Building steel protects a hammering pipe puller Download PDFInfo
- Publication number
- CN208088299U CN208088299U CN201820469084.7U CN201820469084U CN208088299U CN 208088299 U CN208088299 U CN 208088299U CN 201820469084 U CN201820469084 U CN 201820469084U CN 208088299 U CN208088299 U CN 208088299U
- Authority
- CN
- China
- Prior art keywords
- steel pile
- pile casting
- cuff
- hammering
- steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 60
- 239000010959 steel Substances 0.000 title claims abstract description 60
- 238000005266 casting Methods 0.000 claims description 43
- 238000009434 installation Methods 0.000 claims description 4
- 238000010276 construction Methods 0.000 abstract description 9
- 239000002689 soil Substances 0.000 abstract description 5
- 239000004744 fabric Substances 0.000 abstract description 2
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 abstract 4
- 235000017166 Bambusa arundinacea Nutrition 0.000 abstract 2
- 235000017491 Bambusa tulda Nutrition 0.000 abstract 2
- 241001330002 Bambuseae Species 0.000 abstract 2
- 235000015334 Phyllostachys viridis Nutrition 0.000 abstract 2
- 239000011425 bamboo Substances 0.000 abstract 2
- 229910052742 iron Inorganic materials 0.000 abstract 2
- 238000005516 engineering process Methods 0.000 description 5
- 238000010586 diagram Methods 0.000 description 4
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000001737 promoting effect Effects 0.000 description 1
- 238000004804 winding Methods 0.000 description 1
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The utility model discloses a building steel protects a section of thick bamboo hammering tube drawer and includes tube drawer, anchor clamps and at least a wedge iron spare, and the tube drawer includes hammering drum and linking arm one, and one end is unsealed among them of hammering drum, and anchor clamps are installed and are fixed on the steel protects a section of thick bamboo, and anchor clamps and tube drawer pass through wire rope card and wire rope connection; the wedge-shaped iron piece is clamped between the steel casing and the hoop and used for installing and fixing the steel casing and the hoop. The utility model has the advantages that the hammering pipe drawer has simple structure, can effectively and quickly draw out the steel casing which is driven into the soil body, and avoids the phenomenon that the steel casing is deformed or broken due to the force deflection in the traditional pipe drawing mode, thereby improving the repeated utilization rate of the steel casing; the use of manpower and large-scale machinery is reduced, and the construction cost is reduced; the fixture is used for connecting the steel protection cylinder and the pipe extractor, and compared with the traditional mode that the steel protection cylinder is fixed by the cloth belt, the safety of construction and the pipe extracting operation efficiency are improved.
Description
Technical field
The utility model belongs to technical field of buildings, and in particular to a kind of building steel pile casting hammering pipe extractor.
Background technology
With the rapid development of Building technology, the deep basal pit of existing architectural engineering, high slope class engineering are more and more.Therewith
Side slope bolt-spary supports, the resisting buoyancy of foundation come handles also increasingly common;But the reason of in work progress because of geological conditions, anchor pole at
It often will appear collapse hole phenomenon when hole, to avoid the appearance of collapse hole, side slope anchor pole from generally using with pipe construction, being constructed into reduce
This, the casing of follow-up, which will be extracted, to be reused.
Traditional tube drawing uses Fabric tape winding casing, external mechanical traction tube drawing, but strap easily occurs in this kind of construction technology
Slip and fall off, draw force direction and phenomena such as deviation occurs in casing center line, reduced so as to cause tube drawing efficiency or the disconnected pipe of casing,
Situations such as deformation, therefore great economic loss is brought to unit in charge of construction.
Utility model content
To overcome technological deficiency of the existing technology, the utility model discloses a kind of building steel pile castings to hammer tube drawing
Device, the hammering pipe extractor is simple in structure, it is easy to use and convenient for promote, can effectively and rapidly extract squeeze into the soil body steel shield
Cylinder, the phenomenon that avoiding the offset in traditional tube drawing mode because of power from making the deformation of steel pile casting or disconnected pipe, to improve steel pile casting
Reuse rate.
Technical solution adopted by the utility model to solve its technical problems is a kind of building steel pile castings to hammer pipe extractor, packet
Pipe extractor, fixture and at least one piece wedge-shaped ironware are included, the pipe extractor includes hammering cylinder and being symmetricly set on to hammer cylinder side
Linking arm one on wall, the unclosed and unclosed one end in hammering cylinder wherein one end are all provided in connection wall one towards steel pile casting
Sets of holes one are equipped with, sets of holes one are arranged with anchor pole one;
The fixture is mounted on steel pile casting, and fixture includes cuff, and the cuff is in truncated cone-shaped, and two above and below cuff
End is unclosed, and linking arm two is symmetrically arranged on cuff side wall, sets of holes two are provided in connection wall two, sets of holes two are arranged with anchor
Wire line shoe is provided on bar two, anchor pole one and anchor pole two, fixture is connected with pipe extractor by wire line shoe and steel wire rope;
Wedge-shaped ironware card is fixed between steel pile casting and cuff for steel pile casting and cuff installation.
Preferably, the connection wall one includes square plate one, and one end of square plate one is connect with hammering cylinder side wall, and sets of holes one are set
It sets in square plate one.
Preferably, the connection wall two includes two pieces of square plates two, and two pieces of square plates two are mutually arranged in parallel on cuff side wall,
Sets of holes two are both provided in two pieces of square plates two, two pieces of square plates two are connected by anchor pole two.
Preferably, the wire line shoe is U-shaped buckle.
It is easy to use and convenient for promoting the utility model has the beneficial effects that the hammering pipe extractor is simple in structure, can effectively,
The steel pile casting squeezed into the soil body is quickly extracted, the offset in traditional tube drawing mode because of power is avoided to make the deformation of steel pile casting or disconnected pipe
The phenomenon that, to improve the reuse rate of steel pile casting;Reduce artificial and big machinery use, shortens the duration, subtract
Construction cost is lacked;Steel pile casting and pipe extractor are connected using fixture, steel pile casting is fixed using strap relative to traditional approach, is solved
The problem of strap slides or even fall off steel pile casting is easily caused, safety and the tube drawing operating efficiency of construction are improved.
Description of the drawings
Fig. 1 is a kind of specific implementation mode structural schematic diagram of the utility model.
Fig. 2 is a kind of specific implementation mode structural schematic diagram of hammering cylinder described in the utility model.
Fig. 3 is a kind of specific implementation mode structural schematic diagram of fixture described in the utility model.
Fig. 4 is a kind of specific implementation mode schematic diagram of fixture described in the utility model and steel pile casting mounting means.
Reference numeral:1- hammers cylinder, 2- square plates one, 21- sets of holes one, 22- anchor poles one, 3- cuffs, 4- square plates two, 41-
Anchor pole two, 5- sets of holes two, 6- wedge shape ironwares, 7- steel pile castings, 8- wire line shoes, 9- steel wire ropes.
Specific implementation mode
More detailed description is done to the embodiment of the utility model below in conjunction with attached drawing and reference numeral, makes to be familiar with ability
The technology people in domain can implement according to this after studying this specification carefully.It should be appreciated that specific embodiment described herein is only solving
The utility model is released, is not used to limit the utility model.
In the description of the present invention, it should be noted that the orientation of the instructions such as term "upper", "horizontal", "inner" or
Position relationship is to be based on the orientation or positional relationship shown in the drawings, and is merely for convenience of describing the present invention and simplifying the description,
It does not indicate or imply the indicated device or element must have a particular orientation, with specific azimuth configuration and operation, because
This should not be understood as limiting the present invention.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " is pacified
Dress ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or be integrally connected;It can
Can also be electrical connection to be mechanical connection;It can be directly connected, can also indirectly connected through an intermediary, Ke Yishi
Connection inside two elements.For the ordinary skill in the art, above-mentioned term can be understood at this with concrete condition
Concrete meaning in utility model.
Embodiment:Referring to attached drawing 1, attached drawing 2, attached drawing 3, a kind of attached building steel pile casting shown in Fig. 4 hammers pipe extractor, including
The wedge-shaped ironware 6 of pipe extractor, fixture and at least one piece, the pipe extractor include hammering cylinder 1 and being symmetricly set on to hammer 1 side of cylinder
Linking arm one on wall, the unclosed and unclosed one end in hammering cylinder 1 wherein one end is towards steel pile casting 7, in connection wall one
Sets of holes 1 are provided with, sets of holes 1 are arranged with anchor pole 1;
The fixture is mounted on steel pile casting 7, and fixture includes cuff 3, and the cuff 3 is in truncated cone-shaped, and on cuff 3
Lower both ends are unclosed, and linking arm two is symmetrically arranged on 3 side wall of cuff, and sets of holes 25, sets of holes 25 are provided in connection wall two
It is arranged with anchor pole 2 41, wire line shoe 8 is provided on anchor pole 1 and anchor pole 2 41, anchor pole 1 and anchor are connected with steel wire rope 9
Wire line shoe 8 on bar 2 41 realizes the connection of fixture and pipe extractor;
The card of wedge-shaped ironware 6 is fixed between steel pile casting 7 and cuff 3 for steel pile casting 7 and the installation of cuff 3.
In the present embodiment, pipe extractor is used for the device of transmitting forces, and fixture is mounted on steel pile casting 7, steel pile casting 7
It is mounted on fixture, anchor pole 1 is arranged in sets of holes 1, and anchor pole 2 41 is arranged in sets of holes 25, and anchor pole 1
Connection is realized by wire line shoe 8 and steel wire rope 9 with wire line shoe 8, fixture and pipe extractor is provided on anchor pole 2 41, by tube drawing
Device is sleeved on the quartering hammer drill rod of digging machine, and digging machine active force transfers the force to folder in one end unclosed on hammering cylinder 1
Tool, then make with the fixture active force that connect of hammering cylinder 1 on steel pile casting 7, to make steel pile casting 7 be extracted from rock-soil layer,
The tube drawing of steel pile casting 7 when hammering pipe extractor suitable for being especially anchor bolt construction in boulder bed all kinds of rock-soil layers.
The phenomenon that this hammering pipe extractor avoids the offset in traditional tube drawing mode because of power from making the deformation of steel pile casting 7 or disconnected pipe,
To improve the reuse rate of steel pile casting 7;Reduce artificial and big machinery use, shortens the duration, reduce and apply
Work cost;Steel pile casting 7 and pipe extractor are connected using fixture, steel pile casting 7 is fixed using strap relative to traditional approach, solution is easily made
The problem of even falling off steel pile casting 7 is slided at strap, improves safety and the tube drawing operating efficiency of construction.
Wedge-shaped ironware 6 is fixed for the installation of steel pile casting 8 and cuff 3 between the two, and steel pile casting 7 is made to be not easy to take off from fixture
It falls.
Preferably, the connection wall one includes square plate 1, and one end of square plate 1 is connect with hammering 1 side wall of cylinder, sets of holes
One 21 are arranged in square plate 1.Sets of holes 1 in square plate 1 are provided with anchor pole 1, and anchor pole 1 is used for pipe extractor and folder
The connection of tool.
Preferably, the connection wall two includes two pieces of square plates 24, and two pieces of square plates 24 are arranged in parallel in 3 side wall of cuff
On, sets of holes 25 are both provided in two pieces of square plates 24, two pieces of square plates 24 are connected by anchor pole 2 41.Square plate positioned at the same side
Sets of holes 25 on 24 are linked together by anchor pole 2 41, and anchor pole 2 41 is used to connect the connection of pipe extractor and fixture.
Preferably, the wire line shoe 8 is U-shaped buckle.U-shaped buckle button is extremely on anchor pole 1 and anchor pole 2 41, then leads to
It crosses steel wire rope 9 U-shaped buckle on anchor pole 1 and anchor pole 2 41 links together, realizes the connection of fixture and pipe extractor.
The above content is the further descriptions made to the utility model in conjunction with specific preferred embodiment, cannot recognize
Determine specific embodiment of the present utility model and is confined to these explanations.For the common skill of the utility model technical field
For art personnel, the other embodiment obtained in the case where not departing from the technical solution of the utility model should be included in this practicality
In novel protection domain.
Claims (4)
1. a kind of building steel pile casting hammers pipe extractor, it is characterised in that:Including the wedge-shaped ironware of pipe extractor, fixture and at least one piece
(6), the pipe extractor includes hammering cylinder(1)And it is symmetricly set on hammering cylinder(1)Linking arm one on side wall hammers cylinder
(1)Wherein one end is unclosed, and unclosed one end is towards steel pile casting(7), sets of holes one are both provided in connection wall one(21), set
Kong Yi(21)It is arranged with anchor pole one(22);
The fixture is mounted on steel pile casting(7)On, fixture includes cuff(3), the cuff(3)In truncated cone-shaped, and cuff
(3)Upper and lower ends are unclosed, cuff(3)It is symmetrically arranged with linking arm two on side wall, sets of holes two are provided in connection wall two
(5), sets of holes two(5)It is arranged with anchor pole two(41), anchor pole one(22)With anchor pole two(41)On be provided with wire line shoe(8), fixture
Pass through wire line shoe with pipe extractor(8)And steel wire rope(9)Connection;
Wedge-shaped ironware(6)Block to steel pile casting(7)And cuff(3)Between, it is used for steel pile casting(7)And cuff(3)Installation is fixed.
2. building steel pile casting hammers pipe extractor as described in claim 1, it is characterised in that:The connection wall one includes square plate one
(2), square plate one(2)One end with hammering cylinder(1)Side wall connects, sets of holes one(21)It is arranged in square plate one(2)On.
3. building steel pile casting hammers pipe extractor as described in claim 1, it is characterised in that:The connection wall two includes two pieces of sides
Plate two(4), two pieces of square plates two(4)It is arranged in parallel in cuff(3)On side wall, two pieces of square plates two(4)On be both provided with sets of holes
Two(5), two pieces of square plates two(4)Pass through anchor pole two(41)Connection.
4. building steel pile casting hammers pipe extractor as described in claim 1, it is characterised in that:The wire line shoe(8)It is locked for U-shaped
Button.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820469084.7U CN208088299U (en) | 2018-03-30 | 2018-03-30 | Building steel protects a hammering pipe puller |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820469084.7U CN208088299U (en) | 2018-03-30 | 2018-03-30 | Building steel protects a hammering pipe puller |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208088299U true CN208088299U (en) | 2018-11-13 |
Family
ID=64058039
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820469084.7U Expired - Fee Related CN208088299U (en) | 2018-03-30 | 2018-03-30 | Building steel protects a hammering pipe puller |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208088299U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111287779A (en) * | 2020-02-11 | 2020-06-16 | 中国矿业大学(北京) | Fixing device and fixing method for gob-side roadway gangue side |
-
2018
- 2018-03-30 CN CN201820469084.7U patent/CN208088299U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111287779A (en) * | 2020-02-11 | 2020-06-16 | 中国矿业大学(北京) | Fixing device and fixing method for gob-side roadway gangue side |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102828513A (en) | Tool type operating platform for pile foundation tremie extension | |
CN208088299U (en) | Building steel protects a hammering pipe puller | |
CN105332376B (en) | Hydraulic mechanical hand-lifting stake clamping device and pile-drawing machine | |
CN101624825B (en) | Static drawing machine | |
CN110690589A (en) | Grounding pile capable of being pulled up and pulled out quickly | |
CN206986912U (en) | A kind of steel pipe pile foundation | |
CN210825317U (en) | Auxiliary pulling device for angle iron pile | |
CN212865935U (en) | Pile pulling device of pile driving and pulling machine | |
CN210236958U (en) | Be fixed in portable hoist that is used for hanging chain block on H shaped steel roof beam | |
CN203760929U (en) | Tension tower line-tightening steering pulley used during construction of power transmission line tower | |
CN209029545U (en) | Adjustable grounding pin | |
CN207436056U (en) | A kind of timber piling equipment | |
CN201459729U (en) | Holder for H-shape steel | |
CN202658593U (en) | Rammer connecting device for non-unhooking dynamic compactor and dynamic compactor with rammer connecting device | |
CN206903188U (en) | Support body tension member structure | |
CN203361151U (en) | Light and portable ground anchor | |
CN215629951U (en) | Dig a pile casing soon and beat and pull out auxiliary device | |
CN213836795U (en) | Tamping device for breaking hammer drill rod and excavator | |
CN214989698U (en) | Prefabricated tubular pile hoist device | |
CN204385733U (en) | Man-made digging pile mould-pipe template | |
CN210908835U (en) | Angle iron pile pulling device | |
CN215443035U (en) | All-steel climbing frame for building construction | |
CN212336626U (en) | High-rise building pipe well vertical pipeline structure assembled in sections | |
CN221027222U (en) | Special handling instrument of I-steel beam | |
CN209554624U (en) | Gripping apparatus for recovering concrete well pipe |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181113 |