CN208088635U - A kind of rail mounted keel furred ceiling Fast Installation structure - Google Patents
A kind of rail mounted keel furred ceiling Fast Installation structure Download PDFInfo
- Publication number
- CN208088635U CN208088635U CN201820487572.0U CN201820487572U CN208088635U CN 208088635 U CN208088635 U CN 208088635U CN 201820487572 U CN201820487572 U CN 201820487572U CN 208088635 U CN208088635 U CN 208088635U
- Authority
- CN
- China
- Prior art keywords
- keel
- furred ceiling
- rail mounted
- secondary track
- level
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000009434 installation Methods 0.000 title claims abstract description 52
- 241000700647 Variola virus Species 0.000 claims abstract description 11
- 229910000831 Steel Inorganic materials 0.000 claims description 37
- 239000010959 steel Substances 0.000 claims description 37
- 229910052782 aluminium Inorganic materials 0.000 claims description 22
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 claims description 21
- 239000004411 aluminium Substances 0.000 claims description 18
- 210000000988 bone and bone Anatomy 0.000 claims description 4
- 239000002699 waste material Substances 0.000 description 24
- 238000000034 method Methods 0.000 description 21
- 239000000463 material Substances 0.000 description 19
- 239000010813 municipal solid waste Substances 0.000 description 14
- 230000008569 process Effects 0.000 description 11
- 239000000428 dust Substances 0.000 description 10
- 239000003973 paint Substances 0.000 description 10
- 238000004519 manufacturing process Methods 0.000 description 9
- 235000012241 calcium silicate Nutrition 0.000 description 8
- 238000005520 cutting process Methods 0.000 description 8
- 238000010079 rubber tapping Methods 0.000 description 8
- 238000000576 coating method Methods 0.000 description 6
- 241001347978 Major minor Species 0.000 description 5
- 239000011248 coating agent Substances 0.000 description 5
- 239000011490 mineral wool Substances 0.000 description 5
- 239000004033 plastic Substances 0.000 description 5
- 229920003023 plastic Polymers 0.000 description 5
- 238000005507 spraying Methods 0.000 description 5
- 239000000378 calcium silicate Substances 0.000 description 4
- 229910052918 calcium silicate Inorganic materials 0.000 description 4
- OYACROKNLOSFPA-UHFFFAOYSA-N calcium;dioxido(oxo)silane Chemical compound [Ca+2].[O-][Si]([O-])=O OYACROKNLOSFPA-UHFFFAOYSA-N 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 4
- 239000003292 glue Substances 0.000 description 4
- 241000132536 Cirsium Species 0.000 description 3
- 230000008901 benefit Effects 0.000 description 3
- 238000005034 decoration Methods 0.000 description 3
- 229910052500 inorganic mineral Inorganic materials 0.000 description 3
- 239000011707 mineral Substances 0.000 description 3
- 238000000465 moulding Methods 0.000 description 3
- 238000005498 polishing Methods 0.000 description 3
- 239000000843 powder Substances 0.000 description 3
- 238000004080 punching Methods 0.000 description 3
- 230000009467 reduction Effects 0.000 description 3
- 239000000853 adhesive Substances 0.000 description 2
- 230000001680 brushing effect Effects 0.000 description 2
- 239000004568 cement Substances 0.000 description 2
- 230000008859 change Effects 0.000 description 2
- 150000001875 compounds Chemical class 0.000 description 2
- 238000005260 corrosion Methods 0.000 description 2
- 238000013461 design Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000004134 energy conservation Methods 0.000 description 2
- 239000003063 flame retardant Substances 0.000 description 2
- 238000009499 grossing Methods 0.000 description 2
- 238000009413 insulation Methods 0.000 description 2
- 239000004816 latex Substances 0.000 description 2
- 229920000126 latex Polymers 0.000 description 2
- 238000012423 maintenance Methods 0.000 description 2
- 229910052751 metal Inorganic materials 0.000 description 2
- 239000002184 metal Substances 0.000 description 2
- WSFSSNUMVMOOMR-NJFSPNSNSA-N methanone Chemical compound O=[14CH2] WSFSSNUMVMOOMR-NJFSPNSNSA-N 0.000 description 2
- 238000004064 recycling Methods 0.000 description 2
- 230000008439 repair process Effects 0.000 description 2
- 239000002893 slag Substances 0.000 description 2
- 239000007921 spray Substances 0.000 description 2
- 238000010023 transfer printing Methods 0.000 description 2
- 230000032258 transport Effects 0.000 description 2
- 125000000391 vinyl group Chemical group [H]C([*])=C([H])[H] 0.000 description 2
- 229920002554 vinyl polymer Polymers 0.000 description 2
- OKTJSMMVPCPJKN-UHFFFAOYSA-N Carbon Chemical group [C] OKTJSMMVPCPJKN-UHFFFAOYSA-N 0.000 description 1
- 241000196324 Embryophyta Species 0.000 description 1
- 229920000715 Mucilage Polymers 0.000 description 1
- 240000007594 Oryza sativa Species 0.000 description 1
- 235000007164 Oryza sativa Nutrition 0.000 description 1
- VYPSYNLAJGMNEJ-UHFFFAOYSA-N Silicium dioxide Chemical compound O=[Si]=O VYPSYNLAJGMNEJ-UHFFFAOYSA-N 0.000 description 1
- 238000003723 Smelting Methods 0.000 description 1
- 208000027418 Wounds and injury Diseases 0.000 description 1
- 230000002159 abnormal effect Effects 0.000 description 1
- 230000001070 adhesive effect Effects 0.000 description 1
- 150000001398 aluminium Chemical class 0.000 description 1
- 238000010923 batch production Methods 0.000 description 1
- 229910001570 bauxite Inorganic materials 0.000 description 1
- 230000003796 beauty Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 239000004566 building material Substances 0.000 description 1
- 229910052799 carbon Inorganic materials 0.000 description 1
- 235000019504 cigarettes Nutrition 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000006378 damage Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000001066 destructive effect Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 235000013399 edible fruits Nutrition 0.000 description 1
- 239000000839 emulsion Substances 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 238000001125 extrusion Methods 0.000 description 1
- 239000004744 fabric Substances 0.000 description 1
- 238000009408 flooring Methods 0.000 description 1
- 239000010931 gold Substances 0.000 description 1
- 229910052737 gold Inorganic materials 0.000 description 1
- 239000006115 industrial coating Substances 0.000 description 1
- 208000014674 injury Diseases 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 238000011835 investigation Methods 0.000 description 1
- 230000001788 irregular Effects 0.000 description 1
- 238000002844 melting Methods 0.000 description 1
- 230000008018 melting Effects 0.000 description 1
- 239000007769 metal material Substances 0.000 description 1
- 238000002156 mixing Methods 0.000 description 1
- 230000001473 noxious effect Effects 0.000 description 1
- 239000010893 paper waste Substances 0.000 description 1
- 238000005554 pickling Methods 0.000 description 1
- 239000002574 poison Substances 0.000 description 1
- 231100000614 poison Toxicity 0.000 description 1
- 230000002265 prevention Effects 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 230000000979 retarding effect Effects 0.000 description 1
- 235000009566 rice Nutrition 0.000 description 1
- 238000007665 sagging Methods 0.000 description 1
- 230000035939 shock Effects 0.000 description 1
- 239000000741 silica gel Substances 0.000 description 1
- 229910002027 silica gel Inorganic materials 0.000 description 1
- 230000007480 spreading Effects 0.000 description 1
- 238000003892 spreading Methods 0.000 description 1
- 239000000758 substrate Substances 0.000 description 1
- 238000004381 surface treatment Methods 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
- 239000002341 toxic gas Substances 0.000 description 1
- 238000005406 washing Methods 0.000 description 1
Landscapes
- Finishing Walls (AREA)
Abstract
The utility model discloses a kind of rail mounted keel furred ceiling Fast Installation structures, include the level-one rail mounted keel being fixedly connected with smallpox and the level-one rail mounted keel secondary track formula keel being slidably connected and the furred ceiling object being slidably connected with the secondary track formula keel, the extending direction of the wherein described level-one rail mounted keel and secondary track formula keel is mutually perpendicular to, and the secondary track formula keel also both sides in its lower end are reserved with attachment rail, and furred ceiling object both sides form the hook slot for coordinating the attachment rail.
Description
Technical field
The utility model is related to architectural hardware technical field more particularly to a kind of rail mounted keel furred ceiling Fast Installation knots
Structure.
Background technology
Traditional furred ceiling probably has following 9 kinds:(1)Mold is molded square plasterboard class furred ceiling;(2)Square calcium silicate board class
Furred ceiling;(3)Square mineral wool board class furred ceiling;(4)Square concealed installation aluminium sheet class furred ceiling;(5)The bright dress aluminium sheet class furred ceiling of square;(6)Gang up with
Type concealed installation aluminium sheet class furred ceiling;(7)Enclosed type Thistle board class furred ceiling;(8)Enclosed type calcium silicate board class furred ceiling;(9)Dark keel
Aluminium-plastic panel furred ceiling.
The shortcomings that prior art and prior art:Existing 9 kinds of raised flooring systems have the shortcomings that respective:
(1)Mold is molded square plasterboard class furred ceiling:This formed in mould square plasterboard class furred ceiling, itself due to
Factory is using formed in mould, it needs to produce a large amount of silica gel mould in advance, wastes a large amount of human resources and object
Expect resource, to be demoulded one by one after form, upper interior wall paint coating, this plasterboard class furred ceiling are also sprayed in factory after demoulding
It produces more than 20 years, either polishing smoothing technique or surface spraying wall paint technique are all after releasing process or demoulding
Not environmentally, surface spraying material is all the national pollution technique to be shut down, not only pollutes air for pole, and a large amount of TVOC that volatilize are toxic
Gas, and this plasterboard class furred ceiling due to weight it is very heavy, every square metre about weighs 20 kilograms, substantially exceed country to save material
Energy-efficient code requirement is already belonging to super energy-consuming product.It more wastes, since plasterboard is all mold into mould square, peace
The keel of dress are all that the major-minor keel of bright dress are interlockingly connected, and other sizes cannot be customized in factory, and corner and receipts side will be in works
Journey scene is cut, and causes engineering site largely to cut the cutting waste material rubbish of airborne dust and plasterboard and keel, while also increasing
A large amount of rubbish is dynamic clearly to be taken, expensive expense resource of taking a lot of work;
(2)Square calcium silicates class furred ceiling:This square calcium silicates quasi-mineral plate furred ceiling, is after mixing cement with glue
High temperature and pressure grouting compacting, a large amount of not environmentally material cement and adhesive have been used in production and weight is very heavy, have often been put down
Square rice is also up to more than 20 kilograms, and it is carbon isotopes to also belong to, and does not meet the theory of national energy conservation and emission reduction.It is also to use when installation
Bright dress the mode that is interlockingly connected of major-minor keel, be also intended to cut into square when factory is molded, sprayed coating is also wanted on surface
It could use, be also to produce a large amount of cutting airborne dust and calcium silicates waste material head rubbish and useless keel rubbish at project installation scene
Rubbish.Pole not environmentally with it is energy saving.
(3)Square mineral wool board class furred ceiling:This mineral wool class platform sling is done using broken useless minerals powder and waste paper paddle material
At base material, surface is sprayed industrial coating in factory and is produced.The mineral wool board worked it out in this way is due to can constantly break up
Minerals granulated slag is fallen down, the requirement of furred ceiling is not achieved, nor it is environmentally friendly, it is also non-watertight moisture-proof containing a large amount of formaldehyde, with
The passage of time, can constantly be subside sagging.In addition, this mineral wool class furred ceiling, due to the also side of being machined in factory process
Type and be also that the keel installation mode being interlockingly connected using major-minor keel cuts a large amount of waste materials similarly there is in engineering site
The phenomenon that rubbish, moreover, the slag powders constantly fallen under office's ceiling are very small, are easy so that office worker sucks body
It inside falls ill, this product has been eliminated for many years in foreign countries, can still have a large amount of users in our country.
(4)Square concealed installation keel metallic plate class furred ceiling:The base material of this square concealed installation keel metallic plate class furred ceiling is aluminium sheet
Either steel plate surface mostly uses spray paint technique or pre- billowing technique or heat passes print technique productions.This kind of steel ceiling board
Secondary track formula keel mostly use the zinc-plated keel of triangle greatly or chevron shaped zinc-plated keel concealed installation keel are installed, this gold
The shortcomings that installation for belonging to Ceiling Suspension keel is not easy to remove, and when dismounting, which must find professional, can just dismantle, and when dismounting is big
More planks can deform, cause be difficult when second of installation installation, and this kind of metal steel ceiling board be also factory process at
Square-panel, dimensions is single, when engineering site is installed, encounters house beam, the pillars of a house and turning and receives side, will be due to on-site cutting
The useless head waste material of a large amount of cutting is generated, a large amount of waste material rubbish is produced and also increases refuse collection expense, do not meet energy-saving building material
Development.
(5)The bright keel aluminium sheet class furred ceiling of square:This bright keel metallic plate class furred ceiling of square is in factory by punching press
Mould punching is molding, and the washing pretreatment to the coating such as pickling and chromaking and spraying process or pre- roll coating process are also carried out after molding
Or caloric transfer printing technology, the process of surface treatment of this metallic plate belongs to high temperature highly energy-consuming technique, and pole is not environmentally, while aluminium
The strategical stock goods and materials of country, it is a large amount of using the waste in smallpox being pole, and aluminium sheet class material as hanging in use,
When meeting high temperature since the fusing point of aluminium is low, when catching fire, flower fair fusing in day subsides to get off to hurt sb.'s feelings.In addition, the aluminum steel of this square
Ceiling board is due to being will produce in building-site secondary track formula keel and aluminium sheet high amount of in factory's mold forming
Side crops are cut, to generate a large amount of building waste, waste a large amount of bauxite resource, it is useless to become treasured, and limitation uses
Metal class furred ceiling is without floral material;
(6)Gang up with type concealed installation keel aluminium sheet class furred ceiling:This type concealed installation keel aluminium sheet class furred ceiling of ganging up with is with the different trades mark
Made of roll forming being torn open with the aluminum substrate punching press of state, the angle of attack, the pretreatment work that also to carry out oil removing after molding, remove removing oxide layer
Skill, again in the paint or powder or caloric transfer printing technology of surface spraying different demands, this aluminium day after pretreating process before drenching
Flower furred ceiling, which can make square, can also make abnormal shape, and size may customize specification and may customize, but be carried out in building Administrative Area
When installing and using, since room corner is too many, the house beam pillars of a house is too many, can cause largely waste and waste material rubbish, on-site cutting
Dust is flown upward, and dust pollution, not energy-efficient environmental protection, the cost of clearing and removing refuse of the transportation cost of raising are caused.In addition most disadvantageously,
Due to be use gang up with keel installation, installer gangs up with plate during installation, due to aluminum and ceaselessly shakes, plate with
The bad investigation in gap of plate, also adjust after plate stitch again can because of plate shaking and gap and influence beauty, as a result, pacify
Dress worker, which has just been connected each plate by tapping screw lock, gets up to become a whole platform sling so that furred ceiling in the future can not
Easily safeguarding arbitrarily easily to replace so that maintenance cost in the future is very high and is also less prone to detachable maintaining lamp source and top
The comprehensive wiring in portion.
(7)Enclosed type Thistle board class furred ceiling:This kind of furred ceiling is mainly used in megastore, industrial building and warehouse
Furred ceiling, this every plank for furred ceiling is all very big and unusual weight, and whens freight charges is primary to be loaded and unloaded using forklift, expense of taking a lot of work
When.Major-minor level-one rail mounted keel are first installed when furred ceiling is installed, then everyone one group of installer 4,1220mm+
Top eminence is moved in the big plate lift of 2440mm to, and then, 2 installers under shelf resist big plate with support on the ground
Lower part, other self-tapping screw nail on 2 installer's electric tools on installation shelf, every block of plate at least will more than upper 50
A self-tapping screw nail also closes self-tapping screw nail being smeared with anticorrosive paint one by one after first-class self-tapping screw nail
With anti-corrosion, smears and with cracking-proof, then the seam of plate and plate cloth base Netowrk tape has been applied white glue with vinyl patch jail after antirust paint
Criticize again Tired ash, then polish spray interior wall coating or brush interior wall coating, this furred ceiling waste man power and money, take a lot of work material expense resource, install
Expense is high, and installer stands on simple and crude installation ladder always, and installation Frequent Accidents, installation risk are very big, Er Qie
Work post scene will produce a large amount of airborne dust and rubbish.And the fire endurance of this plate is very low, and fusing point is very low, and it is easy to meet high temperature of fire
It subsides and hurts sb.'s feelings.And this plank frame furred ceiling once there is maintenance problem will be as being installed new plate furred ceiling, process is complicated,
Waste a large amount of manpower and materials and financial resources.Want that it is impossible to change plank, only damaging dismounting, is then mended on plank again
It goes, repeats original process.
(8)Enclosed type calcium silicate board class furred ceiling:This kind of furred ceiling and(7)The totally-enclosed furred ceiling of class Thistle board is the same,
It is mainly used for the furred ceiling of office building, megastore and warehouse workshop, the specification of this every plate for furred ceiling is all very big,
The bad transport of building-site upstairs on freight charges, heavy removed using forklift of the big plate of plate are unloaded.Freight is very high.And this plate of installation
The process of son is very complicated, major-minor level-one rail mounted keel installation is finished successively, and then 3 people or 4 people are an installation group,
In big plate lift to move to ceiling height, 2 installers being then under installation shelf withstand calcium silicates on the ground with supporter
Big plate, the installer on installation shelf nail on self-tapping screw on calcium silicate board tightly securely, so with electric tool
Screw is smeared anti-corrosion with antirust paint again afterwards, the seam of plate and plate is then posted closing with white glue with vinyl again, then with Tired
It criticizes and smears polishing smoothing, then brushing interiro wall latex paint or spraying interiro wall latex paint.Due to as it can be seen that this plank ceiling construction process
Complicated, time-consuming, engineering site airborne dust simultaneously generates a large amount of building waste.And this kind of furred ceiling does not just have once installing
There is method arbitrarily to dismantle, if the comprehensive wiring of furred ceiling over top goes wrong, must just be torn open with specific purpose tool is destructive
Except part furred ceiling, also to be closed again with plank after repair, still as preceding processes, batch putty polishing sanding brushing interior wall
Emulsion paint thinks that repair is extremely difficult once furred ceiling goes wrong.
(9)Dark keel aluminium-plastic panel class furred ceiling:This dark keel aluminium-plastic panel class furred ceiling be first by level-one rail mounted keel according to
Drawing pitch requirements, which arrange, all to be locked with self-tapping screw nail securely, then further according to the lattice size of drawing requirement bottoming
Fire-retardant wooden splint self-tapping screw nail is fixed on mounted level-one rail mounted keel, and finally aluminium-plastic panel is wanted by drawing again
It asks specification to cut at the scene to divide, then is overlayed on the fire-retardant wooden splint of bottoming with multi-use mucilage, then again between plate and plate
Gap in beat weather-resistant glue complete furred ceiling.As new fire safety rules GB -50222 of country are in the execution on April 1st, 2018, this
The furred ceiling that kind aluminium-plastic panel meets fire release cigarette poison can be all halted.In addition, cutting processing has airborne dust and a large amount of rubbish at the scene
Rubbish generates, and this mounting structure is also that can not ensure to accomplish what arbitrary dismounting and change was repaired when something goes wrong when top, this
The waste that the ceiling structure of sample will produce prodigious hidden dangers in project and a large amount of human resources and property can be caused to waste, is to wash in a pan
The product structure eliminated.
Invention content
The purpose of the utility model is to overcome the deficiencies in the prior art, provide a kind of structure novel, simple to install flexibly,
Exempting false keel structure reduces the rail mounted keel furred ceiling Fast Installation structure of secondary track formula keel load.
In order to achieve the goal above, technical solution used by the utility model is:A kind of rail mounted keel furred ceiling is quick
Mounting structure, include the level-one rail mounted keel being fixedly connected with smallpox, with the level-one rail mounted keel be slidably connected two
Grade rail mounted keel and the furred ceiling object that is slidably connected with the secondary track formula keel, wherein the level-one rail mounted keel with
The extending direction of secondary track formula keel is mutually perpendicular to, and also in its lower end, both sides are reserved with installation to the secondary track formula keel
Track, furred ceiling object both sides form the hook slot for coordinating the attachment rail.
Further, hanging piece, the hanging piece upper end are connected between the level-one rail mounted keel and secondary track formula keel
It is formed with and the hook of the level-one rail mounted keel is coordinated to be reserved with buckling groove, the secondary track formula dragon in hanging piece lower end simultaneously
Bone upper end is formed with the clamping item for coordinating the buckling groove, and the clamping item extends along the length direction of secondary track formula keel.
Further, the T-shaped structure in cross section of the buckling groove and clamping item.
Further, the secondary track formula keel lower end forms the decoration extended along secondary track formula keel length direction
Slot, the C-shaped structure in cross section of the decorative groove.
Further, the level-one rail mounted keel are all made of steel or aluminium with secondary track formula keel.
Further, the hanging piece uses steel or aluminium.
Further, the furred ceiling object includes steel ceiling board or LED lamp.
The advantageous effect of the utility model patent:
(1)During practical installation of ceiling, zero rubbish, no pollution, nil waste, zero dust, zero formaldehyde, zero are lost, are green
Superior performance in terms of waste is protected, saves material, economizes on resources and reduced to colour circle:All secondary track formula keel, before manufacture
All according to designing size, cuts out to need to be transported to project installation scene with length in factory and installed;All all steels
Compound steel ceiling board is all the module with sliding slot made according to design drawing in factory, after reaching project installation scene,
It need to only be sequentially placed into attachment rail and be slided according to the secondary track formula keel completed in advance.Entire production and installation
Process is all in the direct customized production of factory, and the secondary track formula keel and steel ceiling board produced are transported to building-site, no
With saw cut, engineering site is neat and tidy, without any steel furred ceiling board waste material rubbish, is truly realized zero rubbish, zero loss, zero dirt
Dye, zero dust, nil waste, can 100% recycling be used for multiple times, waste utilization and emission reduction to greatest extent is green energy conservation production true
Product.
(2)The superior performance in terms of fire protection flame retarding, protection personal safety:Object burning needs three conditions, burning things which may cause a fire disaster, flammable
Object and oxygen-supplying amount, oxygen-supplying amount and the bad control of burning things which may cause a fire disaster, external burning things which may cause a fire disaster source-drain are all likely to become burning things which may cause a fire disaster, can uniquely control
It is exactly the material of steel ceiling board.The utility model steel ceiling board material belongs to A grades of non-ignitable, all steel materials of high fire resisting fusing point
Material itself is not only the A grades of non-ignitable materials of fire prevention, but also fusing point is up to 1538 degree, can effectively obstruct burning things which may cause a fire disaster, prevent fire spreading,
NFA requirement is complied fully with, noxious material will not be generated burning in fire, it is extremely safe reliable.
(3)The advantage for having traditional smallpox steel ceiling board impassable in terms of producing customization:Furred ceiling is without pair
Keel, the only main bone of secondary track formula keel rail mounted aluminium section, specification can according to required by engineering site not
Same size, nonstandard size, irregular size are arbitrarily completed in factory's customized production, and the length of all keel can be in factory
Cutting customization is completed, and without being processed in engineering site, and the compound smallpox steel ceiling board of all steel customized is furred ceiling again
Decoration plate body is the false keel in suspended ceiling mounting structure again, and it is dry operation entirely to be customized to Field Force's installation from plant produced,
Whole pollution-free, lossless, Fast Installation is greatly saved manually installed expense and Master Cost.
(4)The utility model superior performance in terms of Fast Installation and sound insulation and noise reduction:The utility model patent is two level rail
Road formula keel have attachment rail, and the steel ceiling board customized can be used as the false keel in conventional mounting structure and participate in installation knot
Among structure, secondary track formula keel and steel ceiling board inlay overlap joint by nature splicing seams, and each steel ceiling board can be
Art skating in the attachment rail of secondary track formula keel, including LED lamp can also aluminum frame make slidable hook
The formula lamp panel of taking is placed on automatic sliding in the attachment rail of secondary track formula keel, completes efficient smallpox Fast Installation and arbitrary
Dismounting, moreover it is possible to it is effective against external shock and sound insulation effect can be reached, can effectively obstruct noise transmission upstairs to downstairs, every
Audio fruit is better than various traditional smallpox steel ceiling boards.
(5)There is important advantage in terms of mixed economy cost:The rail mounted keel furred ceiling of the utility model is quickly pacified
Assembling structure, due to installing in two steps, and be first the secondary track formula keel by production daily spend layout drawing in marked
Size scale produces and is transported to engineering site installation, when steel ceiling board is produced and transports to engineering site, two level in advance
Installation is complete for rail mounted keel, then steel ceiling board is placed sequentially in again complete in the attachment rail of secondary track formula keel
At lifting.So the cutting of engineering site will not be caused, the airborne dust of engineering site will not be caused, without waste material, is not lost, does not have
It is whether great or small customized in batch production to have waste, the specification of all secondary track formula keel and steel ceiling board
, it is installed again to worker from producing to transporting, all expenses are all most saved, and the overall cost finally used is very low.
(6)Performance is more excellent in terms of use scope and usage scenario:Secondary track formula dragon in the utility model patent
Bone and steel ceiling board are all the customized production in factory, it is widely used in the furred ceiling installation of various public domains,
Such as office building, school, hospital, the large-scale furred ceiling in the subway of airport.This structure can be not only used for furred ceiling and may be used also
For the finishing of outdoor metope.
(7)In recycling, advantages in terms of ecological environment are safeguarded in protection:Due to two in the utility model patent
Big material, either secondary track formula keel or steel ceiling board all be use metal material, they can repeatedly without
The use of limit time, until melting down smelting extrusion use again to scrapping, service life is all at 30 years or more, to reduce smallpox steel
Injury of the ceiling board processed to the earth and environment, can effectively protect earth environment.
Description of the drawings
Fig. 1 is the front view of the secondary track formula keel of the utility model.
Fig. 2 is the front view of the hanging piece of the utility model.
Fig. 3 is the side view of the hanging piece of the utility model.
Fig. 4 is the front view of the steel ceiling board of the utility model.
Fig. 5 is the assembling schematic diagram of the utility model.
Fig. 6 is the partial enlarged view of region A in Fig. 5.
Wherein, 1- level-ones rail mounted keel, 2- secondary track formula keel, 21- attachment rails, 22- are clamped item, 23- decorations
Slot, 3- furred ceiling objects, 31- hook slot, 4- hanging pieces, 41- hooks, 42- buckling grooves.
Specific implementation mode
The utility model technical solution claimed is made further specifically in conjunction with the drawings and specific embodiments
It is bright.
Shown in Fig. 1 to Fig. 4, a kind of rail mounted keel furred ceiling Fast Installation structure in the present embodiment, including with day
The level-one rail mounted keel 1 that flower is fixedly connected and the secondary track formula keel 2 that the level-one rail mounted keel 1 are slidably connected connect
It the hanging piece 4 that is connected between level-one rail mounted keel 1 and secondary track formula keel 2 and is slided with the secondary track formula keel 2
The furred ceiling object 3 of connection.In the present embodiment, level-one rail mounted keel 1, hanging piece 4 and secondary track formula keel 2 be all made of steel or
Aluminium.
It is connected by hoist cable between the wherein described level-one rail mounted keel 1 and smallpox, level-one rail mounted keel 1 and two level rail
The extending direction of road formula keel 2 is mutually perpendicular to, and 4 upper end of hanging piece is formed with the cooperation level-one rail mounted keel in the present embodiment
1 hook 41 is reserved with the buckling groove 42 of T shapes in 4 lower end of hanging piece simultaneously, and 2 upper end of secondary track formula keel is formed with cooperation
The clamping item 22 of the T shapes of the buckling groove 42, the clamping item 22 extend along the length direction of secondary track formula keel 2.Specifically
The hook 41 of ground hanging piece 4 hangs over level-one rail mounted keel 1 and can finally adjust two level rail along 1 slidable adjustment of level-one rail mounted keel
The position of road formula keel 2, while being coordinated by buckling groove 42 and clamping item 22 between secondary track formula keel 2 and hanging piece 4, it utilizes
Aforesaid way realizes being slidably connected between level-one rail mounted keel 1 and secondary track formula keel 2.
2 lower end of secondary track formula keel forms the decorative groove 23 extended along 2 length direction of secondary track formula keel, described
The C-shaped structure in cross section of decorative groove 23, specifically attachment rail 21 take shape in 23 upper surface both sides of decorative groove.The furred ceiling object
3 both sides form the hook slot 31 for coordinating the attachment rail 21, in the present embodiment furred ceiling object 3 include steel ceiling board or
LED lamp.Decorative groove 23 can leave a blank or by snapping ornamental strip to cover the gap between furred ceiling object 3.
Shown in Fig. 5 and Fig. 6, the specific mounting structure method of the present embodiment is as follows:The first step, first secondary track
The special steel hanging piece 4 of formula keel 2 is linked up with 41 by it and is hung on the level-one rail mounted keel 1 for being fixedly installed in smallpox, completes
The first step of furred ceiling.
Second step:The secondary track formula keel 2 for being already cut into required length size according to actual design drawing are picked up, are led to
The clamping item 22 crossed on secondary track formula keel 2 matches with the buckling groove 42 on hanging piece 4 to be installed, then according still further to above-mentioned method
Step is sequentially completed the secondary track formula keel 2 of entire installation region.
Third walks:Oneself slot 31 is hooked by it respectively according to the steel ceiling board of drawing size forming respectively to hang over
On the attachment rail 21 of secondary track formula keel 2 and it is pushed into corresponding position, will gradually be placed on two level successively through the above steps
All steel ceiling boards in rail mounted keel 2 shift the installation that accurate location completes whole steel ceiling boards onto.
4th step:To the LED lamp that slot 31 is made be hooked by special proximate matter frame again and is also disposed in secondary track formula
The Fast Installation of LED lamp is completed in the attachment rail 21 of keel 2.
The embodiment of the above is only the preferred embodiment of the utility model, not does any form to the utility model
On limitation.Any technical person familiar with the field all can profit in the case where not departing from technical solutions of the utility model ambit
More possible variations and retouching are made to technical solutions of the utility model with the technology contents of the disclosure above, or are revised as equivalent
The equivalent embodiment of variation.Therefore all contents without departing from technical solutions of the utility model, the thinking according to the utility model are made
Equivalent equivalence changes, should all be covered by the scope of protection of the utility model.
Claims (7)
1. a kind of rail mounted keel furred ceiling Fast Installation structure, it is characterised in that:It include the level-one track being fixedly connected with smallpox
Formula keel(1)And the level-one rail mounted keel(1)The secondary track formula keel being slidably connected(2)And with the two level rail
Road formula keel(2)The furred ceiling object being slidably connected(3), wherein the level-one rail mounted keel(1)With secondary track formula keel(2)'s
Extending direction is mutually perpendicular to, and the secondary track formula keel(2)Also in its lower end, both sides are reserved with attachment rail(21), described
Furred ceiling object(3)Both sides form the cooperation attachment rail(21)Hook slot(31).
2. a kind of rail mounted keel furred ceiling Fast Installation structure according to claim 1, it is characterised in that:The level-one rail
Road formula keel(1)With secondary track formula keel(2)Between be connected with hanging piece(4), the hanging piece(4)Upper end is formed with described in cooperation
Level-one rail mounted keel(1)Hook(41)Simultaneously in hanging piece(4)Lower end is reserved with buckling groove(42), the secondary track formula dragon
Bone(2)Upper end is formed with the cooperation buckling groove(42)Clamping item(22), the clamping item(22)Along secondary track formula keel
(2)Length direction extend.
3. a kind of rail mounted keel furred ceiling Fast Installation structure according to claim 2, it is characterised in that:The buckling groove
(42)And clamping item(22)The T-shaped structure in cross section.
4. a kind of rail mounted keel furred ceiling Fast Installation structure according to claim 1, it is characterised in that:The two level rail
Road formula keel(2)Lower end is formed along secondary track formula keel(2)The decorative groove that length direction extends(23), the decorative groove
(23)The C-shaped structure in cross section.
5. a kind of rail mounted keel furred ceiling Fast Installation structure according to claim 1, it is characterised in that:The level-one rail
Road formula keel(1)With secondary track formula keel(2)It is all made of steel or aluminium.
6. a kind of rail mounted keel furred ceiling Fast Installation structure according to claim 2, it is characterised in that:The hanging piece
(4)Using steel or aluminium.
7. a kind of rail mounted keel furred ceiling Fast Installation structure according to claim 1, it is characterised in that:The furred ceiling
Object(3)Include steel ceiling board or LED lamp.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820487572.0U CN208088635U (en) | 2018-04-08 | 2018-04-08 | A kind of rail mounted keel furred ceiling Fast Installation structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820487572.0U CN208088635U (en) | 2018-04-08 | 2018-04-08 | A kind of rail mounted keel furred ceiling Fast Installation structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208088635U true CN208088635U (en) | 2018-11-13 |
Family
ID=64058342
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820487572.0U Expired - Fee Related CN208088635U (en) | 2018-04-08 | 2018-04-08 | A kind of rail mounted keel furred ceiling Fast Installation structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208088635U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114182873A (en) * | 2021-12-29 | 2022-03-15 | 舒舍仁居(江苏)节能装饰科技有限公司 | A-level fireproof environment-friendly ceiling system and construction method and application thereof |
-
2018
- 2018-04-08 CN CN201820487572.0U patent/CN208088635U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114182873A (en) * | 2021-12-29 | 2022-03-15 | 舒舍仁居(江苏)节能装饰科技有限公司 | A-level fireproof environment-friendly ceiling system and construction method and application thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104533046B (en) | Dry-hanging and wet-adhering combined mounting method of cement-based artificial flat stone | |
CN204617847U (en) | A kind of mounting structure hiding pelmet | |
CN208088635U (en) | A kind of rail mounted keel furred ceiling Fast Installation structure | |
CN114897496A (en) | Green building construction system of assembled steel construction house | |
CN205369639U (en) | Automatic daylight roof of rotation type | |
CN208088773U (en) | A kind of raised flooring Fast Installation structure | |
CN108729619A (en) | A kind of installation method of raised flooring system and its production method and the floor | |
CN207032622U (en) | A kind of composite ceiling structure for furred ceiling Fast Installation | |
CN111364767A (en) | Construction method of short-slot dry-hanging argil plate | |
CN204552155U (en) | A kind of container house | |
Szalay | Life cycle environmental impacts of residential buildings | |
CN206538924U (en) | Plug-in type ceiling decoration structure | |
CN206538967U (en) | Plug-in type wall decoration structure | |
CN208184025U (en) | A kind of civilian villa combined wall board | |
CN206538901U (en) | A kind of assembling type partition wall | |
CN111173310A (en) | Non-stop large steel structure roof reinforcing construction method | |
CN206144019U (en) | Frameless frame industrialization wall body can be built fast to light | |
CN105804411A (en) | A heat preservation and decoration integrated board installing process | |
Zhou et al. | Design and implementation of green construction scheme for a high-rise residential building project | |
CN204626823U (en) | One is novel hides light trough structure | |
CN204728557U (en) | A kind of 3 D plane baked keel falls step ceiling system | |
CN209025491U (en) | Box type house transformed from waste containers | |
Azariy et al. | Organizational and design requirements for facade systems works in structures and buildings | |
CN217027710U (en) | Level smooth closed furred ceiling mounting structure | |
CN206942007U (en) | Modularization blade inserting environment protection wall board wall surface decoration system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20200629 Address after: No.3-2, Shuntai South Road, Lishui Town, Nanhai District, Foshan City, Guangdong Province Patentee after: FOSHAN CARLOS METAL BUILDING MATERIALS Co.,Ltd. Address before: 528244 No. 3, seven, Shun Tai Road, B District, Lishui town and Guangxi Industrial Park, Nanhai District, Foshan, Guangdong. Patentee before: FOSHAN XINZHONGMAO ENERGY SAVING BUILDING MATERIAL TECHNOLOGY Co.,Ltd. |
|
TR01 | Transfer of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181113 |
|
CF01 | Termination of patent right due to non-payment of annual fee |