CN208137373U - A kind of construction hoisting operation framing scaffold - Google Patents

A kind of construction hoisting operation framing scaffold Download PDF

Info

Publication number
CN208137373U
CN208137373U CN201721780056.9U CN201721780056U CN208137373U CN 208137373 U CN208137373 U CN 208137373U CN 201721780056 U CN201721780056 U CN 201721780056U CN 208137373 U CN208137373 U CN 208137373U
Authority
CN
China
Prior art keywords
fixed
hole
support rod
block
fixed block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721780056.9U
Other languages
Chinese (zh)
Inventor
徐书龙
潘晓蒙
周文斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Construction Co Ltd of China Construction Seventh Engineering Division Corp Ltd
Original Assignee
Second Construction Co Ltd of China Construction Seventh Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Construction Co Ltd of China Construction Seventh Engineering Division Corp Ltd filed Critical Second Construction Co Ltd of China Construction Seventh Engineering Division Corp Ltd
Priority to CN201721780056.9U priority Critical patent/CN208137373U/en
Application granted granted Critical
Publication of CN208137373U publication Critical patent/CN208137373U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Ladders (AREA)

Abstract

The utility model discloses a kind of construction hoisting operation framing scaffolds, including fixed frame, support rod there are four being set in a rectangular parallelepiped shape above the fixed frame, several card holes of several word arrays are provided on the support rod, the supporting bar top is connected with top plate, stabilizer blade corresponding with support rod is equipped with below the fixed link, the stabilizer blade bottom is equipped with cushion block, and the cushion block is fixedly connected by the first connecting cylinder with stabilizer blade;The utility model setting hinged by the first fixed block and the second fixed block, enable fixing piece being buckled on support rod at any time of the utility model, and pass through the setting of clamping bar and card slot and nut, first fixed block and the second fixed block are fixed together by the fixing piece of the utility model on demand, pass through the setting of fixing bolt, fixture nut and fixed hole and card hole, the fixing piece of the utility model is fixed on support rod on demand, to play for sole to be fixed at required position.

Description

A kind of construction hoisting operation framing scaffold
Technical field
The utility model belongs to the realm of building construction, is related to a kind of scaffold, specifically a kind of construction lifting construction Scaffold.
Background technique
Scaffold is to guarantee each work progress is gone on smoothly and is set up workbench.It is divided by the position set up outer Scaffold, internal scaffolding;Timber scaffolding, bamboo scaffolding, steel pipe scaffold can be divided by material difference;It is divided by structural form vertical Rod-type scaffold, door-type scaffold, swinging scaffold, suspended scaffold, chooses formula scaffold, climbs formula foot hand bridge scaffold Frame.
And it is current, some hoisting operation framing scaffolds on construction site are usually practical all not convenient enough later, and Dismounting and fixed all existing defects now provide a solution to solve drawbacks described above.
Utility model content
The purpose of this utility model is to provide a kind of construction hoisting operation framing scaffolds.
The purpose of this utility model can be achieved through the following technical solutions:
A kind of construction hoisting operation framing scaffold, including fixed frame, the fixed frame top are equipped with four in a rectangular parallelepiped shape A support rod is provided with several card holes of several word arrays on the support rod, and the supporting bar top is connected with top plate, described Stabilizer blade corresponding with support rod is equipped with below fixed frame, the stabilizer blade bottom is equipped with cushion block, and the cushion block passes through the first connecting cylinder It is fixedly connected with stabilizer blade;
Several soles are also socketed on the support rod, four corner positions of the sole are provided with connection through-hole, the company It connects hole and support rod cooperates;Sole is fixed on support rod by fixing piece below the sole, the fixing piece On be provided with fixed hole, the fixed hole and card hole are coaxially disposed, and are equipped with fixing bolt in the fixed hole and card hole And fixture nut, the fixing piece are secured the fix on support rod by the cooperation of fixing bolt and fixture nut.
Further, the fixing piece includes the first fixed block and the second fixed block, and the fixed hole includes that setting exists The first fixed hole on first fixed block and the second fixed hole being arranged on the second fixed block, first fixed hole It is oppositely arranged with the second fixed hole.
Further, it is additionally provided with the first mounting groove in first fixed block, is equipped with swingle in first mounting groove;
Second fixed block is equipped with the first fixing end, is provided with rotating through hole, the rotation in first fixing end Through-hole and swingle cooperate, and second fixed block is hinged by swingle and rotating through hole and the first fixed block.
Further, first fixed block one end is also connected with the first mounting blocks, is provided with card on first mounting blocks Slot;
Second fixed block one end is also connected with the second mounting blocks, and second mounting blocks are equipped with clamping bar, described Clamping bar and the card slot cooperate, and clamping bar upper end is provided with external screw thread, and the clamping bar threaded upper ends are connected with spiral shell It is female;Clamping bar is fixed with card slot by nut.
Further, it is additionally provided with inserted block at the top of the stabilizer blade, the inserted block upper end is connected with the second connecting cylinder, and described second It is equipped with internal screw thread in connecting cylinder, is equipped with external screw thread at the top of the stabilizer blade, second connecting cylinder is threadedly coupled with stabilizer blade, described to insert Block lower end is also connected with the voussoir of several circumference array;
The wedge hole of several circumference array is also provided on the cushion block, the voussoir and wedge hole cooperate.
The beneficial effects of the utility model:A kind of construction hoisting operation framing scaffold, when needing mobile, it is only necessary to logical It crosses and inserted block is fixed on stabilizer blade upper end by the second connecting cylinder, scaffold can be moved on demand, needed for being moved to when place, Play the role of fixed scaffold by wedging the voussoir on inserted block in the wedge hole on cushion block by rotated down inserted block;? When needing work, it is only necessary to which installation needs sole being moved to desired height, needed for being fixed on sole by fixing piece Position can work.
The utility model setting hinged by the first fixed block and the second fixed block, so that the fixing piece of the utility model It can be buckled on support rod at any time, and pass through the setting of clamping bar and card slot and nut, so that the fixation of the utility model First fixed block and the second fixed block can be fixed together by part on demand, pass through fixing bolt, fixture nut and fixed hole And the setting of card hole, the fixing piece of the utility model is fixed on support rod on demand, to play for by sole It is fixed at required position;By the setting of voussoir and wedge hole, so that the utility model real can pass through voussoir not needing to move It is fixed.
Detailed description of the invention
In order to facilitate the understanding of those skilled in the art, the utility model will be further described below with reference to the accompanying drawings.
Fig. 1 is the utility model structure diagram;
Fig. 2 is the utility model structure diagram;
Fig. 3 is the utility model anchor structure schematic diagram;
Fig. 4 is the structural blast view after Fig. 3 removal fixing bolt and fixture nut.
Specific embodiment
As shown in Figs 1-4, a kind of construction hoisting operation framing scaffold, including fixed frame 1 are in above the fixed frame 1 Rectangular-shape is set there are four support rod 2, and several card holes 201 of several word arrays, the support rod are provided on the support rod 2 2 tops are connected with top plate 3, and stabilizer blade 4 corresponding with support rod 2 is equipped with below the fixed frame 1, and 4 bottom of stabilizer blade is equipped with pad Block 5, the cushion block 5 are fixedly connected by the first connecting cylinder 501 with stabilizer blade 4;
Several soles 6 are also socketed on the support rod 2,6 four corner positions of the sole are provided with connection through-hole, described It connects through-hole and support rod 2 cooperates;Sole 6 is fixed on support rod 2 by fixing piece 7 below the sole 6, institute It states and is provided with fixed hole 8 on fixing piece 7, the fixed hole 8 is coaxially disposed with card hole 201, the fixed hole 8 and card hole Fixing bolt 9 and fixture nut 901 are equipped in 201, the fixing piece 7 passes through the cooperation of fixing bolt 9 and fixture nut 901 Fixing piece 7 is fixed on support rod 2.
Further, the fixing piece 7 includes the first fixed block 10 and the second fixed block 11, and the fixed hole 8 includes First be arranged on the first fixed block 10 fixed hole 801 and the second fixed hole for being arranged on the second fixed block 11 802, first fixed hole 801 and the second fixed hole 802 are oppositely arranged.
Further, the first mounting groove 1001 is additionally provided in first fixed block 10, in first mounting groove 1001 Equipped with swingle 1002;
Second fixed block 11 is equipped with the first fixing end 1101, is provided with rotating through hole in first fixing end 1101 1102, the rotating through hole 1102 cooperates with swingle 1002, and second fixed block 11 passes through swingle 1002 and rotation Turn through-hole 1102 and the first fixed block 10 is hinged.
Further, described first fixed block, 10 one end is also connected with the first mounting blocks 12, on first mounting blocks 12 It is provided with card slot 1201;
Described second fixed block, 11 one end is also connected with the second mounting blocks 13, and second mounting blocks 13 are equipped with clamping bar 1301, the clamping bar 1301 cooperates with the card slot 1201, and 1301 upper end of clamping bar is provided with external screw thread, described 1301 threaded upper ends of clamping bar are connected with nut 14;It is by nut 14 that clamping bar 1301 and card slot 1201 is fixed.
Further, inserted block 15 is additionally provided at the top of the stabilizer blade 4,15 upper end of inserted block is connected with the second connecting cylinder 1501, second connecting cylinder 1501 is interior to be equipped with internal screw thread, is equipped with external screw thread, second connecting cylinder at the top of the stabilizer blade 4 1501 are threadedly coupled with stabilizer blade 4, and 15 lower end of inserted block is also connected with the voussoir 1502 of several circumference array;
The wedge hole 502 of several circumference array, the voussoir 1502 and 502 phase interworking of wedge hole are also provided on the cushion block 5 It closes.
A kind of construction hoisting operation framing scaffold, when needing mobile, it is only necessary to by the way that inserted block is passed through the second connection Cylinder is fixed on stabilizer blade upper end, can move on demand scaffold, needed for being moved to when place, by rotated down inserted block, leads to It crosses in the wedge hole on the voussoir wedging cushion block on inserted block, plays the role of fixed scaffold;When needing work, it is only necessary to pacify Dress needs sole being moved to desired height, and sole can be fixed on to required position by fixing piece, can be worked.
The utility model setting hinged by the first fixed block and the second fixed block, so that the fixing piece of the utility model It can be buckled on support rod at any time, and pass through the setting of clamping bar and card slot and nut, so that the fixation of the utility model First fixed block and the second fixed block can be fixed together by part on demand, pass through fixing bolt, fixture nut and fixed hole And the setting of card hole, the fixing piece of the utility model is fixed on support rod on demand, to play for by sole It is fixed at required position;By the setting of voussoir and wedge hole, so that the utility model real can pass through voussoir not needing to move It is fixed.
Above content is only to the utility model structure example and explanation, the technology people of affiliated the art Member makes various modifications or additions to the described embodiments or is substituted in a similar manner, without departing from reality With novel structure or beyond the scope defined by this claim, all should belong to the protection range of the utility model.

Claims (5)

1. a kind of construction hoisting operation framing scaffold, which is characterized in that including fixed frame (1), be in above the fixed frame (1) Rectangular-shape is set there are four support rod (2), and several card holes (201) of several word arrays are provided on the support rod (2), described Support rod (2) top is connected with top plate (3), and stabilizer blade (4) corresponding with support rod (2) is equipped with below the fixed frame (1), described Stabilizer blade (4) bottom is equipped with cushion block (5), and the cushion block (5) is fixedly connected by the first connecting cylinder (501) with stabilizer blade (4);
It is also socketed with several soles (6) on the support rod (2), (6) four corner positions of the sole are provided with connection through-hole, institute It states connection through-hole and support rod (2) cooperates;Sole (6) is fixed on support by fixing piece (7) below the sole (6) It on bar (2), is provided with fixed hole (8) on the fixing piece (7), the fixed hole (8) and card hole (201) are coaxially disposed, institute It states in fixed hole (8) and card hole (201) and is equipped with fixing bolt (9) and fixture nut (901), the fixing piece (7) passes through Fixing piece (7) is fixed on support rod (2) by the cooperation of fixing bolt (9) and fixture nut (901).
2. a kind of construction hoisting operation framing scaffold according to claim 1, which is characterized in that the fixing piece (7) Including the first fixed block (10) and the second fixed block (11), the fixed hole (8) includes being arranged on the first fixed block (10) The first fixed hole (801) and the second fixed hole (802) on the second fixed block (11) is set, described first is fixed logical Hole (801) and the second fixed hole (802) are oppositely arranged.
3. a kind of construction hoisting operation framing scaffold according to claim 2, which is characterized in that first fixed block (10) it is additionally provided with the first mounting groove (1001) in, is equipped with swingle (1002) in first mounting groove (1001);
Second fixed block (11) is equipped with the first fixing end (1101), and it is logical that rotation is provided in first fixing end (1101) Hole (1102), the rotating through hole (1102) and swingle (1002) cooperate, and second fixed block (11) passes through rotation Bar (1002) and rotating through hole (1102) and the first fixed block (10) are hinged.
4. a kind of construction hoisting operation framing scaffold according to claim 2, which is characterized in that first fixed block (10) one end is also connected with the first mounting blocks (12), is provided with card slot (1201) on first mounting blocks (12);
Described second fixed block (11) one end is also connected with the second mounting blocks (13), and second mounting blocks (13) are equipped with clamping Bar (1301), the clamping bar (1301) and the card slot (1201) cooperate, and clamping bar (1301) upper end is provided with outer Screw thread, clamping bar (1301) threaded upper ends are connected with nut (14);By nut (14) by clamping bar (1301) and card slot (1201) fixed.
5. a kind of construction hoisting operation framing scaffold according to claim 1, which is characterized in that stabilizer blade (4) top Portion is additionally provided with inserted block (15), and inserted block (15) upper end is connected with the second connecting cylinder (1501), second connecting cylinder (1501) It is interior to be equipped with internal screw thread, it is equipped with external screw thread at the top of the stabilizer blade (4), second connecting cylinder (1501) is threadedly coupled with stabilizer blade (4), Inserted block (15) lower end is also connected with the voussoir (1502) of several circumference array;
The wedge hole (502) of several circumference array is also provided on the cushion block (5), the voussoir (1502) and wedge hole (502) are mutual Cooperation.
CN201721780056.9U 2017-12-19 2017-12-19 A kind of construction hoisting operation framing scaffold Expired - Fee Related CN208137373U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721780056.9U CN208137373U (en) 2017-12-19 2017-12-19 A kind of construction hoisting operation framing scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721780056.9U CN208137373U (en) 2017-12-19 2017-12-19 A kind of construction hoisting operation framing scaffold

Publications (1)

Publication Number Publication Date
CN208137373U true CN208137373U (en) 2018-11-23

Family

ID=64283938

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721780056.9U Expired - Fee Related CN208137373U (en) 2017-12-19 2017-12-19 A kind of construction hoisting operation framing scaffold

Country Status (1)

Country Link
CN (1) CN208137373U (en)

Similar Documents

Publication Publication Date Title
CN201763002U (en) Independent adjustable steel supporting device
CN203514794U (en) Adjustable large steel formwork support leg
CN207499504U (en) A kind of efficiently construction prefabricated frame is set a roof beam in place erecting device
CN108035546B (en) Template fixing device is pour to shear force wall for building
CN201186864Y (en) Self-climbing type hydraulic jacking device for mounting large-sized equipment
CN208137373U (en) A kind of construction hoisting operation framing scaffold
CN211369597U (en) Construction is with recoverable bearing diagonal structure
CN205088951U (en) Many function combination jackscrew
CN211314231U (en) Adjustable tunnel trolley template
CN206530077U (en) A kind of support frame
CN215760679U (en) Be applicable to interim strutting arrangement of large-span assembled floor
CN209179544U (en) Building leveling support frame
CN204747810U (en) High adjusting station
CN211369495U (en) Support base convenient to disassemble for building
CN210685334U (en) Assembly type building external hanging platform
CN211114063U (en) Limiting type rotating bracket for inclined upright rod
CN210194667U (en) Elevator foundation bottom plate supported by steel pipe column
CN220705123U (en) Scaffold adjustable screw rod component
CN220133452U (en) Scaffold convenient to use
CN211691362U (en) Scaffold for building installation
CN219569697U (en) Supporting device for roof color steel plate replacement
CN210013447U (en) Novel elevator shaft protection platform
CN205242988U (en) Cantilever type steel with inclined support at bottom
CN209760879U (en) Supporting structure of roof template for building engineering
CN219365350U (en) Movable scaffold tower

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181123