CN208108807U - Pottery art with preheating cavity processes kiln - Google Patents
Pottery art with preheating cavity processes kiln Download PDFInfo
- Publication number
- CN208108807U CN208108807U CN201820438700.2U CN201820438700U CN208108807U CN 208108807 U CN208108807 U CN 208108807U CN 201820438700 U CN201820438700 U CN 201820438700U CN 208108807 U CN208108807 U CN 208108807U
- Authority
- CN
- China
- Prior art keywords
- fire room
- preheating chamber
- pottery
- preheating
- fuel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Vertical, Hearth, Or Arc Furnaces (AREA)
Abstract
The utility model relates to pottery art kilns, and in particular to the pottery art with preheating cavity processes kiln.Including preheating chamber setting up and down(1)And fire room(2), preheating chamber(1)Positioned at fire room(2)Top, and pass through partition(3)Partition;The fire room(2)Top is communicated with thermally conductive chimney(4), thermally conductive chimney(4)Across preheating chamber(1)And from preheating chamber(1)Top is pierced by;The preheating chamber(1)And fire room(2)Side wall offers outlet(5), outlet(5)It is provided with closing door(6).The utility model makes full use of the waste heat of chimney when firing pottery to carry out preheating and drying to the pottery that is not fired in the case where not increasing land occupation, and will not allow smoke pollution pottery.
Description
Technical field
The utility model relates to pottery art kilns, and in particular to the pottery art with preheating cavity processes kiln.
Background technique
In traditional pottery art sintering procedure at base after, first base is dried, is fired using firing kiln, traditional burning
Kiln processed generally uses firing kiln ontology to add the design of chimney, and in sintering procedure, the heat in chimney is wasted.
Utility model content
The purpose of this utility model is to provide the pottery arts with preheating cavity to process kiln, solves existing pottery art firing kiln cigarette
The problem of chimney waste heat wastes.
In order to solve the above technical problems, the utility model uses following technical scheme:
Pottery art with preheating cavity processes kiln, and including preheating chamber and fire room setting up and down, preheating chamber is located at fire room
Top, and separated by partition;It is communicated with thermally conductive chimney at the top of the fire room, thermally conductive chimney passes through preheating chamber and from preheating
Ceiling portion is pierced by;The preheating chamber and fire room side wall offers outlet, and outlet is provided with closing door.
Fire room adds fuel, the flue gas of generation is discharged from thermally conductive chimney, thermally conductive cigarette for firing pottery in fire room
Chimney passes through preheating chamber, and the waste heat in thermally conductive chimney is used for the preheating of pottery to preheating heating indoor.Pottery in preheating chamber is also not
Dry, partition separates preheating chamber and fire room, therefore flue gas will not enter preheating chamber, will not cause dirt to undried pottery
Dye.
Preferably, the fire room side wall is cylindrical, it is uniformly heated, and centre bottom is opened in fire room
Equipped with fuel bath;Separately be provided with the plate that feeds intake, be connected to fuel bath diagonally downward from the exit of fire room, convenient for launch fuel with
And convenient for clearing up the fuel after burning.
Preferably, being provided with slag notch below the outlet of the fire room, filter is provided in the middle part of the fuel bath
Slag net 0 is separately provided with out slag plate spontaneous combustion hopper bottom angled and is connected to slag notch downwards.Slugging is from filter residue net 0 after fuel combustion
It falls to fuel trench bottom, then slides out to slag notch from slag plate out, when firing is convenient to clean waste fuel.
Preferably, the preheating chamber and fire room side wall includes inner layer wall, outer wall, between inner layer wall and outer wall
Fill sand.Double-layer structure, and between fill sand, play good insulation effect.
Preferably, being horizontally disposed on the preheating chamber and fire room inner sidewall has placement plate.Placement plate is for placing
Pottery increases space utilization rate.
Preferably, being provided with the through-hole of connection placement plate upper and lower surface in the placement plate.Conducive to pottery bottom
Ventilation is heated, is heated evenly.
Compared with prior art, the utility model can at least generate a kind of following beneficial effect:The utility model is not increasing
In the case where adding land occupation, the waste heat of chimney when firing pottery is made full use of to carry out preheating and drying to the pottery not being fired, and
And smoke pollution pottery will not be allowed;The utility model fire room by it is warm uniformly, convenient for launching fuel and convenient for after to burning
Fuel is cleared up;The utility model thermal insulation property is good;The utility model is conducive to pottery bottom convenient for preventing pottery
Ventilation is heated, is heated evenly.
Detailed description of the invention
FIG. 1 is a schematic structural view of the utility model.
Specific embodiment
In order to make the purpose of the utility model, technical solutions and advantages more clearly understood, below in conjunction with attached drawing and implementation
Example, the present invention will be further described in detail.It should be appreciated that specific embodiment described herein is only used to explain
The utility model is not used to limit the utility model.
Fig. 1 shows the structure of such pottery art processing kiln with preheating cavity, enumerates several embodiments below with reference to legend.
Embodiment 1:
Pottery art with preheating cavity processes kiln, and including preheating chamber 1 and fire room 2 setting up and down, preheating chamber 1, which is located at, to be fired
2 top of room, and separated by partition 3;Thermally conductive chimney 4 is communicated at the top of the fire room 2, thermally conductive chimney 4 passes through preheating chamber 1
And it is pierced by the top of preheating chamber 1;The preheating chamber 1 and 2 side wall of fire room offers outlet 5, and outlet 5 is provided with closing door
6。
Fire room 2 adds fuel, the flue gas of generation is discharged from thermally conductive chimney 4, leads for firing pottery in fire room 2
Hot chimney 4 passes through preheating chamber 1, and the waste heat in thermally conductive chimney 4 is used for the preheating of pottery to heating in preheating chamber 1.In preheating chamber 1
Pottery is also unseasoned, and partition 3 separates preheating chamber 1 and fire room 2, therefore flue gas will not enter preheating chamber 1, will not be to unseasoned
Pottery pollute.
Embodiment 2:
Pottery art with preheating cavity processes kiln, and including preheating chamber 1 and fire room 2 setting up and down, preheating chamber 1, which is located at, to be fired
2 top of room, and separated by partition 3;Thermally conductive chimney 4 is communicated at the top of the fire room 2, thermally conductive chimney 4 passes through preheating chamber 1
And it is pierced by the top of preheating chamber 1;The preheating chamber 1 and 2 side wall of fire room offers outlet 5, and outlet 5 is provided with closing door
6.2 side wall of fire room is cylindrical, is uniformly heated, and centre bottom offers fuel bath 7 in fire room 2;
It separately is provided with the plate 8 that feeds intake, is connected to fuel bath 7 diagonally downward from the outlet of fire room 25, convenient for launching fuel and being convenient for
Fuel after burning is cleared up.
Fire room 2 adds fuel, the flue gas of generation is discharged from thermally conductive chimney 4, leads for firing pottery in fire room 2
Hot chimney 4 passes through preheating chamber 1, and the waste heat in thermally conductive chimney 4 is used for the preheating of pottery to heating in preheating chamber 1.In preheating chamber 1
Pottery is also unseasoned, and partition 3 separates preheating chamber 1 and fire room 2, therefore flue gas will not enter preheating chamber 1, will not be to unseasoned
Pottery pollute.
Embodiment 3:
Pottery art with preheating cavity processes kiln, and including preheating chamber 1 and fire room 2 setting up and down, preheating chamber 1, which is located at, to be fired
2 top of room, and separated by partition 3;Thermally conductive chimney 4 is communicated at the top of the fire room 2, thermally conductive chimney 4 passes through preheating chamber 1
And it is pierced by the top of preheating chamber 1;The preheating chamber 1 and 2 side wall of fire room offers outlet 5, and outlet 5 is provided with closing door
6.2 side wall of fire room is cylindrical, is uniformly heated, and centre bottom offers fuel bath 7 in fire room 2;
It separately is provided with the plate 8 that feeds intake, is connected to fuel bath 7 diagonally downward from the outlet of fire room 25, convenient for launching fuel and being convenient for
Fuel after burning is cleared up.It is provided with slag notch 9 below the outlet 5 of fire room 2, is arranged in the middle part of the fuel bath 7
There is filter residue net 10, is separately provided with out slag plate 11 from 7 bottom angled of fuel bath and is connected to slag notch 9 downwards.Slugging after fuel combustion
7 bottom of fuel bath is fallen to from filter residue net 10, then slides out to slag notch 9 from slag plate 11 out, and when firing is convenient to clean waste fuel.
Fire room 2 adds fuel, the flue gas of generation is discharged from thermally conductive chimney 4, leads for firing pottery in fire room 2
Hot chimney 4 passes through preheating chamber 1, and the waste heat in thermally conductive chimney 4 is used for the preheating of pottery to heating in preheating chamber 1.In preheating chamber 1
Pottery is also unseasoned, and partition 3 separates preheating chamber 1 and fire room 2, therefore flue gas will not enter preheating chamber 1, will not be to unseasoned
Pottery pollute.
Embodiment 4:
Pottery art with preheating cavity processes kiln, including preheating chamber 1 and fire room 2 setting up and down, preheating chamber 1 and fire room
2 side walls include inner layer wall 12, outer wall 13, fill sand between inner layer wall 12 and outer wall 13.Double-layer structure, and between fill out
Sand is filled, good insulation effect is played.Preheating chamber 1 is located at 2 top of fire room, and is separated by partition 3;The fire room
2 tops are communicated with thermally conductive chimney 4, and thermally conductive chimney 4 passes through preheating chamber 1 and is pierced by the top of preheating chamber 1;The preheating chamber 1 and
2 side wall of fire room offers outlet 5, and outlet 5 is provided with closing door 6.2 side wall of fire room is cylindrical, is heated more
Add uniformly, and centre bottom offers fuel bath 7 in fire room 2;It separately is provided with the plate 8 that feeds intake, from the outlet of fire room 25
It is connected to fuel bath 7 diagonally downward, convenient for launching fuel and convenient for clearing up the fuel after burning.Fire room 2 goes out
5 lower section of mouth is provided with slag notch 9, is provided with filter residue net 10 in the middle part of the fuel bath 7, is separately provided with out slag plate 11 from fuel bath
7 bottom angleds are connected to downwards slag notch 9.Slugging falls to 7 bottom of fuel bath from filter residue net 10 after fuel combustion, then from slagging tap
Plate 11 slides out to slag notch 9, and when firing is convenient to clean waste fuel.
Fire room 2 adds fuel, the flue gas of generation is discharged from thermally conductive chimney 4, leads for firing pottery in fire room 2
Hot chimney 4 passes through preheating chamber 1, and the waste heat in thermally conductive chimney 4 is used for the preheating of pottery to heating in preheating chamber 1.In preheating chamber 1
Pottery is also unseasoned, and partition 3 separates preheating chamber 1 and fire room 2, therefore flue gas will not enter preheating chamber 1, will not be to unseasoned
Pottery pollute.
Embodiment 5:
Pottery art with preheating cavity processes kiln, including preheating chamber 1 and fire room 2 setting up and down, preheating chamber 1 and fire room
2 side walls include inner layer wall 12, outer wall 13, fill sand between inner layer wall 12 and outer wall 13.Double-layer structure, and between fill out
Sand is filled, good insulation effect is played.Preheating chamber 1 is located at 2 top of fire room, and is separated by partition 3;The fire room
2 tops are communicated with thermally conductive chimney 4, and thermally conductive chimney 4 passes through preheating chamber 1 and is pierced by the top of preheating chamber 1;The preheating chamber 1 and
2 side wall of fire room offers outlet 5, and outlet 5 is provided with closing door 6.It is horizontally disposed on 2 inner sidewall of preheating chamber 1 and fire room
There is placement plate 14.Placement plate 14 increases space utilization rate for placing pottery.2 side wall of fire room is cylindrical, is heated
It is more uniform, and centre bottom offers fuel bath 7 in fire room 2;It separately is provided with the plate 8 that feeds intake, from the outlet of fire room 25
Place is connected to fuel bath 7 diagonally downward, convenient for launching fuel and convenient for clearing up the fuel after burning.Fire room 2
5 lower section of outlet is provided with slag notch 9, is provided with filter residue net 10 in the middle part of the fuel bath 7, is separately provided with out slag plate 11 from fuel
7 bottom angled of slot is connected to downwards slag notch 9.Slugging falls to 7 bottom of fuel bath from filter residue net 10 after fuel combustion, then from out
Slag plate 11 slides out to slag notch 9, and when firing is convenient to clean waste fuel.
Fire room 2 adds fuel, the flue gas of generation is discharged from thermally conductive chimney 4, leads for firing pottery in fire room 2
Hot chimney 4 passes through preheating chamber 1, and the waste heat in thermally conductive chimney 4 is used for the preheating of pottery to heating in preheating chamber 1.In preheating chamber 1
Pottery is also unseasoned, and partition 3 separates preheating chamber 1 and fire room 2, therefore flue gas will not enter preheating chamber 1, will not be to unseasoned
Pottery pollute.
Optimum embodiment:
Pottery art with preheating cavity processes kiln, including preheating chamber 1 and fire room 2 setting up and down, preheating chamber 1 and fire room
2 side walls include inner layer wall 12, outer wall 13, fill sand between inner layer wall 12 and outer wall 13.Double-layer structure, and between fill out
Sand is filled, good insulation effect is played.Preheating chamber 1 is located at 2 top of fire room, and is separated by partition 3;The fire room
2 tops are communicated with thermally conductive chimney 4, and thermally conductive chimney 4 passes through preheating chamber 1 and is pierced by the top of preheating chamber 1;The preheating chamber 1 and
2 side wall of fire room offers outlet 5, and outlet 5 is provided with closing door 6.It is horizontally disposed on 2 inner sidewall of preheating chamber 1 and fire room
There is placement plate 14.Placement plate 14 increases space utilization rate for placing pottery.It is provided in placement plate 14 in connection placement plate 14
The through-hole of lower surface.It is heated conducive to the ventilation of pottery bottom, it is heated evenly.2 side wall of fire room is cylindrical, is heated more
Add uniformly, and centre bottom offers fuel bath 7 in fire room 2;It separately is provided with the plate 8 that feeds intake, from the outlet of fire room 25
It is connected to fuel bath 7 diagonally downward, convenient for launching fuel and convenient for clearing up the fuel after burning.Fire room 2 goes out
5 lower section of mouth is provided with slag notch 9, is provided with filter residue net 10 in the middle part of the fuel bath 7, is separately provided with out slag plate 11 from fuel bath
7 bottom angleds are connected to downwards slag notch 9.Slugging falls to 7 bottom of fuel bath from filter residue net 10 after fuel combustion, then from slagging tap
Plate 11 slides out to slag notch 9, and when firing is convenient to clean waste fuel.
Fire room 2 adds fuel, the flue gas of generation is discharged from thermally conductive chimney 4, leads for firing pottery in fire room 2
Hot chimney 4 passes through preheating chamber 1, and the waste heat in thermally conductive chimney 4 is used for the preheating of pottery to heating in preheating chamber 1.In preheating chamber 1
Pottery is also unseasoned, and partition 3 separates preheating chamber 1 and fire room 2, therefore flue gas will not enter preheating chamber 1, will not be to unseasoned
Pottery pollute.
Multiple explanatory embodiments spoken of in the present specification refer to the specific structure packet for combining embodiment description
It includes at least one embodiment of the application generality description.It is not certain that statement of the same race, which occur, in multiple places in the description
Refer to the same embodiment.Furthermore, it is understood that is advocated is to combine when describing a structure in conjunction with any one embodiment
Other embodiments realize that this structure is fallen in the scope of the utility model.
Claims (6)
1. the pottery art with preheating cavity processes kiln, it is characterised in that:Including preheating chamber setting up and down(1)And fire room(2), in advance
Hot cell(1)Positioned at fire room(2)Top, and pass through partition(3)Partition;The fire room(2)Top is communicated with thermally conductive chimney
(4), thermally conductive chimney(4)Across preheating chamber(1)And from preheating chamber(1)Top is pierced by;The preheating chamber(1)And fire room(2)
Side wall offers outlet(5), outlet(5)It is provided with closing door(6).
2. the pottery art according to claim 1 with preheating cavity processes kiln, it is characterised in that:The fire room(2)Side
Wall is cylindrical, and in fire room(2)Interior centre bottom offers fuel bath(7);Separately it is provided with the plate that feeds intake(8), from fire room
(2)Outlet(5)Place is connected to fuel bath diagonally downward(7).
3. the pottery art according to claim 2 with preheating cavity processes kiln, it is characterised in that:The fire room(2)'s
Outlet(5)Lower section is provided with slag notch(9), the fuel bath(7)Middle part is provided with filter residue net(10), separately it is provided with out slag plate
(11)From fuel bath(7)Bottom angled is connected to downwards slag notch(9).
4. the pottery art according to claim 1 with preheating cavity processes kiln, it is characterised in that:The preheating chamber(1)And
Fire room(2)Side wall includes inner layer wall(12), outer wall(13), inner layer wall(12)With outer wall(13)Between fill sand.
5. the pottery art according to claim 1 with preheating cavity processes kiln, it is characterised in that:The preheating chamber(1)And
Fire room(2)Being horizontally disposed on inner sidewall has placement plate(14).
6. the pottery art according to claim 5 with preheating cavity processes kiln, it is characterised in that:The placement plate(14)On
It is provided with connection placement plate(14)The through-hole of upper and lower surface.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820438700.2U CN208108807U (en) | 2018-03-29 | 2018-03-29 | Pottery art with preheating cavity processes kiln |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820438700.2U CN208108807U (en) | 2018-03-29 | 2018-03-29 | Pottery art with preheating cavity processes kiln |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208108807U true CN208108807U (en) | 2018-11-16 |
Family
ID=64122020
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820438700.2U Expired - Fee Related CN208108807U (en) | 2018-03-29 | 2018-03-29 | Pottery art with preheating cavity processes kiln |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208108807U (en) |
-
2018
- 2018-03-29 CN CN201820438700.2U patent/CN208108807U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US4559882A (en) | Biomass-fueled furnace | |
JP4206440B2 (en) | Solid biomass fuel combustion system | |
CN209568063U (en) | A kind of energy saving and environment friendly bamboo charcoal burning equipment | |
CN102266114B (en) | Airflow descending dense curing barn having brick-concrete structure | |
CN108204582A (en) | A kind of environmental protection heat exchange power economized boiler | |
CN204806454U (en) | Clean burning stove of many fuel cooking heating type | |
CN208108807U (en) | Pottery art with preheating cavity processes kiln | |
US7025589B2 (en) | Wood burning oven | |
CN205228024U (en) | Drying system of adobe | |
CN208952073U (en) | Three layers of combustion chamber boiler of biomass pluralities of fuel | |
CN201724256U (en) | Environment-friendly biomass energy particle burning furnace with easy discharging of fuel black dirt | |
CN208026093U (en) | Environmentally friendly waste heat recovery pottery art processes kiln | |
CN106642074A (en) | Pellet combustion device | |
CN208108806U (en) | Temperature control preheats firing kiln | |
CN210663894U (en) | Quick sintering equipment of magnesia-calcium brick | |
CN205535967U (en) | Biomass burning device | |
CN205316334U (en) | Waste gasification heat accumulation burner | |
CN107191940A (en) | A kind of domestic garbage incineration equipment | |
RU109270U1 (en) | BATTERY FURNACE WITH A GAS-GENERATOR NOZZLE AND STEAM BATH FOR IT | |
CN203785006U (en) | Underground flue heating oven | |
CN207793160U (en) | A kind of charcoal smokeless production system | |
CN106705061A (en) | Auxiliary-heating garbage high-efficiency treatment system | |
RU2445550C1 (en) | Heating device | |
CN206656551U (en) | A kind of mosquito-repellent incense drying device | |
CN206803181U (en) | A kind of garbage burning system of gas, solid efficient circulation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181116 Termination date: 20200329 |
|