foundation pit construction water circulation utilization system of the utility model.
In figure: Guamishi -1, steel reinforcement cage -2, well -3, the first water pump -4, flow pipe -5, reservoir -6, the first filtering Pond -7, the second filtering ponds -8, third filtering ponds -9, tee tube -10, the second water pump -11.
Specific embodiment
To be easy to understand the technical means, creative features, achievement of purpose, and effectiveness of the utility model, below In conjunction with specific embodiment, the utility model is further described.
Referring to Fig. 1, the utility model provides a kind of foundation pit construction water circulation utilization system, structure includes: Guamishi 1, steel reinforcement cage 2, well 3, the first water pump 4, flow pipe 5, reservoir 6, the first filtering ponds 7, the second filtering ponds 8, third filtering ponds 9, tee tube 10, the second water pump 11, the steel reinforcement cage 2 are located at the medial surface of well 3 and are flexibly connected with it, first water pump 4 are fixedly connected by being located at the flow pipe 5 of its front surface with reservoir 6, and the reservoir 6 and the first filtering ponds 7 are parallel to each other And be flexibly connected by flow pipe 5, second water pump 11 is set to the inside of reservoir 6 and is firmly connected with it, described three Siphunculus 10 is fixedly mounted on the front surface of flow pipe 5, and the Guamishi 1 is set to the interior surface of steel reinforcement cage 2, second filtering Pond 8 is located at the right of the first filtering ponds 7 and is fixedly connected by flow pipe 5, and the third filtering ponds 9 are located at the second filtering ponds 8 Right and be flexibly connected by flow pipe 5, first filtering ponds 7, the second filtering ponds 8 and third filtering ponds 9 are mutually flat Row, second water pump 11 are fixedly connected with flow pipe 5, and the well 3 is mutually perpendicular to steel reinforcement cage 2, and the first water pump 4 uses Metal material is made.
First water pump 4 described in the utility model is a kind of pressure to increase liquid or gas, is allowed to transport flow Machinery.
Big according to geologic information selection top sand good water permeability, reservoir storage after into building site, lower part bedrock fracture is relatively sent out It educates, pile foundation and material stockyard, road etc. are avoided according to design document in the big stratum of hydraulic pressure, and it sets position and prepares construction well, To make full use of data well 3 that can be arranged by the position of dewatering well, the construction of well 3 can also use Percussion Piles with rotary drilling rig Machine is reached in bedrock fracture layer using mud off pore-forming, disposes steel reinforcement cage 2, the close mesh filter screen of steel reinforcement cage outsourcing, strainer outer ring It is fixed around steel wire, backfills Guamishi, can maintain to set up water in hole wall stabilization and the quick seepage flow to hole of periphery water storage Pump, water is continually pumped into sedimentation basin, then set up water pump in reservoir, water is pumped into flow pipe, flow pipe is pre- every 30m Three-way connection is stayed, construction area is can be convenient and directly fetches water use, construction auxiliary is pumped after gutter flows into sedimentation basin again with water Enter ditch, through three-level sedimentation basin, into reservoir, recycling is pumped into flow pipe supply construction water.
The Guamishi 1, steel reinforcement cage 2, well 3, the first water pump 4, flow pipe 5, reservoir 6, first of the utility model filter Pond 7, the second filtering ponds 8, third filtering ponds 9, tee tube 10,11 component of the second water pump are universal standard part or art technology The component that personnel know, structure and principle are all that this technology personnel can be learnt by technical manual or by routine experiment side Method knows, the utility model solves the problems, such as it is that periphery is general mating not perfect, and municipal water is plugged into a little more, is difficult to meet work The needs of journey construction, municipal water and blowdown are costly, and site construction water consumption is big, and many is construction auxiliary water, Condition with recycling, if not recycled using rear direct blowdown the problem of higher cost, the utility model passes through Above-mentioned component is combined with each other, and it is general mating more perfect to can achieve periphery, and municipal water is plugged into a little less, can satisfy work The needs of journey construction, municipal water and blowdown expense are lower, and site construction water consumption is small, and many for construction auxiliary water, tool There is the condition of recycling, direct blowdown water circulation use then lower-cost purpose can be used, described in detail below:
The steel reinforcement cage 2 is located at the medial surface of well 3 and is flexibly connected with it, before first water pump 4 is by being located at it The flow pipe 5 on surface is fixedly connected with reservoir 6, and the reservoir 6 and the first filtering ponds 7 are parallel to each other and by flow pipe 5 It is flexibly connected, second water pump 11 is set to the inside of reservoir 6 and is firmly connected with it, the fixed peace of the tee tube 10 Mounted in the front surface of flow pipe 5, the Guamishi 1 is set to the interior surface of steel reinforcement cage 2, and second filtering ponds 8 are located at first It the right of filtering ponds 7 and is fixedly connected by flow pipe 5, the third filtering ponds 9 are located at the right of the second filtering ponds 8 and lead to Cross the flexible connection of flow pipe 5.
The basic principles and main features of the present invention and the advantages of the present invention have been shown and described above, for For those skilled in the art, it is clear that the present invention is not limited to the details of the above exemplary embodiments, and without departing substantially from this In the case where the spirit or essential attributes of utility model, the utility model can be realized in other specific forms.Therefore, no matter From the point of view of which point, the present embodiments are to be considered as illustrative and not restrictive, and the scope of the utility model is by institute Attached claim rather than above description limit, it is intended that will fall within the meaning and scope of the equivalent elements of the claims All changes are embraced therein.It should not treat any reference in the claims as limiting related right It is required that.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should It considers the specification as a whole, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art The other embodiments being understood that.

Claims (6)

1. a kind of foundation pit construction water circulation utilization system, it is characterised in that: its structure includes: Guamishi (1), steel reinforcement cage (2), water Well (3), the first water pump (4), flow pipe (5), reservoir (6), the first filtering ponds (7), the second filtering ponds (8), third filtering ponds (9), tee tube (10), the second water pump (11), the steel reinforcement cage (2) are located at the medial surface of well (3) and are flexibly connected with it, institute It states the first water pump (4) and is fixedly connected by being located at the flow pipe (5) of its front surface with reservoir (6), the reservoir (6) and the One filtering ponds (7) are parallel to each other and are flexibly connected by flow pipe (5), and second water pump (11) is set to the interior of reservoir (6) It portion and is firmly connected with it, the tee tube (10) is fixedly mounted on the front surface of flow pipe (5), and the Guamishi (1) sets Interior surface in steel reinforcement cage (2).
2. a kind of foundation pit construction water circulation utilization system according to claim 1, it is characterised in that: second filtering ponds (8) it is located at the right of the first filtering ponds (7) and is fixedly connected by flow pipe (5).
3. a kind of foundation pit construction water circulation utilization system according to claim 1, it is characterised in that: the third filtering ponds (9) it is located at the right of the second filtering ponds (8) and is flexibly connected by flow pipe (5).
4. a kind of foundation pit construction water circulation utilization system according to claim 1, it is characterised in that: first filtering ponds (7), the second filtering ponds (8) and third filtering ponds (9) are parallel to each other.
5. a kind of foundation pit construction water circulation utilization system according to claim 1, it is characterised in that: second water pump (11) it is fixedly connected with flow pipe (5).
6. a kind of foundation pit construction water circulation utilization system according to claim 1, it is characterised in that: the well (3) with Steel reinforcement cage (2) is mutually perpendicular to.
CN201721021697.6U 2017-08-15 2017-08-15 A kind of foundation pit construction water circulation utilization system Active CN208717929U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721021697.6U CN208717929U (en) 2017-08-15 2017-08-15 A kind of foundation pit construction water circulation utilization system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721021697.6U CN208717929U (en) 2017-08-15 2017-08-15 A kind of foundation pit construction water circulation utilization system

Publications (1)

Publication Number Publication Date
CN208717929U true CN208717929U (en) 2019-04-09

Family

ID=65967633

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721021697.6U Active CN208717929U (en) 2017-08-15 2017-08-15 A kind of foundation pit construction water circulation utilization system

Country Status (1)

Country Link
CN (1) CN208717929U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112727542A (en) * 2021-01-12 2021-04-30 中国铁路设计集团有限公司 Underground water comprehensive utilization system for tunnel in water-rich area and use method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112727542A (en) * 2021-01-12 2021-04-30 中国铁路设计集团有限公司 Underground water comprehensive utilization system for tunnel in water-rich area and use method

Similar Documents

Publication Publication Date Title
CN104174191B (en) Integral grit chamber for treating rainwater and treating method
CN205804380U (en) A kind of Deep Foundation Pit Well-Point Dewatering and the wastewater recycling system of pile tube subsoil water
CN206801581U (en) A kind of tunnel lining structure defect reinforcing device
CN206045589U (en) Car washing water circulation system
CN208717929U (en) A kind of foundation pit construction water circulation utilization system
CN203173911U (en) Precipitation device
CN206721904U (en) A kind of integrated precipitation pumping system
CN203855966U (en) Vertical mud-slurry storage and separation system
US3261401A (en) Water production
CN103343690A (en) Shaft antiseep structure used when large section of inclined shaft passes through aquifer and construction method thereof
CN106939610A (en) A kind of integrated precipitation pumping system
CN204940314U (en) A kind of bellend pressure reduction well and deep foundation ditch structure thereof
CN207278220U (en) Assembled pile foundation slurry circulating treating system
CN203989972U (en) A kind of integrated setting pot of processing rainwater
CN204113292U (en) Shield machine sewage-treatment plant in a kind of subway tunnel shield method construction
CN207549111U (en) One kind is suitable for cement grout agitator
CN202055248U (en) Pile foundation mud pit
CN202787289U (en) Shut-in dewatering device for tube well
CN109529448A (en) A kind of afforestation rain collector
CN211445327U (en) Organic contaminated site groundwater remediation system
CN206438508U (en) Split type quick hole cleaning device
CN205839776U (en) Drainage of foundation pit and circulating water utilization system
CN205935052U (en) Floating small -size pump station
CN210827741U (en) Rainwater collection, purification and recycling system
CN204447424U (en) A kind of architectural engineering groundwater treatment and reclamation set

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 510000 Unit 1002-1007, 140 Dongfeng West Road, Yuexiu District, Guangzhou City, Guangdong Province

Patentee after: China Coal Jiangnan Construction Development Co., Ltd.

Address before: 510000 Unit 1002-1007, 140 Dongfeng West Road, Yuexiu District, Guangzhou City, Guangdong Province

Patentee before: Guangdong China Coal Jiangnan Foundation Engineering Co., Ltd.

CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: Unit 1002-1007, 140 Dongfeng West Road, Yuexiu District, Guangzhou, Guangdong 510000

Patentee after: China Coal Jiangnan Construction Development Group Co., Ltd

Address before: Unit 1002-1007, 140 Dongfeng West Road, Yuexiu District, Guangzhou, Guangdong 510000

Patentee before: CHINA COAL JIANGNAN CONSTRUCTION DEVELOPMENT Co.,Ltd.

CP01 Change in the name or title of a patent holder