CN208136931U - The steel sheet-pile cofferdam that construction of hydro project is used convenient for assembling - Google Patents

The steel sheet-pile cofferdam that construction of hydro project is used convenient for assembling Download PDF

Info

Publication number
CN208136931U
CN208136931U CN201820614647.7U CN201820614647U CN208136931U CN 208136931 U CN208136931 U CN 208136931U CN 201820614647 U CN201820614647 U CN 201820614647U CN 208136931 U CN208136931 U CN 208136931U
Authority
CN
China
Prior art keywords
steel sheet
construction
assembling
fixed ring
pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820614647.7U
Other languages
Chinese (zh)
Inventor
宁明超
宁明人
宁立群
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jilin Haixin Hydraulic Engineering Co Ltd
Original Assignee
Jilin Haixin Hydraulic Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jilin Haixin Hydraulic Engineering Co Ltd filed Critical Jilin Haixin Hydraulic Engineering Co Ltd
Priority to CN201820614647.7U priority Critical patent/CN208136931U/en
Application granted granted Critical
Publication of CN208136931U publication Critical patent/CN208136931U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model provides a kind of construction of hydro project steel sheet-pile cofferdam for being convenient for assembling, the technical solution improves the mode directly driven piles in riverbed at present, with cyclic annular basic structural bearing enclosing, steel sheet pile is plugged in the jack of enclosing again, the assembling of steel sheet pile is carried out can in land by this improvement, avoids the more difficult problem of underwater construction.On this basis, the utility model is above-mentioned cyclic annular basic structure matching driving mechanism, and the lifting platform for personnel's operation is arranged, to improve the convenience to steel sheet pile leak detection, closure operation.The utility model realizes good technical effect by innovative technological improvement, and cost is relatively low, is easily achieved, therefore has broad application prospects.

Description

The steel sheet-pile cofferdam that construction of hydro project is used convenient for assembling
Technical field
The utility model relates to hydraulic and hydroelectric engineering technical fields, and in particular to a kind of construction of hydro project is used convenient for assembling Steel sheet-pile cofferdam.
Background technique
Cofferdam refers in hydraulic engineering construction, to build permanent water conservancy projects, the provisional building enclosure built.Its Effect is to prevent water and soil from building position into building, so that in cofferdam internal drainage, excavation pit builds building.One As be mainly used in waterwork, except as formal building a part in addition to, cofferdam is generally removed after being finished.Cofferdam height Higher than the peak level being likely to occur in the construction time.Different from the ground pit supporting construction built when the construction of land, the construction in cofferdam It is carried out completely in water body, therefore it is more inconvenient to construct, especially steel sheet pile or steel-pipe pile are embedding in riverbed, not only use To large scale equipments such as immersible pump, piling machines, but also artificial abutment joint is needed to carry out leak stopping, draw water, therefore project amount is larger, then In addition its construction environment is in water body, therefore difficulty of construction is larger.In this case, if can develop a kind of convenient for steel plate Stake or steel-pipe pile assembling, and the cofferdam of most of building can be completed before entering water, then it is expected to reduce the engineering of cofferdam construction Amount, lifting construction efficiency.
Summary of the invention
The utility model is intended to the technological deficiency for the prior art, provides a kind of construction of hydro project and uses convenient for assembling Steel sheet-pile cofferdam, to need under water embedding steel sheet pile one by one when solving the construction of current cofferdam, thus inconvenient technology of constructing is asked Topic.
To realize the above technical purpose, the utility model uses following technical scheme:
The steel sheet-pile cofferdam that construction of hydro project is used convenient for assembling, including fixed ring, rotating ring, wing plate, enclosing, jack, Steel sheet pile, clip, pillar, pin rod, groove body, support frame, lifting platform, driving gear, motor, wherein fixed ring is equipped with annular Slideway, rotating ring bottom end are equipped with idler wheel, and rotating ring is connected in the annular slide track by the idler wheel, and wing plate is located at fixed ring Outer ledge at, enclosing is fixedly connected on rotating ring, and the enclosing has several jacks, and steel sheet pile is plugged on the jack In, it is connected with clip in the junction of steel sheet pile and jack, pillar is connected at the inside edge of fixed ring, is had on the pillar There is a groove body, pin rod is hinged on pillar, and support frame is also connected at the outer ledge of fixed ring, and lifting platform is connected to support frame On, motor is also connected at the outer ledge of fixed ring, driving gear is connect with electric-motor drive, the outer ledge of rotating ring Place has rack gear, driving gear and rack gear engaged transmission.
Preferably, wing plate has 2, the center of circle of the line of the two Jing Guo fixed ring.
Preferably, the top edge of support frame is higher than enclosing.
Preferably, pin rod is located in groove body.
Preferably, fixed ring, rotating ring, round slide three be concentric circles.
In above technical scheme, fixed ring is as basic structure for carrying the moulds such as rotating ring, support frame, transmission mechanism Block;The enclosing being connected on rotating ring offers several jacks, and jack matches with steel sheet pile specification, thus can convenient and fast grafting Steel sheet pile passes through clip after the completion of grafting and is fixed in junction;Support frame in fixed ring is used to support lifting platform, makes to build It builds worker and can stand on lifting platform and steel sheet pile seam is adjusted, it, can since rotation petticoat is provided with rack gear Rotating ring rotation is driven by motor and driving gear, to make construction worker that can carry out on lifting platform to whole steel sheet piles Operation.
The assembling in the cofferdam can be completed in land, to whole steel sheet pile grafting after, the pin that will be hinged on pillar Bar is lifted from groove body, and card is refuted on rotating ring, so that position-limiting action is played, to prevent rotating ring from rotating;Then by motor, The structural demolitions such as driving gear, lifting platform, device is integrally transferred to it is underwater, by fixed ring, wing plate be embedded in riverbed and with Riverbed is fixed, so that completes cofferdam enters water, due to completing the grafting and inspection of steel sheet pile on land, is only needed after entering water Intermediate water body is drained and completes entire cofferdam building.
The utility model provides a kind of construction of hydro project steel sheet-pile cofferdam for being convenient for assembling, and the technical solution is to mesh The preceding mode directly driven piles in riverbed is improved, and with cyclic annular basic structural bearing enclosing, then steel sheet pile is plugged on enclosing Jack in, carry out the assembling of steel sheet pile can in land by this improvement, avoid that underwater construction is more difficult to ask Topic.On this basis, the utility model is above-mentioned cyclic annular basic structure matching driving mechanism, and the liter for personnel's operation is arranged Platform drops, to improve the convenience to steel sheet pile leak detection, closure operation.The utility model is real by innovative technological improvement Good technical effect is showed, cost is relatively low, is easily achieved, therefore has broad application prospects.
Detailed description of the invention
Fig. 1 is the schematic perspective view of the utility model;
Fig. 2 is the main view of the utility model;
In figure:
1, fixed ring 2, rotating ring 3, wing plate 4, enclosing
5, jack 6, steel sheet pile 7, clip 8, pillar
9, pin rod 10, groove body 11, support frame 12, lifting platform
13, driving gear 14, motor.
Specific embodiment
Specific embodiment of the present utility model will be described in detail below.In order to avoid excessive unnecessary thin Section will not be described in detail to belonging to well known structure or function in the examples below.Used in following embodiment Approximating language can be used for quantitative expression, show to allow quantity to have certain variation in the case where not changing basic function. In addition to being defined, technical and scientific term used in following embodiment has general with the utility model one of ordinary skill in the art All over the identical meanings understood.
Embodiment 1
The steel sheet-pile cofferdam that construction of hydro project is used convenient for assembling, as shown in Figure 1 and Figure 2, including fixed ring 1, rotating ring 2, Wing plate 3, enclosing 4, jack 5, steel sheet pile 6, clip 7, pillar 8, pin rod 9, groove body 10, support frame 11, lifting platform 12, driving gear 13, motor 14, wherein fixed ring 1 is equipped with annular slide track, and 2 bottom end of rotating ring is equipped with idler wheel, and rotating ring 2 passes through the idler wheel It is connected in the annular slide track, wing plate 3 is located at the outer ledge of fixed ring 1, and enclosing 4 is fixedly connected on rotating ring 2, institute Enclosing 4 is stated with several jacks 5, steel sheet pile 6 is plugged in the jack 5, is connected in steel sheet pile 6 and the junction of jack 5 Clip 7 is connected with pillar 8 at the inside edge of fixed ring 1, has a groove body 10 on the pillar 8, pin rod 9 is hinged on pillar 8 On, support frame 11 is also connected at the outer ledge of fixed ring 1, lifting platform 12 is connected on support frame 11, the outside of fixed ring 1 Edge is also connected with motor 14, and driving gear 13 and motor 14 are sequentially connected, and has tooth at the outer ledge of rotating ring 2 Item, driving gear 13 and rack gear engaged transmission.Wherein, wing plate 3 has 2, the center of circle of the line of the two Jing Guo fixed ring 1; The top edge of support frame 11 is higher than enclosing 4;Pin rod 9 is located in groove body 10;Fixed ring 1, rotating ring 2, round slide three are same Heart circle.
The working principle of the device is as follows:Fixed ring 1 is as basic structure for carrying rotating ring 2, support frame 11, transmission The modules such as mechanism;The enclosing 4 being connected on rotating ring 2 offers several jacks 5, and jack 5 matches with 6 specification of steel sheet pile, because And easily grafting steel sheet pile 6, grafting it can pass through clip 7 after the completion and be fixed in junction;Support frame 11 in fixed ring 1 It is used to support lifting platform 12, construction worker is stood on can on lifting platform 12 and 6 seam of steel sheet pile is adjusted, due to rotating ring 2 outer edges are provided with rack gear, therefore rotating ring 2 can be driven to rotate by motor 14 and driving gear 13, to make to build work People can operate whole steel sheet piles 6 on lifting platform 12.
The assembling in the cofferdam can be completed in land, to whole 6 grafting of steel sheet pile after, will be hinged on 8 on pillar Pin rod 9 is lifted from groove body 10, and card is refuted on rotating ring 2, so that position-limiting action is played, to prevent rotating ring 2 from rotating;Then will Device is integrally transferred under water, fixed ring 1, wing plate 3 is buried by the structural demolitions such as motor 14, driving gear 13, lifting platform 12 It is placed in riverbed and is fixed with riverbed, so that completes cofferdam enters water, due to completing the grafting and inspection of steel sheet pile 6 on land It looks into, therefore enters intermediate water body need to only be drained after water and complete entire cofferdam building.
Embodiment 2
The steel sheet-pile cofferdam that construction of hydro project is used convenient for assembling, as shown in Figure 1 and Figure 2, including fixed ring 1, rotating ring 2, Wing plate 3, enclosing 4, jack 5, steel sheet pile 6, clip 7, pillar 8, pin rod 9, groove body 10, support frame 11, lifting platform 12, driving gear 13, motor 14, wherein fixed ring 1 is equipped with annular slide track, and 2 bottom end of rotating ring is equipped with idler wheel, and rotating ring 2 passes through the idler wheel It is connected in the annular slide track, wing plate 3 is located at the outer ledge of fixed ring 1, and enclosing 4 is fixedly connected on rotating ring 2, institute Enclosing 4 is stated with several jacks 5, steel sheet pile 6 is plugged in the jack 5, is connected in steel sheet pile 6 and the junction of jack 5 Clip 7 is connected with pillar 8 at the inside edge of fixed ring 1, has a groove body 10 on the pillar 8, pin rod 9 is hinged on pillar 8 On, support frame 11 is also connected at the outer ledge of fixed ring 1, lifting platform 12 is connected on support frame 11, the outside of fixed ring 1 Edge is also connected with motor 14, and driving gear 13 and motor 14 are sequentially connected, and has tooth at the outer ledge of rotating ring 2 Item, driving gear 13 and rack gear engaged transmission.
The embodiments of the present invention are described in detail above, but the content is only the preferable of the utility model Embodiment is not intended to limit the utility model.All any modifications made in the application range of the utility model are equally replaced It changes and improves, should be included within the scope of protection of this utility model.

Claims (5)

1. the steel sheet-pile cofferdam that construction of hydro project is used convenient for assembling, it is characterised in that including fixed ring (1), rotating ring (2), the wing Plate (3), enclosing (4), jack (5), steel sheet pile (6), clip (7), pillar (8), pin rod (9), groove body (10), support frame (11), Lifting platform (12), driving gear (13), motor (14), wherein fixed ring (1) is equipped with annular slide track, rotating ring (2) bottom end Equipped with idler wheel, rotating ring (2) is connected in the annular slide track by the idler wheel, and wing plate (3) is located at the outside of fixed ring (1) Edge, enclosing (4) are fixedly connected on rotating ring (2), and the enclosing (4) has several jacks (5), steel sheet pile (6) grafting In the jack (5), it is connected with clip (7) in the junction of steel sheet pile (6) and jack (5), the inside edge of fixed ring (1) Place is connected with pillar (8), has a groove body (10) on the pillar (8), and pin rod (9) is hinged on pillar (8), fixed ring (1) Outer ledge at be also connected with support frame (11), lifting platform (12) is connected on support frame (11), the outer side edges of fixed ring (1) It is also connected at edge motor (14), driving gear (13) and motor (14) are sequentially connected, at the outer ledge of rotating ring (2) With rack gear, driving gear (13) and rack gear engaged transmission.
2. the steel sheet-pile cofferdam that construction of hydro project according to claim 1 is used convenient for assembling, it is characterised in that wing plate (3) There are 2, the line of the two passes through the center of circle of fixed ring (1).
3. the steel sheet-pile cofferdam that construction of hydro project according to claim 1 is used convenient for assembling, it is characterised in that support frame (11) top edge is higher than enclosing (4).
4. the steel sheet-pile cofferdam that construction of hydro project according to claim 1 is used convenient for assembling, it is characterised in that pin rod (9) In groove body (10).
5. the steel sheet-pile cofferdam that construction of hydro project according to claim 1 is used convenient for assembling, it is characterised in that fixed ring (1), rotating ring (2), round slide three are concentric circles.
CN201820614647.7U 2018-04-27 2018-04-27 The steel sheet-pile cofferdam that construction of hydro project is used convenient for assembling Expired - Fee Related CN208136931U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820614647.7U CN208136931U (en) 2018-04-27 2018-04-27 The steel sheet-pile cofferdam that construction of hydro project is used convenient for assembling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820614647.7U CN208136931U (en) 2018-04-27 2018-04-27 The steel sheet-pile cofferdam that construction of hydro project is used convenient for assembling

Publications (1)

Publication Number Publication Date
CN208136931U true CN208136931U (en) 2018-11-23

Family

ID=64310366

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820614647.7U Expired - Fee Related CN208136931U (en) 2018-04-27 2018-04-27 The steel sheet-pile cofferdam that construction of hydro project is used convenient for assembling

Country Status (1)

Country Link
CN (1) CN208136931U (en)

Similar Documents

Publication Publication Date Title
CN108381743A (en) A kind of lining concrete watering curing means of constructing tunnel
CN216999710U (en) Hydraulic engineering is with pulling out post device
CN104746475A (en) Device and method for disposing river sewage through wind and tidal power generation and water storage drainage
CN101280569A (en) Walking telescopic arm type remote control digging machine
CN208136931U (en) The steel sheet-pile cofferdam that construction of hydro project is used convenient for assembling
CN209498106U (en) A kind of afforestation project planting of plants device
CN203729276U (en) Lightweight quick waterproof gate
CN207609374U (en) Lift self-travel type full-sleeve full-rotation drill
CN208803929U (en) A kind of liftable waterwheel generator adapting to deep water basin
CN202125396U (en) Water wheel capable of generating electricity and irrigating
CN216082182U (en) Water source sampling device for geological exploration
CN202990001U (en) Amphibious river channel working platform
CN210827357U (en) Dam with automatic cleaning function
CN207919554U (en) A kind of static pressed pile soil digging machine
CN113522947B (en) Soil remediation device for honeycomb cellular rainwater garden
CN213838505U (en) Drilling equipment is used in geotechnical engineering reconnaissance
CN208428457U (en) A kind of horizontal dabbing machine device of concrete precast pipe pile
CN215629984U (en) Desert area photovoltaic pile foundation construction equipment
CN217840145U (en) Special irrigation canals and ditches excavation auxiliary device of building engineering water supply
CN110469170A (en) A kind of intelligent stereo garage
CN211735228U (en) A environmental protection atomizing dust device for road maintenance
CN215253089U (en) Gardens are land backfill device for civil engineering
CN215629861U (en) Compaction leveling device for earthwork
CN216309543U (en) Quick sampling device of groundwater
CN204225177U (en) One leads wall chase automatic excavator continuously

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181123

Termination date: 20210427