CN208105811U - A kind of construction and installation scaffold - Google Patents
A kind of construction and installation scaffold Download PDFInfo
- Publication number
- CN208105811U CN208105811U CN201820222103.6U CN201820222103U CN208105811U CN 208105811 U CN208105811 U CN 208105811U CN 201820222103 U CN201820222103 U CN 201820222103U CN 208105811 U CN208105811 U CN 208105811U
- Authority
- CN
- China
- Prior art keywords
- bar
- cross bar
- upright
- upright bar
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Ladders (AREA)
Abstract
The utility model discloses a kind of construction and installation scaffolds,Including upright bar,Cushion block of stopping over is provided with below the upright bar,And upright bar is provided with three rows,There are three the settings of upright bar described in every row,And three upright bars equidistantly arrange,Positive cross bar is mounted on the side wall of upright bar described in every row,Side cross bar is provided with at the perpendicular position of positive cross bar on the side wall of upright bar described in left column,Side cross bar is also equipped with at the perpendicular position of positive cross bar on the side wall of upright bar described in right column,Support is provided at the bottom plate of the construction and installation scaffold to cut,It is kept fixed in slot between being cut on insertion cross bar by support,It can reduce the hollow area at bottom plate,Plank is spread also to be conducive to walk,It is unlikely to make a misstep,Make worker as though walking upon flat ground,Substantially increase the efficiency of construction,And the deckle board with metallic airbag net is installed on cross bar,Protective is good,Safety net will not be dropped object and cut,And facilitate arrangement and preservation,It is used for next engineering.
Description
Technical field
The utility model belongs to Architectural Equipment technical field, and in particular to a kind of construction and installation scaffold.
Background technique
Scaffold is a kind of to guarantee each work progress is gone on smoothly and is set up workbench, and the classification of scaffold has
Very much, building scaffold and decoration scaffold are divided into according to function, but current building scaffold still has a little shortcoming.
For current building scaffold due to mutually being fixed by vertical bar at bottom plate, hollow area is larger, although paving above
If plank facilitates walking, but plank, with trampling for a long time and exposing to the weather, it is big that plank becomes toughness, and people is in plank row
It is easily made a misstep when walking, influences constructing operation;And the plastic safety net that will be installed green close to extraneous region of scaffold, it places
High vacancy has object to fall, but is easy to be cut, and is easy to fall ash, and it is more difficult that engineering terminates recycling;It is installed using connector
When cross bar, often cross bar is easy installation inclination, causes the power of the receiving of connector larger, is easy to lose service life, etc. and ask
Topic need us and solves.
Utility model content
It is mentioned above in the background art to solve the purpose of this utility model is to provide a kind of construction and installation scaffold
For current building scaffold due to mutually being fixed by vertical bar at bottom plate, hollow area is larger, although being laid with plank above
Facilitate walking, but plank, with trampling for a long time and exposing to the weather, it is big that plank becomes toughness, and people easily steps on when plank is walked
Sky influences constructing operation;And the plastic safety net that will be installed green close to extraneous region of scaffold, placing high vacancy has
Object is fallen, but is easy to be cut, and is easy to fall ash, and it is more difficult that engineering terminates recycling;When utilization connector installs cross bar
It waits, often cross bar is easy installation inclination, causes the power of the receiving of connector larger, is easy the problem of losing the service life.
To achieve the above object, the utility model provides the following technical solutions:A kind of construction and installation scaffold, including it is vertical
Bar is provided with cushion block of stopping over below the upright bar, and upright bar is provided with three rows, and there are three the settings of upright bar described in every row, and three
A upright bar equidistantly arranges, and positive cross bar is mounted on the side wall of upright bar described in every row, and upright bar passes through connector and positive cross bar
Be fixedly connected, on the side wall of upright bar described in left column be provided with side cross bar at the perpendicular position of positive cross bar, stood described in right column
Side cross bar is also equipped with at the perpendicular position of positive cross bar on the side wall of bar.
Preferably, it is provided with the first restriction ring and second on the side wall of the upright bar and limits ring.
Preferably, the gap location of two positive cross bar horizontal positions is provided with support and cuts, and the support is cut is cut by first
Bar and second cuts bar composition, and described first cuts bar is cut bar with second and be fixedly connected by tension spring, and the positive cross bar is respectively with first
Cut bar and second cut bar end offer a slot.
Preferably, the gap location of two positive cross bar vertical positions is provided with deckle board, and the deckle board is internally provided with
Safety net.
Preferably, the two sides up and down of the deckle board are provided with fixed ring, and the rear of the fixed ring is provided with swivel becket,
Mounting blocks are provided at the back of the deckle board and the end opposite position of swivel becket, the swivel becket passes through bolt and installation
Block is fixedly connected.
Compared with prior art, the utility model has the beneficial effects that:It is provided at the bottom plate of the construction and installation scaffold
Support is cut, and is kept fixed in slot between being cut on insertion cross bar by support, be can reduce the hollow area at bottom plate, spread plank
Also it is conducive to walking, is unlikely to make a misstep, makes worker as though walking upon flat ground, substantially increase the efficiency of construction, and be equipped with and have on cross bar
The deckle board of metallic airbag net, protective is good, and safety net will not be dropped object and cut, and facilitate arrangement and preservation, for next work
Journey uses;Can all there be restriction ring with cross bar junction in upright bar, find link position when facilitating installation, avoid the cross bar of installation inclined
It moves, so that connector discontinuity, and one end stress is larger, is easy to lose the service life, while dismantling also relatively elaborate.
Detailed description of the invention
Fig. 1 is the utility model main view;
Fig. 2 is the top view of the utility model;
Fig. 3 is the positive bar structure schematic diagram of the utility model;
Fig. 4 is the upright bar structural schematic diagram of the utility model;
Fig. 5 is the deckle board right view of the utility model.
In figure:Stop over cushion block, 6- second of 1- upright bar, the positive cross bar of 2-, 3- connector, the side 4- cross bar, 5- limits ring, 7- first
Limit ring, 8- deckle board, 9- safety net, 10- fixed ring, 11- first cut bar, 12- second cuts bar, 13- support is cut, 14- tension spring,
Slot, 16- swivel becket, 17- mounting blocks between 15-.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
Fig. 1-5 is please referred to, the utility model provides a kind of technical solution:A kind of construction and installation scaffold, including upright bar 1,
The lower section of upright bar 1 is provided with cushion block 5 of stopping over, and upright bar 1 is provided with three rows, and there are three every settings of row's upright bar 1, and three upright bars 1
It is equidistant to arrange, positive cross bar 2 is mounted on the side wall of every row's upright bar 1, and upright bar 1 connects by the way that connector 3 and positive cross bar 2 are fixed
Connect, on the side wall of left column upright bar 1 be provided with side cross bar 4 at the perpendicular position of positive cross bar 2, on the side wall of right column upright bar 1
Side cross bar 4 is also equipped with at the perpendicular position of positive cross bar 2.
In the present embodiment, it is preferred that be provided with the first restriction ring 7 and second on the side wall of upright bar 1 and limit ring 6, limit ring
Presence conveniently find the position of installation, facilitate installation, installation avoided to deviate, so that the positive cross bar 2 that connector 3 is born
Gravity is larger, is easy to lose the service life.
In the present embodiment, it is preferred that the gap location of two 2 horizontal positions of positive cross bar is provided with support and cuts 13, and support cuts 13
It cuts bar 11 and second by first to cut bar 12 and form, first, which cuts bar 11, cuts bar 12 with second by tension spring 14 and be fixedly connected, positive cross bar 2
Cut respectively with first bar 12 and second cut bar 12 end offer a slot 15, due to can be laid on the bottom of scaffold plank use
In walking, but most of planks are with trampling and exposing to the weather for a long time, and plank becomes that toughness is big, and both ends start volume and stick up, and
People plank walk when easily make a misstep, influence constructing operation and support the presence for cutting 13 increase worker safety and operation it is steady
Qualitative, the worker that is more suitable is moving above.
In the present embodiment, it is preferred that the gap location of two 2 vertical positions of positive cross bar is provided with deckle board 8, the inside of deckle board 8
It is provided with safety net 9, the safety net 9 on deckle board 8 is metal material, compared to the protective net of the plastic material of green color, in quilt
Stone and fall object it is hit when, will not be cut, substantially increase the safety of protection.
In the present embodiment, it is preferred that the two sides up and down of deckle board 8 are provided with fixed ring 10, the rear setting of fixed ring 10
There is swivel becket 16, is provided with mounting blocks 17 at the back of deckle board 8 and the end opposite position of swivel becket 16, swivel becket 16 passes through
Bolt is fixedly connected with mounting blocks 17, and the deckle board 8 is convenient for disassembly and assembly, need to only be unloaded bolt, that is, it is very fast to can be taken off deckle board 8
Victory, the plastic protection net compared to green are easier to arrange and save after use, use for next time.
Working principle:When the utility model is used, user inserts the bottom of upright bar 1 first when installing scaffold
Enter to fixed on cushion block 5 of stopping over, is ready for the horizontal equidistant arrangement of three upright bars 1, then first in upright bar 1 limits ring
Upright bar 1 and positive cross bar 2 are connected and fixed using connector 3 at position on 7, then at the position on the second restriction ring 6 again
The secondary positive cross bar 2 of installation, and continue to install until being equipped with three groups of upright bars 1 side by side, installation is conveniently found in the presence for limiting ring
Position facilitates installation, and installation is avoided to deviate, so that the gravity for the positive cross bar 2 that connector 3 is born is larger, is easy to lose the longevity
Then life is equipped with side cross bar 4 in the upright bar of left end 1, and makes side cross bar 4 and the fixed company of upright bar 1 using connector 3
It connects, side cross bar 4 and positive cross bar 2 are vertical relation at this time, then further take out support and cut 13, firmly strut first and cut bar 12 and second
Bar 12 is cut, so that tension spring 14 is in open configuration, the longitudinal separation that support cuts 13 at this time is equipped with apparent contracting compared to raw bits
It is short, while distance is less than the distance of the positive cross bar 2 in front and back of horizontal position, then cuts bar 12 and second first and cuts the end of bar 12
It is put between two positive cross bars 2 at 15 opposite position of gap location and slot, unclamps again hand, tension spring 14 is shunk at this time, and first cuts
Bar 12 and second cut bar 12 end resist a slot 15 edge be fixed extremely, due to can be laid on the bottom of scaffold plank use
In walking, but most of planks are with trampling and exposing to the weather for a long time, and plank becomes that toughness is big, and both ends start volume and stick up, and
People plank walk when easily make a misstep, influence constructing operation and support the presence for cutting 13 increase worker safety and operation it is steady
Qualitative, the worker that is more suitable is moving above, and then installs deckle board 8, and handle in the gap location of two positive cross bars 2 of vertical direction
The fixed ring 10 of about 8 two sides of deckle board is stuck on positive cross bar 2, and then turn swivel becket 16 utilizes spiral shell until enclosing positive cross bar 2
Bolt makes swivel becket 16 and the mounting blocks 17 at 8 rear of deckle board fixed, so that deckle board 8 is capable of fixing on positive cross bar 2, due to deckle board
The safety net 9 of metal material is provided on 8, compared to the plastic material of green color, then by stone and fall object it is hit when, will not
It is cut, substantially increases the safety of protection, and engineering terminates also to facilitate arrangement and preservation, used for next time, it is entire to work
Process terminates.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art,
It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired
Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.
Claims (5)
1. a kind of construction and installation scaffold, including upright bar (1), it is characterised in that:Pad of stopping over is provided with below the upright bar (1)
Block (5), and upright bar (1) is provided with three rows, there are three upright bar described in every row (1) settings, and three upright bars (1) equidistantly arrange,
It is mounted on the side wall of upright bar described in every row (1) positive cross bar (2), and upright bar (1) is solid by connector (3) and positive cross bar (2)
Fixed connection, on the side wall of upright bar (1) described in left column be provided with side cross bar (4), right column at positive cross bar (2) perpendicular position
Side cross bar (4) are also equipped with at positive cross bar (2) perpendicular position on the side wall of the upright bar (1).
2. a kind of construction and installation scaffold according to claim 1, it is characterised in that:It is set on the side wall of the upright bar (1)
It is equipped with the first restriction ring (7) and second and limits ring (6).
3. a kind of construction and installation scaffold according to claim 1, it is characterised in that:Two positive cross bars (2) are horizontal
The gap location of position is provided with support and cuts (13), and the support, which cuts (13) and cuts bar (11) and second by first, cuts bar (12) and form,
Described first cuts bar (11) is cut bar (12) with second and is fixedly connected by tension spring (14), and the positive cross bar (2) is cut with first respectively
Bar (11) and second cut bar (12) end offer a slot (15).
4. a kind of construction and installation scaffold according to claim 1, it is characterised in that:Two positive cross bars (2) are vertical
The gap location of position is provided with deckle board (8), and the deckle board (8) is internally provided with safety net (9).
5. a kind of construction and installation scaffold according to claim 4, it is characterised in that:The two sides up and down of the deckle board (8)
Be provided with fixed ring (10), the rear of the fixed ring (10) is provided with swivel becket (16), the back of the deckle board (8) with turn
It is provided at the end opposite position of rotating ring (16) mounting blocks (17), the swivel becket (16) passes through bolt and mounting blocks (17)
It is fixedly connected.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820222103.6U CN208105811U (en) | 2018-02-07 | 2018-02-07 | A kind of construction and installation scaffold |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820222103.6U CN208105811U (en) | 2018-02-07 | 2018-02-07 | A kind of construction and installation scaffold |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208105811U true CN208105811U (en) | 2018-11-16 |
Family
ID=64124516
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820222103.6U Active CN208105811U (en) | 2018-02-07 | 2018-02-07 | A kind of construction and installation scaffold |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208105811U (en) |
-
2018
- 2018-02-07 CN CN201820222103.6U patent/CN208105811U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201129027Y (en) | Scaffold widening two-linkage hinge turning plate guardrail | |
CN208105811U (en) | A kind of construction and installation scaffold | |
CN212926995U (en) | Scaffold with prevent tilting mechanism | |
CN212247882U (en) | Protection machine for road and bridge site operation | |
CN211114956U (en) | Anti-seismic stability-increasing reinforcing structure for concrete stairs | |
CN208310302U (en) | A kind of new reinforcing steel bar processing protection canopy | |
CN214739838U (en) | Dish knot formula scaffold frame based on BIM | |
CN201620593U (en) | Spring-board frame for building construction | |
CN214994580U (en) | Assembled steel construction building | |
CN211949696U (en) | Protection device for assembly type building construction | |
CN211647949U (en) | Portable high-altitude extension ladder for rebounding | |
CN210947630U (en) | Scaffold with hard isolation structure for construction of exterior wall dry-hanging marble | |
CN211037748U (en) | Novel construction scaffold without fastener | |
CN207332386U (en) | One kind is easy to clean steel-structure factory building | |
CN206971143U (en) | A kind of easy-to-mount municipal administration decoration guardrail | |
CN213806482U (en) | Combined scaffold for construction site | |
CN213927558U (en) | A assembled platform of unloading safely for construction | |
CN217232618U (en) | Building engineering building climbing frame | |
CN214498374U (en) | Support arrangement for climb die carrier and wall body | |
CN220451382U (en) | Building engineering is with climbing frame | |
CN220319258U (en) | Building engineering security fence | |
CN219414139U (en) | Building support with reinforced structure | |
CN207436463U (en) | A kind of architectural engineering portable type scaffold for being easily installed dismounting | |
CN215055470U (en) | GIS dustless dustproof shed erection device | |
CN214697227U (en) | But quick assembly disassembly's railing |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |