CN208088095U - Beams of concrete midspan closing structure - Google Patents

Beams of concrete midspan closing structure Download PDF

Info

Publication number
CN208088095U
CN208088095U CN201820275011.4U CN201820275011U CN208088095U CN 208088095 U CN208088095 U CN 208088095U CN 201820275011 U CN201820275011 U CN 201820275011U CN 208088095 U CN208088095 U CN 208088095U
Authority
CN
China
Prior art keywords
embedded section
concrete
beams
embedded
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820275011.4U
Other languages
Chinese (zh)
Inventor
徐升桥
焦亚萌
简方梁
杨永明
李先婷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Engineering Consulting Group Co Ltd
Original Assignee
China Railway Engineering Consulting Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Engineering Consulting Group Co Ltd filed Critical China Railway Engineering Consulting Group Co Ltd
Priority to CN201820275011.4U priority Critical patent/CN208088095U/en
Application granted granted Critical
Publication of CN208088095U publication Critical patent/CN208088095U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a kind of beams of concrete midspan closing structures comprising:First embedded section, the second embedded section and the lifting segment between first embedded section and the second embedded section, and the lifting segment is entered by way of lifting in the region between first embedded section and the second embedded section.Its simple structure convenient for construction, and can effectively reduce the influence to traffic of opening the navigation or air flight under bridge and security risk.

Description

Beams of concrete midspan closing structure
Technical field
The utility model is related to science of bridge building field more particularly to a kind of beams of concrete midspan closing structures.
Background technology
Existing concrete continuous bridge girder construction multispan get over the barriers such as river, road setting, for do not influence river under bridge, Road navigation traffic, the mode for mostly using cantilever pouring are constructed, i.e., Hanging Basket are arranged at the fulcrum of both sides, successively paragraph by paragraph to branch The symmetrical movable hanging basket in point both sides pours beam body, to further increase the safety for traffic of opening the navigation or air flight under bridge, also goes to river sometimes using along bridge Stream or road pour beam body, then turn mode in place and construct.
No matter which kind of mode, finally all there is Middle span closing this construction procedure, mostly use at present and Hanging Basket is moved to conjunction Imperial section, then in pouring across concrete to complete midspan closing, then Hanging Basket is stepped back to the mode of dismounting and carries out Middle span closing.But due to Cradle structure is complicated, and part is numerous, needs movable hanging basket equipment twice in addition, thus still can cause one to the navigation traffic under bridge Fixing is rung and security risk.And when bridge structure width is larger, corresponding Hanging Basket equipment is also more complicated, simultaneously as Cradle structure is integrally fixed on the completed bridge subsection of closure section both sides, and the safety to the bridge subsection of both sides is also A kind of test.
Utility model content
The utility model is directed to the drawbacks described above of the prior art, provides a kind of beams of concrete midspan closing structure, constructs Simply, it is convenient for construction, and can effectively reduces the influence to traffic of opening the navigation or air flight under bridge and security risk.
Technical solution adopted by the utility model to solve its technical problems is:
A kind of beams of concrete midspan closing structure is provided comprising:First embedded section, the second embedded section and positioned at described Lifting segment between first embedded section and the second embedded section, and the lifting segment enters described first by way of lifting In region between embedded section and the second embedded section.
Preferably, the side of first embedded section towards second embedded section is extended with the first protruding portion;Described The side of two embedded sections towards first embedded section is extended with the second protruding portion;First protruding portion and the second protruding portion It is oppositely arranged, and is provided commonly for carrying the lifting segment.
Preferably, the width of first protruding portion and/or the second protruding portion is 30-60cm.
Preferably, in the direction of the width, the lifting segment side is equipped with the first securing plate;And/or the lifting segment is another Side is equipped with the second securing plate.
Preferably, several first ribbed stiffeners are provided in first embedded section;And/or it is set in second embedded section It is equipped with several second ribbed stiffeners;And/or several third ribbed stiffeners are provided in the lifting segment.
Preferably, several first WELDING STUDSs are provided in first embedded section;And/or it is set in second embedded section It is equipped with several second WELDING STUDSs;And/or several third WELDING STUDSs are provided in the lifting segment.
Preferably, first embedded section is embedded in the first concrete structure;And/or second embedded section is pre-buried In the second concrete structure.
Preferably, the lifting segment is divided into several subelements in the direction of the width.
The advantageous effect of technical solutions of the utility model is:
Concrete-bridge midspan closing structure in the utility model can from using the large scale equipments such as Hanging Basket in construction, And reduce lifting weight by way of lateral piecemeal, and convenient for construction, and after lifting segment closing, the construction of entire follow-up closure section It is all located in enclosed construction, substantially traffic etc. of opening the navigation or air flight under bridge is not had an impact, thus can be eliminated safe hidden trouble, is had wide Application space.
Description of the drawings
Below in conjunction with accompanying drawings and embodiments, the utility model is described in further detail, in attached drawing:
Fig. 1 is the elevation of beams of concrete midspan closing structure in the embodiments of the present invention one;
Fig. 2 is the cross-section diagram of beams of concrete midspan closing structure in the embodiments of the present invention one;
Fig. 3 is the vertical view of beams of concrete midspan closing structure in the embodiments of the present invention one;
Fig. 4 is the scheme of installation of lifting segment in the embodiments of the present invention one.
Specific implementation mode
In order to make the purpose of this utility model, technical solution and advantage be more clearly understood, below in conjunction with attached drawing and reality Example is applied, the present invention will be further described in detail.It should be understood that tool described herein
Body embodiment is only used for explaining the utility model, is not used to limit the utility model.
Embodiment one:
Fig. 1-3 shows the beams of concrete midspan closing structure of the utility model comprising:First embedded section 1, second is pre- Section 1 ' and the lifting segment 2 between first embedded section, 1 and second embedded section 1 ' are buried, and the lifting segment 2 passes through The mode of lifting enters in the region between first embedded section, 1 and second embedded section 1 ', to form the concrete Beam midspan closing structure.In the present embodiment, first embedded section 1 can be embedded in advance in the first girder beam body 10;And/or Second embedded section 1 ' can be embedded in advance in the second girder beam body 10 ', and first embedded section 1, the second embedded section 1 ' And one or several in lifting segment 2 uses resistant material, such as weathering steel to be made, and the steel construction later stage is thus avoided to need frequency The problem of numerous progress application maintenance;In addition, due to bridge lateral wider width, for ease of practice of construction and mitigate lifting weight Amount, the lifting segment 2 are divided into several subelements in the direction of the width, when lifting, can by subelement along Fig. 4 arrow institute Finger direction is lifted between first embedded section, 1 and second embedded section 1 ', is then carried out again to several described subelements Welding.
Further, the first girder beam body 10 is on the first inside 110 of the second girder beam body 10 ', court Extend the first protruding portion 111 to second embedded section 1 ';The second girder beam body 10 ' is close to the first girder beam body Extend the second protruding portion 111 ' on 10 the second inside 110 ', towards first embedded section 1;And first protruding portion 111 and second protruding portion 111 ' be laid flat platform as taking, the two is oppositely arranged, and is provided commonly for carrying the entirety of the lifting segment 2 Weight, it is preferred that the width d of first protruding portion, 111 and/or second protruding portion 111 ' is 30-60cm (preferably 50cm); After the lifting segment 2 is between first embedded section 1 and second embedded section 1 ', with the first protruding portion 111 and Two protruding portions 111 ' form the agent structure of closure section together.
Further, the rigidity to reinforce steel plate structure and the bond strength between concrete, first embedded section 1 Inside it is provided with several first ribbed stiffeners 11;And/or it is provided with several second ribbed stiffeners 11 ' in second embedded section 1 ';With/ Or, being provided with several third ribbed stiffeners 21 in the lifting segment 2;Preferably, first ribbed stiffener, 11 and/or second ribbed stiffener 11 ' and/or third ribbed stiffener 21 extend on width direction W, and in the length directionl uniform intervals be arranged;
Meanwhile in first embedded section 1, be provided with several first WELDING STUDSs 12;And/or second embedded section 1 ' Inside it is provided with several second WELDING STUDSs 12;And/or it is provided with several third WELDING STUDSs 22 in the lifting segment 2;Further , first internal layer, 110 width direction W is equipped with the first securing plate 23 being connect with 21 side of third ribbed stiffener;With/ Or, second internal layer, 110 ' width direction W is equipped with the second securing plate being connect with 21 other side of third ribbed stiffener 23 ', 2 entirety of lifting segment is further reinforced by first securing plate 23, the second securing plate 23 ', it is preferred that described First securing plate 23 and/or the second securing plate 23 ' extend along its length, and are steel plate structure.
Further, since wider width, in order to reinforce the 110, second inside 110 ' of the first inside in span centre casting concrete Structural safety performance, be provided with several first hangs muscles 13 in first embedded section 1;And/or in second embedded section 1 ' It is provided with several second hangs muscles 13 ', it is preferred that first hangs muscle, 13 and/or second hangs muscle 13 ' is uniform on width direction W Interval setting, and extend in short transverse H;Thus can the first embedded section 1, the second embedded section 1 ' by add hangs muscle come pair Structure is integrally reinforced;Preferably, first hangs muscle, 13 and/or second hangs muscle 13 ' is made of fining twisted steel, can be into Row pre-tightens.
Embodiment two:
Present embodiments provide a kind of construction method of above-mentioned beams of concrete midspan closing structure comprising following steps:
S1, construction form first embedded section, the second embedded section and lifting segment;And the first ribbed stiffener, first are cut Power tack welding is connected in the first embedded section, the second ribbed stiffener, the second WELDING STUDS is welded in the second embedded section, and third is added Strength rib, third WELDING STUDS are welded in lifting segment;The first hangs muscle of corresponding installation and the second hangs muscle simultaneously, and tensioning is carried out, reinforce The general safety of first embedded section, the second pre-buried segment structure;
It is S2, first embedded section and the second embedded section is pre-buried in place, further first is formed on the first inside Protruding portion, and form the second protruding portion on the second inside;
S3, lifting segment is divided into several subelements, and subelement is lifted into first embedded section and one by one It between two embedded sections, and is shelved on the first protruding portion and the second protruding portion, and makes lifting segment and the first ribbed stiffener, second Ribbed stiffener and the alignment of third ribbed stiffener;Thus the lifting segment integral hoisting is pre-buried to first embedded section and second Between section;
On S4, width direction, the first securing plate is welded in third ribbed stiffener side, other side welding second is reinforced Thus plate locks the lifting segment;And it is welded further the gap between each subelement of lifting segment, enclosed shape is integral;
And S5, progress reinforcing bar binding and concreting inside the lifting segment, complete beams of concrete midspan closing The construction of structure.
It should be noted that the technical characteristic in above-described embodiment one, two can carry out arbitrary combination, the technology being composed Scheme belongs to the scope of protection of the utility model.
In conclusion the concrete-bridge midspan closing structure in the utility model can be from using Hanging Basket etc. in construction Large scale equipment, and reduce lifting weight by way of lateral piecemeal, it is entire subsequently to close convenient for construction, and after lifting segment closing The construction of imperial section is all located in enclosed construction, is not had an impact to traffic etc. of opening the navigation or air flight under bridge substantially, it is hidden thus can to eliminate safety Suffer from, there is wide application space.
The above is only the preferred embodiment of the present invention, is not intended to limit the utility model, all in this practicality Within novel spirit and principle, any modification, equivalent replacement, improvement and so on should be included in the guarantor of the utility model Within the scope of shield.

Claims (8)

1. a kind of beams of concrete midspan closing structure, which is characterized in that including:First embedded section, the second embedded section and it is located at Lifting segment between first embedded section and the second embedded section, and the lifting segment entered by way of lifting it is described In region between first embedded section and the second embedded section.
2. beams of concrete midspan closing structure as described in claim 1, which is characterized in that first embedded section is described in The side of second embedded section is extended with the first protruding portion;The side of second embedded section towards first embedded section is extended with Second protruding portion;First protruding portion and the second protruding portion are oppositely arranged, and are provided commonly for carrying the lifting segment.
3. beams of concrete midspan closing structure as claimed in claim 2, which is characterized in that first protruding portion and/or The width of two protruding portions is 30-60cm.
4. beams of concrete midspan closing structure as described in claim 1, which is characterized in that in the direction of the width, the lifting Section side is equipped with the first securing plate;And/or the lifting segment other side is equipped with the second securing plate.
5. beams of concrete midspan closing structure as described in claim 1, which is characterized in that be provided in first embedded section Several first ribbed stiffeners;And/or several second ribbed stiffeners are provided in second embedded section;And/or in the lifting segment It is provided with several third ribbed stiffeners.
6. beams of concrete midspan closing structure as described in claim 1, which is characterized in that be provided in first embedded section Several first WELDING STUDSs;And/or several second WELDING STUDSs are provided in second embedded section;And/or in the lifting segment It is provided with several third WELDING STUDSs.
7. beams of concrete midspan closing structure as described in claim 1, which is characterized in that first embedded section is embedded in In one concrete structure;And/or second embedded section is embedded in the second concrete structure.
8. beams of concrete midspan closing structure as described in claim 1, which is characterized in that the lifting segment is in the direction of the width It is divided into several subelements.
CN201820275011.4U 2018-02-26 2018-02-26 Beams of concrete midspan closing structure Active CN208088095U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820275011.4U CN208088095U (en) 2018-02-26 2018-02-26 Beams of concrete midspan closing structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820275011.4U CN208088095U (en) 2018-02-26 2018-02-26 Beams of concrete midspan closing structure

Publications (1)

Publication Number Publication Date
CN208088095U true CN208088095U (en) 2018-11-13

Family

ID=64061307

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820275011.4U Active CN208088095U (en) 2018-02-26 2018-02-26 Beams of concrete midspan closing structure

Country Status (1)

Country Link
CN (1) CN208088095U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108193585A (en) * 2018-02-26 2018-06-22 中铁工程设计咨询集团有限公司 Beams of concrete midspan closing structure and its construction method
CN111155435A (en) * 2020-01-08 2020-05-15 中铁大桥局第七工程有限公司 Mid-span closure construction method for steel box girder bridge

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108193585A (en) * 2018-02-26 2018-06-22 中铁工程设计咨询集团有限公司 Beams of concrete midspan closing structure and its construction method
CN111155435A (en) * 2020-01-08 2020-05-15 中铁大桥局第七工程有限公司 Mid-span closure construction method for steel box girder bridge
CN111155435B (en) * 2020-01-08 2021-05-14 中铁大桥局第七工程有限公司 Mid-span closure construction method for steel box girder bridge

Similar Documents

Publication Publication Date Title
Wardlaw The improvement of aerodynamic performance
CN103938557B (en) A kind of bridge crossing method for dismounting
CN108060636B (en) The construction method of overall assembled composite beam bridge
CN203270457U (en) Suspension bar anchoring structure capable of initiatively reinforcing concrete tied-arch bridge
CN106758871A (en) A kind of full cantilever construction prestressed concrete continuous rigid-framed bridge and its construction method
CN208088095U (en) Beams of concrete midspan closing structure
CN106049289B (en) Bailey beam make-shift bridge transform the construction method of steel reinforced concrete combination permanent bridge as
CN209652741U (en) Across the rail yard large span overpass of one kind
CN106087711B (en) Antinode work beam-steel concrete top plate-external prestressing combines T-shaped simply supported beam
CN208472543U (en) CFST Arch Bridge
CN109024219A (en) A kind of prefabricated ultra-high performance concrete-normal concrete composite beam bridge girder construction and construction method
CN108060634A (en) Duplexing font ultra-high performance concrete-normal concrete composite beam bridge girder construction and its construction method
CN109137747A (en) A kind of flexible suspension for long-span arch bridge main girder construction
CN103410090A (en) Suspender anchoring structure of initiative-reinforcement concrete tied-arch bridge and construction method thereof
CN108193585A (en) Beams of concrete midspan closing structure and its construction method
CN205934687U (en) Antinode worker roof beam - steel concrete roof - external prestress combination T type simple beam
CN208472473U (en) A kind of suspension type monorail and highway bridge build structure jointly
CN105088962B (en) A kind of integral hoisting method of Wavelike steel webplate part
CN208183539U (en) A kind of four beam type I-shaped steel-concrete composite beams of bridge
CN209619849U (en) A kind of shear connections structure for bridge
CN208183549U (en) Swivel bridges closure section steel shell
CN207828712U (en) A kind of straddle-type monorail composite bridge track
CN107964875B (en) The PCSC of plate-girder overall assembled composite beam bridge shears coupling arrangement
KR20060115699A (en) Construction Method of Composite Slab Bridge Using Composite Truss Girder
CN210737353U (en) Temporary passing structure for replacing bridge expansion device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant