- CN208094073U CN208094073U CN201820476338.8U CN201820476338U CN208094073U CN 208094073 U CN208094073 U CN 208094073U CN 201820476338 U CN201820476338 U CN 201820476338U CN 208094073 U CN208094073 U CN 208094073U
- Authority
- CN
- China
- Prior art keywords
- fixing bracket
- distribution network
- wire clamp
- pin fixing
- network live
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Suspension Of Electric Lines Or Cables (AREA)
Abstract
本实用新型公开了一种配网带电作业专用引线固定支架,其由主导线线夹、绝缘拉杆和开关引线线夹构成,主导线线夹由两个半圆形管槽Ⅰ组成,两个半圆形管槽Ⅰ的一端分别由合页Ⅰ组合链接在一起,另一端通过吊环螺栓Ⅰ固定,构成封闭的环形圆管Ⅰ;开关引线线夹由两个半圆形管槽Ⅱ组成,两个半圆形管槽Ⅱ的一端分别由合页Ⅱ组合链接在一起,另一端通过吊环螺栓Ⅱ固定,构成封闭的环形圆管Ⅱ;主导线线夹与开关引线线夹带有螺帽的一端分别通过加固螺帽与绝缘拉杆固定连接在一起。本实用新型作业过程中采用先固定再拆除的方法,有效地解决了在带负荷更换柱上开关作业中存在的问题,杜绝了依靠人力存在的危险因素,符合带电作业安全要求,使用方便,安全可靠。
The utility model discloses a special lead wire fixing bracket for live work in a distribution network, which is composed of a main wire clamp, an insulating pull rod and a switch lead wire clamp. The main wire clamp is composed of two semicircular pipe grooves I, two half One end of the circular pipe groove Ⅰ is combined and linked together by the hinge Ⅰ, and the other end is fixed by the eyebolt Ⅰ to form a closed circular pipe Ⅰ; the switch lead wire clip is composed of two semicircular pipe grooves Ⅱ, two One end of the semi-circular pipe groove II is linked together by the hinge II, and the other end is fixed by the eyebolt II to form a closed circular pipe II; The reinforcing nut is fixedly connected with the insulating pull rod. In the working process of the utility model, the method of first fixing and then dismantling is adopted, which effectively solves the problems existing in the switch operation on the replacement column with load, eliminates the risk factor of relying on manpower, meets the safety requirements of live work, and is convenient and safe to use. reliable.
Description
技术领域:Technical field:
本实用新型涉及电力用辅助工具领域,特别涉及一种配网带电作业专用引线固定支架。The utility model relates to the field of auxiliary tools for electric power, in particular to a special lead wire fixing bracket for live work in a distribution network.
背景技术:Background technique:
在带负荷更换10千伏柱上开关作业中,拆除、安装开关引线以及如何处理悬空的开关引线是该作业项目的关键点,也是主要的危险点。在拆除、安装开关引线时,力求快、准,并且悬空的开关引线要与带电设备保持不小于0.4米的安全距离。In the operation of replacing a 10 kV pole-mounted switch with load, removal and installation of the switch leads and how to deal with the suspended switch leads are the key points of the project and the main danger points. When removing and installing switch leads, strive to be fast and accurate, and keep a safe distance of not less than 0.4 meters between the suspended switch leads and live equipment.
目前,拆除开关引线时,作业人员利用绝缘绳扣将开关引线与主导线固定,然后拆除并沟线夹,将拆除的开关引线悬挂在空中,安装时,将开关引线与主导线并在一起,用并沟线夹固定即可。然而存在四个方面的问题:一是在拆除开关引线前,用绝缘绳扣将开关引线和导线固定,由于绝缘绳扣连接属于软连接,松开并沟线夹后,开关引线只能靠人力控制,由于突然“松劲”,可能会导致开关引线、并沟线夹脱落,不符合带电作业安全要求;二是悬空的开关引线不能可靠固定,断开的线头随意摆动,安全距离不好控制,存在安全风险;三是在安装开关引线时,也只能靠人力上提、固定开关引线,不能快速安装,存在安全风险;四是此类作业项目均为单人操作,作业极不方便。At present, when removing the switch leads, the operator fixes the switch leads and the main wires with an insulating rope buckle, then removes the parallel groove clamp, hangs the removed switch leads in the air, and when installing, puts the switch leads and the main wires together. Fix it with parallel groove clamps. However, there are four problems: one is to fix the switch lead wire and the wire with an insulating rope buckle before removing the switch lead wire. Since the connection of the insulating rope buckle is a soft connection, after the wire clamp is loosened, the switch lead wire can only rely on manpower Control, due to sudden "looseness", may cause the switch lead wire and the ditch wire clip to fall off, which does not meet the safety requirements for live work; second, the suspended switch lead wire cannot be reliably fixed, and the disconnected wire ends swing freely, and the safety distance is not easy to control. There are safety risks; the third is that when installing the switch leads, the switch leads can only be lifted and fixed by manpower, which cannot be installed quickly, and there are safety risks; fourth, such operations are all operated by a single person, and the operation is extremely inconvenient.
发明内容:Invention content:
为了克服现有技术存在的问题,本实用新型提供一种用于带负荷更换柱上开关工作中临时固定开关引线的配网带电作业专用引线固定支架,方便快捷,安全可靠。In order to overcome the problems existing in the prior art, the utility model provides a special lead wire fixing bracket for live work of the distribution network, which is used for temporarily fixing the lead wire of the switch in the work of replacing the switch on the pole with load, which is convenient, fast, safe and reliable.
为解决上述技术问题,本实用新型采取以下技术方案:In order to solve the above technical problems, the utility model adopts the following technical solutions:
一种配网带电作业专用引线固定支架,主要由主导线线夹、绝缘拉杆和开关引线线夹构成,主导线线夹由两个半圆形管槽Ⅰ组成,两个半圆形管槽Ⅰ的一端分别由合页Ⅰ组合链接在一起,另一端通过吊环螺栓Ⅰ固定,构成封闭的环形圆管Ⅰ;开关引线线夹由两个半圆形管槽Ⅱ组成,两个半圆形管槽Ⅱ的一端分别由合页Ⅱ组合链接在一起,另一端通过吊环螺栓Ⅱ固定,构成封闭的环形圆管Ⅱ;主导线线夹与开关引线线夹带有螺帽的一端分别通过加固螺帽与绝缘拉杆固定连接在一起。A special lead wire fixing bracket for live work in distribution network, which is mainly composed of main wire clamp, insulating pull rod and switch lead wire clamp. One end of the hinge Ⅰ is combined and linked together, and the other end is fixed by the eyebolt Ⅰ to form a closed circular tube Ⅰ; the switch lead wire clip is composed of two semicircular tube slots Ⅱ, and the two semicircular tube slots One end of Ⅱ is connected together by hinge Ⅱ, and the other end is fixed by eyebolt Ⅱ to form a closed circular tube Ⅱ; the ends with nuts of main wire clamp and switch lead wire clamp are respectively connected by reinforcing nut and insulation The tie rods are fixedly connected together.
上述主导线线夹与绝缘拉杆之间的连接夹角为90°,开关引线线夹与绝缘拉杆之间的连接夹角为30°,以满足开关引线的正常运行条件。The connection angle between the main lead wire clip and the insulating pull rod is 90°, and the connection angle between the switch lead wire clip and the insulation pull rod is 30°, so as to meet the normal operating conditions of the switch lead wire.
上述半圆形管槽Ⅰ和半圆形管槽Ⅱ均采用铝合金材质制成。Both the above-mentioned semicircular pipe groove I and semicircular pipe groove II are made of aluminum alloy.
上述环形圆管Ⅰ的内径设有绝缘橡胶,可防止损伤导线。The inner diameter of the above-mentioned circular tube I is provided with insulating rubber to prevent damage to the wires.
上述环形圆管Ⅱ的内径设有绝缘橡胶,且绝缘橡胶上设有横向的条纹,可防止损伤导线。The inner diameter of the annular tube II is provided with insulating rubber, and the insulating rubber is provided with horizontal stripes, which can prevent damage to the wires.
上述绝缘拉杆采用绝缘树脂材料制成,长度为0.5米,直径为50mm。The above-mentioned insulating pull rod is made of insulating resin material, has a length of 0.5 meters and a diameter of 50 mm.
本实用新型的有益效果在于:The beneficial effects of the utility model are:
本实用新型配网带电作业专用引线固定支架作业过程中采用先固定再拆除的方法,有效地解决了在带负荷更换柱上开关作业中存在的问题,杜绝了依靠人力存在的危险因素,符合带电作业安全要求,使用方便,安全可靠。The utility model adopts the method of first fixing and then dismantling the special lead wire fixing bracket for live work of the distribution network, which effectively solves the problems existing in the switch operation on the load replacement column, eliminates the risk factor of relying on manpower, and conforms to the live Operational safety requirements, easy to use, safe and reliable.
附图说明:Description of drawings:
图1是本实用新型配网带电作业专用引线固定支架的正面结构示意图;Figure 1 is a schematic diagram of the front structure of the special lead wire fixing bracket for live work in the distribution network of the utility model;
图2是本实用新型配网带电作业专用引线固定支架的背面结构示意图;Fig. 2 is a schematic diagram of the back structure of the special lead wire fixing bracket for live work in the distribution network of the utility model;
图中:1-主导线线夹,2-绝缘拉杆,3-开关引线线夹,4-吊环螺栓Ⅰ,5-加固螺帽,6-合页Ⅰ,7-环形圆管Ⅰ,8-合页Ⅱ,9-吊环螺栓Ⅱ,10-环形圆管Ⅱ。In the figure: 1-main wire clamp, 2-insulation rod, 3-switch lead wire clamp, 4-eyebolt Ⅰ, 5-reinforcing nut, 6-hinge Ⅰ, 7-ring tube Ⅰ, 8-close Page Ⅱ, 9-Eyebolt Ⅱ, 10-Ring Tube Ⅱ.
具体实施方式:Detailed ways:
下面结合附图对本实用新型的技术方案进行详细说明。The technical solution of the utility model will be described in detail below in conjunction with the accompanying drawings.
如图1所示,一种配网带电作业专用引线固定支架,主要由主导线线夹1、绝缘拉杆2和开关引线线夹3构成,主导线线夹1由两个半圆形管槽Ⅰ组成,两个半圆形管槽Ⅰ的一端分别由合页Ⅰ6组合链接在一起,另一端通过吊环螺栓Ⅰ4固定,构成封闭的环形圆管Ⅰ7;开关引线线夹3由两个半圆形管槽Ⅱ组成,两个半圆形管槽Ⅱ的一端分别由合页Ⅱ8组合链接在一起,另一端通过吊环螺栓Ⅱ固定,构成封闭的环形圆管Ⅱ10;主导线线夹1与开关引线线夹3带有螺帽的一端分别通过加固螺帽5与绝缘拉杆2固定连接在一起;所述主导线线夹1与绝缘拉杆2之间的连接夹角为90°,开关引线线夹3与绝缘拉杆2之间的连接夹角为30°,以满足开关引线的正常运行条件。As shown in Figure 1, a special lead fixing bracket for live work in the distribution network is mainly composed of a main wire clamp 1, an insulating pull rod 2 and a switch lead wire clamp 3. The main wire clamp 1 consists of two semicircular pipe slots I One end of the two semicircular pipe grooves I is combined and linked together by the hinge I6, and the other end is fixed by the eyebolt I4 to form a closed circular pipe I7; the switch lead clamp 3 is composed of two semicircular pipes One end of the two semicircular pipe grooves II is combined and linked together by the hinge II8, and the other end is fixed by the eyebolt II to form a closed circular pipe II10; the main wire clamp 1 and the switch lead wire clamp 3. One end with a nut is fixedly connected with the insulating pull rod 2 through the reinforcing nut 5 respectively; The connection angle between the pull rods 2 is 30° to meet the normal operating conditions of the switch leads.
实际操作中,使用本实用新型的配网带电作业专用引线固定支架流程为:将该固定支架安装在距离并沟线夹外侧约0.4米处,分别将主导线线夹1和开关引线线夹3固定牢固;拆除并沟线夹或者其他的接续金具;将开关引线线头进行绝缘遮蔽,与主导线保持0.4米的安全距离牢固固定;更换开关;安装开关引线;拆除该配网带电作业专用引线固定支架。In actual operation, the process of using the special lead wire fixing bracket for distribution network live work of the utility model is as follows: install the fixing bracket at a distance of about 0.4 meters outside the parallel ditch line clamp, and respectively place the main wire clamp 1 and the switch lead wire clamp 3 Fix it firmly; remove the parallel groove clamp or other connecting fittings; insulate and shield the switch lead wire, and keep a safe distance of 0.4 meters from the main wire; replace the switch; install the switch lead wire; remove the special lead wire for live work of the distribution network and fix it stand.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201820476338.8U CN208094073U (en) | 2018-04-04 | 2018-04-04 | Distribution network live line work dedicated pin fixing bracket |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201820476338.8U CN208094073U (en) | 2018-04-04 | 2018-04-04 | Distribution network live line work dedicated pin fixing bracket |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN208094073U true CN208094073U (en) | 2018-11-13 |
Family
ID=64058168
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201820476338.8U Expired - Fee Related CN208094073U (en) | 2018-04-04 | 2018-04-04 | Distribution network live line work dedicated pin fixing bracket |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN208094073U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110504642A (en) * | 2019-08-28 | 2019-11-26 | 长沙佐迩信息科技有限公司 | A kind of power construction Moveable high-pressure down-lead bracket |
| CN113937652A (en) * | 2021-11-10 | 2022-01-14 | 国网山东省电力公司临沂供电公司 | Insulating ribbon for live working |
-
2018
- 2018-04-04 CN CN201820476338.8U patent/CN208094073U/en not_active Expired - Fee Related
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110504642A (en) * | 2019-08-28 | 2019-11-26 | 长沙佐迩信息科技有限公司 | A kind of power construction Moveable high-pressure down-lead bracket |
| CN113937652A (en) * | 2021-11-10 | 2022-01-14 | 国网山东省电力公司临沂供电公司 | Insulating ribbon for live working |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN104505766B (en) | The instrument and method of a kind of charged for replacement transformer station 500kV strain insulator strings | |
| CN205195145U (en) | Support is changed to insulator | |
| CN206542167U (en) | A kind of insulated cable support | |
| CN106887816A (en) | A kind of insulated cable support | |
| CN102185267B (en) | 66KV ground potential hot-line make-and-break bypassing method | |
| CN105207123A (en) | Equipotential operation method of tubular bus | |
| CN201075410Y (en) | Insulated Line Grounding Wire Quick Hanging Tool | |
| CN103474909A (en) | Method for replacing multi-loop strain insulator string in drainage wire supporting distance expanding hot-line working | |
| CN106129901A (en) | A kind of 35kV circuit single pole porcelain pole arm repairing instrument | |
| CN203406589U (en) | Concrete pole grounding lead wire protecting apparatus | |
| CN211701243U (en) | A jumper spacer bar electrified defect elimination device | |
| CN203690799U (en) | Device for replacing suspension angle tower insulator string in live state | |
| CN201562769U (en) | UHV grounding wire device | |
| CN201584691U (en) | A special tool for 220KV double-circuit common-tower line entering the high-tension high-voltage strong electric field | |
| CN204011797U (en) | A kind of earthing wire clip | |
| CN204290220U (en) | A kind of power pipe female joint current diverter | |
| CN105977860B (en) | A kind of replacement overhead transmission line composite cross-arm insulator device and method | |
| CN206023136U (en) | A kind of bypass lead-up cable fixing device | |
| CN210704540U (en) | A tool for high-altitude live remote control electric tightening of wire clamp bolts for transmission lines | |
| CN109066456B (en) | Device and method for replacing insulator | |
| CN111313318B (en) | A kind of live fault elimination device for jumper spacer | |
| CN205609778U (en) | Two division C molded lines clamping connection ground wires in big line footpath are hung and are established device | |
| CN204144862U (en) | The shunting wire clamp that earth potential is installed can be adopted | |
| CN218997548U (en) | High-voltage lead fixing device | |
| CN205029157U (en) | High voltage electricity circuit earth connection action bars |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |