CN208133236U CN201820368060.2U CN201820368060U CN208133236U CN 208133236 U CN208133236 U CN 208133236U CN 201820368060 U CN201820368060 U CN 201820368060U CN 208133236 U CN208133236 U CN 208133236U
Authority
CN
China
Prior art keywords
control
hydraulic
box beam
external mold
demoulding oil
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820368060.2U
Other languages
Chinese (zh)
Inventor
陈兵
易侃
班鹏
王辉
伍劲松
杨保贺
吴燕华
李达
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Third Engineering Bureau Co Ltd
China Construction Third Bureau Infrastructure Construction Investment Co Ltd
Original Assignee
China Construction Third Engineering Bureau Co Ltd
China Construction Third Bureau Infrastructure Construction Investment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Third Engineering Bureau Co Ltd, China Construction Third Bureau Infrastructure Construction Investment Co Ltd filed Critical China Construction Third Engineering Bureau Co Ltd
Priority to CN201820368060.2U priority Critical patent/CN208133236U/en
Application granted granted Critical
Publication of CN208133236U publication Critical patent/CN208133236U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of precast box beam hydraulic external mold synchronous control systems, including modular system, hydraulic system and electric walking system outside box beam, the hydraulic system and the electric walking system integration are installed on dismounting with central control cabinet in synchronously control center to control synchronizing for template;Walking switch control of the movable motor of the box beam external mold by central control cabinet, the positive and negative rotation of the upper each traveling wheel of lower button synchronously control of switch, to control the back-and-forth motion of hydraulic formwork;The hydraulic system is controlled by the solenoid valve at synchronously control center, synchronously control center is operated by the synchronization telescope of the horizontal demoulding oil jar of the corresponding each group of switch control of control solenoid valve and the synchronization lifting of the vertical demoulding oil jar of corresponding each group, to control the synchronous installation of box beam external mold, Demolition Construction.The quick peace that prefabricated case beam template may be implemented in the utility model is torn open, and the construction efficiency of prefabricated case beam and the degree of automation of box girder formwork precast construction are improved.

Description

A kind of precast box beam hydraulic external mold synchronous control system
Technical field
The utility model belongs to technical field of bridge construction, and in particular to a kind of precast box beam hydraulic external mold synchronously control system System.
Background technique
Recently as the continuous development of science of bridge building cause, bridge construction technique also reaching its maturity, diversification, for Construction of Precast Box Beam mostly uses pin-connected panel combined steel formwork.Box beam external mold needs the installation carried out repeatedly to tear open in process conversion process It removes and transports, the problems such as that there are construction efficiency is low, security risk is big, technique falls behind, and template is held during peace is torn open repeatedly It easily deforms, the problems such as faulting of slab ends, piece is big occurs, influence the presentation quality of prefabricated case beam.To improve traditional prefabricated box-beam Plate construction problem designs the synchronous control system of a set of hydraulic external mold, realizes that the quick peace of prefabricated case beam template is torn open, improves pre- The construction efficiency of box beam processed is advantageously implemented the automation of prefabricated case beam template engineering.
Summary of the invention
The purpose of this utility model is that overcome drawbacks described above existing in the prior art, provides a kind of prefabricated Box beam hydraulic external mold synchronous control system.
The utility model is achieved through the following technical solutions above-mentioned purpose, a kind of precast box beam hydraulic external mold synchronously control Modular system, hydraulic system and electric walking system outside system, including box beam, the hydraulic system and the electric walking system integration In synchronously control center, dismounting is installed on to control synchronizing for template with central control cabinet, the outer modular system of the box beam includes pre- Box beam, beam making bench, external mold panel, vertical demoulding oil jar, horizontal demoulding oil jar and traveling wheel processed;The row of the box beam external mold Motor is walked by the walking switch control of central control cabinet, the positive and negative rotation of the upper each traveling wheel of lower button synchronously control of switch, from And control the back-and-forth motion of hydraulic formwork;The hydraulic system is controlled by the solenoid valve at synchronously control center, synchronously control Center is vertically taken off by the synchronization telescope and corresponding each group of the horizontal demoulding oil jar of the corresponding each group of switch control of control solenoid valve The synchronization lifting of mould oil cylinder operates, to control the synchronous installation of box beam external mold, Demolition Construction.
In above-mentioned technical proposal, the outer modular system of the box beam using sizing steel plate and the bolt manufacture of fashioned iron back cord, by 2m~ 3m is a standard knot, is connected by screw bolts forming.
In above-mentioned technical proposal, the hydraulic system includes two vertical demoulding oil jars and a horizontal demoulding oil jar, The left and right sides of the outer modular system of box beam is symmetrical arranged, with specific reference to the length and weight of beam, according to 30m long prefabricated case beam external mold two 4 groups of hydraulic systems are respectively installed and are configured in side.
In above-mentioned technical proposal, the electric walking system is corresponding with hydraulic system to be equipped with, driving box beam external mold system Traveling wheel is moved to next beam making bench along walking track.
In general, can achieve the above technical solutions conceived by the present invention are compared with the prior art, with Lower beneficial effect:
1, the synchronizing moving of each hydraulic package is controlled by synchronously control center, carries out the installation and dismounting of template, is substituted The segmented connection of conventional combination steel form is removed, and is substantially increased template peace and is torn efficiency open, template good integrity is conducive to prefabricated The control of box beam presentation quality;
2, the movable motor of the controllable pallet in synchronously control center, completes the movement of template, substitutes traditional segmented hang Dress transhipment, template transfer efficiency is higher, constructs convenient for circulation, forms continuous productive process;
3, there is the utility model modularization to process, is easy for installation, can repeatedly be used in turn, simple operation and other advantages.
Detailed description of the invention
Specific embodiment of the present utility model is further described in detail with reference to the accompanying drawing, wherein:
Fig. 1 is the overall structure figure of the outer modular system of box beam described in the utility model;
Fig. 2 is the circuit diagram of electric walking system described in the utility model;
Fig. 3 is the circuit diagram of hydraulic oil pump motor in hydraulic system described in the utility model;
Fig. 4 is single group electromagnetic valve circuit control principle drawing described in the utility model;
Fig. 5 is the control principle drawing of hydraulic system described in the utility model;
In figure:1- prefabricated case beam, 2- beam making bench, 3- external mold panel, the vertical demoulding oil jar of 4-, the horizontal demoulding oil jar of 5-, 6- traveling wheel.
Specific embodiment
For the summary of the invention, feature and beneficial effect that can further appreciate that the utility model, in conjunction with 30m prefabricated case beam template This specific embodiment is described in detail.
Box beam exterior sheathing is processed according to 30m box section size design to be connected by screw bolts by 2~3m, mono- standard knot Molding.As shown in Figure 1, for the overall structure diagram of the outer modular system of box beam described in the utility model, including prefabricated case beam 1, system Beam rack 2, external mold panel 3, vertical demoulding oil jar 4, horizontal demoulding oil jar 5 and traveling wheel 6, according to the self weight of box girder formwork and Stress condition, every side template panel 3 are equipped with four groups of hydraulic systems, and each hydraulic system includes two vertical demoulding oil jars 4 and one A horizontal demoulding oil jar 5 controls the upper and lower of template respectively and moves horizontally, while traveling wheel is installed in each hydraulic system lower part 6, it is equipped with movable motor system, controls the longitudinal movement of template.
Central control cabinet integration electric running gear, the control switch of hydraulic system are completed by the button on control cabinet Synchronous installation, disassembly and the moving operation of template.
Fig. 2 is running gear circuit diagram, and the movement of template is completed by the positive and negative rotation of movable motor, motor positive and inverse It needs to complete to be oriented to control to A, B, C three-phase electricity line attachment by two contactors of KM1, KM2.Starting rotates forward switch button, Contactor KM1 circuit closed, normal open switch KM1 closure, normally closed switch KM1 is opened, therefore the circuit KM2 disconnects, and motor rotates forward, mould The walking of plate forward direction, after walking in place, by shutdown switch, contactor KM1 power-off, normal open switch KM1 restores to disconnect, and motor stops. Similarly, hydraulic formwork can control reversely to walk.
Fig. 3 is hydraulic oil pump motor circuit schematic diagram, and fluid pressure motor provides power for hydraulic oil pump, presses hydraulic electricity Motivation starts switch, and circuit is closed circuit, and contactor KM1 is charged, and normal open switch KM1 is closed automatically, motor operation.
Fig. 4 is single group electromagnetic valve circuit control principle drawing, and single group solenoid valve uses 8 contactors, with one group of every two The commutation of 4 solenoid valves of form control, and then four, the upper and lower, left and right movement of oil cylinder is controlled, while on each contactor An auxiliary contactor switch is added, auxiliary contactor switch is connected by the way of parallel with one another.When contactor is attracted, auxiliary is connect Touching switch will be also attracted, and then can control electromagnetic type overflow valve, guarantee any one solenoid valve when being powered, overflow valve is in Working condition.
Fig. 5 is HYDRAULIC CONTROL SYSTEM schematic diagram, and hydraulic electric motor drives hydraulic pump, keeps entire hydraulic system with pressure.①②,⑤ 6. connecting between solenoid valve, hydraulic cylinder above and below control template guarantees that two solenoid valves are same when any solenoid valve operates When act, moved up and down to complete the synchronous of hydraulic cylinder.And for the 3. 4. solenoid valve of control template horizontal movement oil cylinder, Synchronized in the form of shared oil circuit control it is each move horizontally oil cylinder, to guarantee that template is horizontally moved.
As it will be easily appreciated by one skilled in the art that the above is only the preferred embodiment of the utility model only, not For limiting the utility model, any modification made within the spirit and principle of the present invention, equivalent replacement and change Into etc., it should be included within the scope of protection of this utility model.

Claims (5)

1. a kind of precast box beam hydraulic external mold synchronous control system, including modular system, hydraulic system and electric walking outside box beam System, the hydraulic system and the electric walking system integration control the same of template in synchronously control center, with central control cabinet Step is installed on dismounting, it is characterised in that:
The outer modular system of the box beam include prefabricated case beam (1), beam making bench (2), external mold panel (3), vertical demoulding oil jar (4), Horizontal demoulding oil jar (5) and traveling wheel (6);
For the movable motor of the box beam external mold by the walking switch control of central control cabinet, the upper lower button synchronously control of switch is each The positive and negative rotation of a traveling wheel (6), to control the back-and-forth motion of hydraulic formwork;
The hydraulic system is controlled by the solenoid valve at synchronously control center, and synchronously control center is opened by control solenoid valve Close the synchronization lifting of the synchronization telescope and the vertical demoulding oil jar of corresponding each group (4) that control the corresponding horizontal demoulding oil jar of each group (5) Operation, to control the synchronous installation of box beam external mold, Demolition Construction.
2. a kind of precast box beam hydraulic external mold synchronous control system according to claim 1, it is characterised in that:The box beam Outer modular system is a standard knot by 2m~3m, is connected by screw bolts forming using sizing steel plate and the bolt manufacture of fashioned iron back cord.
3. a kind of precast box beam hydraulic external mold synchronous control system according to claim 1, it is characterised in that:It is described hydraulic The left and right sides of system modular system outside box beam is symmetrical arranged, and respectively installs 4 groups of hydraulic pressure systems according to 30m long prefabricated case beam external mold two sides System is configured.
4. a kind of precast box beam hydraulic external mold synchronous control system according to claim 3, it is characterised in that:It is described hydraulic System includes two vertical demoulding oil jars (4) and a horizontal demoulding oil jar (5).
5. a kind of precast box beam hydraulic external mold synchronous control system according to claim 1, it is characterised in that:It is described electronic Running gear is corresponding with hydraulic system to be equipped with, and drives the traveling wheel (6) of box beam external mold system to be moved to along walking track next Beam making bench (2).
CN201820368060.2U 2018-03-19 2018-03-19 A kind of precast box beam hydraulic external mold synchronous control system Expired - Fee Related CN208133236U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820368060.2U CN208133236U (en) 2018-03-19 2018-03-19 A kind of precast box beam hydraulic external mold synchronous control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820368060.2U CN208133236U (en) 2018-03-19 2018-03-19 A kind of precast box beam hydraulic external mold synchronous control system

Publications (1)

Publication Number Publication Date
CN208133236U true CN208133236U (en) 2018-11-23

Family

ID=64289134

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820368060.2U Expired - Fee Related CN208133236U (en) 2018-03-19 2018-03-19 A kind of precast box beam hydraulic external mold synchronous control system

Country Status (1)

Country Link
CN (1) CN208133236U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109763428A (en) * 2019-01-16 2019-05-17 安徽鸿宇路桥工程有限公司 Box beam formwork
CN110774436A (en) * 2019-11-05 2020-02-11 重庆华渝重工机电有限公司 Battery-driven straddle type monorail PC beam template control device
CN112895081A (en) * 2020-12-22 2021-06-04 四川东泉机械设备制造有限公司 Intelligent box girder mold and method for solving mold clamping problem of intelligent box girder mold

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109763428A (en) * 2019-01-16 2019-05-17 安徽鸿宇路桥工程有限公司 Box beam formwork
CN109763428B (en) * 2019-01-16 2020-10-27 安徽鸿宇路桥工程有限公司 Box girder formwork
CN110774436A (en) * 2019-11-05 2020-02-11 重庆华渝重工机电有限公司 Battery-driven straddle type monorail PC beam template control device
CN112895081A (en) * 2020-12-22 2021-06-04 四川东泉机械设备制造有限公司 Intelligent box girder mold and method for solving mold clamping problem of intelligent box girder mold

Similar Documents

Publication Publication Date Title
CN208133236U (en) A kind of precast box beam hydraulic external mold synchronous control system
CN205219397U (en) Ferry -boat formula precast concrete of central authorities component production line
CN201143722Y (en) Hydraulic integral assembling-disassembling type box beam steel external mold
CN209098026U (en) A kind of transfer tooling for the transport of PC wallboard
CN202688965U (en) Ultra-large down-the-hole arc-shaped water gate
CN204235678U (en) A kind of overall pulling type prefabricated box girder inner formwork device
CN203248171U (en) Full fracture surface needle beam trolley without beam frame
CN202754776U (en) Turnover support
CN202239581U (en) Energy-saving overhead cast plate machine system
CN212318014U (en) Open-close type inverted arch template and trestle with inverted arch template
CN102249155B (en) Linkage controlling apparatus for aluminum electrolysis crown block multifunctional integral unit
CN201841594U (en) Internal mold dolly for manufacturing concrete box beam of bridge
CN204221941U (en) A kind of combined type sycon cable duct mould
CN208914437U (en) A kind of Novel movable template grasping mechanism
CN102995062B (en) A kind of intelligence pressure shell method
CN204736468U (en) Novel big four post hydraulic presses of mesa
CN202088279U (en) Straight web box girders shared hydraulic internal mold
CN103255719B (en) Installing method for large-section special-shaped pier cap formwork
CN201898469U (en) SS device for multiple motors
CN202530428U (en) Full-circle needle beam steel form carrier with downward opening
CN202685065U (en) Lead screw type whole T-shaped beam mold of heavy haul railway
CN206899536U (en) One kind building rubble electromagnetic type trimmer
赵斌 et al. Research of Operating Characteristics and Energy Efficiency of Traction Elevator with Hybrid Electric-hydraulic Drive
CN201169634Y (en) Aluminum electrolysis series non-power off aluminum cell link mechanism short circuit device
CN209466449U (en) The automatic pipe lining machine of batch production prefabrication hollow light wall board device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181123