- CN202688965U CN202688965U CN 201220379328 CN201220379328U CN202688965U CN 202688965 U CN202688965 U CN 202688965U CN 201220379328 CN201220379328 CN 201220379328 CN 201220379328 U CN201220379328 U CN 201220379328U CN 202688965 U CN202688965 U CN 202688965U
- Authority
- CN
- China
- Prior art keywords
- gate
- ultra
- oblique support
- arc
- support arm
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Barrages (AREA)
Abstract
Description
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220379328 CN202688965U (en) | 2012-08-02 | 2012-08-02 | Ultra-large down-the-hole arc-shaped water gate |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220379328 CN202688965U (en) | 2012-08-02 | 2012-08-02 | Ultra-large down-the-hole arc-shaped water gate |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202688965U true CN202688965U (en) | 2013-01-23 |
Family
ID=47544605
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220379328 Expired - Lifetime CN202688965U (en) | 2012-08-02 | 2012-08-02 | Ultra-large down-the-hole arc-shaped water gate |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202688965U (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103590377A (en) * | 2013-11-13 | 2014-02-19 | 华北水利水电大学 | Steel arch-gate making corrugated web type structural steel as main beams |
CN104929083A (en) * | 2015-06-23 | 2015-09-23 | 中国水利水电第五工程局有限公司 | Hoisting method used for hydraulic-opening-closing down-hole-type double-hoisting-point arc-shaped gate |
CN105081519A (en) * | 2015-09-16 | 2015-11-25 | 中国葛洲坝集团第六工程有限公司 | Welding method for large-scale surface hole radial gate leaves |
CN106988281A (en) * | 2017-05-08 | 2017-07-28 | 中国电建集团贵阳勘测设计研究院有限公司 | A kind of preparation method and structure of high narrow big aperture main longitudinal grider down-the-hole arc door |
CN107130566A (en) * | 2017-06-19 | 2017-09-05 | 中国电建集团贵阳勘测设计研究院有限公司 | A kind of microstome monoblock cast down-the-hole arc door |
CN108018833A (en) * | 2017-12-05 | 2018-05-11 | 中国电建集团贵阳勘测设计研究院有限公司 | A kind of microstome monoblock cast table radial door |
-
2012
- 2012-08-02 CN CN 201220379328 patent/CN202688965U/en not_active Expired - Lifetime
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103590377A (en) * | 2013-11-13 | 2014-02-19 | 华北水利水电大学 | Steel arch-gate making corrugated web type structural steel as main beams |
CN103590377B (en) * | 2013-11-13 | 2016-01-06 | 华北水利水电大学 | The steel arch-gate of girder is made of antinode shaped steel |
CN104929083A (en) * | 2015-06-23 | 2015-09-23 | 中国水利水电第五工程局有限公司 | Hoisting method used for hydraulic-opening-closing down-hole-type double-hoisting-point arc-shaped gate |
CN104929083B (en) * | 2015-06-23 | 2016-11-09 | 中国水利水电第五工程局有限公司 | A kind of hanging method of the double hanging-point arc shape gate of the down-the-hole type for hydraulic switch |
CN105081519A (en) * | 2015-09-16 | 2015-11-25 | 中国葛洲坝集团第六工程有限公司 | Welding method for large-scale surface hole radial gate leaves |
CN106988281A (en) * | 2017-05-08 | 2017-07-28 | 中国电建集团贵阳勘测设计研究院有限公司 | A kind of preparation method and structure of high narrow big aperture main longitudinal grider down-the-hole arc door |
CN107130566A (en) * | 2017-06-19 | 2017-09-05 | 中国电建集团贵阳勘测设计研究院有限公司 | A kind of microstome monoblock cast down-the-hole arc door |
CN108018833A (en) * | 2017-12-05 | 2018-05-11 | 中国电建集团贵阳勘测设计研究院有限公司 | A kind of microstome monoblock cast table radial door |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202688965U (en) | Ultra-large down-the-hole arc-shaped water gate | |
CN202688888U (en) | Deck type reversely hung template hanging frame | |
CN202945003U (en) | Portal crane for mounting large-scale equipment | |
CN104594201B (en) | A kind of method utilizing one-sided pier-side bracket to set up pier top girder steel | |
CN103383104A (en) | Hoisting installation method for quickly mounting economizer and super heater | |
CN110512517B (en) | Bridge engineering construction platform | |
CN203497959U (en) | Support structure without inclined rod for tower crane | |
CN106988281B (en) | Manufacturing method and structure of high-narrow large-hole-opening main longitudinal beam down-the-hole arc door | |
CN204001189U (en) | A kind of steel frame supporting structure system of not bearing vertical load | |
CN204455858U (en) | A kind of hanger of large sections steel box-girder | |
CN102979063A (en) | Down-the-hole radial gate with multiple frames and multiple trunnions and two lifting pad eyes | |
CN203568689U (en) | Steel structure for wall-sleeving cantilever crane | |
CN202247812U (en) | Multi-frame multi-support-hinge arc-shaped gate with double-lifting-point down-the-hole | |
CN202323727U (en) | Device for adjusting horizontal position of steel box girder | |
CN207538205U (en) | A kind of tower intelligent stereo garage main body module assembly connection structure | |
CN204455850U (en) | The interim suspension connection device of Large Steel box beam erection | |
CN109371848A (en) | The longitudinal temporary connecting structure and method of suspension bridge concrete stiffening girder installation | |
CN202577688U (en) | Articulated cross beam-free metal plate curtain wall | |
CN204575311U (en) | Railway T-beam static test truss | |
CN211194330U (en) | Quadrilateral support for prefabricated side formwork of segmental box girder | |
CN204570396U (en) | D type is the traversing door frame of beam just | |
CN203800548U (en) | Oceaneering heat-preservation moveable fully-enclosed cable bridge | |
CN203428765U (en) | Hoist trolley and crane using same | |
CN108439203A (en) | A kind of crane girder mounting structure | |
CN213682023U (en) | Multi-degree-of-freedom adjusting device for installing arc door leaves |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C56 | Change in the name or address of the patentee |
Owner name: CHINA POWER GROUP GUIYANG INVESTIGATION DESIGN + R Free format text: FORMER NAME: HYDROCHINA GUIYANG ENGINEERING CORPORATION, LTD. Owner name: HYDROCHINA GUIYANG ENGINEERING CORPORATION, LTD. Free format text: FORMER NAME: GUIYANG PROSPECTION + DESIGN INST, CHINA HYDRAULIC POWER CONSULTARY GROUP |
|
CP01 | Change in the name or title of a patent holder |
Address after: 550081 No. 16 Xing Qian Road, Jinyang New District, Guizhou, Guiyang Patentee after: POWERCHINA GUIYANG ENGINEERING Corp.,Ltd. Address before: 550081 No. 16 Xing Qian Road, Jinyang New District, Guizhou, Guiyang Patentee before: HydroChina Guiyang Engineering Corp. Address after: 550081 No. 16 Xing Qian Road, Jinyang New District, Guizhou, Guiyang Patentee after: CHINA POWER CONSRTUCTION GROUP GUIYANG SURVEY AND DESIGN INSTITUTE Co.,Ltd. Address before: 550081 No. 16 Xing Qian Road, Jinyang New District, Guizhou, Guiyang Patentee before: POWERCHINA GUIYANG ENGINEERING Corp.,Ltd. |
|
CX01 | Expiry of patent term |
Granted publication date: 20130123 |
|
CX01 | Expiry of patent term |