CN107964875B - The PCSC of plate-girder overall assembled composite beam bridge shears coupling arrangement - Google Patents

The PCSC of plate-girder overall assembled composite beam bridge shears coupling arrangement Download PDF

Info

Publication number
CN107964875B
CN107964875B CN201711251329.5A CN201711251329A CN107964875B CN 107964875 B CN107964875 B CN 107964875B CN 201711251329 A CN201711251329 A CN 201711251329A CN 107964875 B CN107964875 B CN 107964875B
Authority
CN
China
Prior art keywords
longitudinal
steel
guidance tape
girder
prefabricated concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201711251329.5A
Other languages
Chinese (zh)
Other versions
CN107964875A (en
Inventor
周志祥
周劲宇
乔心格
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Jiaotong University
Original Assignee
Chongqing Jiaotong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Jiaotong University filed Critical Chongqing Jiaotong University
Priority to CN201711251329.5A priority Critical patent/CN107964875B/en
Publication of CN107964875A publication Critical patent/CN107964875A/en
Application granted granted Critical
Publication of CN107964875B publication Critical patent/CN107964875B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete
    • E01D2101/26Concrete reinforced
    • E01D2101/268Composite concrete-metal

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a kind of PCSC of plate-girder overall assembled composite beam bridge to shear coupling arrangement, there is longitudinal side baffle on girder steel, Prefabricated Concrete bridge guidance tape is located at the top of longitudinal side plate after being located in girder steel, longitudinal reperfusion space is formed between Prefabricated Concrete bridge guidance tape and girder steel, make Prefabricated Concrete bridge guidance tape fixed connection on girder steel using Shear connection structure by way of being longitudinally perfused between Prefabricated Concrete bridge guidance tape and girder steel, the present invention forms steel-concrete composite beams using the combination concrete that pressure injection forms longitudinal reperfusion space, pushing tow is in place on corresponding bridge pier to whole steel-concrete composite beams along longitudinal direction again, integral prefabricated concrete bridge road plate unit is realized in conjunction with the assembled of overall steel beam element, it may be implemented in factory and build a steel-concrete composite beams and longitudinal pushing tow entirety in place on corresponding bridge pier to whole steel-concrete composite beams Unit assembled batch production bridge construction method;With PCSS shearing coupling arrangement all advantages, and overcome its site welding heavy workload, production accuracy of fit require high and inconel weld anti-fatigue performance difference three major issues.

Description

The PCSC of plate-girder overall assembled composite beam bridge shears coupling arrangement
Technical field
The invention belongs to building structure and science of bridge building field, in particular to a kind of plate-girder overall assembled composite beam bridge PCSC shears coupling arrangement.
Background technique
Steel-concrete combined structure is reliable, recyclable sharp in the performance of the strength of materials, simple and quick construction, structural behaviour With etc. all have apparent excellent, thus increasingly become the development trend of bridge structure;Due to steel construction and concrete Bridge guidance tape material and characteristic have difference, thus how the simple and efficient simultaneously long-term behaviour that is coupled is reliable therebetween, then is engineering Boundary is all solved the problems, such as in exploration always.
In existing steel-concrete composite beams bridge, it is usually first erected at the girder steel that top surface is provided with WELDING STUDS, concrete bridge guidance tape has Two kinds of construction methods integrally pour concrete bridge guidance tape one is girder steel top surface to form steel-concrete composite beams bridge;Another kind is on girder steel top The concrete bridge guidance tape of precast block is installed in face, and reproduction pours seam concrete to realize that bridge guidance tape to form steel-concrete composite beams with being coupled for girder steel Bridge.The problem is that: the weight of A concrete bridge guidance tape is all born by girder steel, causes steel using amount larger;B cast-in-place concrete The duration of construction is longer and is not easy to guarantee quality;C again applies negative moment area bridge guidance tape after bridge guidance tape is coupled with girder steel pre- Stress, partial prestressing are balanced by girder steel, and it is poor that concrete bridge guidance tape can obtain prestressed validity.
The Chinese patent ZL201310130786.4 of entitled PCSS shearing coupling arrangement, discloses a kind of steel-concrete Composite structure, it is in place using prefabricated bridge guidance tape in the pre-buried Shear transfer steel plate in Prefabricated Concrete bridge road rib of slab side, is installed on girder steel, and Longitudinal prestressing is applied to concrete bridge guidance tape by design requirement, then by the pre-buried Shear transfer steel plate of Prefabricated Concrete bridge road rib of slab side Welded connection is carried out with the longitudinal joint that girder steel top surface is formed and forms steel-concrete composite beam, is realized without cast-in-place connection concrete Full assembled steel-concrete composite beam bridge construction, and overcome in conventional steel-concrete composite continuous beam to concrete bridge Guidance tape applies the problem of prestressed validity difference.But this method needs the pre-buried Shear transfer steel plate and steel to bridge road rib of slab side Top surface of the beam forms the live single-sided welding of a plurality of longitudinal joint progress along overall length of bridge, causes site welding workload very big, welds matter Amount is difficult to ensure, and so one-side-filled angle weld anti-fatigue performance is poor, and there are security risks.And in order to which above structure is carried out , there is the segment steel-concrete composite beams bridge that continuously prefabricated-pushing tow is coupled afterwards in place in practice of construction and its method of construction (is invented special Sharp application number: 2016111547567), and using in place on the continuous prefabricated-pushing tow to Bridge Pier of first steel girder segment, then concrete In place, the pre-buried Shear transfer steel plate and steel of the road Hou Duiqiao rib of slab side on the continuous prefabricated-pushing tow to girder steel top surface of bridge road plate segment Each longitudinal joint of top surface of the beam carries out site welding, overcomes existing packaged type bridges construction and needs the huge prefabricated/storage space of A;B Large-scale lifting device and road transport condition;The defect of structural seam disease hidden danger between C prefabricated component.Although there are a series of excellent Point, but production and in place construction of the girder steel with concrete bridge guidance tape must successively be carried out, and cannot implement the same period, increase construction Period;Construction stage, there are bridge guidance tapes to be self-possessed only by the unfavorable operating condition of girder steel receiving, obviously increases steel using amount therefore;Site welding It is very big to connect workload, welding quality is difficult to ensure;Meanwhile in order to realize prefabricated and incremental launching construction, bridge guidance tape section also invented Duan Lianxu is quick prefabricated-and pushing tow builds the equipment (number of patent application 201611155859.5) of combined bridge.
Therefore, it is necessary to improve to existing steel-concrete combined structure and construction method, both there is PCSS shearing connection Structure makes the advantages of convenient for fabricated construction, and avoids shearing the work of coupling arrangement site welding and more sensitive weldering due to PCSS Fatigue problem is stitched, working efficiency is improved, guarantees the safe handling of bridge, and reduce engineering risk, there is significant Technological Economy Comprehensive benefit.
Summary of the invention
It is coupled structure in view of this, shearing the object of the present invention is to provide a kind of PCSC of plate-girder overall assembled composite beam bridge It makes, has had the advantages that PCSS shearing coupling arrangement not only convenient for fabricated construction, but also avoid shearing coupling arrangement scene due to PCSS Welding and more sensitive weld fatigue problem improve working efficiency, guarantee the safe handling of bridge, and reduce engineering wind Danger has significant Technological Economy comprehensive benefit.
The PCSC of plate-girder overall assembled composite beam bridge of the invention shears coupling arrangement, including girder steel and Prefabricated Concrete bridge road Plate, has longitudinal side plate on the girder steel, and the Prefabricated Concrete bridge guidance tape is located in girder steel rear support in longitudinal side plate, in longitudinal direction side Longitudinal reperfusion space is formed between plate, Prefabricated Concrete bridge guidance tape and girder steel, is equipped with Shear connection structure in the longitudinal direction reperfusion space, Made in such a way that longitudinal reperfusion space is longitudinally perfused using Shear connection structure between Prefabricated Concrete bridge guidance tape and girder steel Prefabricated Concrete bridge guidance tape fixed connection is on girder steel.
Further, it is that pushing tow is in place that the Prefabricated Concrete bridge guidance tape, which is located in the mode of girder steel, and the pushing tow is in place will be pre- Concrete bridge guidance tape processed is supported in longitudinal side baffle and by longitudinal thrusting slip to designated position;The Shear connection structure packet It includes the shear key I for being fixed on girder steel and extending to longitudinal reperfusion space and is embedded in Prefabricated Concrete bridge guidance tape in advance and extends to longitudinal direction The shear key II of reperfusion space, the shear key I and shear key II have in longitudinal reperfusion space staggeredly and in longitudinal space Upper resigning.
Further, the shear key I is the WELDING STUDS for being fixed on girder steel and extending upwardly to longitudinal reperfusion space, described WELDING STUDS is that longitudinal direction is arranged in column, and the shear key II is to be embedded in Prefabricated Concrete bridge guidance tape in advance and extend downward into longitudinal reperfusion space Reinforcing bar.
Further, the reinforcing bar is longitudinally disposed and is in the up-down direction in the reciprocal bending structure of period shape, bending structure Top half be embedded in Prefabricated Concrete bridge guidance tape, lower half portion is located at longitudinal reperfusion space.
Further, the reciprocal bending structure of period shape is rectangle wave structure.
Further, the girder steel is made of the steel unit extended longitudinally, positioned at lateral the two of the top of steel unit Vertically arranged longitudinal direction side shutter configuration is distinguished into longitudinal reperfusion space longitudinal direction side baffle in side;The Prefabricated Concrete bridge guidance tape and institute State that longitudinal side baffle is corresponding to form downwardly projecting longitudinal boss, the both lateral sides of the longitudinal direction boss and corresponding longitudinal direction side Longitudinal reperfusion space is formed between baffle.
Further, the girder steel is made of the steel unit extended longitudinally, positioned at lateral the two of the top of steel unit End is respectively provided with two longitudinal side baffles laterally arranged side by side, and the longitudinal direction reperfusion space is located at two longitudinal side baffles Between, the Prefabricated Concrete bridge guidance tape rear support in place is on longitudinal side baffle.
Further, the Prefabricated Concrete bridge guidance tape is corresponding with the longitudinal reperfusion space downwardly projecting is equipped with leading along longitudinal direction To boss.
Further, the steel unit is steel box-girder or steel I-beam, is laterally set side by side at the top of the steel unit There is longitudinal wing plate, the longitudinal direction reperfusion space is corresponding to be located on wing plate.
Further, it is in place for lifting to be located in the mode of girder steel for the Prefabricated Concrete bridge guidance tape;The Shear connection structure packet It includes the WELDING STUDS for being fixed on girder steel and extending to longitudinal reperfusion space and is embedded in Prefabricated Concrete bridge guidance tape in advance and extends to longitudinal direction The shear reinforcement of reperfusion space, the shear reinforcement are embedded in that longitudinal reinforcement I in Prefabricated Concrete bridge guidance tape, to be located at longitudinal perfusion empty in advance For interior longitudinal reinforcement II and hoop in the stirrup of II periphery of longitudinal reinforcement I and longitudinal reinforcement, the stirrup top half is pre-buried In in Prefabricated Concrete bridge guidance tape.
The beneficial effects of the present invention are: the PCSC of plate-girder overall assembled composite beam bridge of the invention shears coupling arrangement, First integral prefabricated concrete bridge guidance tape can be achieved and apply the prestressing force needed to the bridge guidance tape, then made using lifting or pushing tow Integral prefabricated concrete bridge guidance tape is in place on girder steel, and fixes pre-buried shear reinforcement below Prefabricated Concrete bridge guidance tape with girder steel top surface The WELDING STUDS of setting forms in longitudinally staggered disposition, and longitudinal reperfusion space is then formed between the pressure injection the two and longitudinal side baffle Combination concrete form steel-concrete composite beams, then pushing tow is in place on corresponding bridge pier to whole steel-concrete composite beams along longitudinal direction, real Integral prefabricated concrete bridge road plate unit is showed in conjunction with the assembled of overall steel beam element, it can be achieved that building one in factory Steel-concrete composite beams and longitudinal pushing tow integral unit assembled plant in place on corresponding bridge pier to whole steel-concrete composite beams Bridge construction method;A kind of novel architecture and embodiment party are provided for the full batch production of composite beam bridge, automation, intelligent build Case overcomes existing highway bridge and builds inevitable open work and being shown based on artificial by environment and human factor puzzlement Defect is write, so that practical bridge and design ideal structure is relatively coincide, to reduce bridge later period disease hidden danger;It is more traditional cast-in-place mixed Solidifying soil bridge guidance tape and conventional precast block bridge guidance tape lift after-pouring joint concrete in place and form whole steel-concrete composite beams Bridge can significantly simplify site construction technology, save steel, shorten the construction period, it is ensured that quality;Avoid concrete bridge guidance tape and steel Beam applies the problem of prestressed validity is substantially reduced to bridge guidance tape again after combining, and makes structure construction and stress performance more Rationally;With PCSS shearing coupling arrangement all advantages, and overcome its site welding heavy workload, production accuracy of fit want Seek high and inconel weld anti-fatigue performance difference three major issues.
Detailed description of the invention
The invention will be further described with reference to the accompanying drawings and examples.
Fig. 1 is the first example structure schematic diagram of the invention;
Fig. 2 is Fig. 1 along sectional view along A-A;
Fig. 3 is second of example structure schematic diagram of the invention;
Fig. 4 is Fig. 3 along B-B direction cross-sectional view;
Fig. 5 is the third example structure schematic diagram of the invention;
Fig. 6 be Fig. 5 along C-C to cross-sectional view.
Specific embodiment
Fig. 1 is the first example structure schematic diagram of the invention, and Fig. 2 is Fig. 1 along sectional view along A-A;The present embodiment uses The combination beam that the PCSC shearing coupling arrangement of plate-girder overall assembled composite beam bridge is formed, PCSC shear coupling arrangement specifically: In prefabricated bridge guidance tape (PC) setting position, the shear key I (connection reinforcing bar) in board bottom face is stretched out in pre-buried lower section along longitudinal direction, at girder steel (S) The longitudinally disposed shear key II (WELDING STUDS) in top surface and longitudinal side baffle 4, mounting bridge guidance tape is in place on girder steel, keeps bridge guidance tape pre- In the longitudinal side baffle 4 for burying connection reinforcing bar insertion girder steel top surface, then to by girder steel top surface and two side baffles and bridge road plate top surface shape At strip closing chamber carry out pressure injection combination concrete (C), formed after prefabricated bridge guidance tape (PC) passes through with girder steel (S) and filled Note shears coupling arrangement in conjunction with the PCSC of concrete (C);Girder steel 2 and Prefabricated Concrete bridge guidance tape 1 are specifically included, is had on the girder steel 2 Have longitudinal side baffle 4, generally use welding structure, certainly can also bolt be detachably connected;The Prefabricated Concrete bridge guidance tape 1 is located in 2 rear support of girder steel is located between longitudinal side baffle 4, Prefabricated Concrete bridge guidance tape 1 and girder steel 2 in longitudinal side baffle 4 and forms longitudinal perfusion Space 3, the longitudinal direction reperfusion space 3 is interior to be equipped with Shear connection structure, by longitudinal direction between Prefabricated Concrete bridge guidance tape 1 and girder steel 2 The mode that reperfusion space 3 is longitudinally perfused makes 1 fixed connection of Prefabricated Concrete bridge guidance tape on girder steel 2 using Shear connection structure, Form whole slab and girder;Any steel beam structure of the prior art can be used in girder steel 2, including the steel I-beam, simultaneously being set side by side Arrange the steel box-girder being arranged or integrally-built steel box-girder etc.;Certainly, it can be equipped with lateral ties between steel I-beam, belong to The prior art, details are not described herein;Longitudinal reperfusion space refers to the reperfusion space penetrated through along longitudinal direction, in conjunction with Shear connection structure So that perfusion after girder steel and bridge guidance tape between bond strength be higher than the prior art cast-in-place structural.
In the present embodiment, the mode that the Prefabricated Concrete bridge guidance tape 1 is located in girder steel 2 is that pushing tow is in place, and the pushing tow is in place For Prefabricated Concrete bridge guidance tape 1 is supported in longitudinal side baffle 4 and by longitudinal thrusting slip to designated position, the method for pushing tow Method disclosed in published patent document 201611154756.7 can be used, details are not described herein;The Shear connection knot Structure includes being fixed on girder steel and extending to the shear key I of longitudinal reperfusion space 3 and be embedded in Prefabricated Concrete bridge guidance tape in advance and extend To the shear key II of longitudinal reperfusion space, the shear key I and shear key II have in longitudinal reperfusion space staggeredly and vertical To spatially stepping down, longitudinal space resigning refers to that the two is got out of the way mutually in the longitudinal direction, makes Prefabricated Concrete bridge guidance tape straight skidding just Shear key I and shear key II do not interfere when position.
In the present embodiment, the shear key I is the WELDING STUDS for being fixed on girder steel and extending upwardly to longitudinal reperfusion space 5, the WELDING STUDS is that longitudinal direction is arranged in column, and the shear key II is to be embedded in Prefabricated Concrete bridge guidance tape in advance and extend downward into longitudinal filling The reinforcing bar 6 in space is infused, the WELDING STUDS can be distributed multiple or transversely be arranged side by side, and reinforcing bar is longitudinally arranged and can be It is laterally arranged side by side multiple.
In the present embodiment, the reinforcing bar 6 is longitudinally disposed and is in the up-down direction in the reciprocal bending structure of period shape, bending The top half of structure is embedded in Prefabricated Concrete bridge guidance tape 1, and lower half portion is located at longitudinal reperfusion space 3;The reciprocal bending knot of period shape Structure refers to that same root reinforcing bar up and down direction bending forms periodic waveform, increases whole intensity.
In the present embodiment, the reciprocal bending structure of period shape is rectangle wave structure, and rectangle wave structure refers to bending shape It is rectangular, and periodic arrangement along longitudinal direction, rectangular wave is easy to process, increases pre-buried length after being embedded in bridge guidance tape in advance, and intensity is higher, Meanwhile the rectangular wave part in reperfusion space also has longer perfusion length, increases perfusion intensity;Meanwhile rectangular wave In the rectangular wave that is located in longitudinal reperfusion space be mutually staggered in the longitudinal direction with WELDING STUDS so that Shear connection structure is in perfusion sky It is interior to be evenly distributed, to improve the globality of perfusion.
In the present embodiment, the girder steel 2 is made of the steel unit extended longitudinally, the cross positioned at the top of steel unit It is respectively configured to longitudinal reperfusion space to both ends, the corresponding arrangement of lateral outer side positioned at longitudinal reperfusion space is described vertical To side baffle;The Prefabricated Concrete bridge guidance tape 1 is corresponding with longitudinal side baffle to form downwardly projecting longitudinal boss 1a, described Longitudinal reperfusion space 3 is formed between the both lateral sides of longitudinal boss 1a and corresponding longitudinal side baffle 4;As shown, pre- Concrete bridge guidance tape 1 processed rear support in place has sufficiently small gap at the top of longitudinal side baffle 4, the lower part longitudinal boss 1a and girder steel 2 (it is expected lesser gap even without gap) then then has between longitudinal side baffle 4 and the corresponding side longitudinal boss 1a Have the space of relative closure, which then forms longitudinal reperfusion space, the program can have sufficiently large reperfusion space and Shear connection structure increases bonding strength;Meanwhile longitudinal boss can also increase the integral strength of Prefabricated Concrete bridge guidance tape, with perfusion The concrete being perfused in space is combined into one, and guarantees the overall stability and safety of bridge guidance tape combination girder steel.
Fig. 3 is second of example structure schematic diagram of the invention, and Fig. 4 is Fig. 3 along B-B direction cross-sectional view, and of the invention is another Embodiment is planted, the identical component of appended drawing reference is identical as the first embodiment in figure, and it not will cause and obscure, the present embodiment and first The formation for being different only in that reperfusion space 3 of kind of embodiment is different, i.e., the described girder steel 2 is by the steel unit structure that extends longitudinally At the transverse ends positioned at the top of steel unit are respectively provided with two longitudinal side baffle (longitudinal side blocks laterally arranged side by side Plate 4 and longitudinal direction side baffle 4a), the longitudinal direction reperfusion space 3 is located at two longitudinal side baffle (longitudinal side baffle 4 and the longitudinal directions Side baffle 4a) between, the Prefabricated Concrete bridge guidance tape 1 rear support in place is in longitudinal side baffle (longitudinal side baffle 4 and longitudinal side baffle On 4a);As shown, longitudinal reperfusion space 3 is formed in two longitudinal side baffles (longitudinal side baffle 4 and longitudinal direction side baffle 4a) Between, the structure with relative closure;The program equally can have sufficiently large reperfusion space and Shear connection structure, increase Add bonding strength, and stable structure is regular, convenient later maintenance.In this implementation, the Prefabricated Concrete bridge guidance tape and longitudinal filling Infuse space it is corresponding it is downwardly projecting be equipped with guide ledges 1b along longitudinal direction, guide ledges 1b be located at longitudinal reperfusion space two are vertical It to the guiding between side baffle for pushing tow when in place, avoids wandering off, while increasing the bonding strength after perfusion.
In above-described embodiment, the steel unit is steel box-girder or steel I-beam, in the top of steel unit transverse direction It is equipped with longitudinal wing plate side by side, the longitudinal direction reperfusion space is corresponding to be located on wing plate;;As shown, by taking steel case as an example, steel case is Upper opening structure can reduce overall weight, and can guarantee integrated carrying ability;According to different needs, it can be multiple steel casees It connects side by side and by intermediate stiffening plate 7;Respectively welding is equipped with a longitudinal wing plate on the web of the two sides of steel case, width with wanted The reperfusion space of formation is adapted, and if you need to install other ancillary equipments, then can suitably widen width, details are not described herein;First In kind embodiment, longitudinal side baffle is fixed on the upper surface of wing plate close to lateral outer side, and the upper surface of wing plate is close to laterally inboard The longitudinal boss of (inside and outside for the longitudinal centre line of steel case) support has lesser gap;In second of embodiment, one The upper surface of a longitudinal direction wing plate is respectively provided with longitudinal side baffle close to laterally interior outside, and reperfusion space is located at two longitudinal side baffles Between;In order to increase perfusion intensity, longitudinal side baffle surface corresponding with reperfusion space carries out coarse processing.
Fig. 5 is the third of the invention example structure schematic diagram, and Fig. 6 is Fig. 5 along C-C to cross-sectional view, third of the invention Embodiment is planted, the identical component of appended drawing reference is identical as first and second kind of embodiment in figure, not will cause and obscures, and implements with preceding two The difference of example are as follows: it is in place for lifting that the Prefabricated Concrete bridge guidance tape 1 is located in the mode of girder steel 2;The Shear connection structure includes It is fixed on girder steel and extends to the WELDING STUDS 5 of longitudinal reperfusion space and be embedded in Prefabricated Concrete bridge guidance tape in advance and extend to longitudinal filling Infuse the shear reinforcement in space, the shear reinforcement is embedded in that longitudinal reinforcement I 9 in Prefabricated Concrete bridge guidance tape, to be located at longitudinal perfusion empty in advance Interior longitudinal reinforcement II 10 and hoop is in the stirrup 8 of II 10 periphery of longitudinal reinforcement I 9 and longitudinal reinforcement, 8 upper half of stirrup Divide and be embedded in Prefabricated Concrete bridge guidance tape in advance, this structure shear reinforcement includes the longitudinal reinforcement I 9 in bridge guidance tape and fills positioned at longitudinal Infuse the longitudinal reinforcement II 10 in space, and contacted by stirrup 8, improve whole perfusion intensity, guarantee bridge using safe, Lifting is constructed relative to pushing tow above-mentioned slightly complicated in place in place.
Finally, it is stated that the above examples are only used to illustrate the technical scheme of the present invention and are not limiting, although referring to compared with Good embodiment describes the invention in detail, those skilled in the art should understand that, it can be to skill of the invention Art scheme is modified or replaced equivalently, and without departing from the objective and range of technical solution of the present invention, should all be covered at this In the scope of the claims of invention.

Claims (10)

1. the PCSC of plate-girder overall assembled composite beam bridge a kind of shears coupling arrangement, it is characterised in that: including girder steel and prefabricated Concrete bridge guidance tape, has longitudinal side plate on the girder steel, and the Prefabricated Concrete bridge guidance tape is located in girder steel rear support in longitudinal side plate, Longitudinal reperfusion space is formed between longitudinal side plate, Prefabricated Concrete bridge guidance tape and girder steel, is equipped with shearing in the longitudinal direction reperfusion space and is connected Binding structure utilizes Shear connection in such a way that longitudinal reperfusion space is longitudinally perfused between Prefabricated Concrete bridge guidance tape and girder steel Structure makes Prefabricated Concrete bridge guidance tape fixed connection on girder steel.
2. the PCSC of plate-girder overall assembled composite beam bridge according to claim 1 shears coupling arrangement, it is characterised in that: The mode that the Prefabricated Concrete bridge guidance tape is located in girder steel is that pushing tow is in place, and the pushing tow is to be supported in Prefabricated Concrete bridge guidance tape in place The longitudinal direction side baffle simultaneously passes through longitudinal thrusting slip to designated position;The Shear connection structure includes being fixed on girder steel simultaneously It extends to the shear key I of longitudinal reperfusion space and is embedded in Prefabricated Concrete bridge guidance tape in advance and extends to the shear key of longitudinal reperfusion space II, the shear key I and shear key II have staggeredly in longitudinal reperfusion space and step down on longitudinal space.
3. the PCSC of plate-girder overall assembled composite beam bridge according to claim 2 shears coupling arrangement, it is characterised in that: The shear key I is the WELDING STUDS for being fixed on girder steel and extending upwardly to longitudinal reperfusion space, the WELDING STUDS be it is longitudinal at Column arrangement, the shear key II is to be embedded in Prefabricated Concrete bridge guidance tape in advance and extend downward into the reinforcing bar of longitudinal reperfusion space.
4. the PCSC of plate-girder overall assembled composite beam bridge according to claim 3 shears coupling arrangement, it is characterised in that: The reinforcing bar is longitudinally disposed and is in the up-down direction in the reciprocal bending structure of period shape, and the top half of bending structure is embedded in Prefabricated Concrete bridge guidance tape, lower half portion are located at longitudinal reperfusion space.
5. the PCSC of plate-girder overall assembled composite beam bridge according to claim 4 shears coupling arrangement, it is characterised in that: The reciprocal bending structure of period shape is rectangle wave structure.
6. the PCSC of plate-girder overall assembled composite beam bridge according to claim 1 shears coupling arrangement, it is characterised in that: The girder steel is made of the steel unit extended longitudinally, and the transverse ends positioned at the top of steel unit are respectively configured to described Longitudinal reperfusion space, positioned at the corresponding arrangement of lateral outer side longitudinal side baffle of longitudinal reperfusion space;The Prefabricated Concrete Bridge guidance tape is corresponding with longitudinal side baffle to form downwardly projecting longitudinal boss, the both lateral sides of the longitudinal direction boss with it is right Longitudinal reperfusion space is formed between the longitudinal side baffle answered.
7. the PCSC of plate-girder overall assembled composite beam bridge according to claim 1 shears coupling arrangement, it is characterised in that: The girder steel is made of the steel unit extended longitudinally, and the transverse ends positioned at the top of steel unit are respectively provided with laterally simultaneously The longitudinal side baffle of two of column, the longitudinal direction reperfusion space are located between two longitudinal side baffles, the Prefabricated Concrete Bridge guidance tape rear support in place is on longitudinal side baffle.
8. the PCSC of plate-girder overall assembled composite beam bridge according to claim 7 shears coupling arrangement, it is characterised in that: The Prefabricated Concrete bridge guidance tape and longitudinal reperfusion space are corresponding downwardly projecting equipped with guide ledges along longitudinal direction.
9. the PCSC of plate-girder overall assembled composite beam bridge according to claim 6 or 7 shears coupling arrangement, feature exists In: the steel unit is steel box-girder or steel I-beam, is laterally equipped with longitudinal wing plate, institute side by side at the top of the steel unit It is corresponding on wing plate to state longitudinal reperfusion space.
10. the PCSC of plate-girder overall assembled composite beam bridge according to claim 1 shears coupling arrangement, feature exists In: it is in place for lifting that the Prefabricated Concrete bridge guidance tape is located in the mode of girder steel;The Shear connection structure includes being fixed on girder steel It goes up and extends to the WELDING STUDS of longitudinal reperfusion space and be embedded in Prefabricated Concrete bridge guidance tape in advance and extend to cutting for longitudinal reperfusion space Power reinforcing bar, the shear reinforcement are embedded in the longitudinal reinforcement I in Prefabricated Concrete bridge guidance tape, longitudinal steel in longitudinal reperfusion space in advance In the stirrup of II periphery of longitudinal reinforcement I and longitudinal reinforcement, the stirrup top half is embedded in Prefabricated Concrete bridge road in advance for muscle II and hoop In plate.
CN201711251329.5A 2017-12-01 2017-12-01 The PCSC of plate-girder overall assembled composite beam bridge shears coupling arrangement Active CN107964875B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711251329.5A CN107964875B (en) 2017-12-01 2017-12-01 The PCSC of plate-girder overall assembled composite beam bridge shears coupling arrangement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711251329.5A CN107964875B (en) 2017-12-01 2017-12-01 The PCSC of plate-girder overall assembled composite beam bridge shears coupling arrangement

Publications (2)

Publication Number Publication Date
CN107964875A CN107964875A (en) 2018-04-27
CN107964875B true CN107964875B (en) 2019-07-23

Family

ID=61999299

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711251329.5A Active CN107964875B (en) 2017-12-01 2017-12-01 The PCSC of plate-girder overall assembled composite beam bridge shears coupling arrangement

Country Status (1)

Country Link
CN (1) CN107964875B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114411975B (en) * 2022-02-13 2023-11-07 重庆交通大学 Structure of composite bolting shear key

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002004221A (en) * 2000-06-23 2002-01-09 Hitachi Zosen Corp Composite floor board
CN103334374A (en) * 2013-04-16 2013-10-02 重庆交通大学 PCSS connecting structure
CN203546589U (en) * 2013-10-24 2014-04-16 同济大学 Steel girder-integral lifting arm prefabricated concrete bridge panel combined girder bridge
CN105926440A (en) * 2016-05-09 2016-09-07 湖南城市学院 Steel-concrete combined continuous beam bridge deck as well as manufacturing method and application thereof
CN106638304A (en) * 2016-12-30 2017-05-10 东南大学 UHPC-common-concrete-lamination composite bridge-deck-slab construction and constructing method thereof
JP2017122356A (en) * 2016-01-08 2017-07-13 Jfeスチール株式会社 Replacement steel plate deck of concrete slab and replacement method of concrete slab

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002004221A (en) * 2000-06-23 2002-01-09 Hitachi Zosen Corp Composite floor board
CN103334374A (en) * 2013-04-16 2013-10-02 重庆交通大学 PCSS connecting structure
CN203546589U (en) * 2013-10-24 2014-04-16 同济大学 Steel girder-integral lifting arm prefabricated concrete bridge panel combined girder bridge
JP2017122356A (en) * 2016-01-08 2017-07-13 Jfeスチール株式会社 Replacement steel plate deck of concrete slab and replacement method of concrete slab
CN105926440A (en) * 2016-05-09 2016-09-07 湖南城市学院 Steel-concrete combined continuous beam bridge deck as well as manufacturing method and application thereof
CN106638304A (en) * 2016-12-30 2017-05-10 东南大学 UHPC-common-concrete-lamination composite bridge-deck-slab construction and constructing method thereof

Also Published As

Publication number Publication date
CN107964875A (en) 2018-04-27

Similar Documents

Publication Publication Date Title
CN108060636B (en) The construction method of overall assembled composite beam bridge
CN201671229U (en) Shear connector
CN108547223A (en) The hybrid beam bridge construction method of steel reinforced concrete overlapping
CN107938504A (en) A kind of wet seam construction of floorings using T reinforcing bars and its construction method
CN105839510A (en) Steel-ultra-high-performance concrete combined continuous beam bridge structure and construction method thereof
CN104631348A (en) Transversely-widening splicing structure of three-dimensional prestress concrete continuous box girder bridge
CN106223183A (en) Assembled concrete-filled rectangular steel tube combination truss bridge and construction method
CN109440634A (en) The prefabricated high strength concrete hollow bent cap structure that internal model can be taken off
CN110747805A (en) Prefabricated high-pile wharf node structure and construction method
CN105064195B (en) The fish belly Wavelike steel webplate prestressing with bond steel reinforced concrete combination simply supported girder bridge and its construction method of precast assembly
CN113718632A (en) Bent cap structure that segmentation prefabrication was assembled
CN109024219A (en) A kind of prefabricated ultra-high performance concrete-normal concrete composite beam bridge girder construction and construction method
CN210395128U (en) Hollow core plate beam connection structure in bridge widening
CN107964875B (en) The PCSC of plate-girder overall assembled composite beam bridge shears coupling arrangement
CN108252222B (en) Steel-concrete combined structure formula simple supported-to-continuous girder bridge method
CN110042770A (en) A method of using the original bridge of external prestressing steel Shu Tuokuan in length and breadth
CN106320184B (en) A kind of unit construction bridge beam construction method
CN205874944U (en) Double T type wave form steel web profiled steel sheet combination beam
CN108716191A (en) A kind of concrete arch rib Covered with Angles sleeve-board group and its bracing means
CN109098094A (en) Construction method without bracket horizontal splicing corrugated steel web plate combined box girder
CN106759857B (en) Steel tube regeneration monolith assembling structure
CN208899352U (en) A kind of concrete arch rib Covered with Angles sleeve-board group and its bracing means
CN110373990A (en) The double-deck whole hole of Combined steel truss beam manufactures and erection construction method
CN205474785U (en) Steel - ultra high performance concrete combination continuous bridge structure
CN205857531U (en) A kind of aspect is than the stirrup attachment structure of combined steel and concrete column

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant