CN207526506U - separated steel mould trolley - Google Patents

separated steel mould trolley Download PDF

Info

Publication number
CN207526506U
CN207526506U CN201721467052.5U CN201721467052U CN207526506U CN 207526506 U CN207526506 U CN 207526506U CN 201721467052 U CN201721467052 U CN 201721467052U CN 207526506 U CN207526506 U CN 207526506U
Authority
CN
China
Prior art keywords
template
separated
door frame
steel mould
crossbeam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721467052.5U
Other languages
Chinese (zh)
Inventor
黎汉进
吴新平
许庆华
丁荣斌
姚进
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
XINJIANG CORPS HYDRAULIC AND HYDROELECTRIC ENGINEERING GROUP Co Ltd
Original Assignee
XINJIANG CORPS HYDRAULIC AND HYDROELECTRIC ENGINEERING GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by XINJIANG CORPS HYDRAULIC AND HYDROELECTRIC ENGINEERING GROUP Co Ltd filed Critical XINJIANG CORPS HYDRAULIC AND HYDROELECTRIC ENGINEERING GROUP Co Ltd
Priority to CN201721467052.5U priority Critical patent/CN207526506U/en
Application granted granted Critical
Publication of CN207526506U publication Critical patent/CN207526506U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model proposes a kind of separated steel mould trolleys to include template, door frame, traction running gear, support construction and hydraulic system, template is located at the side of the door frame, template includes backform and the side form being connected with backform, it is connect between template and door frame by hydraulic jack with leading screw, door frame includes upper longitudinal beam, crossbeam, perpendicular support, two crossbeams, walking beam and column, the elevating ram for bearing side form pressure is provided between upper longitudinal beam and crossbeam, perpendicular support positioned at crossbeam and and between two crossbeams, walking beam is set on column bottom, is connected with wheel;Template and door frame can be longitudinally separated as two parts, and door frame is connected at the place of being longitudinally separated by connecting backplate and the first connector, and the place of being longitudinally separated of template passes through the connection of the first connector.The separated steel mould trolley of the utility model, the separation and split of realization telescoping steel form that can be simple and quick, solves in tunnel curved section concrete construction, and telescoping steel form is because designing long the problem of being difficult to pass through.

Description

Separated steel mould trolley
Technical field
Telescoping steel form field more particularly to a kind of separated steel mould trolley the utility model is related to constructing tunnel.
Background technology
The field of civil engineering such as hydroelectric project diversion works, road, bridges and culverts can encounter many tunnel construction operations.Tunnel Operation be mainly two big process of tunnel rock blasting excavation and concrete lining.According to construction period, quality, safety and economy The engineering characteristics such as benefit, the lining cutting of tunnel concrete are generally constructed using telescoping steel form.Telescoping steel form can improve coagulation The mechanization degree of soil construction, accelerates construction progress, and ensures construction quality.Since template has enough strength and stiffness, surely It is qualitative good, panel flat smooth.Concrete surface flat smooth after molding, presentation quality are excellent.Separately there is formwork erection operating speed Soon, it is efficient, input manpower it is few, it is easy to operate the features such as.The telescoping steel form for being currently used in tunnel concrete liner has gantry type Punching block platform, whole-circle needle beam type telescoping steel form, traveling type telescoping steel form etc. are a variety of.Wherein gantry type punching block vehicle uses more.One As construction technology mostly first poured tunnel bottom parts, then the steel rail laying on bottom plate, on rail set up installation telescoping steel form, The concrete lining for carrying out tunnel top margin arch again pours.It is secondary forming, long in time limit, quality that this trolley tunnel construction, which pours, It cannot be guaranteed.
Lining construction is poured using whole-circle needle beam type trolley, needle beam volume is longer, and trolley manufacture is of high cost.It is smaller in diameter Tunnel in when constructing, construction surface is narrow, operating difficulties, and poor to the tunnel adaptability for having bending section, it is impossible to play a role.
Two sets of templates must be made when constructing using traveling type telescoping steel form, and multistage template is installed repeatedly in construction and is worn Row, formwork assembling and disassembling connection workload and difficulty are big, and worker's construction intensity is high, and efficiency is low.
According to the method for operation of telescoping steel form, telescoping steel form is broadly divided into three kinds of monoblock type, pin-connected panel and separate type again, often The separated steel mould trolley seen is separation up and down, is designed and constructed with solving tunnel type size variation.But in tunnel straight line mark In the case of quasi- lift surface length, telescoping steel form can not or can be difficult to construct to sharp radius curve section due to design is longer.
Therefore, the purpose of this utility model is to provide a kind of separated steel mould trolley, it is intended to solve punching block in the prior art Trolley tunnel straight line standard lift surface grow in the case of, can because design it is longer due to can not or be difficult to sharp radius curve section into The defects of row construction.
Utility model content
The utility model provide it is a kind of can quickly, simply realize telescoping steel form be longitudinally separated and split, solve Curved section is difficult to the problem of current, is especially suitable for sharp radius curve section or the separated steel mould trolley of hairpin curve construction.
The separated steel mould trolley of the utility model includes template, door frame, traction running gear, support construction and hydraulic pressure system System, the template are located at the side of the door frame, and the template includes backform and the side form being connected with backform, template and door frame Between connect by hydraulic jack with leading screw, the door frame includes upper longitudinal beam, crossbeam, perpendicular support, two crossbeams, walking beam and stands Column is provided with the elevating ram for bearing side form pressure between upper longitudinal beam and crossbeam, erect support be located at crossbeam with and two crossbeams it Between, the walking beam is set on column bottom, is connected with wheel;The template and door frame can be longitudinally separated as two parts, and door frame exists The place of being longitudinally separated is connected by connecting backplate and the first connector, and the place of being longitudinally separated of template is connected by the first connector;
The support construction provides temporary support when pouring for template and door frame;
The hydraulic system includes hydraulic control panel, hydraulic jack and hydraulic oil pipe, and the hydraulic control panel, which is located at, to be divided At the top of door frame from the rear telescoping steel form using part, the hydraulic control panel controls hydraulic jack to stretch by hydraulic oil pipe Contracting, to adjust the height of trolley formwork part and verticality;
The traction running gear is used to move the separated steel mould trolley.
Further, the side form is unilateral is provided with door, is provided on the backform into storekeeper, between backform and side form It is connected by the second connector, the adjusting of backform and the adjusting of side form are mutual indepedent.
Further, the support construction includes vertical temporary support and lateral temporary support, the vertical temporary support It is supported using jackscrew or mechanical jack, between upper longitudinal beam and crossbeam and between walking beam and rail, cross-brace Using steel pipe band silk, manually rotation is carried out to support, between walking beam between the side form of bottom;It is also set up between adjacent upright posts There is bridging.
Further, the traction running gear includes gearbox, starts electric cabinet, the lumps of wood and rail, the lumps of wood setting Between rail and concrete structure, the gearbox is controlled to drive the telescoping steel form in rail uplink by starting electric cabinet It walks.
Further, translating trolleys and pan carriage are additionally provided on the crossbeam, it is small that the hydraulic jack is located at translation The top of vehicle, the translating trolleys are located in the slot type track on crossbeam, and described pan carriage one end is small with translating by connecting plate Vehicle is connected, and the other end is connected with crossbeam, and the pan carriage pushes translating trolleys to move left and right using hydraulic jack, is adjusted with this Whole top template.
Further, the separated steel mould trolley overall length is 8~15m, and the trolley is two being longitudinally separated punishment Point, using a length of 6~9m in part, not using a length of 2~6m in part.
Further, surface rigidity is strengthened in the back side of the template by angle steel, and the template connects longitudinally through I-steel It connects.
Further, the quantity of the door is 8-12, and the door is symmetricly set on side form.
Further, the location determination that the hydraulic jack and the longitudinally mounted spacing of leading screw pass through column.
Further, first connector is connecting screw, and second connector is steel pin
The construction method of above-mentioned separated steel mould trolley, step include:
S1:Tunnel bend construction storehouse surface is cleared up, carries out the binding work of baseplate reinforcing bar, whole constructions before formwork erection to be met After it is required that, the lumps of wood and rail are laid;
S2:Before trolley enters bend, separated steel mould trolley is longitudinally separated, to the telescoping steel form using part Hydraulic system components and wheel are reinstalled, and completes debugging efforts;
S3:The telescoping steel form that can utilize part is moved into specified construction storehouse surface position using running gear is drawn;
S4:Start hydraulic system adjustment template to carry out formwork erection and support construction is installed;
S5:Carry out concreting;
S6:After concrete strength reaches design strength, form removal;
S7:Mobile trolley used to next construction storehouse surface recycles S2-S6 steps.
Further, in the step 2, separated steel mould trolley is longitudinally separated, refers to first close hydraulic control Then platform removes hydraulic pressure hydraulic oil pipe, connection backplate and connector, after telescoping steel form is longitudinally separated, can utilize portion successively The telescoping steel form divided reinstalls hydraulic pressure hydraulic oil pipe and wheel.
Further, in formwork erection, backform is first found, founds side form afterwards, during concreting, first pours side form, after-pouring top Mould;During form removal, first tear side form open, after tear backform open.
Compared with prior art, the separated steel mould trolley of the utility model, realization telescoping steel form that can be simple and quick Separation and split, solve in tunnel curved section concrete construction, telescoping steel form because design it is long be difficult to the problem of current, And the utility model separated steel mould trolley operation with installation simply, the amount of labour used it is few, more meet curved section concrete construction Progress and appearance requirement.
Above-mentioned technical characteristic may be combined in various suitable ways or be substituted by equivalent technical characteristic, as long as can reach The purpose of this utility model.
Accompanying drawing content
It hereinafter will be more detailed to be carried out to the utility model based on only non-limiting embodiment and refer to the attached drawing Description.Wherein:
Fig. 1 is the cross-sectional view of the separated steel mould trolley of the utility model;
Fig. 2 is the detail view of the door frame of separated steel mould trolley shown in FIG. 1;
Fig. 3 is the structure diagram after door frame shown in Fig. 2 is longitudinally separated;
Fig. 4 is the detail view of the template of separated steel mould trolley shown in FIG. 1;
Fig. 5 is the pan carriage of the template of separated steel mould trolley shown in FIG. 1 and translating trolleys installation diagram;
Fig. 6 is the left view of pan carriage shown in fig. 5 and translating trolleys mounting structure.
Identical component is indicated by identical reference numeral in the figure.Attached drawing is not drawn according to practical ratio.
In figure, each reference numeral represents:
1st, backform;2nd, upper longitudinal beam;3rd, elevating ram;4th, side form;5th, leading screw;6th, hydraulic jack;7th, crossbeam;8th, support is erected; 9th, two crossbeam;10th, column;11st, walking beam;12nd, hydraulic control panel;13rd, start electric cabinet;14th, gearbox;15th, it is laterally interim to prop up Support;16th, wheel;17th, jackscrew;18th, coupling beam is indulged;19th, bridging;20th, rail;21st, the lumps of wood;22nd, backplate is connected;23rd, it translates small Vehicle;24th, pan carriage 25, enter storekeeper;26th, door;27th, flange;28th, the second connector;29th, I-steel;30th, slot type track;31、 Connecting plate.
Specific embodiment
The utility model is described in further details below with reference to Figure of description and specific embodiment.It needs to illustrate As long as not forming conflict, each feature in each embodiment and each embodiment in the utility model can be mutual With reference to the technical solution formed is within the protection scope of the utility model.
As depicted in figs. 1 and 2, the separated steel mould trolley of the utility model, including template, door frame, traction running gear, Support construction and hydraulic system, template are located at the side of door frame, and template includes backform 1 and the side form 4 being connected with backform 1, mould It is connect between plate and door frame by hydraulic jack 6 with leading screw 5, door frame includes upper longitudinal beam 2, crossbeam 7,8, two crossbeams 9 of perpendicular support, row Beam 11 and column 10 are walked, the elevating ram 3 for bearing side form pressure is provided between upper longitudinal beam 2 and crossbeam 7, perpendicular support 8 is located at Crossbeam 7 and and between two crossbeams 9, walking beam 11 be set on 10 bottom of column, be connected with wheel 16;Template can be longitudinally separated with door frame For two parts, as shown in Figure 1, be the place that is longitudinally separated of telescoping steel form at A, door frame the place of being longitudinally separated by connect backplate 22 and First connector connects, and template is connected at the place of being longitudinally separated by the first connector;Preferably, the first connector choosing connection spiral shell Silk.
Support construction provides temporary support when pouring for template and door frame;
Hydraulic system includes hydraulic control panel 12, hydraulic jack 6 and hydraulic oil pipe, and hydraulic control panel 12 is located at door frame top Portion, hydraulic control panel 12 control hydraulic jack 6 flexible by hydraulic oil pipe, to adjust the height of the template of trolley and vertical Degree;
Traction running gear is used to move the separated steel mould trolley.
Fig. 3 is the structure diagram after the door frame of separated steel mould trolley is longitudinally separated.
As shown in Figure 1, it in one embodiment, is connect between template and door frame by hydraulic jack with leading screw, chart Shown being transversely mounted for hydraulic jack and leading screw, vertical installation with the location determination clipping room of column away from.
As shown in figure 4, in one embodiment, unilateral side form 4 is provided with door 26, it is provided on backform 1 into storekeeper 25, Door 26 is mainly used for stretching into pump line progress concrete warehousing, while observe concrete warehousing quality for operating personnel, treats two After the lower layer concrete in side has put in storage, current door 26 is closed, unlatching last layer door 26 carries out continuous concrete and put in storage, pushes up again It is connected between mould 1 and side form 4 by the second connector 28, in this way, not interfering with the adjusting to side form 4 to the adjusting of backform 1, together When the adjusting of backform 1 will not be influenced on the adjusting of side form 4, it is preferred that the second connector selects steel pin.
The quantity of door 26 is 8-12, is symmetricly set on side form 4, it is preferred that the quantity of door 26 is 12, unilateral Respectively include 6 on side form 4.
Again as depicted in figs. 1 and 2, in one embodiment, support construction is including vertical temporary support and laterally interim Support, plays temporary support, template is avoided to be deformed when pouring.Vertical temporary support uses jackscrew 17 or mechanical thousand Jin top support, vertical temporary support are laterally interim between upper longitudinal beam 2 and crossbeam 7 and between walking beam 11 and rail 20 Using steel pipe band silk, manually rotation is carried out to support for support, between the main installation and walking beam 11 and walking beam 11 and side of bottom Between mould 4 and side form 5;Bridging 19 is additionally provided between adjacent upright posts 10.
As shown in Figure 1, in one embodiment, traction running gear includes gearbox 14, starts electric cabinet 13,21 and of the lumps of wood Rail 20, the lumps of wood 21 are set between rail 20 and concrete structure, gearbox 14 are controlled to drive punching block by starting electric cabinet 13 Trolley is walked on rail 20.The lumps of wood 21 must be placed under rail 20, first, in order to protect the concrete structure of lower part, second is that can Telescoping steel form is allow to keep balance and stability with the height for adjusting track.
As shown in Figure 5 and Figure 6, in one embodiment, translating trolleys 23 and pan carriage 24 are additionally provided on crossbeam 7, are lifted Oil-lifting jar 3 is located at the top of translating trolleys 23, and translating trolleys 23 are located in the slot type track 30 on crossbeam 7,24 one end of pan carriage It is connected by connecting plate 31 with translating trolleys 24, the other end is connected with crossbeam 7, and pan carriage 24 is lateral hydraulic jack, is put down Moving frame 24 pushes translating trolleys 23 to move left and right, and is moved left and right with adjusting backform 1, the purpose is to template is made to meet design longitudinal axis Line requirement.Finally adjusting elevating ram again makes template elevation meet design requirement.
In one embodiment, separated steel mould trolley overall length is 8~15m, and trolley is being longitudinally separated punishment as two parts, Using a length of 6~9m in part, not using a length of 2~6m in part.
Preferably, hydraulic control panel 12 is mounted at the top of the door frame using the telescoping steel form of part, in this way in punching block platform Without disassembling and installing hydraulic control panel again after vehicle separation.
In one embodiment, template makes for steel plate, and the back side of template is strengthened using angle steel, to improve template table Face stiffness, form stop welded flange 27, the place of being longitudinally separated of template are connected using the first connector connecting screw, in addition template Longitudinal direction connected using I-steel 26, so as to strengthening template entirety stiffness.
The construction method of the separated steel mould trolley of the utility model, step include:
S1:Tunnel bend construction storehouse surface is cleared up, carries out the binding work of baseplate reinforcing bar, whole constructions before formwork erection to be met After it is required that, the lumps of wood 21 and rail 20 are laid;
S2:Before trolley enters bend, separated steel mould trolley is longitudinally separated, hydraulic control panel 12 is removed successively Hydraulic oil pipe, connection backplate 22 and connecting screw, hydraulic system components and vehicle are reinstalled to the telescoping steel form using part Wheel, and complete debugging efforts;In order to demould after being conducive to concreting, also need to brush oil in template before pouring.
S3:The telescoping steel form that can utilize part is moved into specified construction storehouse surface position using running gear is drawn;Start electricity Source controls gearbox 14 that the telescoping steel form that can utilize part is moved to specified construction storehouse surface position, cuts off gearbox with motor car wheel 14 power supply, places rail meter in time, it is ensured that trolley safe construction.
S4:Start hydraulic system adjustment template to carry out formwork erection and support construction is installed;When determine telescoping steel form be in safety After state, start to start hydraulic system adjustment template progress formwork erection, first found backform 1 by the elevation of measure, afterwards vertical side form 4, operation Hydraulic control panel 12 first controls elevating ram 3, and backform 1 is raised up to design altitude, then controls two ends translating trolleys 23 or so Adjustment, makes the cross section of backform 1 meet design requirement;Then control side hydraulic jack 6 opens side form, reaches design sideline After stop.Finally by multiple checks model sheetinstallat design size, the hydraulic direct that repetition adjusts each hydraulic jack 6 is reached and is applied Work code requirement.After formwork support arrangement is met the requirements, manually from top to bottom start to reinforce, vertical jackscrew 17, side form are installed successively Leading screw 5, the lateral interim steel pipe support of finally installation.
S5:Carry out concreting;Concrete uses row horizontal transport, then the mode that pumping mode puts in storage to pour, and first two Side side form puts in storage, and then puts in storage in backform, both sides storehouse surface uniform parallel is kept to rise during putting in storage.In entire casting process In, it is vibrated using the attached type vibrator on trolley, the same conventional concrete construction method of other casting methods, herein not It is described in detail again.
S6:After concrete strength reaches design strength, form removal;Lateral temporary support, vertical jackscrew 17, side form are removed successively Leading screw 5, backform leading screw 5, then operate hydraulic control panel 12 and first the hydraulic jack 6 on side form 4 is controlled to shrink, then control backform 1 On hydraulic pressure lifting oil cylinder 3 shrink, finally make integral mold plate all be detached from concrete surfaces.S7:Mobile trolley used to next construction Storehouse surface recycles S2-S6 steps;It has been constructed after bend section by this method, then two section trolleys after separation has been spliced, you can It constructs to the straightway after bend.
It should be noted that the separated steel mould trolley and its construction technology are used for tunnel bend concrete or similar engineering During construction, the length and joint number, trolley structure size, template width, stiffness and leading screw size and length etc. of trolley separation With according to being actually adjusted.
Below with a concrete engineering example explanation.
Generate electricity diversion tunnel by import flume section, tower well section, upper horizontal section section, plane turning section, lower curved section, lower adit section and Bifurcated pipe section forms.Diversion tunnel upper horizontal section segment length 247.1m, wherein containing curved section a R=40m, a=28.15, L= 19.656m.Upper horizontal section section gradient i=1:200, internal diameter is the circular cross section of 6.4m after molding;Inclined shaft segment length 78.65m, gradient i =1:1, using steel lining concrete;Lower adit segment length 175.28m, gradient i=1:200, cross dimensions and lining cutting pattern with tiltedly Well section is identical.
With reference to this Engineering Design Characteristics, straight line standard pours storehouse and is up to 12m, and curved section pours every storehouse as 6.552m, therefore Telescoping steel form is then designed as using part 7.25m, not using the detachable telescoping steel form of part 5.25m totally two sections, Middle backform radius is 3.2m, and the total height of detachable telescoping steel form rises to 170mm designs according to elevating ram, at this time side form Minimum point is away from ground 300mm.For this engineering when carrying out concreting, the maximum height difference of both sides storehouse surface is not preferably greater than 400mm, pours It builds thickness and is not preferably greater than 300mm, other casting methods are the same as conventional concrete construction method.
It is proved through practice of construction, the realization telescoping steel form that the separated steel mould trolley of the utility model can be simple and quick Separation and split, solve in tunnel curved section concrete construction, and telescoping steel form, should because designing long the problem of being difficult to pass through In tunnel curved section concrete construction, there is operation and installation is simple, the amount of labour used is few, construction speed is fast and presentation quality is good The advantages that.
Although the present utility model has been described by reference to the preferred embodiments, but in the model for not departing from the utility model In the case of enclosing, various improvement can be carried out to it and component therein can be replaced with equivalent.Especially, as long as not depositing Conflicting, items technical characteristic mentioned in the various embodiments can be combined in any way.The utility model is not It is confined to specific embodiment disclosed herein, but all technical solutions including falling within the scope of the appended claims.

Claims (10)

1. a kind of separated steel mould trolley, including template, door frame, traction running gear, support construction and hydraulic system, feature It is, the template is located at the side of the door frame, and the template includes backform and the side form being connected with backform, template and door It is connect between frame by hydraulic jack with leading screw, the door frame includes upper longitudinal beam, crossbeam, perpendicular support, two crossbeams, walking beam and stands Column is provided with the elevating ram for bearing side form pressure between upper longitudinal beam and crossbeam, erect support between crossbeam and two crossbeams, The walking beam is set on column bottom, is connected with wheel;The template and door frame can be longitudinally separated as two parts, and door frame is in longitudinal direction It is connected at separation by connecting backplate and the first connector, template is connected at the place of being longitudinally separated by the first connector;
The support construction provides temporary support when pouring for template and door frame;
The hydraulic system includes hydraulic control panel, hydraulic jack and hydraulic oil pipe, after the hydraulic control panel is located at dismounting At the top of door frame using the telescoping steel form of part, the hydraulic control panel controls hydraulic jack to stretch by hydraulic oil pipe, To adjust the height of trolley formwork part and verticality;
The traction running gear is used to move the separated steel mould trolley.
2. separated steel mould trolley according to claim 1, which is characterized in that the side form is unilateral to be provided with door, institute It states and is provided on backform into storekeeper, connected between backform and side form by the second connector, the adjusting of backform and the adjusting of side form Independently of each other.
3. separated steel mould trolley according to claim 2, which is characterized in that the support construction includes vertical interim branch Support and lateral temporary support, the vertical temporary support are supported using jackscrew or mechanical jack, the vertical temporary support Between upper longitudinal beam and crossbeam and between walking beam and rail, the transverse direction temporary support is manually revolved using steel pipe band silk Row is rotated into supportting, between walking beam and walking beam and between bottom side form and side form;It is additionally provided between adjacent upright posts Bridging.
4. separated steel mould trolley according to claim 3, which is characterized in that the traction running gear includes speed change Case, the electric cabinet of startup, the lumps of wood and rail, the lumps of wood are set between rail and concrete structure, are passed through and are started electric cabinet control institute Stating gearbox drives the telescoping steel form to walk on rail.
5. separated steel mould trolley according to claim 4, which is characterized in that be additionally provided with translating trolleys on the crossbeam And pan carriage, the elevating ram are located at the top of translating trolleys, the translating trolleys are located in the slot type track on crossbeam, institute Pan carriage is stated as lateral hydraulic lifting jacks, one end is connected by connecting plate with translating trolleys, and the other end is connected with crossbeam, top die Plate, elevating ram and translating trolleys three welding connect together, and the pan carriage pushes translating trolleys to move left and right.
6. separated steel mould trolley according to claim 1, which is characterized in that the separated steel mould trolley overall length is 8 ~15m, the trolley are being longitudinally separated punishment as two parts, using a length of 6~9m in part, not using part a length of 2~ 6m。
7. separated steel mould trolley according to claim 1, which is characterized in that strengthened by angle steel at the back side of the template Surface rigidity, the template are connected longitudinally through I-steel.
8. separated steel mould trolley according to claim 2, which is characterized in that the quantity of the door is 8-12, institute Door is stated to be symmetricly set on side form.
9. separated steel mould trolley according to claim 1, which is characterized in that the longitudinal direction of the hydraulic jack and leading screw Clipping room is away from the location determination by column.
10. separated steel mould trolley according to claim 2, which is characterized in that first connector is connecting screw, Second connector is steel pin.
CN201721467052.5U 2017-11-06 2017-11-06 separated steel mould trolley Active CN207526506U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721467052.5U CN207526506U (en) 2017-11-06 2017-11-06 separated steel mould trolley

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721467052.5U CN207526506U (en) 2017-11-06 2017-11-06 separated steel mould trolley

Publications (1)

Publication Number Publication Date
CN207526506U true CN207526506U (en) 2018-06-22

Family

ID=62572382

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721467052.5U Active CN207526506U (en) 2017-11-06 2017-11-06 separated steel mould trolley

Country Status (1)

Country Link
CN (1) CN207526506U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108005684A (en) * 2017-11-06 2018-05-08 新疆兵团水利水电工程集团有限公司 Separated steel mould trolley and its construction method
CN110529157A (en) * 2019-09-30 2019-12-03 中交第二航务工程局有限公司 Lining construction device and method suitable for circle tunnel containing steel lining
CN110566232A (en) * 2019-09-06 2019-12-13 涟源市湛宇机械设备有限责任公司 steel mould trolley and construction method thereof

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108005684A (en) * 2017-11-06 2018-05-08 新疆兵团水利水电工程集团有限公司 Separated steel mould trolley and its construction method
CN108005684B (en) * 2017-11-06 2023-11-28 新疆兵团水利水电工程集团有限公司 Separated steel mould trolley and construction method thereof
CN110566232A (en) * 2019-09-06 2019-12-13 涟源市湛宇机械设备有限责任公司 steel mould trolley and construction method thereof
CN110566232B (en) * 2019-09-06 2024-04-26 涟源市湛宇机械设备有限责任公司 Steel mould trolley and construction method thereof
CN110529157A (en) * 2019-09-30 2019-12-03 中交第二航务工程局有限公司 Lining construction device and method suitable for circle tunnel containing steel lining
CN110529157B (en) * 2019-09-30 2021-03-26 中交第二航务工程局有限公司 Lining construction equipment and method suitable for circular steel-containing lining tunnel

Similar Documents

Publication Publication Date Title
CN105736016B (en) Tunnel double-lining framework of steel reinforcement construction equipment and its application
CN102146796B (en) Construction technology for inverted arch of two-track tunnel of high-speed railway
CN106089253B (en) A kind of all-hydraulic template system poured for culvert
CN207526506U (en) separated steel mould trolley
CN203022024U (en) Integrally-movable formwork for pipe gallery cast-in-situ construction
CN106013776A (en) Hydraulic climbing type elevator shaft finalization operation platform and construction method
CN111911194A (en) Multifunctional two-lining trolley construction equipment and method for long and wide tunnel
CN102146799A (en) Construction equipment for inverted arch of two-track tunnel of high-speed railway
CN106013233A (en) Slippage system used for underground pipe rack cast-in-place construction and construction method of slippage system
CN104763446A (en) Multi-functional trolley for subway station construction
CN205778918U (en) Loess tunnel excavation and just formwork build concrete construction combined type chassis
CN108661670B (en) Construction method for pipe gallery construction by using formwork trolley
CN205936645U (en) A full liquid die plate system for culvert is pour
CN108005684A (en) Separated steel mould trolley and its construction method
CN110173281A (en) A kind of sliding mode system for circular tunnel concreting
CN202017493U (en) Construction equipment for inverted arch of high-speed railway double-track tunnel
CN205975365U (en) Cast -in -situ box girder combined type moving die carrier
CN202401753U (en) Sliding die device
CN202250105U (en) Integral hydraulic steel formwork trolley
CN109371851B (en) Groove making machine with multiple bottom die head cover supporting frames
CN207144456U (en) Builder's jack I-steel built-in fitting
CN105863261A (en) Universally-adjustable suspension formwork system
CN206439053U (en) Mould trolley is hanged in the lining cutting of tunnel inverted arch
CN206053965U (en) A kind of tunnel ditch cable trough construction trolley
CN202441390U (en) Liftable simple mould base

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant