CN107964875A - The PCSC shearing coupling arrangements of plate-girder overall assembled composite beam bridge - Google Patents

The PCSC shearing coupling arrangements of plate-girder overall assembled composite beam bridge Download PDF

Info

Publication number
CN107964875A
CN107964875A CN201711251329.5A CN201711251329A CN107964875A CN 107964875 A CN107964875 A CN 107964875A CN 201711251329 A CN201711251329 A CN 201711251329A CN 107964875 A CN107964875 A CN 107964875A
Authority
CN
China
Prior art keywords
longitudinal
steel
guidance tape
girder
prefabricated concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711251329.5A
Other languages
Chinese (zh)
Other versions
CN107964875B (en
Inventor
周志祥
周劲宇
乔心格
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Jiaotong University
Original Assignee
Chongqing Jiaotong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Jiaotong University filed Critical Chongqing Jiaotong University
Priority to CN201711251329.5A priority Critical patent/CN107964875B/en
Publication of CN107964875A publication Critical patent/CN107964875A/en
Application granted granted Critical
Publication of CN107964875B publication Critical patent/CN107964875B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete
    • E01D2101/26Concrete reinforced
    • E01D2101/268Composite concrete-metal

Abstract

A kind of PCSC the invention discloses plate-girder overall assembled composite beam bridge shears coupling arrangement,There is longitudinal side shield on girder steel,Prefabricated Concrete bridge guidance tape is located in after girder steel at the top of longitudinal side plate,Longitudinal reperfusion space is formed between Prefabricated Concrete bridge guidance tape and girder steel,Make Prefabricated Concrete bridge guidance tape fixed connection on girder steel using Shear connection structure by way of longitudinally irrigating between Prefabricated Concrete bridge guidance tape and girder steel,The combination concrete that the present invention forms longitudinal reperfusion space using pressure injection forms steel concrete combination beam,Again along longitudinal pushing tow to whole steel concrete combination beams on corresponding bridge pier it is in place,The assembled that integral prefabricated concrete bridge road Slab element is realized with overall steel beam element is combined,It may be implemented in factory and build a steel concrete combination beam and longitudinal pushing tow is to whole steel concrete combination beams integral unit assembled plant bridge construction method in place on corresponding bridge pier;All advantages with PCSS shearing coupling arrangements, and overcome its site welding heavy workload, make high and inconel weld anti-fatigue performance difference the three major issues of accuracy of fit requirement.

Description

The PCSC shearing coupling arrangements of plate-girder overall assembled composite beam bridge
Technical field
The invention belongs to building structure and science of bridge building field, more particularly to a kind of plate-girder overall assembled composite beam bridge PCSC shears coupling arrangement.
Background technology
Steel-concrete combined structure is in the performance of the strength of materials, simple and quick construction, structural behaviour are reliable, recyclable profit With etc. be respectively provided with obvious excellent, thus increasingly become the development trend of bridge structure;Due to steel construction and concrete Bridge guidance tape material and characteristic have difference, thus how the simple and efficient simultaneously long-term behaviour that is coupled is reliable therebetween, then is engineering Boundary is all solved the problems, such as in exploration always.
In existing steel-concrete composite beams bridge, the girder steel that top surface is provided with WELDING STUDS is usually first erected at, concrete bridge guidance tape has Two kinds of construction methods, one kind are that girder steel top surface integrally pours concrete bridge guidance tape to form steel-concrete composite beams bridge;Another kind is on girder steel top The concrete bridge guidance tape of precast block is installed in face, and reproduction pours seam concrete to realize that bridge guidance tape to form steel-concrete composite beams with being coupled for girder steel Bridge.There are the problem of be:The weight of A concrete bridge guidance tapes is all born by girder steel, causes steel using amount larger;B cast-in-place concretes The duration of construction is longer and is not easy to ensure quality;C again applies negative moment area bridge guidance tape after bridge guidance tape is coupled with girder steel pre- Stress, its partial prestressing are balanced by girder steel, and it is poor that concrete bridge guidance tape can obtain prestressed validity.
The Chinese patent ZL201310130786.4 of entitled PCSS shearings coupling arrangement, discloses a kind of steel-concrete Combining structure, it is in place using prefabricated bridge guidance tape in the pre-buried Shear transfer steel plate in Prefabricated Concrete bridge road rib of slab side, is installed on girder steel, and Apply longitudinal prestressing, then the pre-buried Shear transfer steel plate by Prefabricated Concrete bridge road rib of slab side to concrete bridge guidance tape by design requirement Welded connection is carried out with the longitudinal joint that girder steel top surface is formed and forms steel-concrete composite beam, is realized without cast-in-place connection concrete The construction of full assembled steel-concrete composite beam bridge, and overcome in conventional steel-concrete composite continuous beam to concrete bridge Guidance tape applies the problem of prestressed validity is poor.But this method needs pre-buried the Shear transfer steel plate and steel to bridge road rib of slab side Top surface of the beam forms along a plurality of longitudinal joint of overall length of bridge and carries out live single-sided welding, causes site welding workload very big, welds matter Amount is difficult to ensure that, and so one-side-filled angle weld anti-fatigue performance is poor, and there are security risk.And in order to which said structure is carried out , there is the segment steel-concrete composite beams bridge that continuously prefabricated-pushing tow is coupled afterwards in place in practice of construction and its method of construction (is invented special Sharp application number:2016111547567), using in place in continuous prefabricated-pushing tow to the Bridge Pier of first steel girder segment, then concrete In place, pre-buried the Shear transfer steel plate and steel of Hou Duiqiao roads rib of slab side on continuous prefabricated-pushing tow to the girder steel top surface of bridge road plate segment Each bar longitudinal joint of top surface of the beam carries out site welding, and overcoming existing packaged type bridges construction needs the huge prefabricated/storage spaces of A;B Large-scale lifting device and road transport condition;Between C prefabricated components the defects of structural seam disease hidden danger.Although there are a series of excellent Point, but making and in place construction of the girder steel with concrete bridge guidance tape must successively be carried out, it is impossible to and the same period implements, and adds construction Cycle;Construction stage there are the unfavorable operating mode that the dead weight of bridge guidance tape is only born by girder steel, makes steel using amount therefore obvious increase;Site welding It is very big to connect workload, welding quality is difficult to ensure that;Meanwhile in order to realize prefabricated and incremental launching construction, it also invented bridge guidance tape section Duan Lianxu is quick prefabricated-and pushing tow builds the equipment (number of patent application 201611155859.5) of combined bridge.
Therefore, it is necessary to be improved to existing steel-concrete combined structure and construction method, both sheared and joined with PCSS The advantages of structure is made easy to fabricated construction, and avoid due to PCSS shearing coupling arrangement site welding work and more sensitive weldering Fatigue problem is stitched, work efficiency is improved, ensures the safe handling of bridge, and reduces engineering risk, there is significant Technological Economy Comprehensive benefit.
The content of the invention
In view of this, the PCSC shearings the object of the present invention is to provide a kind of plate-girder overall assembled composite beam bridge are coupled structure Make, not only had the advantages that PCSS shearing coupling arrangements are easy to fabricated construction, but also avoid due to PCSS shearing coupling arrangements scene Welding job and more sensitive weld fatigue problem, improve work efficiency, ensure the safe handling of bridge, and reduce engineering wind Danger, has significant Technological Economy comprehensive benefit.
The PCSC shearing coupling arrangements of the plate-girder overall assembled composite beam bridge of the present invention, including girder steel and Prefabricated Concrete bridge road Plate, has longitudinal side plate on the girder steel, and the Prefabricated Concrete bridge guidance tape is located in after girder steel at the top of longitudinal side plate, in longitudinal direction Longitudinal reperfusion space is formed between side plate, Prefabricated Concrete bridge guidance tape and girder steel, Shear connection knot is equipped with the longitudinal direction reperfusion space Structure, utilizes Shear connection structure by way of longitudinally being irrigated longitudinal reperfusion space between Prefabricated Concrete bridge guidance tape and girder steel Make Prefabricated Concrete bridge guidance tape fixed connection on girder steel.
Further, the pre- Prefabricated Concrete bridge guidance tape that is embedded in is located in that the mode of girder steel is in place for pushing tow, and the pushing tow is in place For Prefabricated Concrete bridge guidance tape is supported in longitudinal side shield and by longitudinal thrusting slip to designated position;The Shear connection Structure includes being fixed on girder steel and extending to the shear key I of longitudinal reperfusion space and is embedded in Prefabricated Concrete bridge guidance tape in advance and extends To the shear key II of longitudinal reperfusion space, the shear key I and shear key II have staggeredly and vertical in longitudinal reperfusion space To spatially stepping down.
Further, the shear key I is described to be fixed on girder steel and extending upwardly to the WELDING STUDS of longitudinal reperfusion space WELDING STUDS is arranged in column for longitudinal direction, and the shear key II is to be embedded in Prefabricated Concrete bridge guidance tape in advance and extend downward into longitudinal reperfusion space Reinforcing bar.
Further, the reinforcing bar is longitudinally disposed and is in the reciprocal bending structure of cycle shape in the up-down direction, dogleg section Top half be embedded in Prefabricated Concrete bridge guidance tape, the latter half is located at longitudinal reperfusion space.
Further, the reciprocal bending structure of cycle shape is rectangle wave structure.
Further, the girder steel is made of the steel unit extended longitudinally, and horizontal two positioned at the top of steel unit Vertically arranged longitudinal direction side shutter configuration is distinguished into longitudinal reperfusion space longitudinal direction side shield in side;The Prefabricated Concrete bridge guidance tape and institute State the downwardly projecting longitudinal boss of the corresponding formation of longitudinal side shield, the both lateral sides and corresponding longitudinal direction side of the longitudinal direction boss Longitudinal reperfusion space is formed between baffle.
Further, the girder steel is made of the steel unit extended longitudinally, and horizontal two positioned at the top of steel unit End has two longitudinal side shields laterally arranged side by side respectively, and the longitudinal direction reperfusion space is positioned at two longitudinal side shields Between, the Prefabricated Concrete bridge guidance tape rear support in place is on longitudinal side shield.
Further, the Prefabricated Concrete bridge guidance tape and longitudinal reperfusion space are corresponding downwardly projecting equipped with leading along longitudinal direction To boss.
Further, the steel unit is steel box-girder or steel I-beam, is laterally set side by side with the top of the steel unit There is longitudinal wing plate, the longitudinal direction reperfusion space is corresponded on wing plate..
Further, it is described pre- to be embedded in Prefabricated Concrete bridge guidance tape to be located in the mode of girder steel in place for lifting;The Shear connection Structure includes being fixed on girder steel and extending to the WELDING STUDS of longitudinal reperfusion space and is embedded in Prefabricated Concrete bridge guidance tape in advance and extends To the shear reinforcement of longitudinal reperfusion space, the shear reinforcement is embedded in longitudinal reinforcement I in Prefabricated Concrete bridge guidance tape, positioned at longitudinal direction in advance Longitudinal reinforcement II and hoop in reperfusion space is in the stirrup of longitudinal reinforcement I and the periphery of longitudinal reinforcement II, the stirrup first half Divide and be embedded in advance in Prefabricated Concrete bridge guidance tape.
The beneficial effects of the invention are as follows:The PCSC shearing coupling arrangements of the plate-girder overall assembled composite beam bridge of the present invention, First integral prefabricated concrete bridge guidance tape can be achieved and apply the prestressing force needed to the bridge guidance tape, then made using lifting or pushing tow Integral prefabricated concrete bridge guidance tape is in place on girder steel, and pre-buried shear reinforcement below Prefabricated Concrete bridge guidance tape is fixed with girder steel top surface The WELDING STUDS of setting forms in longitudinally staggered disposition, and then pressure injection should form longitudinal reperfusion space between the two and longitudinal side shield Combination concrete form steel-concrete composite beams, then along longitudinal pushing tow to whole steel-concrete composite beams on corresponding bridge pier it is in place, it is real Show integral prefabricated concrete bridge road Slab element to be combined with the assembled of overall steel beam element, it can be achieved that building one in factory Steel-concrete composite beams and longitudinal pushing tow are to whole steel-concrete composite beams integral unit assembled plant in place on corresponding bridge pier Bridge construction method;A kind of novel architecture and embodiment party are provided for the full batch production of composite beam bridge, automation, intelligent build Case, overcomes existing highway bridge and builds inevitable open work and being shown by environment and human factor puzzlement based on manually Defect is write, actual bridge is relatively coincide with design ideal structure, so as to reduce bridge later stage disease hidden danger;It is more traditional cast-in-place mixed Solidifying soil bridge guidance tape and conventional precast block bridge guidance tape lift after-pouring joint concrete in place and form overall steel-concrete composite beams Bridge, can significantly simplify site construction technology, save steel, shorten the construction period, it is ensured that quality;Avoid concrete bridge guidance tape and steel Beam applies the problem of prestressed validity substantially reduces to bridge guidance tape again after combining, and makes structure construction and stress performance more Rationally;With PCSS shearing coupling arrangement all advantages, and overcome its site welding heavy workload, make accuracy of fit will Seek high and inconel weld anti-fatigue performance difference three major issues.
Brief description of the drawings
The invention will be further described with reference to the accompanying drawings and examples.
Fig. 1 is the first example structure schematic diagram of the invention;
Fig. 2 is Fig. 1 along sectional view along A-A;
Fig. 3 is second of example structure schematic diagram of the invention;
Fig. 4 is Fig. 3 along B-B direction sectional view;
Fig. 5 is the third example structure schematic diagram of the invention;
Fig. 6 is Fig. 5 along C-C to sectional view.
Embodiment
Fig. 1 is the first of the invention example structure schematic diagram, and Fig. 2 is Fig. 1 along sectional view along A-A;The present embodiment uses The combination beam that the PCSC shearing coupling arrangements of plate-girder overall assembled composite beam bridge are formed, PCSC shearing coupling arrangements are specially: The shear key I (connection reinforcing bar) of plate bottom surface is stretched out along the pre-buried lower section in longitudinal direction in prefabricated bridge guidance tape (PC) setting position, at girder steel (S) The longitudinally disposed shear key II (WELDING STUDS) of top surface and longitudinal side shield 4, mounting bridge guidance tape is in place on girder steel, makes bridge guidance tape pre- In the longitudinal side shield 4 for burying connection reinforcing bar insertion girder steel top surface, then to by girder steel top surface and two side shields and bridge road plate top surface shape Into strip closing chamber carry out pressure injection combination concrete (C), form prefabricated bridge guidance tape (PC) and girder steel (S) pass through rear filling PCSC shearing coupling arrangement of the note with reference to concrete (C);Girder steel 2 and Prefabricated Concrete bridge guidance tape 1 are specifically included, is had on the girder steel 2 Have longitudinal side shield 4, generally using welding structure, certainly also can bolt be detachably connected;The Prefabricated Concrete bridge guidance tape 1 is located in Positioned at longitudinal top of side shield 4 after girder steel 2, longitudinal fill is formed between longitudinal side shield 4, Prefabricated Concrete bridge guidance tape 1 and girder steel 2 Space 3 is noted, Shear connection structure is equipped with the longitudinal direction reperfusion space 3, by vertical between Prefabricated Concrete bridge guidance tape 1 and girder steel 2 Make 1 fixed connection of Prefabricated Concrete bridge guidance tape in girder steel 2 using Shear connection structure to the mode that reperfusion space 3 is longitudinally irrigated On, form overall slab and girder;Girder steel 2 can use the prior art any steel beam structure, including be set up in parallel steel I-beam, Steel box-girder or integrally-built steel box-girder for being set up in parallel etc.;Certainly, lateral ties can be equipped between steel I-beam, are belonged to In the prior art, details are not described herein;Longitudinal reperfusion space is referred to along longitudinally through reperfusion space, with reference to Shear connection knot Structure make it that bond strength is higher than the cast-in-place structural of the prior art between girder steel and bridge guidance tape after perfusion.
It is described pre- to be embedded in, the top in place for pushing tow that be located in the mode of girder steel 2 of Prefabricated Concrete bridge guidance tape 1 in the present embodiment It is that Prefabricated Concrete bridge guidance tape 1 is supported in longitudinal side shield 4 and by longitudinal thrusting slip to designated position, pushing tow to push away in place Method can use published patent document 201710677073.8 disclosed in thrustor and pushing method, can also use Method disclosed in published patent document 201611154756.7, details are not described herein;The Shear connection structure includes It is fixed on girder steel and extends to the shear key I of longitudinal reperfusion space 3 and be embedded in Prefabricated Concrete bridge guidance tape in advance and extend to longitudinal direction The shear key II of reperfusion space, the shear key I and shear key II have staggeredly and in longitudinal space in longitudinal reperfusion space Upper resigning, longitudinal space step down and refer to that the two gets out of the way mutually in the vertical, make to cut when Prefabricated Concrete bridge guidance tape straight skidding is in place Power part I and shear key II do not interfere.
In the present embodiment, the shear key I is to be fixed on girder steel and extend upwardly to the WELDING STUDS of longitudinal reperfusion space 5, the WELDING STUDS is arranged in column for longitudinal direction, and the shear key II is to be embedded in Prefabricated Concrete bridge guidance tape in advance and extend downward into longitudinal filling The reinforcing bar 6 in space is noted, the WELDING STUDS can be distributed multiple or transversely be arranged side by side, and reinforcing bar is longitudinally arranged and can be It is laterally arranged side by side multiple.
In the present embodiment, the reinforcing bar 6 is longitudinally disposed and is in the reciprocal bending structure of cycle shape in the up-down direction, bending Partial top half is embedded in Prefabricated Concrete bridge guidance tape 1, and the latter half is located at longitudinal reperfusion space 3;The reciprocal bending knot of cycle shape Structure refers to that the bending of same root reinforcing bar above-below direction forms periodic waveform, increases overall intensity.
In the present embodiment, the reciprocal bending structure of cycle shape is rectangle wave structure, and rectangle wave structure refers to bending shape It is rectangular, and arranged along longitudinal periodicity, rectangular wave is easy to process, increases pre-buried length after being embedded in bridge guidance tape in advance, and intensity is higher, Meanwhile the rectangular wave part in reperfusion space also has longer perfusion length, increase perfusion intensity;Meanwhile rectangular wave In rectangular wave in longitudinal reperfusion space be mutually staggered in the vertical with WELDING STUDS so that Shear connection structure is in perfusion sky It is interior to be evenly distributed, so as to improve the globality of perfusion.
In the present embodiment, the girder steel 2 is made of the steel unit extended longitudinally, the horizontal stroke positioned at the top of steel unit Longitudinal reperfusion space is respectively configured to both ends, it is described vertical to correspond to arrangement positioned at the lateral outer side of longitudinal reperfusion space To side shield;The Prefabricated Concrete bridge guidance tape 1 is corresponding with longitudinal side shield to form downwardly projecting longitudinal boss 1a, described Longitudinal reperfusion space 3 is formed between the both lateral sides of longitudinal boss 1a and corresponding longitudinal side shield 4;It is as shown in the figure, pre- 1 rear support in place of concrete bridge guidance tape processed has sufficiently small gap in longitudinal side shield 4, longitudinal boss 1a lower parts with the top of girder steel 2 (it is expected less gap even without gap), then then have between longitudinal side shield 4 and the corresponding sides of longitudinal boss 1a Have the space of relative closure, which then forms longitudinal reperfusion space, the program can have sufficiently large reperfusion space and Shear connection structure, increases bonding strength;Meanwhile longitudinal boss can also increase the integral strength of Prefabricated Concrete bridge guidance tape, with perfusion The concrete irrigated in space is combined into one, and ensures the overall stability and security of bridge guidance tape combination girder steel.
Fig. 3 is second of example structure schematic diagram of the invention, and Fig. 4 is Fig. 3 along B-B direction sectional view, and of the invention is another Kind of embodiment, the identical component of reference numeral is identical with the first embodiment in figure, will not cause to obscure, the present embodiment and first The difference of kind embodiment is:The pre- Prefabricated Concrete bridge guidance tape 1 that is embedded in is located in the mode of girder steel 2 as lifting is in place and reperfusion space 3 Formation, i.e., described girder steel 2 is made of the steel unit extended longitudinally, and the transverse ends positioned at the top of steel unit are distinguished With two longitudinal side shields (longitudinal side shield 4 and longitudinal direction side shield 4a) laterally arranged side by side, the longitudinal direction reperfusion space 3 Between two longitudinal side shields (longitudinal side shield 4 and longitudinal direction side shield 4a), after the Prefabricated Concrete bridge guidance tape 1 is in place It is supported on longitudinal side shield (longitudinal side shield 4 and longitudinal direction side shield 4a);As shown in the figure, longitudinal reperfusion space 3 is formed at Between two longitudinal side shields (longitudinal side shield 4 and longitudinal direction side shield 4a), there is the structure of relative closure;The program equally may be used With sufficiently large reperfusion space and Shear connection structure, to increase bonding strength, and stable structure is regular, later maintenance side Just.In this implementation, the Prefabricated Concrete bridge guidance tape downwardly projecting guiding being equipped with along longitudinal direction corresponding with the longitudinal direction reperfusion space Boss 1b, guide ledges 1b are located between two longitudinal side shields of longitudinal reperfusion space for guiding when lifting in place, keep away Exempt to wander off, while increase the bonding strength after perfusion.
In above-described embodiment, the steel unit is steel box-girder or steel I-beam, horizontal with the top of the steel unit Longitudinal wing plate is equipped with side by side, and the longitudinal direction reperfusion space is corresponded on wing plate;As shown in the figure, by taking steel case as an example, steel case is Upper opening structure, can mitigate overall weight, and can guarantee that integrated carrying ability;Can be multiple steel casees according to different needs Connected side by side and by middle reinforcing plate 7;Each welding is equipped with a longitudinal wing plate on the web of the both sides of steel case, and width is with wanting The reperfusion space of formation is adapted, and need to such as install other ancillary equipments, then can suitably widen width, details are not described herein;First In kind embodiment, longitudinal side shield is fixed on the upper surface of wing plate close to lateral outer side, and the upper surface of wing plate is close to laterally inboard (inside and outside for the longitudinal centre line of steel case) support longitudinal direction boss has less gap;In second of embodiment, one The upper surface of a longitudinal direction wing plate has longitudinal side shield respectively close to laterally interior outside, and reperfusion space is positioned at two longitudinal direction side shields Between;In order to increase perfusion intensity, longitudinal side shield surface corresponding with reperfusion space carries out coarse processing.
Fig. 5 is the third of the invention example structure schematic diagram, and Fig. 6 is Fig. 5 along C-C to sectional view, the of the invention the 3rd Kind of embodiment, the identical component of reference numeral is identical with first and second kind of embodiment in figure, will not cause to obscure, with preceding two implementations Example is distinguished as:It is described pre- to be embedded in Prefabricated Concrete bridge guidance tape 1 to be located in the mode of girder steel 2 in place for lifting;The Shear connection knot Structure includes being fixed on girder steel and extending to the WELDING STUDS 5 of longitudinal reperfusion space and is embedded in Prefabricated Concrete bridge guidance tape in advance and extends to The shear reinforcement of longitudinal reperfusion space, the shear reinforcement are embedded in longitudinal reinforcement I 9 in Prefabricated Concrete bridge guidance tape, positioned at longitudinal direction in advance Longitudinal reinforcement II 10 and hoop in reperfusion space is in the stirrup 8 of longitudinal reinforcement I 9 and the periphery of longitudinal reinforcement II 10, the stirrup 8 Top half is embedded in Prefabricated Concrete bridge guidance tape in advance, this structure shear reinforcement includes the longitudinal reinforcement I 9 in bridge guidance tape and is located at Longitudinal reinforcement II 10 in longitudinal reperfusion space, and contacted by stirrup 8, overall perfusion intensity is improved, ensures making for bridge With safety, relative to foregoing pushing tow, construction is slightly complicated in place in place for lifting.
Finally illustrate, the above embodiments are merely illustrative of the technical solutions of the present invention and it is unrestricted, although with reference to compared with The present invention is described in detail in good embodiment, it will be understood by those of ordinary skill in the art that, can be to the skill of the present invention Art scheme technical scheme is modified or replaced equivalently, without departing from the objective and scope of technical solution of the present invention, it should all cover at this Among the right of invention.

Claims (10)

  1. A kind of 1. PCSC shearing coupling arrangements of plate-girder overall assembled composite beam bridge, it is characterised in that:Including girder steel and prefabricated Concrete bridge guidance tape, has longitudinal side plate on the girder steel, and the Prefabricated Concrete bridge guidance tape is located in after girder steel at the top of longitudinal side plate, Longitudinal reperfusion space is formed between longitudinal side plate, Prefabricated Concrete bridge guidance tape and girder steel, shearing is equipped with the longitudinal direction reperfusion space Connection structure, is connected between Prefabricated Concrete bridge guidance tape and girder steel by way of longitudinally being irrigated longitudinal reperfusion space using shearing Binding structure makes Prefabricated Concrete bridge guidance tape fixed connection on girder steel.
  2. 2. the PCSC shearing coupling arrangements of plate-girder overall assembled composite beam bridge according to claim 1, it is characterised in that: The pre- Prefabricated Concrete bridge guidance tape that is embedded in is located in that the mode of girder steel is in place for pushing tow, and the pushing tow is by Prefabricated Concrete bridge guidance tape in place It is supported in longitudinal side shield and by longitudinal thrusting slip to designated position;The Shear connection structure includes being fixed on steel On beam and extend to the shear key I of longitudinal reperfusion space and be embedded in Prefabricated Concrete bridge guidance tape in advance and extend to longitudinal reperfusion space Shear key II, the shear key I and shear key II have staggeredly in longitudinal reperfusion space and step down on longitudinal space.
  3. 3. the PCSC shearing coupling arrangements of plate-girder overall assembled composite beam bridge according to claim 2, it is characterised in that: The shear key I to be fixed on girder steel and extend upwardly to the WELDING STUDS of longitudinal reperfusion space, the WELDING STUDS for longitudinal direction into Row arrangement, the shear key II is is embedded in Prefabricated Concrete bridge guidance tape and extends downward into the reinforcing bar of longitudinal reperfusion space in advance.
  4. 4. the PCSC shearing coupling arrangements of plate-girder overall assembled composite beam bridge according to claim 3, it is characterised in that: The reinforcing bar is longitudinally disposed and is in the reciprocal bending structure of cycle shape in the up-down direction, and the top half of dogleg section is embedded in Prefabricated Concrete bridge guidance tape, the latter half are located at longitudinal reperfusion space.
  5. 5. the PCSC shearing coupling arrangements of plate-girder overall assembled composite beam bridge according to claim 4, it is characterised in that: The reciprocal bending structure of cycle shape is rectangle wave structure.
  6. 6. the PCSC shearing coupling arrangements of plate-girder overall assembled composite beam bridge according to claim 1, it is characterised in that: The girder steel is made of the steel unit extended longitudinally, and the transverse ends positioned at the top of steel unit are respectively configured to described Longitudinal reperfusion space, arrangement longitudinal side shield is corresponded to positioned at the lateral outer side of longitudinal reperfusion space;The Prefabricated Concrete Bridge guidance tape is corresponding with longitudinal side shield to form downwardly projecting longitudinal boss, the both lateral sides of the longitudinal direction boss with it is right Longitudinal reperfusion space is formed between the longitudinal side shield answered.
  7. 7. the PCSC shearing coupling arrangements of plate-girder overall assembled composite beam bridge according to claim 1, it is characterised in that: The girder steel is made of the steel unit extended longitudinally, and the transverse ends positioned at the top of steel unit have laterally simultaneously respectively Two longitudinal side shields of row, the longitudinal direction reperfusion space is between two longitudinal side shields, the Prefabricated Concrete Bridge guidance tape rear support in place is on longitudinal side shield.
  8. 8. the PCSC shearing coupling arrangements of plate-girder overall assembled composite beam bridge according to claim 7, it is characterised in that: The Prefabricated Concrete bridge guidance tape downwardly projecting guide ledges being equipped with along longitudinal direction corresponding with the longitudinal direction reperfusion space.
  9. 9. the PCSC shearing coupling arrangements of the plate-girder overall assembled composite beam bridge according to claim 6 or 7, its feature exist In:The steel unit is steel box-girder or steel I-beam, and longitudinal wing plate, institute are laterally equipped with side by side with the top of the steel unit Longitudinal reperfusion space is stated to correspond on wing plate..
  10. 10. the PCSC shearing coupling arrangements of plate-girder overall assembled composite beam bridge according to claim 1, its feature exist In:It is described pre- to be embedded in Prefabricated Concrete bridge guidance tape to be located in the mode of girder steel in place for lifting;The Shear connection structure includes fixing In on girder steel and extending to the WELDING STUDS of longitudinal reperfusion space and pre- be embedded in Prefabricated Concrete bridge guidance tape and to extend to longitudinal direction perfusion empty Between shear reinforcement, the shear reinforcement is embedded in longitudinal reinforcement I in Prefabricated Concrete bridge guidance tape, in longitudinal reperfusion space in advance In the stirrup of longitudinal reinforcement I and the periphery of longitudinal reinforcement II, the stirrup top half is embedded in prefabricated in advance for longitudinal reinforcement II and hoop In concrete bridge guidance tape.
CN201711251329.5A 2017-12-01 2017-12-01 The PCSC of plate-girder overall assembled composite beam bridge shears coupling arrangement Active CN107964875B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711251329.5A CN107964875B (en) 2017-12-01 2017-12-01 The PCSC of plate-girder overall assembled composite beam bridge shears coupling arrangement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711251329.5A CN107964875B (en) 2017-12-01 2017-12-01 The PCSC of plate-girder overall assembled composite beam bridge shears coupling arrangement

Publications (2)

Publication Number Publication Date
CN107964875A true CN107964875A (en) 2018-04-27
CN107964875B CN107964875B (en) 2019-07-23

Family

ID=61999299

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711251329.5A Active CN107964875B (en) 2017-12-01 2017-12-01 The PCSC of plate-girder overall assembled composite beam bridge shears coupling arrangement

Country Status (1)

Country Link
CN (1) CN107964875B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114411975A (en) * 2022-02-13 2022-04-29 重庆交通大学 Composite bolt shear key structure

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002004221A (en) * 2000-06-23 2002-01-09 Hitachi Zosen Corp Composite floor board
CN103334374A (en) * 2013-04-16 2013-10-02 重庆交通大学 PCSS connecting structure
CN203546589U (en) * 2013-10-24 2014-04-16 同济大学 Steel girder-integral lifting arm prefabricated concrete bridge panel combined girder bridge
CN105926440A (en) * 2016-05-09 2016-09-07 湖南城市学院 Steel-concrete combined continuous beam bridge deck as well as manufacturing method and application thereof
CN106638304A (en) * 2016-12-30 2017-05-10 东南大学 UHPC-common-concrete-lamination composite bridge-deck-slab construction and constructing method thereof
JP2017122356A (en) * 2016-01-08 2017-07-13 Jfeスチール株式会社 Replacement steel plate deck of concrete slab and replacement method of concrete slab

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002004221A (en) * 2000-06-23 2002-01-09 Hitachi Zosen Corp Composite floor board
CN103334374A (en) * 2013-04-16 2013-10-02 重庆交通大学 PCSS connecting structure
CN203546589U (en) * 2013-10-24 2014-04-16 同济大学 Steel girder-integral lifting arm prefabricated concrete bridge panel combined girder bridge
JP2017122356A (en) * 2016-01-08 2017-07-13 Jfeスチール株式会社 Replacement steel plate deck of concrete slab and replacement method of concrete slab
CN105926440A (en) * 2016-05-09 2016-09-07 湖南城市学院 Steel-concrete combined continuous beam bridge deck as well as manufacturing method and application thereof
CN106638304A (en) * 2016-12-30 2017-05-10 东南大学 UHPC-common-concrete-lamination composite bridge-deck-slab construction and constructing method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114411975A (en) * 2022-02-13 2022-04-29 重庆交通大学 Composite bolt shear key structure
CN114411975B (en) * 2022-02-13 2023-11-07 重庆交通大学 Structure of composite bolting shear key

Also Published As

Publication number Publication date
CN107964875B (en) 2019-07-23

Similar Documents

Publication Publication Date Title
CN108060636B (en) The construction method of overall assembled composite beam bridge
CN106677049B (en) Assembled steel-concrete combined structure bridge and construction method
US11225803B2 (en) Prestressed bailey beam for reinforcement and construction method therefor
CN204185755U (en) A kind of Wavelike steel webplate post-stressed concrete T beam
CN105484151B (en) The construction and its construction method connected between a kind of enhancing precast concrete segment
CN105839510A (en) Steel-ultra-high-performance concrete combined continuous beam bridge structure and construction method thereof
CN106223183B (en) Assembled concrete-filled rectangular steel tube combines truss bridge and construction method
CN103334374B (en) PCSS shearing coupling arrangement
CN113957782A (en) Bent cap structure adopting double-main-beam prefabrication and assembly method and construction method thereof
CN103590324A (en) Transverse shear resisting section type self-resetting pier and construction method thereof
CN105064195B (en) The fish belly Wavelike steel webplate prestressing with bond steel reinforced concrete combination simply supported girder bridge and its construction method of precast assembly
CN109440634A (en) The prefabricated high strength concrete hollow bent cap structure that internal model can be taken off
CN205205646U (en) Structure of reinforcing prefabricated segment formula concrete bridge intersegmental connection of festival
CN110747805A (en) Prefabricated high-pile wharf node structure and construction method
CN108252222B (en) Steel-concrete combined structure formula simple supported-to-continuous girder bridge method
CN112281663B (en) Construction method for widening connection of upper structures of new and old bridges
CN107964875B (en) The PCSC of plate-girder overall assembled composite beam bridge shears coupling arrangement
CN206887771U (en) A kind of small across footpath plate-beam construction platform structure
CN106320184B (en) A kind of unit construction bridge beam construction method
CN208363352U (en) A kind of T-type node assembling steel plate concrete shear force wall
CN209114299U (en) A kind of Single-box multi-chamber box beam bridge
CN208363351U (en) A kind of cross node assembling steel plate concrete shear force wall
CN108716191A (en) A kind of concrete arch rib Covered with Angles sleeve-board group and its bracing means
CN109098094A (en) Construction method without bracket horizontal splicing corrugated steel web plate combined box girder
CN208899352U (en) A kind of concrete arch rib Covered with Angles sleeve-board group and its bracing means

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant