CN208134562U - A kind of Underwater Engineering splicing floating body boat - Google Patents
A kind of Underwater Engineering splicing floating body boat Download PDFInfo
- Publication number
- CN208134562U CN208134562U CN201820279388.7U CN201820279388U CN208134562U CN 208134562 U CN208134562 U CN 208134562U CN 201820279388 U CN201820279388 U CN 201820279388U CN 208134562 U CN208134562 U CN 208134562U
- Authority
- CN
- China
- Prior art keywords
- hull
- floating body
- body boat
- underwater engineering
- splicing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
A kind of Underwater Engineering splicing floating body boat, including at least one hull and setting are connected between the intracorporal air bag of ship, hull by the connector being fixed on hull, and connector includes connection buckle and the connecting pin with connection buckle grafting.The utility model advantage is, solves the firm position during underwater project construction, large-scale land can be carried and stop operation on the water with construction equipment, more targetedly solves floating body boat area for cutting when implementing large project engineering in waters by the scheme for splicing floating body boat, it can be stitched together to form the construction site of large area by multiple hulls, it can also individually come into operation, more reasonably use resource.
Description
Technical field
Need bearing capacity big the utility model relates to Underwater Engineering field, more particularly to when a kind of engineering construction under water and
It can adapt to the spliced floating body boat of different water surface area requirements.
Background technique
Under water in the work progress of engineering, difficulty of construction is big, and the environment of construction is poor, and various heavy construction equipments are due to certainly
The weight of body is larger, can not put to good use on the water surface, it is therefore desirable to which it is big to provide a kind of bearing capacity on the water surface, relative to balance
Floating body boat cooperates completion construction work, problem to be solved difficult point be can prevent on the water surface positioning of floating body boat from
Water flow or wind direction floating, be when facing big project construction at one, required construction equipment is more, needs to solve
Construction area problem above waters, therefore propose a kind of splicing floating body boat that can be directed to underwater project construction.
Utility model content
The purpose of the utility model is to overcome the shortcoming of above-mentioned traditional technology, it one kind is provided can carry large size and apply
Construction equipment, and can be assembled, to adapt to the spliced floating body boat of different water surface areas.
The purpose of this utility model solves by the following technical programs:
A kind of Underwater Engineering splicing floating body boat, including at least one hull and setting are in the intracorporal air bag of ship, hull
Between connected by the connector that is fixed on hull, connector includes connection buckle and the connecting pin with connection buckle grafting.
As a further improvement, the air bag is at least two groups of settings, every group is at least arranged two, every group of air bag it
Between be equipped with partition.
As a further improvement, the front end and rear end of the air bag are equipped with buting iron, buting iron is at least arranged two pieces, and hands over
Fork is fixed on hull.
As a further improvement, the connector is located on the side of hull and is at least arranged two, the front end face of hull and
Rear end face, which is located in partition, is at least arranged a connector.
As a further improvement, the portion of connection buckle is formed with the catching groove with connecting pin cooperation, the part of connecting pin
Position is formed with the pin hook with connection buckle cooperation.
As a further improvement, the upper plane of the hull is fixed with several tread plates.
As a further improvement, at least four corners for being located at the upper plane of hull are equipped with the lifting lug of lifting floating body boat.
As a further improvement, at least four corners for being located at the upper plane of hull are additionally provided with connecting with anchor for fixed hull
The anchor post connect.
It is flexible coupling as a further improvement, being equipped between the anchor post and anchor.
As a further improvement, the two sides of hull are equipped with guardrail.
The utility model is by above technical scheme, and compared with prior art, generated beneficial effect is:Solves water
Firm position in lower construction process can carry large-scale land with construction equipment and stop operation on the water, by by floating body
The scheme that ship is spliced more targetedly solves floating body boat area for cutting when implementing large project engineering in waters,
It can be stitched together to form the construction site of large area by multiple hulls, can also individually come into operation, it is more reasonable to use
Resource.
Detailed description of the invention
Attached drawing 1 is the overall schematic of the multiple hull splicing of the utility model Underwater Engineering splicing floating body boat;
Attached drawing 2 is the Ship Structure schematic diagram of the utility model Underwater Engineering splicing floating body boat;
Attached drawing 3 is the schematic diagram of the section structure of the utility model Underwater Engineering splicing floating body boat;
Attached drawing 4 is the connector schematic cross-sectional view of the utility model Underwater Engineering splicing floating body boat;
Attached drawing 5 is the connection buckle overall structure diagram of the utility model Underwater Engineering splicing floating body boat;
Attached drawing 6 is the connecting pin overall structure diagram of the utility model Underwater Engineering splicing floating body boat;
In figure:101- hull, 102- buting iron, 103- tread plate, 104- lifting lug, 105- anchor post, 106- are flexible coupling, 107-
Anchor, 108- guardrail, 109- partition, 201- air bag, 3- connector, 301- connection buckle, 302- connecting pin, 303- catching groove, 303- pin
Hook.
Embodiment
It is elaborated to the utility model Underwater Engineering with the embodiment of splicing floating body boat below in conjunction with Detailed description of the invention:
For ease of description and explanation, on the part that connection buckle 301 is formed with catching groove 303 being described as in the present embodiment
The part that connecting pin 302 is formed with pin hook 304 is described as top half by half part.
Attached drawing 1 and Fig. 2 be the utility model Underwater Engineering splicing floating body boat splicing after whole schematic diagram, from the figure
In it can be seen that in the case that and construct required for construction equipment wider in water surface area is more, can be using by multiple hulls
101 are stitched together to be adapted to construction environment, as seen from Figure 2 the specific structure of single hull 101.
Attached drawing 3 be the utility model Underwater Engineering splicing floating body boat every group of air bag 201 and every group of air bag 201 between be
It is spaced by partition 109, to guarantee the equilibrium of buoyancy.
Attached fig. 4 to fig. 6 is the structural schematic diagram of the connector 3 of the utility model Underwater Engineering splicing floating body boat, from this
Can intuitively it find out in figure, which is made of connection buckle 301 and connecting pin 302.
If attached drawing 1 is to shown in Fig. 3, the splicing floating body boat is mainly by hull 101, the air bag being arranged in hull 101 201
And by the splicing composition of connector 3, the inside of hull 101 is equipped with partition 109 and divides hull 101 for two parts, in every part
It is provided at least two air bags 201 and forms one group, be at least arranged two groups in each hull 101, in the front end of each group of air bag 201
Portion and rear end are each provided with the buting iron 102 of an intersection to prevent from moving in hull 101 with fixation balloon 201, and the buting iron 109 is logical
The mode for crossing welding is welded on hull 101, is arranged in sequence with several tread plates 103 in the upper surface of hull 101, this is anti-skidding
Item 103 is the bar shaped plate of metal production, and at least four corners positioned at hull 101 are fixed with lifting lug 104 and anchor post
105, it is used when the setting of lifting lug 104 is readily transported or installs using lifting appliance lifting, anchor post 105 is by being flexible coupling
106 connect with anchor 107, and be flexible coupling 106 chains that can be rope or metal material, and the two sides of hull 101 are additionally provided with shield
Column 108.
It is as shown in Figures 4 to 6 the connector 3 of the hull 101, connector 3 is by connection buckle 301 and 302 groups of connecting pin
At such as Fig. 5 it can be seen that the top half of the connection buckle 301 is formed with catching groove 303, such as Fig. 6 it can be seen that the connecting pin 302
Top half is formed with pin hook 304, and the catching groove 303 of the connection buckle 301 matches with pin hook 304, and the pin hook 304 is in hull
101 are plugged in catching groove 303 when assembled.
In the present embodiment, connector 3 is fixedly disposed on ship, and fixed setting is connection buckle on one hull 101
301, fixed setting is connecting pin 302 on another hull 101, the connector 3 can be carried out removing according to assembled demand or
Increase.
Multiple hulls 101 are stitched together by connector 3 in the present embodiment, the waterborne of larger area is formed and applies
The job platform of construction equipment, connector 3 is set as a connection buckle 301 and connecting pin 302 as can be seen from Figure
Setting, structure is simple, time saving and energy saving in splicing installation process;In order to increase the friction between hull 101 and operating equipment
Power is additionally arranged tread plate 103;Four corners positioned at each hull 101 are equipped with anchor post 105, assembly complete formed compared with
Each hull has respective anchor when big job platform, stable hull 101 can float on the water to greatest extent
The defect of shaking;The setting of guardrail 108 is avoided in operation on hull 101 because unexpected be slipped in water is caused danger.
Claims (10)
1. a kind of Underwater Engineering splicing floating body boat, it is characterised in that:Including at least one hull(101)And it is arranged in hull
(101)Interior air bag(201), hull(101)Between by being fixed at hull(101)On connector(3)Connection, connection
Part(3)Including connection buckle(301)With with connection buckle(301)The connecting pin of grafting(302).
2. Underwater Engineering according to claim 1 splicing floating body boat, it is characterised in that:The air bag(201)At least
Two groups of settings, every group is at least arranged two, every group of air bag(201)Between be equipped with partition(109).
3. Underwater Engineering according to claim 2 splicing floating body boat, it is characterised in that:The air bag(201)Front end
Portion and rear end are equipped with buting iron(102), buting iron(102)At least it is arranged two pieces, and cross-fixing is arranged in hull(101)On.
4. Underwater Engineering according to claim 1 splicing floating body boat, it is characterised in that:The connector(3)Positioned at ship
Body(101)Side on be at least arranged two, hull(101)Front end face and rear end face be located at partition(109)On be at least arranged
One connector(3).
5. Underwater Engineering according to claim 1 splicing floating body boat, it is characterised in that:Connection buckle(301)Part position
It sets and is formed with and connecting pin(302)The catching groove of cooperation(303), connecting pin(302)Portion be formed with and connection buckle(301)
The pin hook of cooperation(304).
6. Underwater Engineering according to claim 1 splicing floating body boat, it is characterised in that:The hull(101)It is upper flat
Face is fixed with several tread plates(103).
7. Underwater Engineering according to claim 1 splicing floating body boat, it is characterised in that:Positioned at hull(101)It is upper flat
At least four corners in face are fixedly installed lifting lug(104).
8. Underwater Engineering according to claim 7 splicing floating body boat, it is characterised in that:Positioned at hull(101)It is upper flat
At least four corners in face are additionally provided with fixed hull(101)And anchor(107)The anchor post of connection(105).
9. Underwater Engineering according to claim 8 splicing floating body boat, it is characterised in that:The anchor post(105)With anchor
(107)Between be equipped be flexible coupling(106).
10. Underwater Engineering according to claim 1 splicing floating body boat, it is characterised in that:Hull(101)Two sides be equipped with
Guardrail(108).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820279388.7U CN208134562U (en) | 2018-02-28 | 2018-02-28 | A kind of Underwater Engineering splicing floating body boat |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820279388.7U CN208134562U (en) | 2018-02-28 | 2018-02-28 | A kind of Underwater Engineering splicing floating body boat |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208134562U true CN208134562U (en) | 2018-11-23 |
Family
ID=64285251
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820279388.7U Expired - Fee Related CN208134562U (en) | 2018-02-28 | 2018-02-28 | A kind of Underwater Engineering splicing floating body boat |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208134562U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110144986A (en) * | 2019-04-15 | 2019-08-20 | 中国电建集团华东勘测设计研究院有限公司 | A kind of quick dredging method |
CN110395362A (en) * | 2019-07-30 | 2019-11-01 | 绵阳高新区恒奥电子科技有限公司 | Floating type water base station |
-
2018
- 2018-02-28 CN CN201820279388.7U patent/CN208134562U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110144986A (en) * | 2019-04-15 | 2019-08-20 | 中国电建集团华东勘测设计研究院有限公司 | A kind of quick dredging method |
CN110395362A (en) * | 2019-07-30 | 2019-11-01 | 绵阳高新区恒奥电子科技有限公司 | Floating type water base station |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE69938294T2 (en) | SEA BUILDING | |
CN208134562U (en) | A kind of Underwater Engineering splicing floating body boat | |
CN204097855U (en) | Deep-sea semi-submersible type lightweight modules pontoon bridge | |
CN101293599B (en) | Method for discharging boat to dock basin with dock yard trestle crane set | |
CN201864449U (en) | Cement joint-row pressing block hoisting frame | |
CN101804849A (en) | Construction program of semi-submersible platform for offshore oil and gas development | |
CN105539740A (en) | Wharf boarding ladder of FLNG barge | |
CN105019417B (en) | The Multifunctional crossbeam repaired for catheterostat | |
CN204282325U (en) | Fence type oil boom | |
CN203159060U (en) | Connecting device for immersing barged tube segment | |
CN209881361U (en) | Submarine cable floating device with ignition device | |
CN206915570U (en) | A kind of multi-purpose cargo ship section bar lifting device | |
CN105882906B (en) | The large-scale ocean floor topographic survey platform of non-metallic material and its lay method | |
CN214729536U (en) | Construction platform for overwater trestle | |
CN210063316U (en) | Float bowl | |
CN105480845B (en) | Lifting tool specially used in water | |
CN207670619U (en) | A kind of fishing device for bridge construction | |
CN201761559U (en) | Large-tonnage mudflat transporter with lifting platform | |
CN109533220B (en) | Combined floating assisting device for large semi-submersible ship and construction method thereof | |
CN202202347U (en) | Foundation trench dredging device | |
CN206417156U (en) | Pontoon | |
CN201458219U (en) | Transportation device for running pipes of power equipment | |
CN210027844U (en) | Inclined supporting seat structure for dragging and moving ship | |
CN206188260U (en) | Hoist top ping lift prevents kinking device and hoist | |
CN219428337U (en) | Water surface floating reinforced concrete floating platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181123 Termination date: 20200228 |