CN208088611U - Bottom modularization building cover board A class plates - Google Patents
Bottom modularization building cover board A class plates Download PDFInfo
- Publication number
- CN208088611U CN208088611U CN201820000454.2U CN201820000454U CN208088611U CN 208088611 U CN208088611 U CN 208088611U CN 201820000454 U CN201820000454 U CN 201820000454U CN 208088611 U CN208088611 U CN 208088611U
- Authority
- CN
- China
- Prior art keywords
- plate
- connecting plate
- wall
- connection
- areas
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Building Environments (AREA)
Abstract
The utility model is related to a kind of bottom modularization building cover board A class plates, belong to structural engineering technical field.Bottom modularization building cover board A class plates are rectangular slab, are that wall connecting plate is indulged on top at the top of longitudinally outboard, bottom is lower part longeron connecting plate, and frame beam connects the two, and the width of the plate of a quarter to 1/6th is exposed at outside plate, forms the areas Shi Ding.The utility model installation operation significantly simplifies, assembling speed is fast, and big component general assembly, industrialization degree higher may be used, good economical benefit, and environmental pollution is avoided, sound insulation, insulating layer are especially embedded into the inside of plate, reduce a large amount of field operations, only need at the scene whole plate modularization apply nail operation, it shortens the construction period at double, is constructed by series, make it have good stress performance.
Description
Technical field
The utility model belongs to building structure technology field, more particularly to a kind of bottom modularization building cover board A class plates.
Background technology
According to statistics, construction industry consumes about 50% energy on the earth, 42% water resource, 50% material and 48%
Arable land.Cause disruption of ecological balance, produce global 24% air pollution, 50% greenhouse effects, 40% pollution of waterhead and
50% chlorofluorocarbons etc..
Green building curbs environmental pollution in China, energy-saving and emission-reduction, plays vital work in terms of the adjustment industrial structure
With.Past China in terms of Development of Green Building, emphasis steel construction and concrete structure and have ignored timber structure green building.
Steel, cement, plastics non-renewable unsustainable property clearly.Present developed country have been recognized that Wood construction and
The building materials processed using agricultural wastes, are the correct directions of building industry sustainable development, however department of the Chinese government and society
Can all circles for the extensive use of novel Wood construction, there is also many mistaken ideas.
For this reason, it is necessary to carry out systematic research and development for timber structure green building and its industrialization, make China's building production
Industry really realizes the green, recyclable, sustainable of overall process.
Utility model content
For the above technical problems, long, environmental protection that the purpose of this utility model is to provide a kind of usage times, can
The bottom modularization building cover board of recycling insulates against sound, insulating layer without in addition setting, reduces a large amount of field operations, ensure simultaneously
Manufacturing procedure is simple, more ensures it with good stress performance.
The technical solution adopted in the utility model is as follows:
Wall connecting plate (3-1-1), upper lateral are indulged in a kind of bottom modularization building cover board A class plates of the utility model, including top
Connecting plate (3-1- between connecting plate (3-1-3), top surface cladding boards (3-1-4), beam upper plate between wall connecting plate (3-1-2), lateral plate
5), lower part longeron connecting plate (3-1-6), lower beam connecting plate (3-1-7), bottom surface cladding boards (3-1-8), postposition add beam slab
Connection reinforcement plate (3-1-9), frame beam (3-1-10), are vertically connected with and reinforce stull (3-1-12), end joist (3-1-11) in plate
Stull (3-1-14), the lower part connection top areas Shi Ding (3-1-15), arc ventilation opening (3-1- in portion's stull (3-1-13), plate
16) the connection areas Shi Ding (3-1-19), upper wall between the areas Shi Ding (3-1-18), beam upper plate, are connected between end-blocking plate (3-1-17), lateral plate
The areas connection wall Wai Shiding (3-1-20), the upper areas wall connection wall Nei Shiding (3-1-21) connect the bottom areas Shi Ding (3-1- with lower part
22);The bottom modularization building cover board A classes plate (3-1) is rectangular slab, and longitudinal is long side, is laterally short side;At the top of longitudinally outboard
Wall connecting plate (3-1-1) is indulged to indulge the top that wall is connect with top, bottom is the lower part longeron connecting plate being connect with lower part longeron
(3-1-6), the two is parallel and corresponding up and down, and along the two length direction, the frame beam (3-1-10) perpendicular with the two will
The two connects, and connects preferentially using nail connection;The width of the plate of a quarter to 1/6th is exposed at outside plate, is exposed at the portion outside plate
Divide and respectively opens up several equally distributed arc ventilation openings (3-1-16);The vertical wall connecting plate (3-1-1) in top is exposed at plate
Outer part forms the areas wall connection wall Wai Shiding (3-1-20), is to apply nail in upper wall connection wall in the region of the same width in inside
Area (3-1-21);The part of lower part longeron connecting plate (3-1-6) being exposed at outside plate forms lower part connection top Shi Ding area (3-1-
15);In inside, the region of same width is that lower part connects the bottom areas Shi Ding (3-1-22), lower part connection top Shi Ding area (3-1-
15), the upper areas wall connection wall Wai Shiding (3-1-20), the upper areas wall connection wall Nei Shiding (3-1-21) connect the bottom areas Shi Ding with lower part
The width of (3-1-22) is equal, and is preferentially equal to the thickness of plate;Longitudinal medial connecting plate (3-1-3) between lateral plate,
Joist (3-1-11), lateral plate in equally distributed plate between connecting plate (3-1-3) and frame beam (3-1-10) between lateral plate
Between connecting plate (3-1-3), frame beam (3-1-10) and joist in plate (3-1-11) it is respectively parallel;In frame beam (3-1-10) and
Be arranged between joist (3-1-11) in plate it is several with both mutually vertical and equally distributed end stull (3-1-13);?
In plate between joist (3-1-11), and respectively set between joist (3-1-11) in connecting plate (3-1-3) and plate between lateral plate
Set stull (3-1-14) in the plate perpendicular with the two;Between the lateral plate connecting plate (3-1-3), frame beam (3-1-10) and
The end of the lateral ends of joist (3-1-11) is respectively connected with end-blocking plate (3-1-17) using nail in plate;In end-blocking plate (3-
1-17) top is the top cross wall connecting plate (3-1-2) being connect with top cross wall, and bottom is the lower lateral being connect with lower beam
Beam connecting plate (3-1-7), the two is parallel and corresponding up and down, along the two length direction, the plate of a quarter to 1/6th
Width be exposed at outside plate, the part being exposed at outside plate respectively opens up several equally distributed arc ventilation openings (3-1-16);On
The part of portion's cross wall connecting plate (3-1-2) being exposed at outside plate forms the areas wall connection wall Wai Shiding (3-1-20), same in inside
The region of width is the upper areas wall connection wall Nei Shiding (3-1-21);The part of lower beam connecting plate (3-1-7) being exposed at outside plate
Form the lower part connection top areas Shi Ding (3-1-15);In inside, the region of same width is that lower part connects the bottom areas Shi Ding (3-1-
22), the lower part connection top areas Shi Ding (3-1-15), the upper areas wall connection wall Wai Shiding (3-1-20), the upper areas wall connection wall Nei Shiding
The width that (3-1-21) connects the bottom areas Shi Ding (3-1-22) with lower part is equal, and is preferentially equal to the thickness of plate;In the side
Into connecting plate between plate (3-1-3), frame beam (3-1-10) and plate the end of the inner opposite end of joist (3-1-11) respectively with
Connecting plate (3-1-5) is connected using nail between beam upper plate;In the connecting plate between lateral plate of the connecting plate (3-1-5) between beam upper plate
In (3-1-3), frame beam (3-1-10) and plate between joist (3-1-11), it is flat to be respectively provided with the connecting plate (3-1-5) between beam upper plate
Stull (3-1-12) is reinforced in capable being vertically connected with, and is vertically connected with and reinforces stull (3-1-12) in line;Indulge wall connecting plate in top
Connecting plate (3-1-3) between (3-1-1), top cross wall connecting plate (3-1-2), lateral plate, is vertically connected with joist (3-1-11) in plate
Reinforce that stull (3-1-12), end stull (3-1-13), the top surface of stull (3-1-14) flushes in plate, and with top surface cladding boards
(3-1-4) is connected;Joist (3-1-11) in frame beam (3-1-10), plate, is vertically connected with reinforcement stull at end-blocking plate (3-1-17)
The bottom surface of stull (3-1-14) flushes in (3-1-12), end stull (3-1-13), plate, and with bottom surface cladding boards (3-1-8)
Connection;Connecting plate (3-1-5), lower part longeron connecting plate (3-1-6), lower lateral between connecting plate (3-1-3), beam upper plate between lateral plate
The bottom surface of beam connecting plate (3-1-7) flushes, and the height for exposing bottom surface cladding boards (3-1-8) is equal, and is to connect between beam upper plate
The plate thickness of plate (3-1-5);The part that connecting plate (3-1-3) exposes between lateral plate forms connection Shi Ding area (3-1- between lateral plate
18) part that, connecting plate (3-1-5) exposes between beam upper plate connects the areas Shi Ding (3-1-19) between forming beam upper plate;All areas Shi Ding
Width it is preferentially equal with plate thickness;It is connected between connecting plate (3-1-3), top surface cladding boards (3-1-4), beam upper plate between lateral plate
It fills and protects in the space that plate (3-1-5), bottom surface cladding boards (3-1-8), frame beam (3-2-10), end-blocking plate (3-2-17) surround
Warm sound insulating material.
Further, the top is vertical connects between wall connecting plate (3-1-1) and top cross wall connecting plate (3-1-2), lateral plate
Connecting plate (3-1-5), lower part longeron connecting plate (3-1-6), lower beam connecting plate (3-1- between fishplate bar (3-1-3), beam upper plate
7), postposition adds beam slab connection reinforcement plate (3-1-9), frame beam (3-1-10), joist (3-1-11) in plate, is vertically connected with reinforcement
Stull (3-1-12), end stull (3-1-13), in plate stull (3-1-14) and end-blocking plate (3-1-17) thickness all same, and
Width is the integral multiple of thickness.
Further, wall connecting plate (3-1-1) and lower part longeron connecting plate (3-1-6) are indulged in the top, in the side of plate
It is semicircle to hold the arc ventilation opening (3-1-16) opened up, and in open edge using opposite arc rounding off, radius of the radian is
8mm-12mm;The spacing of arc ventilation opening (3-1-16) is 400mm-600mm.
Further, the installation method of bottom modularization building cover board A class plates, includes the following steps:
A. beam slab (2) connect by ground anchor bolt (4) with basic (1), ground beam slab (2) and basic (1) of surrounding outside
Surface flushes, and inner surface stretches out basic (1), and the part of stretching is the ground areas beam slab Shi Ding;Internal ground beam slab (2) stretches out basis
(1), the part of stretching is the ground areas beam slab Shi Ding, the width that the ground areas beam slab Shi Ding are stretched out and bottom modularization building cover board A class plates
The width in each areas Shi Ding is equal;
B. bottom modularization building cover board A classes plate (3-1), bottom modularization building cover board B plates (3-2), bottom modularization superstructure
Plate C plates (3-3), bottom modularization building cover board D plates (3-4) are respectively mounted on ground beam slab (2), bottom modularization building cover board A
Class plate (3-1) is mounted on corner;The areas Shi Ding (3-1-15) apply nail at the top of the connection of the lower part of outer side corner sections, using at the top of scene
Injection is followed closely (5-1) and is connect with ground beam slab (2), and ground beam slab (2) bottom that lower part connects the bottom areas Shi Ding (3-1-22) is corresponded in corner
Portion applies nail, and (5-2) is followed closely by the lower part of ground beam slab (2) and bottom modularization building cover board A classes plate (3-1) using scene bottom injection
Longeron connecting plate (3-1-6), lower beam connecting plate (3-1-7) connection;
C. connecting plate (3-1-5) between beam upper plate is placed on internal ground beam slab (2), the areas Shi Ding is connected between beam upper plate
(3-1-19) applies nail, is docked on ground beam slab (2) with longitudinally adjacent plate;Beam slab (2) and bottom modularization building cover board B plates on ground
Postposition is set between (3-2) and adds beam slab connection reinforcement plate (3-1-9), nail is applied in the ground areas beam slab Shi Ding, using scene bottom
(5-2) will be followed closely in injection to add beam slab connection reinforcement plate (3-1-9), bottom modularization building cover board A class plates with ground beam slab (2), postposition
The lower beam connecting plate (3-1-7) of (3-1) connects;
D. the areas Shi Ding (3-1-19) is connected between lateral plate between the beam upper plate of connecting plate (3-1-3) and applies nail, and it is laterally adjacent
Plate connects.
The advantages of the utility model and advantageous effect:
The utility model installation operation significantly simplifies, and assembling speed is fast, and big component general assembly may be used, and industrializes journey
Higher, good economical benefit are spent, and avoids environmental pollution.Sound insulation, insulating layer are especially embedded into the inside of plate, reduced a large amount of
Field operation, it is only necessary to which whole plate modularization applies nail operation at the scene, shortens the construction period at double, is constructed by series, makes it have good
Stress performance.
Description of the drawings
Based on Fig. 1 with ground beam slab connection diagram.
Fig. 2 is bottom modularization superstructure and ground beam slab connection diagram.
Fig. 3 is bottom modularization building cover board A class plate schematic top plan views.
Fig. 4 is bottom modularization building cover board A class plate elevational schematic views.
Fig. 5 is bottom modularization building cover board A class plate schematic side views.
Fig. 6 does not cover top surface cladding boards for bottom modularization building cover board A class plates(It is not added with heat insulating and sound insulating material)Structure
Schematic diagram.
Fig. 7 is the A-A diagrammatic cross-sections of Fig. 3.
In figure:Based on 1;2 be ground beam slab;3 be bottom modularization superstructure;4 be ground anchor bolt;5 follow closely for scene;
3-1 is bottom modularization building cover board A class plates;3-2 is bottom modularization building cover board B plates;3-3 is bottom modularization building
Cover board C plates;3-4 is bottom modularization building cover board D plates;
3-1-1 is that wall connecting plate is indulged on top;3-1-2 is top cross wall connecting plate;3-1-3 connecting plates between lateral plate;3-
1-4 is top surface cladding boards;3-1-5 connecting plates between beam upper plate;3-1-6 is lower part longeron connecting plate;3-1-7 is lower beam
Connecting plate;3-1-8 is bottom surface cladding boards;3-1-9 is that postposition adds beam slab connection reinforcement plate;3-1-10 is frame beam;3-1-11
For joist in plate;3-1-12 is to be vertically connected with reinforcement stull;3-1-13 is end stull;3-1-14 is stull in plate;3-1-15
The top areas Shi Ding are connected for lower part;3-1-16 is arc ventilation opening;3-1-17 is end-blocking plate;3-1-18 is connected between lateral plate and is applied
Follow closely area;3-1-19 connects the areas Shi Ding between beam upper plate;3-1-20 is the upper areas wall connection wall Wai Shiding;3-1-21 is upper wall connection wall
The areas Nei Shiding;3-1-22 is that lower part connects the bottom areas Shi Ding;
5-1 is that scene is followed closely with top injection, 5-2 is scene bottom injection nail.
Specific implementation mode
With reference to the accompanying drawings and embodiments to bottom modularization building cover board A classes plate provided by the utility model and its installation side
Method is described in detail.
Embodiment
As shown in Fig. 1 ~ Fig. 7, a kind of bottom modularization building cover board A class plates include that wall connecting plate 3-1-1, upper lateral are indulged in top
Connecting plate 3-1-5, lower part are vertical between connecting plate 3-1-3, top surface cladding boards 3-1-4, beam upper plate between wall connecting plate 3-1-2, lateral plate
Beam connecting plate 3-1-6, lower beam connecting plate 3-1-7, bottom surface cladding boards 3-1-8, postposition add beam slab connection reinforcement plate 3-1-
9, frame beam 3-1-10, joist 3-1-11 in plate, be vertically connected with and reinforce stull 3-1-12, end stull 3-1-13, stull in plate
It connects and applies between 3-1-14, lower part connection top Shi Ding area 3-1-15, arc ventilation opening 3-1-16, end-blocking plate 3-1-17, lateral plate
Nail area 3-1-18, connection Shi Ding area 3-1-19 between beam upper plate, upper wall connection wall Wai Shiding area 3-1-20, nail is applied in upper wall connection wall
Area 3-1-21 connects the bottom areas Shi Ding 3-1-22 with lower part;The bottom modularization building cover board A class plates 3-1 is rectangular slab, longitudinal
It is laterally short side for long side;Indulge wall connecting plate 3-1-1 to indulge the top that wall connect with top at the top of longitudinally outboard, bottom for
The lower part longeron connecting plate 3-1-6 of lower part longeron connection, the two is parallel and corresponding up and down, along the two length direction, with two
The perpendicular frame beam 3-1-10 of person connects the two, connects preferentially using nail connection;The plate of a quarter to 1/6th
Width is exposed at outside plate, and the part being exposed at outside plate respectively opens up several equally distributed arc ventilation opening 3-1-16;Top is vertical
The part of wall connecting plate 3-1-1 being exposed at outside plate forms wall connection wall Wai Shiding area 3-1-20, in the area of the same width in inside
Domain is upper wall connection wall Nei Shiding area 3-1-21;The part of lower part longeron connecting plate 3-1-6 being exposed at outside plate forms lower part connection
The top areas Shi Ding 3-1-15;In inside, the region of same width is that lower part connects the bottom areas Shi Ding 3-1-22, lower part connection top
The areas Shi Ding 3-1-15, upper wall connection wall Wai Shiding area 3-1-20, upper wall connection wall Nei Shiding area 3-1-21 connect bottom with lower part
The width of the areas Shi Ding 3-1-22 is equal, and is preferentially equal to the thickness of plate;Longitudinal medial connecting plate 3-1- between lateral plate
3, the joist 3-1-11 in equally distributed plate between connecting plate 3-1-3 and frame beam 3-1-10 between lateral plate connect between lateral plate
Fishplate bar 3-1-3, frame beam 3-1-10 and joist 3-1-11 in plate are respectively parallel;The joist 3-1- in frame beam 3-1-10 and plate
Be arranged between 11 it is several with both mutually vertical and equally distributed end stull 3-1-13;In plate joist 3-1-11 it
Between, and between lateral plate in connecting plate 3-1-3 and plate between joist 3-1-11 respectively setting with both in perpendicular plate it is horizontal
Support 3-1-14;Between the lateral plate in connecting plate 3-1-3, frame beam 3-1-10 and plate the lateral ends of joist 3-1-11 end
Portion is respectively connected with end-blocking plate 3-1-17 using nail;Top cross wall at the top of end-blocking plate 3-1-17 to be connect with top cross wall
Connecting plate 3-1-2, bottom are the lower beam connecting plate 3-1-7 being connect with lower beam, and the two is parallel and upper and lower corresponding, edge
The two length direction, the width of the plate of a quarter to 1/6th is exposed at outside plate, and the part being exposed at outside plate respectively opens up
Several equally distributed arc ventilation opening 3-1-16;The part of top cross wall connecting plate 3-1-2 being exposed at outside plate forms wall
Connection wall Wai Shiding area 3-1-20, in inside, the region of same width is upper wall connection wall Nei Shiding area 3-1-21;Lower beam
The part of connecting plate 3-1-7 being exposed at outside plate forms lower part connection top Shi Ding area 3-1-15;In the region of the same width in inside
Connect the bottom areas Shi Ding 3-1-22 for lower part, lower part connection top Shi Ding area 3-1-15, upper wall connection wall Wai Shiding area 3-1-20,
The width that upper wall connection wall Nei Shiding area 3-1-21 connect the bottom areas Shi Ding 3-1-22 with lower part is equal, preferentially equal to plate
Thickness;The end of the inner opposite end of joist 3-1-11 is equal in connecting plate 3-1-3, frame beam 3-1-10 and plate between the lateral plate
Connecting plate 3-1-5 is connected using nail between beam upper plate respectively;Connecting plate 3-1-5's connects between lateral plate between close beam upper plate
In plate 3-1-3, frame beam 3-1-10 and plate between joist 3-1-11, it is respectively provided with parallel upper of the connecting plate 3-1-5 between beam upper plate
Lower connection reinforcement stull 3-1-12 is vertically connected with and reinforces stull 3-1-12 in line;Indulge wall connecting plate 3-1-1, top in top
Connecting plate 3-1-3 between cross wall connecting plate 3-1-2, lateral plate, it joist 3-1-11 in plate, is vertically connected with and reinforces stull 3-1-12, end
The top surface of stull 3-1-14 flushes in portion's stull 3-1-13, plate, and is connect with top surface cladding boards 3-1-4;Frame beam 3-1-10,
Joist 3-1-11, end-blocking plate 3-1-17 in plate, it is vertically connected with and reinforces stull 3-1-12, end stull 3-1-13, stull 3- in plate
The bottom surface of 1-14 flushes, and is connect with bottom surface cladding boards 3-1-8;Connecting plate 3- between connecting plate 3-1-3, beam upper plate between lateral plate
1-5, lower part longeron connecting plate 3-1-6, lower beam connecting plate 3-1-7 bottom surface flush, expose bottom surface cladding boards 3-1-8 height
It spends equal, and is the plate thickness of connecting plate 3-1-5 between beam upper plate;The part that connecting plate 3-1-3 exposes between lateral plate is formed laterally
Shi Ding area 3-1-18 are connected between plate, the part that connecting plate 3-1-5 exposes between beam upper plate forms connection Shi Ding area 3-1- between beam upper plate
19;The width in all areas Shi Ding is preferentially equal with plate thickness;Connecting plate 3-1-3, top surface cladding boards 3-1-4, beam between lateral plate
It is filled in the space that connecting plate 3-1-5, bottom surface cladding boards 3-1-8, frame beam 3-2-10, end-blocking plate 3-2-17 are surrounded between upper plate
Heat insulating and sound insulating material.
Vertical connecting plate 3-1-3, the Liang Shang between wall connecting plate 3-1-1 and top cross wall connecting plate 3-1-2, lateral plate in the top
Connecting plate 3-1-5, lower part longeron connecting plate 3-1-6, lower beam connecting plate 3-1-7, postposition add beam slab connection reinforcement between plate
Plate 3-1-9, frame beam 3-1-10, it joist 3-1-11 in plate, is vertically connected with and reinforces stull 3-1-12, end stull 3-1-13, plate
The thickness all same of interior stull 3-1-14 and end-blocking plate 3-1-17, and the integral multiple that width is thickness.
Wall connecting plate 3-1-1 and lower part longeron connecting plate 3-1-6 is indulged on the top, logical in the arc that the side of plate opens up
Air port 3-1-16 is semicircle, and uses opposite arc rounding off, radius of the radian 8mm-12mm in open edge;Arc is divulged information
The spacing of mouth 3-1-16 is 400mm-600mm.
The installation method of bottom modularization building cover board A class plates, includes the following steps:
A. beam slab 2 is connect by ground anchor bolt 4 with basis 1, is flushed with the outer surface on basis 1 in the ground beam slab 2 of surrounding, interior
Basis 1 is stretched out on surface, and the part of stretching is the ground areas beam slab Shi Ding;Internal ground beam slab 2 stretches out basis 1, and the part of stretching is
The ground areas beam slab Shi Ding, the width and the width in each areas Shi Ding of bottom modularization building cover board A class plates that the ground areas beam slab Shi Ding are stretched out are equal
It is equal;
B. bottom modularization building cover board A class plates 3-1, bottom modularization building cover board B plates 3-2, bottom modularization building cover board C plates
3-3, bottom modularization building cover board D plates 3-4 are respectively mounted on ground beam slab 2, the 3-1 installations of bottom modularization building cover board A class plates
In corner;The areas Shi Ding 3-1-15 applies nail at the top of the connection of the lower part of outer side corner sections, using scene top injection nail 5-1 and ground beam
Plate 2 connects, and nail is applied in 2 bottom of ground beam slab that the connection bottom areas Shi Ding 3-1-22 in lower part is corresponded in corner, is passed through with bottom using scene
Enter to follow closely 5-2 to connect ground beam slab 2 with the lower part longeron connecting plate 3-1-6 of bottom modularization building cover board A class plates 3-1, lower beam
Plate 3-1-7 connections;
C. connecting plate 3-1-5 between beam upper plate is placed on internal ground beam slab 2, Shi Ding area 3-1-19 is connected between beam upper plate
Shi Ding is docked with longitudinally adjacent plate on ground beam slab 2;It is arranged between ground beam slab 2 and bottom modularization building cover board B plates 3-2
Postposition adds beam slab connection reinforcement plate 3-1-9, and nail is applied in the ground areas beam slab Shi Ding, will be with ground using scene bottom injection nail 5-2
Beam slab 2, postposition add the lower beam connecting plate 3- of beam slab connection reinforcement plate 3-1-9, bottom modularization building cover board A class plates 3-1
1-7 connections;
D. Shi Ding area 3-1-19 are connected between lateral plate between the beam upper plate of connecting plate 3-1-3 and apply nail, are connected with laterally adjacent plate
It connects.
The above is only the preferred embodiment of the utility model, it is noted that for the common skill of the art
For art personnel, without departing from the principle of this utility model, several improvements and modifications can also be made, these improve and
Retouching also should be regarded as the scope of protection of the utility model.
Claims (3)
1. wall connecting plate (3-1-1), top cross wall connecting plate (3-1- are indulged in a kind of bottom modularization building cover board A class plates, including top
2), connecting plate (3-1-5), the connection of lower part longeron between connecting plate (3-1-3), top surface cladding boards (3-1-4), beam upper plate between lateral plate
Plate (3-1-6), lower beam connecting plate (3-1-7), bottom surface cladding boards (3-1-8), postposition add beam slab connection reinforcement plate (3-1-
9), frame beam (3-1-10), joist (3-1-11) in plate, be vertically connected with reinforce stull (3-1-12), end stull (3-1-13),
Stull (3-1-14), the lower part connection top areas Shi Ding (3-1-15), arc ventilation opening (3-1-16), end-blocking plate (3-1- in plate
17) the connection areas Shi Ding (3-1-19), the upper areas wall connection wall Wai Shiding between the areas Shi Ding (3-1-18), beam upper plate, are connected between lateral plate
(3-1-20), the upper areas wall connection wall Nei Shiding (3-1-21) connect the bottom areas Shi Ding (3-1-22) with lower part;It is characterized in that:Institute
It is rectangular slab to state bottom modularization building cover board A classes plate (3-1), and longitudinal is long side, is laterally short side;At the top of longitudinally outboard for it is upper
Wall connecting plate (3-1-1) is indulged on the top that portion indulges wall connection, and bottom is the lower part longeron connecting plate (3-1- being connect with lower part longeron
6), the two is parallel and corresponding up and down, and along the two length direction, the frame beam (3-1-10) perpendicular with the two connects the two
It connects, connection is using nail connection;The width of the plate of a quarter to 1/6th is exposed at outside plate, and the part being exposed at outside plate is respectively opened
If several equally distributed arc ventilation openings (3-1-16);Indulge the part shape of wall connecting plate (3-1-1) being exposed at outside plate in top
At the upper areas wall connection wall Wai Shiding (3-1-20), in inside, the region of same width is upper wall connection wall Nei Shiding area (3-1-
21);The part of lower part longeron connecting plate (3-1-6) being exposed at outside plate forms the lower part connection top areas Shi Ding (3-1-15);Inside
The region of the same width in side is that lower part connects the bottom areas Shi Ding (3-1-22), the lower part connection top areas Shi Ding (3-1-15), upper wall
The areas connection wall Wai Shiding (3-1-20), the upper areas wall connection wall Nei Shiding (3-1-21) connect the bottom areas Shi Ding (3-1-22) with lower part
Width be equal, be equal to the thickness of plate;Longitudinal medial connecting plate (3-1-3) between lateral plate, connects between lateral plate
Joist (3-1-11) in equally distributed plate between fishplate bar (3-1-3) and frame beam (3-1-10), connecting plate (3-1- between lateral plate
3), frame beam (3-1-10) and joist in plate (3-1-11) are respectively parallel;Joist (the 3-1- in frame beam (3-1-10) and plate
11) be arranged between it is several with both mutually vertical and equally distributed end stull (3-1-13);Joist (the 3-1- in plate
11) between, and respectively setting and the two are perpendicular between joist (3-1-11) in connecting plate (3-1-3) and plate between lateral plate
Plate in stull (3-1-14);Joist (the 3-1- in connecting plate (3-1-3), frame beam (3-1-10) and plate between the lateral plate
11) end of lateral ends is respectively connected with end-blocking plate (3-1-17) using nail;At the top of the end-blocking plate (3-1-17) for
The top cross wall connecting plate (3-1-2) of top cross wall connection, bottom is the lower beam connecting plate (3-1- being connect with lower beam
7), the two is parallel and corresponding up and down, and along the two length direction, the width of the plate of a quarter to 1/6th is exposed at plate
Outside, the part being exposed at outside plate respectively opens up several equally distributed arc ventilation openings (3-1-16);Top cross wall connecting plate
The part being exposed at outside plate of (3-1-2) forms the areas wall connection wall Wai Shiding (3-1-20), and in inside, the region of same width is
The upper areas wall connection wall Nei Shiding (3-1-21);The part of lower beam connecting plate (3-1-7) being exposed at outside plate forms lower part connection
The top areas Shi Ding (3-1-15);In inside, the region of same width is that lower part connects the bottom areas Shi Ding (3-1-22), lower part connection
The top areas Shi Ding (3-1-15), the upper areas wall connection wall Wai Shiding (3-1-20), the upper areas wall connection wall Nei Shiding (3-1-21) and under
The width of the portion's connection bottom areas Shi Ding (3-1-22) is equal, and is equal to the thickness of plate;Connecting plate (the 3-1- between the lateral plate
3), the end of the inner opposite end of joist (3-1-11) respectively connecting plate (3- between beam upper plate in frame beam (3-1-10) and plate
1-5) using nail connection;In the connecting plate between lateral plate (3-1-3), the frame beam (3- of the connecting plate (3-1-5) between beam upper plate
1-10) and in plate between joist (3-1-11), it is respectively provided with that parallel between beam upper plate connecting plate (3-1-5) to be vertically connected with reinforcement horizontal
It supports (3-1-12), is vertically connected with and reinforces stull (3-1-12) in line;Wall connecting plate (3-1-1) is indulged on top, top cross wall connects
Connecting plate (3-1-3) between fishplate bar (3-1-2), lateral plate, joist (3-1-11) in plate, be vertically connected with reinforce stull (3-1-12),
The top surface of stull (3-1-14) flushes in end stull (3-1-13), plate, and is connect with top surface cladding boards (3-1-4);Frame
Joist (3-1-11), end-blocking plate (3-1-17) in beam (3-1-10), plate are vertically connected with and reinforce stull (3-1-12), end stull
The bottom surface of stull (3-1-14) flushes in (3-1-13), plate, and is connect with bottom surface cladding boards (3-1-8);It is connected between lateral plate
Connecting plate (3-1-5) between plate (3-1-3), beam upper plate, lower part longeron connecting plate (3-1-6), lower beam connecting plate (3-1-7)
Bottom surface flushes, and the height for exposing bottom surface cladding boards (3-1-8) is equal, and is the plate thickness of connecting plate (3-1-5) between beam upper plate;Side
The part exposed to connecting plate between plate (3-1-3) connects the areas Shi Ding (3-1-18) between forming lateral plate, connecting plate (3- between beam upper plate
1-5) part exposed connects the areas Shi Ding (3-1-19) between forming beam upper plate;The width in all areas Shi Ding is equal with plate thickness;?
Connecting plate (3-1-5), bottom surface cladding boards (3- between connecting plate (3-1-3), top surface cladding boards (3-1-4), beam upper plate between lateral plate
1-8), heat insulating and sound insulating material is filled in the space that frame beam (3-2-10), end-blocking plate (3-2-17) surround.
2. bottom modularization building cover board A class plates as described in claim 1, it is characterised in that:Indulge wall connecting plate (3- in the top
1-1) connecting plate (3-1-5), lower part between connecting plate (3-1-3), beam upper plate between top cross wall connecting plate (3-1-2), lateral plate
Longeron connecting plate (3-1-6), lower beam connecting plate (3-1-7), postposition add beam slab connection reinforcement plate (3-1-9), frame beam
Joist (3-1-11) in (3-1-10), plate is vertically connected with and reinforces stull (3-1-12), end stull (3-1-13), stull in plate
The thickness all same of (3-1-14) and end-blocking plate (3-1-17), and the integral multiple that width is thickness.
3. bottom modularization building cover board A class plates as described in claim 1, it is characterised in that:Indulge wall connecting plate in the top
(3-1-1) and lower part longeron connecting plate (3-1-6) is semicircle in the arc ventilation opening (3-1-16) that the side of plate opens up, and
Opposite arc rounding off, radius of the radian 8mm-12mm are used in open edge;The spacing of arc ventilation opening (3-1-16) is
400mm-600mm。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820000454.2U CN208088611U (en) | 2018-01-02 | 2018-01-02 | Bottom modularization building cover board A class plates |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820000454.2U CN208088611U (en) | 2018-01-02 | 2018-01-02 | Bottom modularization building cover board A class plates |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208088611U true CN208088611U (en) | 2018-11-13 |
Family
ID=64065354
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820000454.2U Expired - Fee Related CN208088611U (en) | 2018-01-02 | 2018-01-02 | Bottom modularization building cover board A class plates |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208088611U (en) |
-
2018
- 2018-01-02 CN CN201820000454.2U patent/CN208088611U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103883034B (en) | A kind of fabricated shear wall of belt edge confining part and wall-beam syndeton | |
CN205444458U (en) | Integrated assembled steel construction building | |
CN206053131U (en) | Precast floor slab steel reinforcement cage component and floor | |
CN103352569A (en) | Construction method of integrally-poured architecture building | |
CN205875394U (en) | Antidetonation concrete beam column that dry process is connected | |
CN203270856U (en) | Building wall | |
CN208088611U (en) | Bottom modularization building cover board A class plates | |
CN206859404U (en) | A kind of connecting node applied to modularization steel building | |
CN201972395U (en) | Steel-frame double-layer-net building template | |
CN207892101U (en) | Top-level module building cover board | |
CN208039573U (en) | Bottom modularization building cover board C class plates | |
CN203684522U (en) | Lightweight composite prefabricated wall plate for house | |
CN206016048U (en) | Assemble type concrete slab | |
CN203412143U (en) | Wall body structure of integrally poured building house | |
CN206319887U (en) | A kind of modular variable cross-section tunnel lining trolley | |
CN107938903A (en) | Bottom modularization building cover board A classes plate and its installation method | |
CN108179763A (en) | Bottom modularization building cover board B classes plate and its installation method | |
CN205907887U (en) | Ceramsite concrete coincide floor | |
CN112922207A (en) | Concrete one-way laminated slab with exposed slab net frame at bottom | |
CN107965079A (en) | Bottom modularization building cover board C classes plate and its installation method | |
CN208137225U (en) | Bottom modularization building cover board D class plate | |
CN210369497U (en) | Floor bottom die block and floor | |
CN208310369U (en) | Self-resetting mild steel and damper linkage energy consumption wood joist | |
CN202925710U (en) | Die sleeve type energy-saving wall system | |
CN207863226U (en) | A kind of built-in fabricated shear wall supported |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181113 Termination date: 20220102 |
|
CF01 | Termination of patent right due to non-payment of annual fee |