CN208105811U - A kind of construction and installation scaffold - Google Patents

A kind of construction and installation scaffold Download PDF

Info

Publication number
CN208105811U
CN208105811U CN201820222103.6U CN201820222103U CN208105811U CN 208105811 U CN208105811 U CN 208105811U CN 201820222103 U CN201820222103 U CN 201820222103U CN 208105811 U CN208105811 U CN 208105811U
Authority
CN
China
Prior art keywords
bar
cross bar
upright
upright bar
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820222103.6U
Other languages
Chinese (zh)
Inventor
庄兴
周育军
邱秉达
陈守辉
孙旭敏
朱哲锋
石穗嘉
郑汝飞
龙思丰
独慧琴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGDONG NO 1 CONSTRUCTION ENGINEERING Co Ltd
Original Assignee
GUANGDONG NO 1 CONSTRUCTION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGDONG NO 1 CONSTRUCTION ENGINEERING Co Ltd filed Critical GUANGDONG NO 1 CONSTRUCTION ENGINEERING Co Ltd
Priority to CN201820222103.6U priority Critical patent/CN208105811U/en
Application granted granted Critical
Publication of CN208105811U publication Critical patent/CN208105811U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Ladders (AREA)

Abstract

The utility model discloses a kind of construction and installation scaffolds,Including upright bar,Cushion block of stopping over is provided with below the upright bar,And upright bar is provided with three rows,There are three the settings of upright bar described in every row,And three upright bars equidistantly arrange,Positive cross bar is mounted on the side wall of upright bar described in every row,Side cross bar is provided with at the perpendicular position of positive cross bar on the side wall of upright bar described in left column,Side cross bar is also equipped with at the perpendicular position of positive cross bar on the side wall of upright bar described in right column,Support is provided at the bottom plate of the construction and installation scaffold to cut,It is kept fixed in slot between being cut on insertion cross bar by support,It can reduce the hollow area at bottom plate,Plank is spread also to be conducive to walk,It is unlikely to make a misstep,Make worker as though walking upon flat ground,Substantially increase the efficiency of construction,And the deckle board with metallic airbag net is installed on cross bar,Protective is good,Safety net will not be dropped object and cut,And facilitate arrangement and preservation,It is used for next engineering.

Description

A kind of construction and installation scaffold
Technical field
The utility model belongs to Architectural Equipment technical field, and in particular to a kind of construction and installation scaffold.
Background technique
Scaffold is a kind of to guarantee each work progress is gone on smoothly and is set up workbench, and the classification of scaffold has Very much, building scaffold and decoration scaffold are divided into according to function, but current building scaffold still has a little shortcoming.
For current building scaffold due to mutually being fixed by vertical bar at bottom plate, hollow area is larger, although paving above If plank facilitates walking, but plank, with trampling for a long time and exposing to the weather, it is big that plank becomes toughness, and people is in plank row It is easily made a misstep when walking, influences constructing operation;And the plastic safety net that will be installed green close to extraneous region of scaffold, it places High vacancy has object to fall, but is easy to be cut, and is easy to fall ash, and it is more difficult that engineering terminates recycling;It is installed using connector When cross bar, often cross bar is easy installation inclination, causes the power of the receiving of connector larger, is easy to lose service life, etc. and ask Topic need us and solves.
Utility model content
It is mentioned above in the background art to solve the purpose of this utility model is to provide a kind of construction and installation scaffold For current building scaffold due to mutually being fixed by vertical bar at bottom plate, hollow area is larger, although being laid with plank above Facilitate walking, but plank, with trampling for a long time and exposing to the weather, it is big that plank becomes toughness, and people easily steps on when plank is walked Sky influences constructing operation;And the plastic safety net that will be installed green close to extraneous region of scaffold, placing high vacancy has Object is fallen, but is easy to be cut, and is easy to fall ash, and it is more difficult that engineering terminates recycling;When utilization connector installs cross bar It waits, often cross bar is easy installation inclination, causes the power of the receiving of connector larger, is easy the problem of losing the service life.
To achieve the above object, the utility model provides the following technical solutions:A kind of construction and installation scaffold, including it is vertical Bar is provided with cushion block of stopping over below the upright bar, and upright bar is provided with three rows, and there are three the settings of upright bar described in every row, and three A upright bar equidistantly arranges, and positive cross bar is mounted on the side wall of upright bar described in every row, and upright bar passes through connector and positive cross bar Be fixedly connected, on the side wall of upright bar described in left column be provided with side cross bar at the perpendicular position of positive cross bar, stood described in right column Side cross bar is also equipped with at the perpendicular position of positive cross bar on the side wall of bar.
Preferably, it is provided with the first restriction ring and second on the side wall of the upright bar and limits ring.
Preferably, the gap location of two positive cross bar horizontal positions is provided with support and cuts, and the support is cut is cut by first Bar and second cuts bar composition, and described first cuts bar is cut bar with second and be fixedly connected by tension spring, and the positive cross bar is respectively with first Cut bar and second cut bar end offer a slot.
Preferably, the gap location of two positive cross bar vertical positions is provided with deckle board, and the deckle board is internally provided with Safety net.
Preferably, the two sides up and down of the deckle board are provided with fixed ring, and the rear of the fixed ring is provided with swivel becket, Mounting blocks are provided at the back of the deckle board and the end opposite position of swivel becket, the swivel becket passes through bolt and installation Block is fixedly connected.
Compared with prior art, the utility model has the beneficial effects that:It is provided at the bottom plate of the construction and installation scaffold Support is cut, and is kept fixed in slot between being cut on insertion cross bar by support, be can reduce the hollow area at bottom plate, spread plank Also it is conducive to walking, is unlikely to make a misstep, makes worker as though walking upon flat ground, substantially increase the efficiency of construction, and be equipped with and have on cross bar The deckle board of metallic airbag net, protective is good, and safety net will not be dropped object and cut, and facilitate arrangement and preservation, for next work Journey uses;Can all there be restriction ring with cross bar junction in upright bar, find link position when facilitating installation, avoid the cross bar of installation inclined It moves, so that connector discontinuity, and one end stress is larger, is easy to lose the service life, while dismantling also relatively elaborate.
Detailed description of the invention
Fig. 1 is the utility model main view;
Fig. 2 is the top view of the utility model;
Fig. 3 is the positive bar structure schematic diagram of the utility model;
Fig. 4 is the upright bar structural schematic diagram of the utility model;
Fig. 5 is the deckle board right view of the utility model.
In figure:Stop over cushion block, 6- second of 1- upright bar, the positive cross bar of 2-, 3- connector, the side 4- cross bar, 5- limits ring, 7- first Limit ring, 8- deckle board, 9- safety net, 10- fixed ring, 11- first cut bar, 12- second cuts bar, 13- support is cut, 14- tension spring, Slot, 16- swivel becket, 17- mounting blocks between 15-.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
Fig. 1-5 is please referred to, the utility model provides a kind of technical solution:A kind of construction and installation scaffold, including upright bar 1, The lower section of upright bar 1 is provided with cushion block 5 of stopping over, and upright bar 1 is provided with three rows, and there are three every settings of row's upright bar 1, and three upright bars 1 It is equidistant to arrange, positive cross bar 2 is mounted on the side wall of every row's upright bar 1, and upright bar 1 connects by the way that connector 3 and positive cross bar 2 are fixed Connect, on the side wall of left column upright bar 1 be provided with side cross bar 4 at the perpendicular position of positive cross bar 2, on the side wall of right column upright bar 1 Side cross bar 4 is also equipped with at the perpendicular position of positive cross bar 2.
In the present embodiment, it is preferred that be provided with the first restriction ring 7 and second on the side wall of upright bar 1 and limit ring 6, limit ring Presence conveniently find the position of installation, facilitate installation, installation avoided to deviate, so that the positive cross bar 2 that connector 3 is born Gravity is larger, is easy to lose the service life.
In the present embodiment, it is preferred that the gap location of two 2 horizontal positions of positive cross bar is provided with support and cuts 13, and support cuts 13 It cuts bar 11 and second by first to cut bar 12 and form, first, which cuts bar 11, cuts bar 12 with second by tension spring 14 and be fixedly connected, positive cross bar 2 Cut respectively with first bar 12 and second cut bar 12 end offer a slot 15, due to can be laid on the bottom of scaffold plank use In walking, but most of planks are with trampling and exposing to the weather for a long time, and plank becomes that toughness is big, and both ends start volume and stick up, and People plank walk when easily make a misstep, influence constructing operation and support the presence for cutting 13 increase worker safety and operation it is steady Qualitative, the worker that is more suitable is moving above.
In the present embodiment, it is preferred that the gap location of two 2 vertical positions of positive cross bar is provided with deckle board 8, the inside of deckle board 8 It is provided with safety net 9, the safety net 9 on deckle board 8 is metal material, compared to the protective net of the plastic material of green color, in quilt Stone and fall object it is hit when, will not be cut, substantially increase the safety of protection.
In the present embodiment, it is preferred that the two sides up and down of deckle board 8 are provided with fixed ring 10, the rear setting of fixed ring 10 There is swivel becket 16, is provided with mounting blocks 17 at the back of deckle board 8 and the end opposite position of swivel becket 16, swivel becket 16 passes through Bolt is fixedly connected with mounting blocks 17, and the deckle board 8 is convenient for disassembly and assembly, need to only be unloaded bolt, that is, it is very fast to can be taken off deckle board 8 Victory, the plastic protection net compared to green are easier to arrange and save after use, use for next time.
Working principle:When the utility model is used, user inserts the bottom of upright bar 1 first when installing scaffold Enter to fixed on cushion block 5 of stopping over, is ready for the horizontal equidistant arrangement of three upright bars 1, then first in upright bar 1 limits ring Upright bar 1 and positive cross bar 2 are connected and fixed using connector 3 at position on 7, then at the position on the second restriction ring 6 again The secondary positive cross bar 2 of installation, and continue to install until being equipped with three groups of upright bars 1 side by side, installation is conveniently found in the presence for limiting ring Position facilitates installation, and installation is avoided to deviate, so that the gravity for the positive cross bar 2 that connector 3 is born is larger, is easy to lose the longevity Then life is equipped with side cross bar 4 in the upright bar of left end 1, and makes side cross bar 4 and the fixed company of upright bar 1 using connector 3 It connects, side cross bar 4 and positive cross bar 2 are vertical relation at this time, then further take out support and cut 13, firmly strut first and cut bar 12 and second Bar 12 is cut, so that tension spring 14 is in open configuration, the longitudinal separation that support cuts 13 at this time is equipped with apparent contracting compared to raw bits It is short, while distance is less than the distance of the positive cross bar 2 in front and back of horizontal position, then cuts bar 12 and second first and cuts the end of bar 12 It is put between two positive cross bars 2 at 15 opposite position of gap location and slot, unclamps again hand, tension spring 14 is shunk at this time, and first cuts Bar 12 and second cut bar 12 end resist a slot 15 edge be fixed extremely, due to can be laid on the bottom of scaffold plank use In walking, but most of planks are with trampling and exposing to the weather for a long time, and plank becomes that toughness is big, and both ends start volume and stick up, and People plank walk when easily make a misstep, influence constructing operation and support the presence for cutting 13 increase worker safety and operation it is steady Qualitative, the worker that is more suitable is moving above, and then installs deckle board 8, and handle in the gap location of two positive cross bars 2 of vertical direction The fixed ring 10 of about 8 two sides of deckle board is stuck on positive cross bar 2, and then turn swivel becket 16 utilizes spiral shell until enclosing positive cross bar 2 Bolt makes swivel becket 16 and the mounting blocks 17 at 8 rear of deckle board fixed, so that deckle board 8 is capable of fixing on positive cross bar 2, due to deckle board The safety net 9 of metal material is provided on 8, compared to the plastic material of green color, then by stone and fall object it is hit when, will not It is cut, substantially increases the safety of protection, and engineering terminates also to facilitate arrangement and preservation, used for next time, it is entire to work Process terminates.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.

Claims (5)

1. a kind of construction and installation scaffold, including upright bar (1), it is characterised in that:Pad of stopping over is provided with below the upright bar (1) Block (5), and upright bar (1) is provided with three rows, there are three upright bar described in every row (1) settings, and three upright bars (1) equidistantly arrange, It is mounted on the side wall of upright bar described in every row (1) positive cross bar (2), and upright bar (1) is solid by connector (3) and positive cross bar (2) Fixed connection, on the side wall of upright bar (1) described in left column be provided with side cross bar (4), right column at positive cross bar (2) perpendicular position Side cross bar (4) are also equipped with at positive cross bar (2) perpendicular position on the side wall of the upright bar (1).
2. a kind of construction and installation scaffold according to claim 1, it is characterised in that:It is set on the side wall of the upright bar (1) It is equipped with the first restriction ring (7) and second and limits ring (6).
3. a kind of construction and installation scaffold according to claim 1, it is characterised in that:Two positive cross bars (2) are horizontal The gap location of position is provided with support and cuts (13), and the support, which cuts (13) and cuts bar (11) and second by first, cuts bar (12) and form, Described first cuts bar (11) is cut bar (12) with second and is fixedly connected by tension spring (14), and the positive cross bar (2) is cut with first respectively Bar (11) and second cut bar (12) end offer a slot (15).
4. a kind of construction and installation scaffold according to claim 1, it is characterised in that:Two positive cross bars (2) are vertical The gap location of position is provided with deckle board (8), and the deckle board (8) is internally provided with safety net (9).
5. a kind of construction and installation scaffold according to claim 4, it is characterised in that:The two sides up and down of the deckle board (8) Be provided with fixed ring (10), the rear of the fixed ring (10) is provided with swivel becket (16), the back of the deckle board (8) with turn It is provided at the end opposite position of rotating ring (16) mounting blocks (17), the swivel becket (16) passes through bolt and mounting blocks (17) It is fixedly connected.
CN201820222103.6U 2018-02-07 2018-02-07 A kind of construction and installation scaffold Active CN208105811U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820222103.6U CN208105811U (en) 2018-02-07 2018-02-07 A kind of construction and installation scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820222103.6U CN208105811U (en) 2018-02-07 2018-02-07 A kind of construction and installation scaffold

Publications (1)

Publication Number Publication Date
CN208105811U true CN208105811U (en) 2018-11-16

Family

ID=64124516

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820222103.6U Active CN208105811U (en) 2018-02-07 2018-02-07 A kind of construction and installation scaffold

Country Status (1)

Country Link
CN (1) CN208105811U (en)

Similar Documents

Publication Publication Date Title
CN201129027Y (en) Scaffold widening two-linkage hinge turning plate guardrail
CN208105811U (en) A kind of construction and installation scaffold
CN212926995U (en) Scaffold with prevent tilting mechanism
CN212247882U (en) Protection machine for road and bridge site operation
CN211114956U (en) Anti-seismic stability-increasing reinforcing structure for concrete stairs
CN208310302U (en) A kind of new reinforcing steel bar processing protection canopy
CN214739838U (en) Dish knot formula scaffold frame based on BIM
CN201620593U (en) Spring-board frame for building construction
CN214994580U (en) Assembled steel construction building
CN211949696U (en) Protection device for assembly type building construction
CN211647949U (en) Portable high-altitude extension ladder for rebounding
CN210947630U (en) Scaffold with hard isolation structure for construction of exterior wall dry-hanging marble
CN211037748U (en) Novel construction scaffold without fastener
CN207332386U (en) One kind is easy to clean steel-structure factory building
CN206971143U (en) A kind of easy-to-mount municipal administration decoration guardrail
CN213806482U (en) Combined scaffold for construction site
CN213927558U (en) A assembled platform of unloading safely for construction
CN217232618U (en) Building engineering building climbing frame
CN214498374U (en) Support arrangement for climb die carrier and wall body
CN220451382U (en) Building engineering is with climbing frame
CN220319258U (en) Building engineering security fence
CN219414139U (en) Building support with reinforced structure
CN207436463U (en) A kind of architectural engineering portable type scaffold for being easily installed dismounting
CN215055470U (en) GIS dustless dustproof shed erection device
CN214697227U (en) But quick assembly disassembly's railing

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant