CN206986912U - A kind of steel pipe pile foundation - Google Patents

A kind of steel pipe pile foundation Download PDF

Info

Publication number
CN206986912U
CN206986912U CN201720747307.7U CN201720747307U CN206986912U CN 206986912 U CN206986912 U CN 206986912U CN 201720747307 U CN201720747307 U CN 201720747307U CN 206986912 U CN206986912 U CN 206986912U
Authority
CN
China
Prior art keywords
steel pipe
pile
elastic card
expansion type
type elastic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720747307.7U
Other languages
Chinese (zh)
Inventor
魏永国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changsha Municipal Engineering Co Ltd
Original Assignee
Changsha Municipal Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changsha Municipal Engineering Co Ltd filed Critical Changsha Municipal Engineering Co Ltd
Priority to CN201720747307.7U priority Critical patent/CN206986912U/en
Application granted granted Critical
Publication of CN206986912U publication Critical patent/CN206986912U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of steel pipe pile foundation, the pile crown of steel pipe front end is fixed on including steel pipe and suit, the pile crown forms by the pile top of taper and with the sleeve pipe that pile top rear end is fixedly connected, the internal diameter of described sleeve pipe and the external diameter of steel pipe match, described sleeve pipe rear end axially offers otch and forms expansion type elastic card claw, the described one end of expansion type elastic card claw away from pile top is provided with the hook portion of cannula center extension, and the steel pipe is inserted into described sleeve pipe and gripped by expansion type elastic card claw.In the utility model pile top by expansion type elastic card claw realize with the connection of steel pipe, the assembling process is convenient and swift, reduces the installation that in-site installation carries out pile crown, improves operating efficiency, at the same also eliminate because welding and caused by etching problem.

Description

A kind of steel pipe pile foundation
Technical field
The utility model belongs to building field, and in particular to a kind of steel pipe pile foundation.
Background technology
Steel pipe pile foundation is widely used in hydraulic engineering, science of bridge building, industry and the basis of civil buildings etc..Existing steel pipe The work progress of pile foundation is:The steel-pipe pile designed and produced is transported to job site, in order to make steel-pipe pile smoothly be driven into Or in press-in soil layer, the pile crown of taper is typically welded at the stake end of steel-pipe pile, is then sling stake with loop wheel machine, align piles position, use Stake is squeezed into or during static pressure buries by stake machine, when pile crown enters in supporting course at designed elevation, that is, stops piling or static pressure.Pile crown needs It is welded in pile pipe, installation is inconvenient, adds labor intensity, and high to the quality requirement of welding, influences efficiency of construction, For operation steel pipe pile foundation in river course or in ocean, steel pipe pile foundation construction working condition is more severe, and weld is easy Corrosion so that steel pipe pile foundation bearing capacity declines.
Utility model content
The purpose of this utility model is to provide the steel pipe pile foundation that a kind of efficiency of construction is high, bearing strength is high.
In order to solve the above technical problems, steel pipe pile foundation provided by the utility model, including steel pipe and suit are fixed on The pile crown of steel pipe front end, the pile crown form by the pile top of taper and with the sleeve pipe that pile top rear end is fixedly connected, described sleeve pipe The external diameter of internal diameter and steel pipe matches, and described sleeve pipe rear end axially offers otch and forms expansion type elastic card claw, the expansion The one end of formula elastic card claw away from pile top is provided with the hook portion of cannula center extension, and the steel pipe is inserted into described sleeve pipe simultaneously Gripped by expansion type elastic card claw.
Further, inner tube is arranged with the steel pipe, is poured between the steel pipe and inner tube formed with reinforced concrete.
Further, described outer wall of steel pipe is provided with zinc coat.
Compared with prior art, the utility model has the advantages that:Pile top passes through expansion type in the utility model Elastic card claw realizes the connection with steel pipe, and the assembling process is convenient and swift, reduces the installation that in-site installation carries out pile crown, carries High operating efficiency, at the same also eliminate because welding and caused by etching problem.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is top view of the present utility model;
Fig. 3 is pile crown structural representation in the utility model;
Wherein:1- steel pipes;2- pile crowns;3- pile tops;4- sleeve pipes;5- expansion type elastic card claws;6- hook portions;7- inner tubes;8- steel Muscle concrete, 9- steel reinforcement cages.
Embodiment
Below in conjunction with the drawings and specific embodiments, the utility model is further described.
As shown in Figure 1-Figure 3, steel pipe pile foundation provided by the utility model, including steel pipe 1 and suit are fixed on steel pipe 1 The pile crown 2 of front end, the pile crown 2 form by the pile top 3 of taper and with the sleeve pipe 4 that the rear end of pile top 3 is fixedly connected, described sleeve pipe 4 The external diameter of internal diameter and steel pipe 1 match, the rear end of described sleeve pipe 4 axially offers otch and forms expansion type elastic card claw 5, described Steel pipe 1 is inserted into described sleeve pipe 4 and gripped by expansion type elastic card claw 5, is determined by the clamping of expansion type elastic card claw 5 Position steel pipe, it is convenient not assemble tightly, improves operating efficiency, at the same steel pipe 1 be sleeved in sleeve pipe after directly supported with the rear end face of pile top 3 Connect, soil layer prevents steel pipe 1 from being destroyed and influenceing whole base the reaction force of steel pipe 1 during can effectively buffering piling The bearing capacity of plinth, the hook portion 6 of the center of sleeve pipe 1 extension is provided with the one end of expansion type elastic card claw 5 away from pile top 3, if The insertion that the one side of hook portion 6 facilitates steel pipe is put, the holding capability of expansion type elastic card claw 5 can also be improved in addition.
As depicted in figs. 1 and 2, another specific embodiment of the present utility model, coaxial sleeve is provided with inner tube 7 in steel pipe 1, Poured between the steel pipe 1 and inner tube 7 formed with reinforced concrete 8, integrally-built section is effectively increased by increasing reinforced concrete 8 Modulus, improve structural-load-carrying capacity;Can reduce simultaneously foundation pile displacement deformation amount during use, outer layer pipe wall thickness with again Amount.
To improve the corrosion resistance of steel pipe 1, zinc coat is provided with the outer wall of steel pipe 1.
Work progress of the present utility model is as follows:
1st, preparation steel pipe 1, inner tube 7 and pile crown 2 and concrete;
2nd, will be abutted in the plug-in-sleeve 4 of steel pipe 1 and with the rear end face of pile top 3, expansion type elastic card claw 5 is clamped steel pipe 1;
3rd, steel pipe 1 is squeezed into ground using special pile driving equipment, pile top 3 is reached in supporting course at designed elevation, Stop piling;
4th, inner tube 7 is lifted in steel pipe 1 using lifting appliance, while steel reinforcement cage 9 is put between steel pipe 1 and inner tube 7 Annular chamber in and placing concrete, whole steel pipe pile foundation is formed after concrete setting.
Described above is only preferred embodiment of the present utility model, and the scope of protection of the utility model is not limited merely to Above-described embodiment, all technical schemes belonged under the utility model thinking belong to the scope of protection of the utility model.It should refer to Go out, for those skilled in the art, some improvement under the premise of the utility model principle is not departed from and Retouching, these improvements and modifications also should be regarded as the scope of protection of the utility model.

Claims (3)

  1. A kind of 1. steel pipe pile foundation, it is characterised in that:Be fixed on the pile crown of steel pipe front end including steel pipe and suit, the pile crown by The pile top of taper and the sleeve pipe composition being fixedly connected with pile top rear end, the internal diameter of described sleeve pipe and the external diameter of steel pipe match, institute State sleeve pipe rear end and axially offer otch formation expansion type elastic card claw, the described one end of expansion type elastic card claw away from pile top is set There is the hook portion towards cannula center extension, the steel pipe is inserted into described sleeve pipe and clamped by expansion type elastic card claw solid It is fixed.
  2. 2. steel pipe pile foundation according to claim 1, it is characterised in that:Inner tube, the steel pipe are arranged with the steel pipe Poured between inner tube formed with reinforced concrete.
  3. 3. steel pipe pile foundation according to claim 1, it is characterised in that:Described outer wall of steel pipe is provided with zinc coat.
CN201720747307.7U 2017-06-26 2017-06-26 A kind of steel pipe pile foundation Active CN206986912U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720747307.7U CN206986912U (en) 2017-06-26 2017-06-26 A kind of steel pipe pile foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720747307.7U CN206986912U (en) 2017-06-26 2017-06-26 A kind of steel pipe pile foundation

Publications (1)

Publication Number Publication Date
CN206986912U true CN206986912U (en) 2018-02-09

Family

ID=61399188

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720747307.7U Active CN206986912U (en) 2017-06-26 2017-06-26 A kind of steel pipe pile foundation

Country Status (1)

Country Link
CN (1) CN206986912U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112681292A (en) * 2021-01-15 2021-04-20 重庆大学 Novel steel pipe pile foundation

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112681292A (en) * 2021-01-15 2021-04-20 重庆大学 Novel steel pipe pile foundation

Similar Documents

Publication Publication Date Title
CN206986912U (en) A kind of steel pipe pile foundation
CN204753567U (en) Arrangement of reinforcement high pressure jet struts pilework
CN202644519U (en) Special fixing clamp for preventing reinforcement cage of cast-in-situ bored pile from floating upward
CN104594343B (en) A kind of assembled stake and its construction method
CN103452115B (en) A kind of utilize send at the bottom of bushing type after intubate the construction method that post-grouting device carries out constructing
CN206736920U (en) A kind of internal-expansion type pipe drawing device
CN206800379U (en) Grouting behind shaft or drift lining pre-stress hollow square pile
CN206591540U (en) Basement bottom board cushion cap and engineering pile attachment structure
CN105544551B (en) A kind of super-long filling pile quickly transfers the construction method of steel reinforcement cage
CN108179743A (en) A kind of synchronous grouting pile for prestressed pipe and construction method
CN210134420U (en) Composite hoop for trestle steel pipe pile parallel connection
CN2900627Y (en) Concrete head beating tubular pile
CN210177533U (en) Large-diameter multistage pile feeder for offshore wind power pile driving
CN110158635A (en) A kind of major diameter multistage Pile feeder and operating method for offshore wind power piling
CN211171995U (en) Cold joint treatment structure for secant pile construction
CN207846413U (en) A kind of soil pore-forming equipment
CN102155015A (en) Barbed implanted steel pipe anchor rod
CN201943071U (en) Implantable steel tube anchor rod with stabs
CN207959201U (en) Synchronous grouting pile for prestressed pipe
CN206800380U (en) A kind of PHC tubular pile splicings structure
CN207193966U (en) A kind of prestressed concrete pipe pile
CN220394520U (en) Steel-plastic composite pile casing
CN213709536U (en) Single-main-pipe annular multi-grouting-point post-grouting device for cast-in-place pile
CN210395344U (en) Foundation pile pit ramming rammer structure
CN207878445U (en) A kind of support door frame of strong rammer hammer arm

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant