1. a kind of dedicated inspection platform of steam turbine, it is characterised in that:Including pedestal(1), universal wheel(2), character cut in bas-relief seat(3), gas
Compression bar(4), supporting block(5), the first riser(6), the first sliding rail(7), the first platform(8), driving motor(9), limited block(10),
First lifter plate(11), the first leading screw(12), the second leading screw(13), first bearing(14), second bearing(15), the first belt pulley
(16), the second belt pulley(17), third belt pulley(18), belt(19), the second riser(20), the second sliding rail(21), upper limit
Block(22), lower position block(23), the second lifter plate(24), safety barrier(25), the second platform(26), winding motor(27), it is sliding
Take turns mounting rod(28), pulley(29)And cable wire(30);
The pedestal(1)Lower surface both sides are respectively connected with universal wheel(2);
The pedestal(1)Character cut in bas-relief seat there are one being fixedly connected on the center of lower surface(3);
The character cut in bas-relief seat(3)In be fixedly connected there are two spaced atmospheric pressure pole(4);
The atmospheric pressure pole(4)Output shaft on be fixedly connected there are one supporting block(5);
The pedestal(1)First riser there are one being fixedly connected on the left of upper surface(6);
First riser(6)Right side on be fixedly connected there are one the first sliding rail(7);
First sliding rail(7)Top on be fixedly connected there are one limited block(10);
First riser(6)Left side upper end be fixedly connected there are one the first platform(8);
First platform(8)On be fixedly connected there are one driving motor(9);
First sliding rail(7)On be slidably connected there are one the first lifter plate(11);
First lifter plate(11)In the first leading screw is connected separately with by screw thread(12)With the second leading screw(13);
First leading screw(12)End pass through first bearing(14)It is connected to pedestal(1)In, second leading screw(13)'s
End passes through second bearing(15)It is connected to pedestal(1)In;
Second leading screw(13)Top on be fixedly connected there are one the first belt pulley(16);
First leading screw(12)Top on be respectively fixedly connected with the second belt pulley(17)With third belt pulley(18);
First belt pulley(16)With the second belt pulley(17)Between pass through belt(19)It is connected together;
The driving motor(9)Output shaft pass through belt(19)With third belt pulley(18)It is connected together;
First lifter plate(11)Right side on be fixedly connected there are one the second riser(20);
Second riser(20)Right side on be fixedly connected there are one the second sliding rail(21);
Second sliding rail(21)Top on be fixedly connected there are one upper limit position block(22);
Second sliding rail(21)Bottom end on be fixedly connected there are one lower position block(23);
Second sliding rail(21)On be slidably connected there are one the second lifter plate(24);
Second lifter plate(24)Right-hand end on be fixedly connected there are one safety barrier(25);
Second riser(20)Top on be fixedly connected there are one pulley mounting rod(28);
The pulley mounting rod(28)There are one pulleys for upper flexible connection(29);
Second riser(20)Left side upper end be fixedly connected there are one the second platform(26);
Second platform(26)On be fixedly connected there are one winding motor(27);
The pulley(29)On set there are one cable wire(30);
The cable wire(30)One end be fixedly connected on winding motor(27)Scroll on, the cable wire(30)The other end it is solid
Surely it is connected to the second lifter plate(24)Right side.