- CN208088239U CN208088239U CN201820311756.1U CN201820311756U CN208088239U CN 208088239 U CN208088239 U CN 208088239U CN 201820311756 U CN201820311756 U CN 201820311756U CN 208088239 U CN208088239 U CN 208088239U
- Authority
- CN
- China
- Prior art keywords
- gate
- sluice
- renovates
- reinforced concrete
- prefabricated reinforced
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Barrages (AREA)
Abstract
The utility model is related to a kind of sluice work locks for dredging waterway, espespecially a kind of sluice using prefabricated reinforced concrete main gate renovates system, sluice regulation system includes mainly crossbeam, access bridge and the work brake gear being mounted on above river, the brake gear that wherein works is arranged below access bridge and is abutted against with crossbeam, crossbeam is construction or support platform, and three's work cooperatively forms sluice regulation key water control project;The work brake gear includes mainly that gate, supporting steel, lock column and gate protect structure; the utility model provides the new construction gate that a kind of volume is larger, higher-height gate renovates process as sluice; in addition to cooperation water level may be implemented and be turned up to reach flood retention, block the basic functions such as tide; flow can also preferably be controlled, buffering flowing water is adjusted, reply more flood etc.; and structure further improves; intensity higher is more sturdy; stablize using more permanent, and lower than existing shutter structure under same function.
Description
Technical field
It is espespecially a kind of to use prefabricated reinforced concrete the utility model is related to a kind of sluice work lock for dredging waterway
The sluice of main gate renovates system.
Background technology
In building or renovate in river, can flow be controlled using the setting that gate is built in architectural design and adjust water level
And water resource utilizes, and with flood retention, gear tide or upstream water level can be raised in closed shutter, with meet irrigation, power generation, shipping,
The needs such as aquatic products, environmental protection, industry and domestic water;Starting gate can drain off floodwater, excess water, abandon water or waste water, also can be under
Swim river or canal water supply;In hydraulic engineering, sluice is as water blocking, sluicing or the building of water intaking, using universal, effect compared with
Greatly, water resource has been made full use of.
And in dredging waterway build, because of landform reason, climate reasons etc., it is sometimes desirable to change height, the thickness of sluice
And endurance condition etc., but be directed to for the sluice that update or regulation are built, river water utilization during regulation
Or control all can be impacted, it is therefore desirable to complete construction as early as possible, otherwise have on water level control influences for a long time, but is being transformed
Early period, the selection to gate are also a problems, and it is steel-slag sand to commonly use safer gate, but steel-slag sand cost is high, especially
When it is that the river needs periodically rectification replacement gate, the excessively high gate of cost is not suitable for prolonged application, in addition normal in low water level
Log stop door when the gate of use, but the support force of log stop door is weaker, is difficult to resist, and work as water level and increase if flood is larger
When, it can not also support, safe dynamics is insufficient;Therefore the gate selection of present dredging waterway system and its structure design are urgently
Problem to be solved.
Invention content
It works lock to solve the above problems, the utility model is intended to disclose a kind of sluice for dredging waterway, espespecially one
Kind renovates system using the sluice of prefabricated reinforced concrete main gate.
To achieve the above object, the technical solution adopted in the utility model is:It is a kind of to be worked using prefabricated reinforced concrete
The sluice of gate renovates system, which is characterized in that the sluice regulation system include mainly be mounted on crossbeam above river,
Access bridge and work brake gear, wherein the brake gear that works is arranged below access bridge and is abutted against with crossbeam, crossbeam is construction or branch
Platform is supportted, three's work cooperatively forms sluice regulation key water control project;The work brake gear mainly include gate, supporting steel,
Lock column and gate protect structure.
The gate is C35 reinforced concrete gates, is in-situ precast form gate.
The supporting steel is i-beam structure, is mainly made of bearing diagonal steel and vertical supporting steel, and gate is mounted on
Inside wall surface, supported with rake formula respective outer side edges.
The described gate protection structure include mainly be arranged door surfaces cover to reinforcement and be enclosed in gate edge
Channel steel protect edge.
The thickness of protection tier is 3-5cm, and it is 12# channel steels that channel steel, which protects edge,.
The gate is fixedly mounted, opens and closes and carries out auxiliary control by handling apparatus.
The gate top is provided with the reinforcing bar lifting lug being linked and packed with handling apparatus, reinforcing bar lifting lug and supporting steel from lock
Door top is welded as a whole.
The gate is offering buffer channel by proximal portion, buffer channel level of incline face and open up, buffer channel
The gate height of lower section is higher than 8.5m water level lines.
It is mainly made of supporting beam, conveying steel, pulley assembly on the crossbeam, conveying steel fixed point is fixed on supporting beam
On, pulley assembly is formed on conveying steel can be along the mounting structure that conveying steel slides.
The access bridge mainly includes access bridge main body and the ladder crane span structure for being disposed in parallel in access bridge side, passes through rank
Terraced crane span structure monitoring or auxiliary construction.
The beneficial effects of the utility model are embodied in:The utility model provides that a kind of volume is larger, higher-height gate
The new construction gate that process is renovated as sluice is turned up except cooperation water level may be implemented to reach flood retention, block the basic functions such as tide
Outside, flow, the adjusting of buffering flowing water, reply more flood etc. can also be preferably controlled, and structure further improves, by force
It is more sturdy to spend higher, application is stablized more for a long time, and lower than existing shutter structure under same function;It is arranged simultaneously
Gate structure enhance protection protective capacities from internal, external.
Description of the drawings
Fig. 1 is the plan structure schematic diagram of the utility model.
Fig. 2 is the cross-section structure schematic diagram that the bridge floor of the utility model disconnects.
Attached drawing marks explanation:1- crossbeams, 2- access bridges, 3- work brake gears, 4- ladder crane span structures.
Specific implementation mode
The specific implementation mode that according to the present invention will be described in detail below with reference to the accompanying drawings:
A kind of sluice using prefabricated reinforced concrete main gate renovates system, and sluice regulation system is mainly wrapped
Crossbeam 1, access bridge 2 and the work brake gear 3 above river are included, wherein the brake gear 3 that works is arranged below access bridge 2
And abutted against with crossbeam 1, crossbeam 1 is construction or support platform, and three's work cooperatively forms sluice regulation key water control project;The work
It includes gate, supporting steel, lock column and gate protection structure to make brake gear 3 mainly;The gate is C35 armored concrete locks
Door, be in-situ precast form gate, lock column be provided with it is multiple, be arranged at intervals on the wall surface periphery of gate with formed fence protection knot
Structure, lock column are C30 armored concrete locks column;The supporting steel is i-beam structure, mainly by bearing diagonal steel and vertical support
Steel forms, and is mounted on inside the wall surface of gate, is supported with rake formula respective outer side edges, enhances gate internal stress;The gate
Protection structure includes mainly cover to reinforcement and the channel steel protection edge for being enclosed in gate edge being arranged in door surfaces, enhances lock
Portion's protective capacities outdoors;The thickness of protection tier is 3-5cm, and it is 12# channel steels that channel steel, which protects edge,;The gate is fixed
Formula is installed, and is opened and closed and is carried out auxiliary control by handling apparatus;The gate top is provided with to be linked and packed with handling apparatus
Reinforcing bar lifting lug, reinforcing bar lifting lug is welded as a whole with supporting steel from gate top;The gate offered by proximal portion it is slow
Rush channel, buffer channel level of incline face and open up, the gate height below buffer channel be higher than 8.5m water level lines;The crossbeam
It is mainly made of supporting beam, conveying steel, pulley assembly on 1, conveying steel fixed point is fixed in supporting beam, pulley assembly installation
Being formed on conveying steel can be along the mounting structure that conveying steel slides;The access bridge 2 mainly include 2 main body of access bridge with
It is disposed in parallel in the ladder crane span structure 4 of 2 side of access bridge, by the monitoring of ladder crane span structure 4 or auxiliary construction, access bridge 2 is main
Traffic band, ladder crane span structure 4 provide the transmission platform of construction, monitoring platform, and handling apparatus or mixed can be operated from ladder crane span structure 4
Solidifying soil scene preparation etc., while normal transport hub is not influenced.
The above is only the preferred embodiment of the utility model, is not made to the technical scope of the utility model any
Limitation, the technical staff of the industry can make some deformations and modification under the inspiration of the technical program, every according to this
The technical spirit of utility model still falls within this practicality to any modification, equivalent variations and modification made by above embodiment
In the range of new technique scheme.
Claims (10)
1. a kind of sluice using prefabricated reinforced concrete main gate renovates system, which is characterized in that the sluice regulation
System includes mainly crossbeam, access bridge and the work brake gear being mounted on above river, wherein the brake gear that works is arranged in traffic
It is abutted against below bridge and with crossbeam, crossbeam is construction or support platform, and three's work cooperatively forms sluice regulation key water control project;It is described
Work brake gear include mainly that gate, supporting steel, lock column and gate protect structure.
2. a kind of sluice using prefabricated reinforced concrete main gate according to claim 1 renovates system, feature
It is, the gate is C35 reinforced concrete gates, is in-situ precast form gate.
3. a kind of sluice using prefabricated reinforced concrete main gate according to claim 1 renovates system, feature
It is, the supporting steel is i-beam structure, is mainly made of bearing diagonal steel and vertical supporting steel, and the wall surface of gate is mounted on
Inside is supported with rake formula respective outer side edges.
4. a kind of sluice using prefabricated reinforced concrete main gate according to claim 1 renovates system, feature
Be, gate protection structure include mainly be arranged door surfaces cover to reinforcement and be enclosed in the slot at gate edge
Steel protects edge.
5. a kind of sluice using prefabricated reinforced concrete main gate according to claim 4 renovates system, feature
It is, the thickness of protection tier is 3-5cm, and it is 12# channel steels that channel steel, which protects edge,.
6. a kind of sluice using prefabricated reinforced concrete main gate according to claim 1 renovates system, feature
It is, the gate is fixedly mounted, opens and closes and carries out auxiliary control by handling apparatus.
7. a kind of sluice using prefabricated reinforced concrete main gate according to claim 1 renovates system, feature
It is, the gate top is provided with the reinforcing bar lifting lug being linked and packed with handling apparatus, reinforcing bar lifting lug and supporting steel from gate
Top is welded as a whole.
8. a kind of sluice using prefabricated reinforced concrete main gate according to claim 1 renovates system, feature
Be, the gate is offering buffer channel by proximal portion, buffer channel level of incline face and open up, below buffer channel
Gate height be higher than 8.5m water level lines.
9. a kind of sluice using prefabricated reinforced concrete main gate according to claim 1 renovates system, feature
It is, is mainly made of supporting beam, conveying steel, pulley assembly on the crossbeam, conveying steel fixed point is fixed in supporting beam,
Pulley assembly is formed on conveying steel can be along the mounting structure that conveying steel slides.
10. a kind of sluice using prefabricated reinforced concrete main gate according to claim 1 renovates system, feature
It is, the access bridge mainly includes access bridge main body and the ladder crane span structure for being disposed in parallel in access bridge side, passes through ladder
Crane span structure monitors or auxiliary construction.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820311756.1U CN208088239U (en) | 2018-03-07 | 2018-03-07 | A kind of sluice using prefabricated reinforced concrete main gate renovates system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820311756.1U CN208088239U (en) | 2018-03-07 | 2018-03-07 | A kind of sluice using prefabricated reinforced concrete main gate renovates system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208088239U true CN208088239U (en) | 2018-11-13 |
Family
ID=64061788
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820311756.1U Active CN208088239U (en) | 2018-03-07 | 2018-03-07 | A kind of sluice using prefabricated reinforced concrete main gate renovates system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208088239U (en) |
-
2018
- 2018-03-07 CN CN201820311756.1U patent/CN208088239U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102434175A (en) | Tunnel lining self waterproof drainage system | |
CN100473790C (en) | Tower crane foundation for construction and manufacturing method thereof | |
CN110439036A (en) | A kind of poured band of outer wall of basement advance water stop construction method | |
CN109441110A (en) | A kind of basement shear wall post-cast strip precast outer die construction method | |
CN205242445U (en) | Intelligent integrated piping lane maintenance of city underground is imported and exported | |
CN208088239U (en) | A kind of sluice using prefabricated reinforced concrete main gate renovates system | |
CN106567365B (en) | Earth and rockfill dam longitudinal reinforcement construction method | |
CN205893922U (en) | T roof beam precasting yard that sets up on having longitudinal gradient's road bed | |
CN209760415U (en) | water gate and pump station combined drainage system | |
CN208039192U (en) | Plugging structure for diversion tunnel based on karst landform | |
CN207452889U (en) | Artificial digging pile assembled retaining wall | |
CN108316260A (en) | Plugging structure for diversion tunnel based on karst landform and method | |
CN201485843U (en) | Stream-guidance navigation pier structure | |
CN209868960U (en) | PC component curing kiln channel | |
CN208415187U (en) | A kind of assembly concrete wave wall | |
Donaldson | Rehabilitation and modernisation of irrigation schemes | |
CN208235535U (en) | A kind of H profile steel anchor pole composite pile-prefabricated board wall deep footing groove enclosing structure | |
CN211621486U (en) | Assembled sluice | |
CN118516951B (en) | Dam seepage prevention reinforcing system and method for detecting seepage prevention effect of dam | |
CN207376568U (en) | A kind of anti-flood wall | |
CN209243669U (en) | A kind of stake dam that economic serviceability is strong | |
CN107190658A (en) | A kind of free frame pin-connected panel railway Evacuation platform of steel | |
CN210636451U (en) | Adjustable pond structure based on bucket formula basis | |
CN215977585U (en) | Novel drainage structures in garage ground | |
Grubb et al. | Refurbishing the historic Old Tweed Bridge, Scotland–the challenges and innovations |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |