CN107964875A - The PCSC shearing coupling arrangements of plate-girder overall assembled composite beam bridge - Google Patents
The PCSC shearing coupling arrangements of plate-girder overall assembled composite beam bridge Download PDFInfo
- Publication number
- CN107964875A CN107964875A CN201711251329.5A CN201711251329A CN107964875A CN 107964875 A CN107964875 A CN 107964875A CN 201711251329 A CN201711251329 A CN 201711251329A CN 107964875 A CN107964875 A CN 107964875A
- Authority
- CN
- China
- Prior art keywords
- longitudinal
- steel
- guidance tape
- girder
- prefabricated concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2101/00—Material constitution of bridges
- E01D2101/20—Concrete, stone or stone-like material
- E01D2101/24—Concrete
- E01D2101/26—Concrete reinforced
- E01D2101/268—Composite concrete-metal
Abstract
A kind of PCSC the invention discloses plate-girder overall assembled composite beam bridge shears coupling arrangement,There is longitudinal side shield on girder steel,Prefabricated Concrete bridge guidance tape is located in after girder steel at the top of longitudinal side plate,Longitudinal reperfusion space is formed between Prefabricated Concrete bridge guidance tape and girder steel,Make Prefabricated Concrete bridge guidance tape fixed connection on girder steel using Shear connection structure by way of longitudinally irrigating between Prefabricated Concrete bridge guidance tape and girder steel,The combination concrete that the present invention forms longitudinal reperfusion space using pressure injection forms steel concrete combination beam,Again along longitudinal pushing tow to whole steel concrete combination beams on corresponding bridge pier it is in place,The assembled that integral prefabricated concrete bridge road Slab element is realized with overall steel beam element is combined,It may be implemented in factory and build a steel concrete combination beam and longitudinal pushing tow is to whole steel concrete combination beams integral unit assembled plant bridge construction method in place on corresponding bridge pier;All advantages with PCSS shearing coupling arrangements, and overcome its site welding heavy workload, make high and inconel weld anti-fatigue performance difference the three major issues of accuracy of fit requirement.
Description
Technical field
The invention belongs to building structure and science of bridge building field, more particularly to a kind of plate-girder overall assembled composite beam bridge
PCSC shears coupling arrangement.
Background technology
Steel-concrete combined structure is in the performance of the strength of materials, simple and quick construction, structural behaviour are reliable, recyclable profit
With etc. be respectively provided with obvious excellent, thus increasingly become the development trend of bridge structure;Due to steel construction and concrete
Bridge guidance tape material and characteristic have difference, thus how the simple and efficient simultaneously long-term behaviour that is coupled is reliable therebetween, then is engineering
Boundary is all solved the problems, such as in exploration always.
In existing steel-concrete composite beams bridge, the girder steel that top surface is provided with WELDING STUDS is usually first erected at, concrete bridge guidance tape has
Two kinds of construction methods, one kind are that girder steel top surface integrally pours concrete bridge guidance tape to form steel-concrete composite beams bridge;Another kind is on girder steel top
The concrete bridge guidance tape of precast block is installed in face, and reproduction pours seam concrete to realize that bridge guidance tape to form steel-concrete composite beams with being coupled for girder steel
Bridge.There are the problem of be:The weight of A concrete bridge guidance tapes is all born by girder steel, causes steel using amount larger;B cast-in-place concretes
The duration of construction is longer and is not easy to ensure quality;C again applies negative moment area bridge guidance tape after bridge guidance tape is coupled with girder steel pre-
Stress, its partial prestressing are balanced by girder steel, and it is poor that concrete bridge guidance tape can obtain prestressed validity.
The Chinese patent ZL201310130786.4 of entitled PCSS shearings coupling arrangement, discloses a kind of steel-concrete
Combining structure, it is in place using prefabricated bridge guidance tape in the pre-buried Shear transfer steel plate in Prefabricated Concrete bridge road rib of slab side, is installed on girder steel, and
Apply longitudinal prestressing, then the pre-buried Shear transfer steel plate by Prefabricated Concrete bridge road rib of slab side to concrete bridge guidance tape by design requirement
Welded connection is carried out with the longitudinal joint that girder steel top surface is formed and forms steel-concrete composite beam, is realized without cast-in-place connection concrete
The construction of full assembled steel-concrete composite beam bridge, and overcome in conventional steel-concrete composite continuous beam to concrete bridge
Guidance tape applies the problem of prestressed validity is poor.But this method needs pre-buried the Shear transfer steel plate and steel to bridge road rib of slab side
Top surface of the beam forms along a plurality of longitudinal joint of overall length of bridge and carries out live single-sided welding, causes site welding workload very big, welds matter
Amount is difficult to ensure that, and so one-side-filled angle weld anti-fatigue performance is poor, and there are security risk.And in order to which said structure is carried out
, there is the segment steel-concrete composite beams bridge that continuously prefabricated-pushing tow is coupled afterwards in place in practice of construction and its method of construction (is invented special
Sharp application number:2016111547567), using in place in continuous prefabricated-pushing tow to the Bridge Pier of first steel girder segment, then concrete
In place, pre-buried the Shear transfer steel plate and steel of Hou Duiqiao roads rib of slab side on continuous prefabricated-pushing tow to the girder steel top surface of bridge road plate segment
Each bar longitudinal joint of top surface of the beam carries out site welding, and overcoming existing packaged type bridges construction needs the huge prefabricated/storage spaces of A;B
Large-scale lifting device and road transport condition;Between C prefabricated components the defects of structural seam disease hidden danger.Although there are a series of excellent
Point, but making and in place construction of the girder steel with concrete bridge guidance tape must successively be carried out, it is impossible to and the same period implements, and adds construction
Cycle;Construction stage there are the unfavorable operating mode that the dead weight of bridge guidance tape is only born by girder steel, makes steel using amount therefore obvious increase;Site welding
It is very big to connect workload, welding quality is difficult to ensure that;Meanwhile in order to realize prefabricated and incremental launching construction, it also invented bridge guidance tape section
Duan Lianxu is quick prefabricated-and pushing tow builds the equipment (number of patent application 201611155859.5) of combined bridge.
Therefore, it is necessary to be improved to existing steel-concrete combined structure and construction method, both sheared and joined with PCSS
The advantages of structure is made easy to fabricated construction, and avoid due to PCSS shearing coupling arrangement site welding work and more sensitive weldering
Fatigue problem is stitched, work efficiency is improved, ensures the safe handling of bridge, and reduces engineering risk, there is significant Technological Economy
Comprehensive benefit.
The content of the invention
In view of this, the PCSC shearings the object of the present invention is to provide a kind of plate-girder overall assembled composite beam bridge are coupled structure
Make, not only had the advantages that PCSS shearing coupling arrangements are easy to fabricated construction, but also avoid due to PCSS shearing coupling arrangements scene
Welding job and more sensitive weld fatigue problem, improve work efficiency, ensure the safe handling of bridge, and reduce engineering wind
Danger, has significant Technological Economy comprehensive benefit.
The PCSC shearing coupling arrangements of the plate-girder overall assembled composite beam bridge of the present invention, including girder steel and Prefabricated Concrete bridge road
Plate, has longitudinal side plate on the girder steel, and the Prefabricated Concrete bridge guidance tape is located in after girder steel at the top of longitudinal side plate, in longitudinal direction
Longitudinal reperfusion space is formed between side plate, Prefabricated Concrete bridge guidance tape and girder steel, Shear connection knot is equipped with the longitudinal direction reperfusion space
Structure, utilizes Shear connection structure by way of longitudinally being irrigated longitudinal reperfusion space between Prefabricated Concrete bridge guidance tape and girder steel
Make Prefabricated Concrete bridge guidance tape fixed connection on girder steel.
Further, the pre- Prefabricated Concrete bridge guidance tape that is embedded in is located in that the mode of girder steel is in place for pushing tow, and the pushing tow is in place
For Prefabricated Concrete bridge guidance tape is supported in longitudinal side shield and by longitudinal thrusting slip to designated position;The Shear connection
Structure includes being fixed on girder steel and extending to the shear key I of longitudinal reperfusion space and is embedded in Prefabricated Concrete bridge guidance tape in advance and extends
To the shear key II of longitudinal reperfusion space, the shear key I and shear key II have staggeredly and vertical in longitudinal reperfusion space
To spatially stepping down.
Further, the shear key I is described to be fixed on girder steel and extending upwardly to the WELDING STUDS of longitudinal reperfusion space
WELDING STUDS is arranged in column for longitudinal direction, and the shear key II is to be embedded in Prefabricated Concrete bridge guidance tape in advance and extend downward into longitudinal reperfusion space
Reinforcing bar.
Further, the reinforcing bar is longitudinally disposed and is in the reciprocal bending structure of cycle shape in the up-down direction, dogleg section
Top half be embedded in Prefabricated Concrete bridge guidance tape, the latter half is located at longitudinal reperfusion space.
Further, the reciprocal bending structure of cycle shape is rectangle wave structure.
Further, the girder steel is made of the steel unit extended longitudinally, and horizontal two positioned at the top of steel unit
Vertically arranged longitudinal direction side shutter configuration is distinguished into longitudinal reperfusion space longitudinal direction side shield in side;The Prefabricated Concrete bridge guidance tape and institute
State the downwardly projecting longitudinal boss of the corresponding formation of longitudinal side shield, the both lateral sides and corresponding longitudinal direction side of the longitudinal direction boss
Longitudinal reperfusion space is formed between baffle.
Further, the girder steel is made of the steel unit extended longitudinally, and horizontal two positioned at the top of steel unit
End has two longitudinal side shields laterally arranged side by side respectively, and the longitudinal direction reperfusion space is positioned at two longitudinal side shields
Between, the Prefabricated Concrete bridge guidance tape rear support in place is on longitudinal side shield.
Further, the Prefabricated Concrete bridge guidance tape and longitudinal reperfusion space are corresponding downwardly projecting equipped with leading along longitudinal direction
To boss.
Further, the steel unit is steel box-girder or steel I-beam, is laterally set side by side with the top of the steel unit
There is longitudinal wing plate, the longitudinal direction reperfusion space is corresponded on wing plate..
Further, it is described pre- to be embedded in Prefabricated Concrete bridge guidance tape to be located in the mode of girder steel in place for lifting;The Shear connection
Structure includes being fixed on girder steel and extending to the WELDING STUDS of longitudinal reperfusion space and is embedded in Prefabricated Concrete bridge guidance tape in advance and extends
To the shear reinforcement of longitudinal reperfusion space, the shear reinforcement is embedded in longitudinal reinforcement I in Prefabricated Concrete bridge guidance tape, positioned at longitudinal direction in advance
Longitudinal reinforcement II and hoop in reperfusion space is in the stirrup of longitudinal reinforcement I and the periphery of longitudinal reinforcement II, the stirrup first half
Divide and be embedded in advance in Prefabricated Concrete bridge guidance tape.
The beneficial effects of the invention are as follows:The PCSC shearing coupling arrangements of the plate-girder overall assembled composite beam bridge of the present invention,
First integral prefabricated concrete bridge guidance tape can be achieved and apply the prestressing force needed to the bridge guidance tape, then made using lifting or pushing tow
Integral prefabricated concrete bridge guidance tape is in place on girder steel, and pre-buried shear reinforcement below Prefabricated Concrete bridge guidance tape is fixed with girder steel top surface
The WELDING STUDS of setting forms in longitudinally staggered disposition, and then pressure injection should form longitudinal reperfusion space between the two and longitudinal side shield
Combination concrete form steel-concrete composite beams, then along longitudinal pushing tow to whole steel-concrete composite beams on corresponding bridge pier it is in place, it is real
Show integral prefabricated concrete bridge road Slab element to be combined with the assembled of overall steel beam element, it can be achieved that building one in factory
Steel-concrete composite beams and longitudinal pushing tow are to whole steel-concrete composite beams integral unit assembled plant in place on corresponding bridge pier
Bridge construction method;A kind of novel architecture and embodiment party are provided for the full batch production of composite beam bridge, automation, intelligent build
Case, overcomes existing highway bridge and builds inevitable open work and being shown by environment and human factor puzzlement based on manually
Defect is write, actual bridge is relatively coincide with design ideal structure, so as to reduce bridge later stage disease hidden danger;It is more traditional cast-in-place mixed
Solidifying soil bridge guidance tape and conventional precast block bridge guidance tape lift after-pouring joint concrete in place and form overall steel-concrete composite beams
Bridge, can significantly simplify site construction technology, save steel, shorten the construction period, it is ensured that quality;Avoid concrete bridge guidance tape and steel
Beam applies the problem of prestressed validity substantially reduces to bridge guidance tape again after combining, and makes structure construction and stress performance more
Rationally;With PCSS shearing coupling arrangement all advantages, and overcome its site welding heavy workload, make accuracy of fit will
Seek high and inconel weld anti-fatigue performance difference three major issues.
Brief description of the drawings
The invention will be further described with reference to the accompanying drawings and examples.
Fig. 1 is the first example structure schematic diagram of the invention;
Fig. 2 is Fig. 1 along sectional view along A-A;
Fig. 3 is second of example structure schematic diagram of the invention;
Fig. 4 is Fig. 3 along B-B direction sectional view;
Fig. 5 is the third example structure schematic diagram of the invention;
Fig. 6 is Fig. 5 along C-C to sectional view.
Embodiment
Fig. 1 is the first of the invention example structure schematic diagram, and Fig. 2 is Fig. 1 along sectional view along A-A;The present embodiment uses
The combination beam that the PCSC shearing coupling arrangements of plate-girder overall assembled composite beam bridge are formed, PCSC shearing coupling arrangements are specially:
The shear key I (connection reinforcing bar) of plate bottom surface is stretched out along the pre-buried lower section in longitudinal direction in prefabricated bridge guidance tape (PC) setting position, at girder steel (S)
The longitudinally disposed shear key II (WELDING STUDS) of top surface and longitudinal side shield 4, mounting bridge guidance tape is in place on girder steel, makes bridge guidance tape pre-
In the longitudinal side shield 4 for burying connection reinforcing bar insertion girder steel top surface, then to by girder steel top surface and two side shields and bridge road plate top surface shape
Into strip closing chamber carry out pressure injection combination concrete (C), form prefabricated bridge guidance tape (PC) and girder steel (S) pass through rear filling
PCSC shearing coupling arrangement of the note with reference to concrete (C);Girder steel 2 and Prefabricated Concrete bridge guidance tape 1 are specifically included, is had on the girder steel 2
Have longitudinal side shield 4, generally using welding structure, certainly also can bolt be detachably connected;The Prefabricated Concrete bridge guidance tape 1 is located in
Positioned at longitudinal top of side shield 4 after girder steel 2, longitudinal fill is formed between longitudinal side shield 4, Prefabricated Concrete bridge guidance tape 1 and girder steel 2
Space 3 is noted, Shear connection structure is equipped with the longitudinal direction reperfusion space 3, by vertical between Prefabricated Concrete bridge guidance tape 1 and girder steel 2
Make 1 fixed connection of Prefabricated Concrete bridge guidance tape in girder steel 2 using Shear connection structure to the mode that reperfusion space 3 is longitudinally irrigated
On, form overall slab and girder;Girder steel 2 can use the prior art any steel beam structure, including be set up in parallel steel I-beam,
Steel box-girder or integrally-built steel box-girder for being set up in parallel etc.;Certainly, lateral ties can be equipped between steel I-beam, are belonged to
In the prior art, details are not described herein;Longitudinal reperfusion space is referred to along longitudinally through reperfusion space, with reference to Shear connection knot
Structure make it that bond strength is higher than the cast-in-place structural of the prior art between girder steel and bridge guidance tape after perfusion.
It is described pre- to be embedded in, the top in place for pushing tow that be located in the mode of girder steel 2 of Prefabricated Concrete bridge guidance tape 1 in the present embodiment
It is that Prefabricated Concrete bridge guidance tape 1 is supported in longitudinal side shield 4 and by longitudinal thrusting slip to designated position, pushing tow to push away in place
Method can use published patent document 201710677073.8 disclosed in thrustor and pushing method, can also use
Method disclosed in published patent document 201611154756.7, details are not described herein;The Shear connection structure includes
It is fixed on girder steel and extends to the shear key I of longitudinal reperfusion space 3 and be embedded in Prefabricated Concrete bridge guidance tape in advance and extend to longitudinal direction
The shear key II of reperfusion space, the shear key I and shear key II have staggeredly and in longitudinal space in longitudinal reperfusion space
Upper resigning, longitudinal space step down and refer to that the two gets out of the way mutually in the vertical, make to cut when Prefabricated Concrete bridge guidance tape straight skidding is in place
Power part I and shear key II do not interfere.
In the present embodiment, the shear key I is to be fixed on girder steel and extend upwardly to the WELDING STUDS of longitudinal reperfusion space
5, the WELDING STUDS is arranged in column for longitudinal direction, and the shear key II is to be embedded in Prefabricated Concrete bridge guidance tape in advance and extend downward into longitudinal filling
The reinforcing bar 6 in space is noted, the WELDING STUDS can be distributed multiple or transversely be arranged side by side, and reinforcing bar is longitudinally arranged and can be
It is laterally arranged side by side multiple.
In the present embodiment, the reinforcing bar 6 is longitudinally disposed and is in the reciprocal bending structure of cycle shape in the up-down direction, bending
Partial top half is embedded in Prefabricated Concrete bridge guidance tape 1, and the latter half is located at longitudinal reperfusion space 3;The reciprocal bending knot of cycle shape
Structure refers to that the bending of same root reinforcing bar above-below direction forms periodic waveform, increases overall intensity.
In the present embodiment, the reciprocal bending structure of cycle shape is rectangle wave structure, and rectangle wave structure refers to bending shape
It is rectangular, and arranged along longitudinal periodicity, rectangular wave is easy to process, increases pre-buried length after being embedded in bridge guidance tape in advance, and intensity is higher,
Meanwhile the rectangular wave part in reperfusion space also has longer perfusion length, increase perfusion intensity;Meanwhile rectangular wave
In rectangular wave in longitudinal reperfusion space be mutually staggered in the vertical with WELDING STUDS so that Shear connection structure is in perfusion sky
It is interior to be evenly distributed, so as to improve the globality of perfusion.
In the present embodiment, the girder steel 2 is made of the steel unit extended longitudinally, the horizontal stroke positioned at the top of steel unit
Longitudinal reperfusion space is respectively configured to both ends, it is described vertical to correspond to arrangement positioned at the lateral outer side of longitudinal reperfusion space
To side shield;The Prefabricated Concrete bridge guidance tape 1 is corresponding with longitudinal side shield to form downwardly projecting longitudinal boss 1a, described
Longitudinal reperfusion space 3 is formed between the both lateral sides of longitudinal boss 1a and corresponding longitudinal side shield 4;It is as shown in the figure, pre-
1 rear support in place of concrete bridge guidance tape processed has sufficiently small gap in longitudinal side shield 4, longitudinal boss 1a lower parts with the top of girder steel 2
(it is expected less gap even without gap), then then have between longitudinal side shield 4 and the corresponding sides of longitudinal boss 1a
Have the space of relative closure, which then forms longitudinal reperfusion space, the program can have sufficiently large reperfusion space and
Shear connection structure, increases bonding strength;Meanwhile longitudinal boss can also increase the integral strength of Prefabricated Concrete bridge guidance tape, with perfusion
The concrete irrigated in space is combined into one, and ensures the overall stability and security of bridge guidance tape combination girder steel.
Fig. 3 is second of example structure schematic diagram of the invention, and Fig. 4 is Fig. 3 along B-B direction sectional view, and of the invention is another
Kind of embodiment, the identical component of reference numeral is identical with the first embodiment in figure, will not cause to obscure, the present embodiment and first
The difference of kind embodiment is:The pre- Prefabricated Concrete bridge guidance tape 1 that is embedded in is located in the mode of girder steel 2 as lifting is in place and reperfusion space 3
Formation, i.e., described girder steel 2 is made of the steel unit extended longitudinally, and the transverse ends positioned at the top of steel unit are distinguished
With two longitudinal side shields (longitudinal side shield 4 and longitudinal direction side shield 4a) laterally arranged side by side, the longitudinal direction reperfusion space 3
Between two longitudinal side shields (longitudinal side shield 4 and longitudinal direction side shield 4a), after the Prefabricated Concrete bridge guidance tape 1 is in place
It is supported on longitudinal side shield (longitudinal side shield 4 and longitudinal direction side shield 4a);As shown in the figure, longitudinal reperfusion space 3 is formed at
Between two longitudinal side shields (longitudinal side shield 4 and longitudinal direction side shield 4a), there is the structure of relative closure;The program equally may be used
With sufficiently large reperfusion space and Shear connection structure, to increase bonding strength, and stable structure is regular, later maintenance side
Just.In this implementation, the Prefabricated Concrete bridge guidance tape downwardly projecting guiding being equipped with along longitudinal direction corresponding with the longitudinal direction reperfusion space
Boss 1b, guide ledges 1b are located between two longitudinal side shields of longitudinal reperfusion space for guiding when lifting in place, keep away
Exempt to wander off, while increase the bonding strength after perfusion.
In above-described embodiment, the steel unit is steel box-girder or steel I-beam, horizontal with the top of the steel unit
Longitudinal wing plate is equipped with side by side, and the longitudinal direction reperfusion space is corresponded on wing plate;As shown in the figure, by taking steel case as an example, steel case is
Upper opening structure, can mitigate overall weight, and can guarantee that integrated carrying ability;Can be multiple steel casees according to different needs
Connected side by side and by middle reinforcing plate 7;Each welding is equipped with a longitudinal wing plate on the web of the both sides of steel case, and width is with wanting
The reperfusion space of formation is adapted, and need to such as install other ancillary equipments, then can suitably widen width, details are not described herein;First
In kind embodiment, longitudinal side shield is fixed on the upper surface of wing plate close to lateral outer side, and the upper surface of wing plate is close to laterally inboard
(inside and outside for the longitudinal centre line of steel case) support longitudinal direction boss has less gap;In second of embodiment, one
The upper surface of a longitudinal direction wing plate has longitudinal side shield respectively close to laterally interior outside, and reperfusion space is positioned at two longitudinal direction side shields
Between;In order to increase perfusion intensity, longitudinal side shield surface corresponding with reperfusion space carries out coarse processing.
Fig. 5 is the third of the invention example structure schematic diagram, and Fig. 6 is Fig. 5 along C-C to sectional view, the of the invention the 3rd
Kind of embodiment, the identical component of reference numeral is identical with first and second kind of embodiment in figure, will not cause to obscure, with preceding two implementations
Example is distinguished as:It is described pre- to be embedded in Prefabricated Concrete bridge guidance tape 1 to be located in the mode of girder steel 2 in place for lifting;The Shear connection knot
Structure includes being fixed on girder steel and extending to the WELDING STUDS 5 of longitudinal reperfusion space and is embedded in Prefabricated Concrete bridge guidance tape in advance and extends to
The shear reinforcement of longitudinal reperfusion space, the shear reinforcement are embedded in longitudinal reinforcement I 9 in Prefabricated Concrete bridge guidance tape, positioned at longitudinal direction in advance
Longitudinal reinforcement II 10 and hoop in reperfusion space is in the stirrup 8 of longitudinal reinforcement I 9 and the periphery of longitudinal reinforcement II 10, the stirrup 8
Top half is embedded in Prefabricated Concrete bridge guidance tape in advance, this structure shear reinforcement includes the longitudinal reinforcement I 9 in bridge guidance tape and is located at
Longitudinal reinforcement II 10 in longitudinal reperfusion space, and contacted by stirrup 8, overall perfusion intensity is improved, ensures making for bridge
With safety, relative to foregoing pushing tow, construction is slightly complicated in place in place for lifting.
Finally illustrate, the above embodiments are merely illustrative of the technical solutions of the present invention and it is unrestricted, although with reference to compared with
The present invention is described in detail in good embodiment, it will be understood by those of ordinary skill in the art that, can be to the skill of the present invention
Art scheme technical scheme is modified or replaced equivalently, without departing from the objective and scope of technical solution of the present invention, it should all cover at this
Among the right of invention.
Claims (10)
- A kind of 1. PCSC shearing coupling arrangements of plate-girder overall assembled composite beam bridge, it is characterised in that:Including girder steel and prefabricated Concrete bridge guidance tape, has longitudinal side plate on the girder steel, and the Prefabricated Concrete bridge guidance tape is located in after girder steel at the top of longitudinal side plate, Longitudinal reperfusion space is formed between longitudinal side plate, Prefabricated Concrete bridge guidance tape and girder steel, shearing is equipped with the longitudinal direction reperfusion space Connection structure, is connected between Prefabricated Concrete bridge guidance tape and girder steel by way of longitudinally being irrigated longitudinal reperfusion space using shearing Binding structure makes Prefabricated Concrete bridge guidance tape fixed connection on girder steel.
- 2. the PCSC shearing coupling arrangements of plate-girder overall assembled composite beam bridge according to claim 1, it is characterised in that: The pre- Prefabricated Concrete bridge guidance tape that is embedded in is located in that the mode of girder steel is in place for pushing tow, and the pushing tow is by Prefabricated Concrete bridge guidance tape in place It is supported in longitudinal side shield and by longitudinal thrusting slip to designated position;The Shear connection structure includes being fixed on steel On beam and extend to the shear key I of longitudinal reperfusion space and be embedded in Prefabricated Concrete bridge guidance tape in advance and extend to longitudinal reperfusion space Shear key II, the shear key I and shear key II have staggeredly in longitudinal reperfusion space and step down on longitudinal space.
- 3. the PCSC shearing coupling arrangements of plate-girder overall assembled composite beam bridge according to claim 2, it is characterised in that: The shear key I to be fixed on girder steel and extend upwardly to the WELDING STUDS of longitudinal reperfusion space, the WELDING STUDS for longitudinal direction into Row arrangement, the shear key II is is embedded in Prefabricated Concrete bridge guidance tape and extends downward into the reinforcing bar of longitudinal reperfusion space in advance.
- 4. the PCSC shearing coupling arrangements of plate-girder overall assembled composite beam bridge according to claim 3, it is characterised in that: The reinforcing bar is longitudinally disposed and is in the reciprocal bending structure of cycle shape in the up-down direction, and the top half of dogleg section is embedded in Prefabricated Concrete bridge guidance tape, the latter half are located at longitudinal reperfusion space.
- 5. the PCSC shearing coupling arrangements of plate-girder overall assembled composite beam bridge according to claim 4, it is characterised in that: The reciprocal bending structure of cycle shape is rectangle wave structure.
- 6. the PCSC shearing coupling arrangements of plate-girder overall assembled composite beam bridge according to claim 1, it is characterised in that: The girder steel is made of the steel unit extended longitudinally, and the transverse ends positioned at the top of steel unit are respectively configured to described Longitudinal reperfusion space, arrangement longitudinal side shield is corresponded to positioned at the lateral outer side of longitudinal reperfusion space;The Prefabricated Concrete Bridge guidance tape is corresponding with longitudinal side shield to form downwardly projecting longitudinal boss, the both lateral sides of the longitudinal direction boss with it is right Longitudinal reperfusion space is formed between the longitudinal side shield answered.
- 7. the PCSC shearing coupling arrangements of plate-girder overall assembled composite beam bridge according to claim 1, it is characterised in that: The girder steel is made of the steel unit extended longitudinally, and the transverse ends positioned at the top of steel unit have laterally simultaneously respectively Two longitudinal side shields of row, the longitudinal direction reperfusion space is between two longitudinal side shields, the Prefabricated Concrete Bridge guidance tape rear support in place is on longitudinal side shield.
- 8. the PCSC shearing coupling arrangements of plate-girder overall assembled composite beam bridge according to claim 7, it is characterised in that: The Prefabricated Concrete bridge guidance tape downwardly projecting guide ledges being equipped with along longitudinal direction corresponding with the longitudinal direction reperfusion space.
- 9. the PCSC shearing coupling arrangements of the plate-girder overall assembled composite beam bridge according to claim 6 or 7, its feature exist In:The steel unit is steel box-girder or steel I-beam, and longitudinal wing plate, institute are laterally equipped with side by side with the top of the steel unit Longitudinal reperfusion space is stated to correspond on wing plate..
- 10. the PCSC shearing coupling arrangements of plate-girder overall assembled composite beam bridge according to claim 1, its feature exist In:It is described pre- to be embedded in Prefabricated Concrete bridge guidance tape to be located in the mode of girder steel in place for lifting;The Shear connection structure includes fixing In on girder steel and extending to the WELDING STUDS of longitudinal reperfusion space and pre- be embedded in Prefabricated Concrete bridge guidance tape and to extend to longitudinal direction perfusion empty Between shear reinforcement, the shear reinforcement is embedded in longitudinal reinforcement I in Prefabricated Concrete bridge guidance tape, in longitudinal reperfusion space in advance In the stirrup of longitudinal reinforcement I and the periphery of longitudinal reinforcement II, the stirrup top half is embedded in prefabricated in advance for longitudinal reinforcement II and hoop In concrete bridge guidance tape.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711251329.5A CN107964875B (en) | 2017-12-01 | 2017-12-01 | The PCSC of plate-girder overall assembled composite beam bridge shears coupling arrangement |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711251329.5A CN107964875B (en) | 2017-12-01 | 2017-12-01 | The PCSC of plate-girder overall assembled composite beam bridge shears coupling arrangement |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107964875A true CN107964875A (en) | 2018-04-27 |
CN107964875B CN107964875B (en) | 2019-07-23 |
Family
ID=61999299
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711251329.5A Active CN107964875B (en) | 2017-12-01 | 2017-12-01 | The PCSC of plate-girder overall assembled composite beam bridge shears coupling arrangement |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107964875B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114411975A (en) * | 2022-02-13 | 2022-04-29 | 重庆交通大学 | Composite bolt shear key structure |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002004221A (en) * | 2000-06-23 | 2002-01-09 | Hitachi Zosen Corp | Composite floor board |
CN103334374A (en) * | 2013-04-16 | 2013-10-02 | 重庆交通大学 | PCSS connecting structure |
CN203546589U (en) * | 2013-10-24 | 2014-04-16 | 同济大学 | Steel girder-integral lifting arm prefabricated concrete bridge panel combined girder bridge |
CN105926440A (en) * | 2016-05-09 | 2016-09-07 | 湖南城市学院 | Steel-concrete combined continuous beam bridge deck as well as manufacturing method and application thereof |
CN106638304A (en) * | 2016-12-30 | 2017-05-10 | 东南大学 | UHPC-common-concrete-lamination composite bridge-deck-slab construction and constructing method thereof |
JP2017122356A (en) * | 2016-01-08 | 2017-07-13 | Jfeスチール株式会社 | Replacement steel plate deck of concrete slab and replacement method of concrete slab |
-
2017
- 2017-12-01 CN CN201711251329.5A patent/CN107964875B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002004221A (en) * | 2000-06-23 | 2002-01-09 | Hitachi Zosen Corp | Composite floor board |
CN103334374A (en) * | 2013-04-16 | 2013-10-02 | 重庆交通大学 | PCSS connecting structure |
CN203546589U (en) * | 2013-10-24 | 2014-04-16 | 同济大学 | Steel girder-integral lifting arm prefabricated concrete bridge panel combined girder bridge |
JP2017122356A (en) * | 2016-01-08 | 2017-07-13 | Jfeスチール株式会社 | Replacement steel plate deck of concrete slab and replacement method of concrete slab |
CN105926440A (en) * | 2016-05-09 | 2016-09-07 | 湖南城市学院 | Steel-concrete combined continuous beam bridge deck as well as manufacturing method and application thereof |
CN106638304A (en) * | 2016-12-30 | 2017-05-10 | 东南大学 | UHPC-common-concrete-lamination composite bridge-deck-slab construction and constructing method thereof |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114411975A (en) * | 2022-02-13 | 2022-04-29 | 重庆交通大学 | Composite bolt shear key structure |
CN114411975B (en) * | 2022-02-13 | 2023-11-07 | 重庆交通大学 | Structure of composite bolting shear key |
Also Published As
Publication number | Publication date |
---|---|
CN107964875B (en) | 2019-07-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108060636B (en) | The construction method of overall assembled composite beam bridge | |
CN106677049B (en) | Assembled steel-concrete combined structure bridge and construction method | |
US11225803B2 (en) | Prestressed bailey beam for reinforcement and construction method therefor | |
CN204185755U (en) | A kind of Wavelike steel webplate post-stressed concrete T beam | |
CN105484151B (en) | The construction and its construction method connected between a kind of enhancing precast concrete segment | |
CN105839510A (en) | Steel-ultra-high-performance concrete combined continuous beam bridge structure and construction method thereof | |
CN106223183B (en) | Assembled concrete-filled rectangular steel tube combines truss bridge and construction method | |
CN103334374B (en) | PCSS shearing coupling arrangement | |
CN113957782A (en) | Bent cap structure adopting double-main-beam prefabrication and assembly method and construction method thereof | |
CN103590324A (en) | Transverse shear resisting section type self-resetting pier and construction method thereof | |
CN105064195B (en) | The fish belly Wavelike steel webplate prestressing with bond steel reinforced concrete combination simply supported girder bridge and its construction method of precast assembly | |
CN109440634A (en) | The prefabricated high strength concrete hollow bent cap structure that internal model can be taken off | |
CN205205646U (en) | Structure of reinforcing prefabricated segment formula concrete bridge intersegmental connection of festival | |
CN110747805A (en) | Prefabricated high-pile wharf node structure and construction method | |
CN108252222B (en) | Steel-concrete combined structure formula simple supported-to-continuous girder bridge method | |
CN112281663B (en) | Construction method for widening connection of upper structures of new and old bridges | |
CN107964875B (en) | The PCSC of plate-girder overall assembled composite beam bridge shears coupling arrangement | |
CN206887771U (en) | A kind of small across footpath plate-beam construction platform structure | |
CN106320184B (en) | A kind of unit construction bridge beam construction method | |
CN208363352U (en) | A kind of T-type node assembling steel plate concrete shear force wall | |
CN209114299U (en) | A kind of Single-box multi-chamber box beam bridge | |
CN208363351U (en) | A kind of cross node assembling steel plate concrete shear force wall | |
CN108716191A (en) | A kind of concrete arch rib Covered with Angles sleeve-board group and its bracing means | |
CN109098094A (en) | Construction method without bracket horizontal splicing corrugated steel web plate combined box girder | |
CN208899352U (en) | A kind of concrete arch rib Covered with Angles sleeve-board group and its bracing means |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |