- Publication number
- CN208148135U CN208148135U CN201820562397.7U CN201820562397U CN208148135U CN 208148135 U CN208148135 U CN 208148135U CN 201820562397 U CN201820562397 U CN 201820562397U CN 208148135 U CN208148135 U CN 208148135U
- Authority
- CN
- China
- Prior art keywords
- driving
- cross slide
- wallboard
- slide way
- core pulling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
- 238000007493 shaping process Methods 0.000 claims abstract description 15
- 238000004519 manufacturing process Methods 0.000 claims abstract description 9
- 239000002994 raw material Substances 0.000 claims abstract description 6
- 208000002925 dental caries Diseases 0.000 claims abstract description 3
- 230000005611 electricity Effects 0.000 claims description 5
- 238000004891 communication Methods 0.000 claims description 3
- 230000005484 gravity Effects 0.000 claims description 3
- 210000003781 tooth socket Anatomy 0.000 claims description 3
- 238000012423 maintenance Methods 0.000 abstract description 3
- 238000005192 partition Methods 0.000 description 15
- 239000011449 brick Substances 0.000 description 6
- 238000010586 diagram Methods 0.000 description 4
- 238000004513 sizing Methods 0.000 description 4
- 230000000694 effects Effects 0.000 description 3
- 238000009413 insulation Methods 0.000 description 3
- 238000000034 method Methods 0.000 description 3
- 239000000284 extract Substances 0.000 description 2
- 239000004570 mortar (masonry) Substances 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 238000003491 array Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010960 commercial process Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 239000005431 greenhouse gas Substances 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 230000008450 motivation Effects 0.000 description 1
- 230000000630 rising effect Effects 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
A kind of poling core pulling equipment includes walking track, tube body, at least one pipeline support mechanism, track laying walk on the ground, tube body, the setting of pipeline support mechanism is on walking track, in walking moving on rails, the walking track includes first cross slide way, longitudinal rail, two the second cross slide ways, two third cross slide ways, the tube body includes support underframe, first driving mechanism, connection frame, several perforated pipes, pass through track of walking, tube body, the cooperation of pipeline support mechanism, realize the efficient poling of wallboard, manpower is saved, the structure of the utility model is relatively simple simultaneously, equipment production cost and later maintenance cost are lower.It include wallboard shaping equipment, poling core pulling equipment the present invention also provides a kind of wallboard laminator, the wallboard shaping equipment is equipped with several die cavitys, forms wallboard base to fill configured wallboard raw materials for production, the front end of wallboard shaping equipment is uniformly arranged several through-holes.
Description
Technical field
The utility model relates to wallboard equipment technical field more particularly to a kind of poling core pulling equipment and wallboard laminators.
Background technique
The wall of building generally comprises load bearing wall and non-load bearing wall, and non-load bearing wall is generally called and does partition wall.Brick mix structure
The wall of building be typically all load bearing wall.And it is interior with the building of frame structure made of steel bar concrete water in advance
The wall in portion is typically all partition wall.Partition wall has the effects of sound insulation, heat-insulated, partition space.Currently, there are mainly two types of shapes for building trade
The partition wall of formula, a form of partition wall are brick masonry walls made of being assembled with brick and mortar, another form of partition wall be with
The wall that the identical partition plate of story height is spliced, is bonded between partition plate and partition plate with mortar.The work of brick masonry wall
Industry efficiency is lower and sound insulation, heat-proof quality are general, while the links such as bake bricks need to consume high-quality soil, energy etc. and to discharge
A large amount of greenhouse gases.With the development of building trade, the rising of labor cost, the reduction of natural resources, environmental problem
It becomes increasingly conspicuous, brick masonry wall will gradually be replaced by partition plate.Partition plate generally has an exhausting hole, to play saving material, subtract
Light partition wall plate weight, heat-insulated, sound insulation effect.The production of traditional partition plate is usually that raw material are filled into mold, so
It is perforated to obtain by raw material of the worker to the sizing in mold again afterwards.The mode efficiency of this production partition plate is lower and compares
Compared with consuming worker's physical strength.
Summary of the invention
In view of this, it is necessary to provide a kind of efficient, labor-saving poling core pulling equipment and wallboard laminators.
A kind of poling core pulling equipment includes walking track, tube body, at least one pipeline support mechanism, walking track paving
If on the ground, tube body, the setting of pipeline support mechanism are on walking track, in walking moving on rails, the walking
Track includes first cross slide way, longitudinal rail, two the second cross slide ways, two third cross slide ways, first cross slide way
It is laid on the ground, the lower end of longitudinal rail is equipped with the first traveling wheel, so that longitudinal rail is laterally transported in first cross slide way
Dynamic, the lower end of tube body longitudinal movement on longitudinal rail, the two sides of longitudinal rail are fixedly connected with the second cross slide way, with
Making longitudinal rail and the second cross slide way synchronizing moving, the two sides of the lower end of third cross slide way are equipped with the second traveling wheel, so that
The two sides of the transverse movement on the second cross slide way of third cross slide way, the upper end of third cross slide way are equipped with guide-track groove, pipeline
The transverse movement in the guide-track groove of third cross slide way of the lower end of supporting mechanism, the tube body include support underframe, first
Driving mechanism, connection frame, several perforated pipes, the support underframe and the first driving mechanism are arranged on longitudinal rail, support
The lower end of chassis is equipped with the third traveling wheel matched with longitudinal rail, so that support underframe is vertically moved along longitudinal rail,
The lower end of first driving mechanism is fixedly connected with longitudinal rail, so that the first driving mechanism is moved synchronously with longitudinal rail, first
The driving end of driving mechanism is connect with support underframe, to drive support underframe to move on longitudinal rail, the lower end of connection frame with
Support underframe is fixedly connected, so that the first driving mechanism drives connection frame longitudinal movement on long rails, the longitudinal direction of connection frame
Side and one end of perforated pipe are detachably connected, and several perforated pipes are erected in pipeline support mechanism, the first driving mechanism
When driving connection frame longitudinal movement, perforated pipe longitudinal movement in pipeline support mechanism.
Preferably, first driving mechanism includes the first driving motor, driving gear, driven gear, drive chain, institute
The side that longitudinal rail is arranged in driving motor is stated, the shaft of first driving motor is fixedly connected with driving gear, actively
Gear is connected with driven gear by drive chain, and the other side of long rails is arranged in driven gear, the lower end of connection frame
Two sides are fixedly connected with drive chain, move connection frame on long rails under the drive of the first driving motor, connection
The side of frame is equipped at least one column and connects through-hole, and the side that perforated pipe is connect with connection frame is equipped with and connect what through-hole matched
Through-hole, so that connection frame and perforated pipe pin joint.
Preferably, the pipeline support mechanism includes braced frame, several horizontal support pieces, and the lower end of braced frame is equipped with
Fourth line walks wheel, and fourth line is walked wheel and moved on third cross slide way, thus move braced frame along third cross slide way,
Several horizontal support pieces are evenly arranged in the two sides of braced frame, and are detachably connected with braced frame, so that perforated pipe frame
It is located on horizontal support piece.
Preferably, the guide-track groove of the third cross slide way be zigzag, correspondingly, fourth line walk wheel be and guide-track groove phase
The gear-like of cooperation, so that braced frame stabilized walking on third cross slide way.
Preferably, the pipeline support mechanism further includes the second driving mechanism, the driving end and the 4th of the second driving mechanism
The shaft of traveling wheel is fixedly connected, to drive fourth line to walk wheel rotation, to make pipeline support mechanism on third cross slide way
It is mobile.
Preferably, the pipeline support mechanism further includes third driving mechanism, and third driving mechanism includes pipe-hanging hook, consolidates
Determine frame, third driving motor, driving wheel, electromagnet, card slot, the lower end of the two sides of the pipe-hanging hook is laterally walked with second
Track is fixedly connected, and the upper end of the pipe-hanging hook is equipped with guide rail beam, and fixed frame is set on guide rail beam, guide rail beam
With two layers, the upper surface on the upper layer of guide rail beam is contacted with fixed frame, and third driving motor is fixedly connected with fixed frame,
The shaft of third driving motor is fixedly connected with driving wheel, and driving wheel is gear-like, and the upper surface of the lower layer of guide rail beam is equipped with
The tooth socket matched with driving wheel, so that driving wheel stable motion on guide rail beam, the lower end of fixed frame is equipped with electromagnet
And guide hole, the upper end of card slot are equipped with the slide post matched with guide hole, slide post moves up and down in guide hole, electromagnet
When power-off, card slot is moved downward by gravity, and is stuck in the braced frame of pipeline support mechanism, when electromagnet is powered,
Card slot is moved upwards by the attraction of electromagnet, and is detached from braced frame.
Preferably, the poling core pulling equipment further includes the 4th driving mechanism, the driving end and first of the 4th driving mechanism
The shaft of traveling wheel is fixedly connected, to drive the first walking rotation dynamic, so that the 4th driving mechanism be made to drive longitudinal rail and the
Two cross slide ways move synchronously.
Preferably, the poling core pulling equipment further includes control device, and control device includes remote controler, receiver, control
Device, the first electromagnetic switch, the second electromagnetic switch, third electromagnetic switch, the 4th electromagnetic switch, the remote controler and receiver are wireless
Communication connection, receiver and controller are electrically connected, and the control signal that remote controler is sent are sent to controller, controller is also
With the first electromagnetic switch, the second electromagnetic switch, third electromagnetic switch, the 4th electromagnetic switch be electrically connected, the first electromagnetic switch with
First driving motor is electrically connected, and the second electromagnetic switch and the second driving mechanism are electrically connected, and third electromagnetic switch and third are driven
Dynamic electrical connection of motor, the 4th electromagnetic switch and third driving motor are electrically connected, to pass through controller control the first driving electricity
The starting or closing of machine, the second driving mechanism, third driving motor, the 4th driving mechanism.
A kind of wallboard laminator includes wallboard shaping equipment, poling core pulling equipment, and the wallboard shaping equipment is equipped with several
Die cavity forms wallboard base to fill configured wallboard raw materials for production, and the front end of wallboard shaping equipment is uniformly arranged several through-holes,
The perforated pipe of poling core pulling equipment passes through the through-hole of wallboard shaping equipment, to perforate to the wallboard base in die cavity.
Beneficial effect:The poling core pulling equipment of the utility model includes walking track, tube body, at least one pipeline branch
Support mechanism, walking track include first cross slide way, longitudinal rail, two the second cross slide ways, two third cross slide ways, are led to
The cooperation for crossing walking track, tube body, pipeline support mechanism, realizes the efficient poling of wallboard, has saved manpower, while this
The structure of utility model is relatively simple, and equipment production cost and later maintenance cost are lower.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of a preferred angle of the poling core pulling equipment of the utility model.
Fig. 2 is the structural schematic diagram of another preferred angle of the poling core pulling equipment of the utility model.
Fig. 3 is that the structure of an only preferred angle of the poling core pulling equipment comprising one group of perforated pipe of the utility model is shown
It is intended to.
Fig. 4 is the structural representation of a preferred angle of the poling core pulling equipment not comprising perforated pipe of the utility model
Figure.
Fig. 5 is the partial structural diagram of the poling core pulling equipment not comprising perforated pipe of the utility model.
Fig. 6 is the structural schematic diagram of the wallboard laminator of this practicability.
In figure:Poling core pulling equipment 10, walking track 101, first cross slide way 1011, longitudinal rail 1012,4 wheel driven
Motivation structure 10121, the second cross slide way 1013, third cross slide way 1014, the second driving mechanism 10141, tube body 102,
Support underframe 1021, the first driving mechanism 1022, the first driving motor 10221, driving gear 10222, driven gear 10223,
Drive chain 10224, connection frame 1023, perforated pipe 1024, pipeline support mechanism 103, braced frame 1031, horizontal support piece
1032, third driving mechanism 1033, pipe-hanging hook 10331, guide rail beam 103311, fixed frame 10332, third driving motor
10333, card slot 10334, wallboard shaping equipment 20.
Specific embodiment
It, below will be to use required in embodiment in order to illustrate more clearly of the technical solution of the utility model embodiment
Attached drawing be briefly described, it should be apparent that, the accompanying drawings in the following description is some embodiments of the utility model, for this
For the those of ordinary skill of field, without creative efforts, it can also be obtained according to these attached drawings others
Attached drawing.
Fig. 1 to Fig. 5 is please referred to, poling core pulling equipment 10 includes walking track 101, tube body 102, at least one pipeline
Supporting mechanism 103, walking track 101 are laid on the ground, and tube body 102, the setting of pipeline support mechanism 103 are in walking track
On 101, with walking track 101 on move, the walking track 101 including first cross slide way 1011, longitudinal rail 1012,
Two the second cross slide ways, 1013, two third cross slide ways 1014, first cross slide way 1011 are laid on the ground, longitudinally lead
The lower end of rail 1012 is equipped with the first traveling wheel, so that the transverse movement in first cross slide way 1011 of longitudinal rail 1012, poling
The longitudinal movement on longitudinal rail 1012 of the lower end of mechanism 102, the two sides of longitudinal rail 1012 and the second cross slide way 1013 are solid
Fixed connection, so that 1013 synchronizing moving of longitudinal rail 1012 and the second cross slide way, the two of the lower end of third cross slide way 1014
Side is equipped with the second traveling wheel, so that the transverse movement on the second cross slide way 1013 of third cross slide way 1014, third are laterally led
The two sides of the upper end of rail 1014 are equipped with guide-track groove, the guide-track groove of the lower end of pipeline support mechanism 103 in third cross slide way 1014
Interior transverse movement, the tube body 102 include support underframe 1021, the first driving mechanism 1022, connection frame 1023, several wear
Hole pipeline 1024, the support underframe 1021 and the first driving mechanism 1022 are arranged on longitudinal rail 1012, support underframe
1021 lower end is equipped with the third traveling wheel matched with longitudinal rail 1012, so that support underframe 1021 is along longitudinal rail
1012 longitudinal movements, the lower end of the first driving mechanism 1022 is fixedly connected with longitudinal rail 1012, so that the first driving mechanism
1022 move synchronously with longitudinal rail 1012, and the driving end of the first driving mechanism 1022 is connect with support underframe 1021, to drive
Support underframe 1021 moves on longitudinal rail 1012, and the lower end of connection frame 1023 is fixedly connected with support underframe 1021, so that
First driving mechanism 1022 drives the longitudinal movement on long rails of connection frame 1023, longitudinal side of connection frame 1023 and perforation
One end of pipeline 1024 is detachably connected, and several perforated pipes 1024 are erected in pipeline support mechanism 103, the first driving mechanism
When 1022 drive 1023 longitudinal movement of connection frame, the longitudinal movement in pipeline support mechanism 103 of perforated pipe 1024.
The utility model setting first cross slide way 1011 is in order to facilitate transverse shifting tube body 102 and pipeline support
Mechanism 103 enables to perforated pipe 1024 to face with wallboard to be perforated;It is to wear for convenience that longitudinal rail 1012, which is arranged,
Pipe mechanism 102 vertically moves, to carry out poling and core pulling operation to wallboard;It is for convenience that the second cross slide way 1013, which is arranged,
Mobile third transverse shifting guide rail;Setting third cross slide way 1014 is in order to facilitate transverse shifting pipeline support mechanism 103.Cause
Track for the longitudinal movement of the transverse movement and tube body 102 of pipeline support mechanism 103 will appear interference.In order not to mutual
Interference, third cross slide way 1014 are provided with two, when tube body 102 carries out poling or core pulling operates, two third cross
Direction guiding rail 1014 separates, to will not interfere with the longitudinal movement of tube body 102;When pipeline support mechanism 103 is needed from longitudinal direction
When the side of guide rail 1012 passes through the other side, two merging of third cross slide way 1014 are in contact.In order to more figuratively bright,
Long rails can be regarded as river, two third cross slide ways 1014 are two sections of bridges, and tube body 102 is ship, pipeline support
Mechanism 103 is vehicle.In commercial process, multiple wallboard vertical arrays to poling are had together, one group of perforated pipe
Road 1024 needs to be placed in wallboard after to the perforation of corresponding wallboard, again extracts perforated pipe 1024 out after a period of time.
If extracted out immediately, wallboard is easily deformed in the case where no sizing is completed.It, can be first in order to keep perforation more efficient
Multiple groups perforated pipe 1024 is corresponded to afterwards and is inserted into multiple wallboards, therefore multiple pipelines can be set on third cross slide way 1014
Supporting mechanism 103, to place perforated pipe 1024.Just the perforated pipe 1024 of insertion wallboard will not be taken out immediately, this can make
Pipeline support mechanism 103 is vacant, it is therefore desirable to which pipeline support mechanism 103 is moved on to the other side of longitudinal rail 1012.Until wall
After the completion of plate sizing, then perforated pipe 1024 is extracted out and is placed in vacant pipeline support mechanism 103, pipeline support mechanism
103 move backward again.After perforated pipe 1024 is inserted into wallboard, the connection frame 1023 of punch block mechanism will be retracted to connect another group
Perforated pipe 1024, therefore connection frame 1023 is to be detachably connected with perforated pipe 1024.
By the cooperation of walk track 101, tube body 102, pipeline support mechanism 103, efficiently wearing for wallboard is realized
Pipe, has saved manpower, while the structure of the utility model is relatively simple, equipment production cost and later maintenance cost compared with
It is low.
Further, first driving mechanism 1022 include the first driving motor 10221, it is driving gear 10222, driven
The side of longitudinal rail 1012, first driving motor is arranged in gear 10223, drive chain 10224, the driving motor
10221 shaft is fixedly connected with driving gear 10222, and driving gear 10222 and driven gear 10223 pass through drive chain
The other side of long rails, the two sides of the lower end of connection frame 1023 and drive chain is arranged in 10224 connections, driven gear 10223
Item 10224 is fixedly connected, move connection frame 1023 on long rails under the drive of the first driving motor 10221, even
The side for connecing frame 1023 is equipped at least one column and connects through-hole, and the side that perforated pipe 1024 is connect with connection frame 1023 is equipped with and connects
The through-hole that hole matches is connected, so that connection frame 1023 and 1024 pin joint of perforated pipe.
Further, the pipeline support mechanism 103 includes braced frame 1031, several horizontal support pieces 1032, support
The lower end of frame 1031 is equipped with fourth line and walks wheel, and fourth line is walked wheel and moved on third cross slide way 1014, to make support frame
Frame 1031 is moved along third cross slide way 1014, and several horizontal support pieces 1032 are evenly arranged in the two of braced frame 1031
Side, and be detachably connected with braced frame 1031, so that perforated pipe 1024 is erected on horizontal support piece 1032.
In a better embodiment, the horizontal support piece 1032 is symmetrical structure, and horizontal support piece 1032 is plate,
A groove is respectively set in the both ends of horizontal support piece 1032, to place perforated pipe 1024.Not for easy to process and placement
With the perforated pipe 1024 of diameter, groove is arch.The middle-end and braced frame 1031 of horizontal support piece 1032 can by bolt
Dismantling connection.Multiple threaded holes are arranged in braced frame 1031 accordingly, to facilitate fixing bolt, while convenient for adjusting cross-brace
Part 1032 is at a distance from ground.
Further, the guide-track groove of the third cross slide way 1014 is zigzag, is and leads correspondingly, fourth line walks wheel
The gear-like that track slot matches, so that the stabilized walking on third cross slide way 1014 of braced frame 1031.
Guide-track groove is zigzag, is conducive to moving synchronously for the both ends of braced frame 1031, to make perforated pipe 1024
It will not be displaced, so that perforated pipe 1024 and wallboard be made to be able to maintain face.
Further, the pipeline support mechanism 103 further includes the second driving mechanism 10141, the second driving mechanism 10141
Driving end be fixedly connected with the shaft that fourth line walks wheel, with drive fourth line walk wheel rotation, to make pipeline support mechanism 103
It is moved on third cross slide way 1014.
Further, the pipeline support mechanism 103 further includes third driving mechanism 1033, and third driving mechanism 1033 is wrapped
Pipe-hanging hook 10331, fixed frame 10332, third driving motor 10333, driving wheel, electromagnet, card slot 10334 are included, it is described
The lower end of the two sides of pipe-hanging hook 10331 with second laterally walking track 101 be fixedly connected, the pipe-hanging hook 10331 it is upper
End is equipped with guide rail beam 103311, and fixed frame 10332 is set on guide rail beam 103311, and guide rail beam 103311 has two
Layer, the upper surface on the upper layer of guide rail beam 103311 are contacted with fixed frame 10332, third driving motor 10333 and fixed frame
Frame 10332 is fixedly connected, and the shaft of third driving motor 10333 is fixedly connected with driving wheel, and driving wheel is gear-like, and guide rail is horizontal
The upper surface of the lower layer of beam 103311 is equipped with the tooth socket matched with driving wheel, so that driving wheel is steady on guide rail beam 103311
Fixed movement, the lower end of fixed frame 10332 are equipped with electromagnet and guide hole, and the upper end of card slot 10334 is equipped with to match with guide hole
The slide post of conjunction, slide post move up and down in guide hole, and when electromagnet powers off, card slot 10334 is transported downwards by gravity
It is dynamic, and be stuck in the braced frame 1031 of pipeline support mechanism 103, when electromagnet is powered, suction of the card slot 10334 by electromagnet
Draw and move upwards, and is detached from braced frame 1031.
Card slot 10334 can push pipeline support mechanism 103 to move, under the cooperation of guide rail beam 103311, Neng Gouyou
Effect prevents braced frame 1031 from skew occur.
Further, the poling core pulling equipment 10 further includes the 4th driving mechanism 10121, the 4th driving mechanism 10121
Driving end be fixedly connected with the shaft of the first traveling wheel, to drive the first walking rotation dynamic, to make the 4th driving mechanism
10121 drive longitudinal rails 1012 and the second cross slide way 1013 move synchronously.
Further, the poling core pulling equipment 10 further includes control device, control device include remote controler, receiver,
Controller, the first electromagnetic switch, the second electromagnetic switch, third electromagnetic switch, the 4th electromagnetic switch, the remote controler and receiver
Wireless communication connection, receiver and controller are electrically connected, and the control signal that remote controler is sent is sent to controller, are controlled
Device is also electrically connected with the first electromagnetic switch, the second electromagnetic switch, third electromagnetic switch, the 4th electromagnetic switch, and the first electromagnetism is opened
It closes and is electrically connected with the first driving motor 10221, the second electromagnetic switch and the second driving mechanism 10141 are electrically connected, third electricity
Magnetic switch and third driving motor 10333 are electrically connected, and the 4th electromagnetic switch and third driving motor 10333 are electrically connected, with
The first driving motor 10221, the second driving mechanism 10141, third driving motor the 10333, the 4th is controlled by controller to drive
The starting or closing of mechanism.
Specifically, remote controler remotely controls the 4th electromagnetic switch when longitudinal rail 1012 moves laterally to predetermined position
Keep the 4th driving mechanism out of service, 1012 stop motion of longitudinal rail.The first electromagnetic switch of remote control control makes the first driving
Mechanism 1022 starts, and tube body 102 longitudinally moves to predetermined position, and the first driving mechanism 1022 is out of service, perforated pipe
1024 separate with connection frame pin joint, two third cross slide ways 1014, the first driving mechanism 1022 of starting, before perforated pipe 1024
It perforates into wallboard, after perforated pipe 1024 is moved to predetermined position, the first driving mechanism 1022 is out of service.At this point,
Perforated pipe 1024 and pipeline support mechanism 103 are detached from.Connecting pin is opened, separates perforated pipe 1024 with connection frame 1023,
Start the first driving mechanism 1022, retreats connection frame 1023 to predetermined position, two third cross slide ways 1014 close up, empty
Pipeline support mechanism 103 passes through the sidesway of the second driving mechanism 10141 or third driving mechanism 10333 from longitudinal rail 1012
It moves to the other side.Aforesaid operations are so repeated, until needing from wallboard to extract perforated pipe 1024 out.Then according to perforated pipe
The mode that road 1024 is inserted into wallboard again extracts all perforated pipes out.
Fig. 6 is please referred to, wallboard laminator includes wallboard shaping equipment 20, poling core pulling equipment 10, the wallboard sizing dress
It sets 20 and is equipped with several die cavitys, form wallboard base to fill configured wallboard raw materials for production, the front end of wallboard shaping equipment 20 is equal
Even several through-holes of setting, the perforated pipe 1024 of poling core pulling equipment 10 passes through the through-hole of wallboard shaping equipment 20, to die cavity
In wallboard base perforate.
Above disclosures are merely preferred embodiments of the utility model, the utility model cannot be limited with this certainly
Interest field, those skilled in the art can understand all or part of the processes for realizing the above embodiment, and according to this reality
The equivalent variations made by novel claim, still falls within the scope of the utility model.
Claims (9)
1. a kind of poling core pulling equipment, it is characterised in that:Including walk track, tube body, at least one pipeline support mechanism,
Track laying walk on the ground, tube body, the setting of pipeline support mechanism are on walking track, to transport on walking track
Dynamic, the walking track includes first cross slide way, longitudinal rail, two the second cross slide ways, two third cross slide ways, the
One cross slide way is laid on the ground, and the lower end of longitudinal rail is equipped with the first traveling wheel, so that longitudinal rail is laterally led first
Transverse movement on rail, the longitudinal movement on longitudinal rail of the lower end of tube body, the two sides of longitudinal rail and the second cross slide way
It is fixedly connected, so that longitudinal rail and the second cross slide way synchronizing moving, the two sides of the lower end of third cross slide way are equipped with second
Traveling wheel, so that the transverse movement on the second cross slide way of third cross slide way, the two sides of the upper end of third cross slide way are equipped with
Guide-track groove, lower end transverse movement in the guide-track groove of third cross slide way of pipeline support mechanism, the tube body include branch
Chassis, the first driving mechanism, connection frame, several perforated pipes are supportted, the support underframe and the first driving mechanism are arranged in longitudinal direction
On guide rail, the lower end of support underframe is equipped with the third traveling wheel matched with longitudinal rail, so that support underframe is led along longitudinal
Rail longitudinal movement, the lower end of the first driving mechanism is fixedly connected with longitudinal rail, so that the first driving mechanism and longitudinal rail are same
Step movement, the driving end of the first driving mechanism is connect with support underframe, to drive support underframe to move on longitudinal rail, connection
The lower end of frame is fixedly connected with support underframe, so that the first driving mechanism drives connection frame longitudinal movement on long rails, even
One end of the longitudinal side and perforated pipe that connect frame is detachably connected, and several perforated pipes are erected in pipeline support mechanism, the
When one driving mechanism drives connection frame longitudinal movement, perforated pipe longitudinal movement in pipeline support mechanism.
2. poling core pulling equipment as described in claim 1, it is characterised in that:First driving mechanism includes the first driving electricity
The side of longitudinal rail, the first driving electricity is arranged in machine, driving gear, driven gear, drive chain, the driving motor
The shaft of machine is fixedly connected with driving gear, and driving gear is connected with driven gear by drive chain, and driven gear setting exists
The two sides of the other side of long rails, the lower end of connection frame are fixedly connected with drive chain, in the drive of the first driving motor
Under move connection frame on long rails, the side of connection frame is equipped at least one column and connects through-hole, perforated pipe and connection frame
The side of connection be equipped with the through-hole that connect through-hole and match so that connection frame and perforated pipe pin joint.
3. poling core pulling equipment as described in claim 1, it is characterised in that:The pipeline support mechanism include braced frame,
Several horizontal support pieces, the lower end of braced frame are equipped with fourth line and walk wheel, and fourth line is walked wheel and moved on third cross slide way, from
And moving braced frame along third cross slide way, several horizontal support pieces are evenly arranged in the two sides of braced frame, and with
Braced frame is detachably connected, so that perforated pipe is erected on horizontal support piece.
4. poling core pulling equipment as described in claim 1, it is characterised in that:The guide-track groove of the third cross slide way is sawtooth
Shape, correspondingly, it is the gear-like matched with guide-track groove that fourth line, which walks wheel, so that braced frame is stablized on third cross slide way
Walking.
5. poling core pulling equipment as described in claim 1, it is characterised in that:The pipeline support mechanism further includes the second driving
The driving end of mechanism, the second driving mechanism is fixedly connected with the shaft that fourth line walks wheel, to drive fourth line to walk wheel rotation, thus
Move pipeline support mechanism on third cross slide way.
6. poling core pulling equipment as claimed in claim 3, it is characterised in that:The pipeline support mechanism further includes third driving
Mechanism, third driving mechanism include pipe-hanging hook, fixed frame, third driving motor, driving wheel, electromagnet, card slot, described outstanding
The lower end and the second lateral walking track for hanging the two sides of bracket are fixedly connected, and the upper end of the pipe-hanging hook is equipped with guide rail beam,
Fixed frame is set on guide rail beam, and guide rail beam has two layers, the upper surface on the upper layer of guide rail beam and fixed frame bridge joint
Touching, third driving motor are fixedly connected with fixed frame, and the shaft of third driving motor is fixedly connected with driving wheel, and driving wheel is
Gear-like, the upper surface of the lower layer of guide rail beam is equipped with the tooth socket matched with driving wheel, so that driving wheel is on guide rail beam
Stable motion, the lower end of fixed frame are equipped with electromagnet and guide hole, and the upper end of card slot is equipped with the sliding matched with guide hole
Column, slide post move up and down in guide hole, and when electromagnet powers off, card slot is moved downward by gravity, and is stuck in pipeline
In the braced frame of supporting mechanism, when electromagnet is powered, card slot is moved upwards by the attraction of electromagnet, and de- with braced frame
From.
7. poling core pulling equipment as described in claim 1, it is characterised in that:The poling core pulling equipment further includes the 4th driving
The driving end of mechanism, the 4th driving mechanism is fixedly connected with the shaft of the first traveling wheel, to drive the first walking rotation dynamic, thus
Make the 4th driving mechanism that longitudinal rail and the second cross slide way be driven to move synchronously.
8. the poling core pulling equipment as described in claim 1 ~ 7 any one, it is characterised in that:The poling core pulling equipment is also wrapped
Control device is included, control device includes remote controler, receiver, controller, the first electromagnetic switch, the second electromagnetic switch, third electricity
Magnetic switch, the 4th electromagnetic switch, the remote controler and receiver wireless communication connect, and receiver and controller are electrically connected, with
The control signal that remote controler is sent is sent to controller, controller is also electric with the first electromagnetic switch, the second electromagnetic switch, third
Magnetic switch, the 4th electromagnetic switch are electrically connected, and the first electromagnetic switch and the first driving motor are electrically connected, the second electromagnetic switch with
Second driving motor is electrically connected, and third electromagnetic switch and third driving motor are electrically connected, and the 4th electromagnetic switch and third are driven
Dynamic electrical connection of motor, to control the first driving motor, the second driving motor, third driving motor, 4 wheel driven by controller
The starting or closing of dynamic motor.
9. a kind of wallboard laminator, it is characterised in that:Including being worn described in wallboard shaping equipment, claim 1 ~ 8 any one
Pipe core pulling equipment, the wallboard shaping equipment are equipped with several die cavitys, form wallboard base to fill configured wallboard raw materials for production,
The front end of wallboard shaping equipment is uniformly arranged several through-holes, and the perforated pipe of poling core pulling equipment passes through the logical of wallboard shaping equipment
Hole, to perforate to the wallboard base in die cavity.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820562397.7U CN208148135U (en) | 2018-04-19 | 2018-04-19 | Poling core pulling equipment and wallboard laminator |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820562397.7U CN208148135U (en) | 2018-04-19 | 2018-04-19 | Poling core pulling equipment and wallboard laminator |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208148135U true CN208148135U (en) | 2018-11-27 |
Family
ID=64378639
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820562397.7U Withdrawn - After Issue CN208148135U (en) | 2018-04-19 | 2018-04-19 | Poling core pulling equipment and wallboard laminator |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208148135U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108274597A (en) * | 2018-04-19 | 2018-07-13 | 宁夏千秋墙体材料有限公司 | Poling core pulling equipment and wallboard laminator |
CN109653421A (en) * | 2019-01-30 | 2019-04-19 | 广州市黄埔建筑工程总公司 | A kind of construction process for cast in situs floor |
CN110385774A (en) * | 2019-08-30 | 2019-10-29 | 山东兴玉机械科技有限公司 | A kind of process units and construction method of bidirectional knockout core precast hollow shock-proof wall plate |
-
2018
- 2018-04-19 CN CN201820562397.7U patent/CN208148135U/en not_active Withdrawn - After Issue
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108274597A (en) * | 2018-04-19 | 2018-07-13 | 宁夏千秋墙体材料有限公司 | Poling core pulling equipment and wallboard laminator |
CN108274597B (en) * | 2018-04-19 | 2023-09-19 | 宁夏千秋墙体材料有限公司 | Poling core pulling equipment and wallboard plate making machine |
CN109653421A (en) * | 2019-01-30 | 2019-04-19 | 广州市黄埔建筑工程总公司 | A kind of construction process for cast in situs floor |
CN110385774A (en) * | 2019-08-30 | 2019-10-29 | 山东兴玉机械科技有限公司 | A kind of process units and construction method of bidirectional knockout core precast hollow shock-proof wall plate |
CN110385774B (en) * | 2019-08-30 | 2024-03-12 | 山东兴玉机械科技有限公司 | Production device and construction method of bidirectional core-pulling prefabricated hollow anti-seismic wallboard |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104260185B (en) | Multifunctional concrete prefabricated components battery mould production equipment and production line | |
CN208148135U (en) | Poling core pulling equipment and wallboard laminator | |
CN101795836A (en) | Line system for producing slabs | |
CN104647577A (en) | Automatic production lien for assembling type housing prefabricated panels | |
CN102042021A (en) | Automatically walking stepped mobile trestle | |
CN203022024U (en) | Integrally-movable formwork for pipe gallery cast-in-situ construction | |
CN105057511B (en) | A kind of processing method and equipment of reinforcing bar keel | |
CN204195939U (en) | Multifunctional concrete prefabricated components battery mould production equipment and production line | |
CN205651498U (en) | Prefabricated staircase production line | |
CN109139056A (en) | The telescoping steel form of tunnel side wall concrete lining cutting | |
CN108274597A (en) | Poling core pulling equipment and wallboard laminator | |
CN105926947A (en) | Thin-layer reactive powder concrete vibrating and levelling method and system | |
CN103669872B (en) | A kind of walling method and walling equipment | |
CN210969361U (en) | Production line for precast concrete hollow anti-seismic wallboard | |
CN110421710B (en) | Prefabricated concrete hollow anti-seismic wallboard production line and construction method | |
CN108005684A (en) | Separated steel mould trolley and its construction method | |
CN2834850Y (en) | Forming machine for hollow wall plate | |
CN202213034U (en) | Large-specification fibrous gypsum board forming equipment | |
CN204530499U (en) | For the automatic travelling device of highway bridge prefabrication beam slab concrete distributing | |
CN207419269U (en) | A kind of integral movable type box beam external mold support device | |
CN105926948A (en) | Smart thin-layer reactive powder concrete vibrating and levelling control method and special control system | |
CN111823366B (en) | Main machine and method for producing gypsum lath | |
CN210651243U (en) | Concrete prefabricated member underground tunnel maintenance system | |
CN212146904U (en) | Rail type core tube plugging machine for wallboard machine | |
CN210969322U (en) | Production device of bidirectional core-pulling prefabricated hollow anti-seismic wallboard |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20181127 Effective date of abandoning: 20230919 |
|
AV01 | Patent right actively abandoned |
Granted publication date: 20181127 Effective date of abandoning: 20230919 |
|
AV01 | Patent right actively abandoned | ||
AV01 | Patent right actively abandoned |