CN208073499U - Diplopore hollow, rectangular section load bearing beam road cutting type protecting arched tunnel liner structure - Google Patents

Diplopore hollow, rectangular section load bearing beam road cutting type protecting arched tunnel liner structure Download PDF

Info

Publication number
CN208073499U
CN208073499U CN201721856618.3U CN201721856618U CN208073499U CN 208073499 U CN208073499 U CN 208073499U CN 201721856618 U CN201721856618 U CN 201721856618U CN 208073499 U CN208073499 U CN 208073499U
Authority
CN
China
Prior art keywords
tunnel
arch wall
longeron
longitudinal direction
liner structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201721856618.3U
Other languages
Chinese (zh)
Inventor
卿伟宸
陶伟明
郑伟
林本涛
张磊
钟昌桂
朱勇
李泽龙
张慧玲
王芳
孟祥磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Eryuan Engineering Group Co Ltd CREEC
Original Assignee
China Railway Eryuan Engineering Group Co Ltd CREEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Eryuan Engineering Group Co Ltd CREEC filed Critical China Railway Eryuan Engineering Group Co Ltd CREEC
Priority to CN201721856618.3U priority Critical patent/CN208073499U/en
Application granted granted Critical
Publication of CN208073499U publication Critical patent/CN208073499U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

Diplopore hollow, rectangular section load bearing beam road cutting type protecting arched tunnel liner structure, eliminate effect of the underground water to tunnel-liner bottom structure, effectively solve the problems, such as karst or the regional tunnel inverted arch floating deformation of underground water development or tunnel bottom structure cracking destruction, ensure stabilization and the safety of constructing tunnel and operation, and prevents in operation railway roadbed ponding polluted underground water in tunnel.The longeron consolidated therewith is arranged in arch wall secondary liner structure both sides abutment wall bottom, and longeron is the rectangular section with top longitudinal direction cavity, lower part longitudinal direction cavity.The longeron not only bearing structure as arch wall preliminary bracing structure and arch wall secondary liner structure, but also as tunnel longitudinal drainage channel.The setting of tunnel bottom fills out basis by changing of constituting of basic surface layer, subfoundation between longeron.Internal excretory system introduces railway roadbed ponding in tunnel in the cavity of top longitudinal direction, and external excretory system introduces arch wall range drainage system and tunnel bottom drainage system charge for remittance in the cavity of lower part longitudinal direction.

Description

Diplopore hollow, rectangular section load bearing beam road cutting type protecting arched tunnel liner structure
Technical field
The utility model is related to tunnel-liners and drainage system to construct, more particularly to one kind applying to underground water development location Or underground water is by the tunnel lining structure in the irregular location of seasonal effect or karst area.
Background technology
Come into 21st century, railway construction in China high speed development, the above high standard double track railways of speed per hour 200km are built It is more and more.Especially in Southwest Mountainous Areas, on the one hand, since lime rock stratum is widely distributed;On the other hand, to high-speed railway, line By sweep, many factors such as big, topographic and geologic complicated condition are restricted road show line, lead to Karst Tunnel scale (quantity and length Degree) it increases sharply.Since karst and karst water development have the characteristics that complexity, diversity and irregularities, karst tunnel of growing up It is higher and higher that risk especially operations risks are built in road.
In recent years, suitable ten thousand, had occurred during Shanghai elder brother, the expensive Railway Tunnels operation such as wide several ballastless track beds deformations, The water damages event such as inverted arch and filling protuberance, causes Railway Design, construction, construction and the great attention for runing each side.Through investigating, Both wired water damage was broadly divided into two classes:
(1) inverted arch filling, which is floated, deforms.The construction joint that the construction in layer of its performance predominantly tunnel bottom structure is brought is in hydraulic pressure Deformation, expansion under effect.
1. code requirement inverted arch should be separated with inverted arch filling and be poured.This engineering method forms construction joint between inverted arch and filling, But underground water penetrates into inverted arch by inverted arch circular construction joint and fills bottom, and about 3~4m heads can cause filling to be floated.
2. in practice of construction, to prevent railway roadbed construction surface from being destroyed by Construction traffic, inverted arch filling often uses placement layer by layer Mode, inverted arch filling surface layer (or regulating course) thickness about 0.2~0.4m of placing before railway roadbed construction, it is only necessary to 0.5~1m High head can cause to fill surface layer floating, and then railway roadbed is caused to deform.
3. ballastless track bed is to road bed board and inverted arch fill surface using the connectionless way of contact, there are construction interfaces, right It is more notable in the sensibility of tunnel bottom infiltration, often also there is " gap " lifting phenomenon and wear phenomenon, under the action of water, disease Evil feature is particularly evident.It is very poor to foundation deformation with the huge stiffness difference of tunnel structure, deformation and track structure Adaptability be further exacerbated by tunnel bottom water evil to the adverse effect and difficulty of governance of operation security.
(2) liner structure is mainly inverted arch strain cracking.
1. limited by vertical, the circumferential blind pipe and abutment wall drain hole drainability that are arranged in tunnel, after work drainage system by Physical (silt, fine grained deposition are silted up), chemical type block (soluble matter is precipitated, concrete and slurry reaction residue condense) Etc. reasons will all cause impeded drainage, hydraulic pressure change dramatically to lead to liner structure cracking failure.
2. the structures such as abutment wall longitudinal direction construction joint, circular construction joint, inverted arch bottom and waterproof weak link recurring structure deformation, Cracking and waterproof failure;Spraying water, gushing silt etc. occur in local location.
3. level of ground water seasonal fluctuations cause lining cutting to bear " dynamic load " influence.In continuous rainfall or Severe rainstorm weather Under the conditions of, level of ground water increases suddenly, and lining cutting bears higher hydraulic pressure.
The tunnel designed at present is largely to have inverted arch lining cutting.By taking one-tunnel two-tracks tunnel as an example, drainage system is with " tunnel Draining in vivo " is Main Patterns, and underground water discharge path is:Country rock → preliminary bracing → draining blind pipe → lateral sulcus → transverse drainage Pipe → Central drain, the i.e. water on tunnel structure periphery are permeated by preliminary bracing enters tunnel structure sheet via draining blind pipe ejectment Central drain within body, it is final to be discharged outside hole.
Drainage system in tunnel body main drawback is that:
1. thering is the pressure release point of pressure underground water to be respectively positioned on to be arranged inside lining cutting agent structure, lining cutting agent structure is caused to bear Hydrostatic pressing or hydrodynamic range are larger.
2. Central drain (or lateral sulcus) is set within tunnel structure, the periphery underground water of main ejectment arch wall range, tunnel Inverted arch ponding below can not effective ejectment, once under continuous rainfall or rainstorm weather, under Local topography inverted arch crevice water or Pipeline water because can not in time ejectment cause hydraulic pressure drastically to increase.Under the effect of high hydraulic pressure, cause tunnel bottom inverted arch cracking failure.
3. tunnel is in underground water seasonal fluctuation zone etc. and the close region of extraneous hydraulic connection, in continuous rainfall or heavy rain It under weather, because of groundwater run off abruptly increase, is limited by abutment wall sluicing pore size and spacing, it is difficult in time by its ejectment to tunnel structure body In interior gutter, drastically increased so as to cause level of ground water.Under the effect of high hydraulic pressure, Lining cracks is caused to destroy.
4. being needed by ballast bed structure, hole auxiliary structures and tunnel cross-section engineering economy being restricted, consider that construction is difficult The cross-section of river degree of freedom of easy degree, hole medial sulcus or Central drain is little, and discharge capacity is limited, often causes water damage in hole.
5. since tunnel bottom is arc-shaped, excavate that control is more difficult, and it is big that tunnel bottom void slag cleans out difficulty completely, during operation Due to tunnel bottom underground water can not ejectment, Train induced load repeated action in addition easily causes tunnel bottom the disasters such as to rise soil.
Therefore, optimize liner structure and drainage system, ensure that draining is unobstructed, reduce or even eliminate tunnel bottom water pressure, become drop Low underground water development location, underground water are ensured operation peace by the irregular location of seasonal effect and karst area tunnel water damage risk It is complete there is an urgent need to.
Utility model content
The technical problem to be solved by the utility model is to provide a kind of diplopore hollow, rectangular section load bearing beam road cutting type protectings Arched tunnel liner structure changes tunnel bear building-up by being transformed to conventional tunnel lining cutting tunnel bottom structure form and drainage system Structure stress form and drainage system eliminate effect of the underground water to tunnel-liner bottom structure, effectively solve karst or underground water The problem of regional tunnel inverted arch floating deformation of development or tunnel bottom structure cracking destruction, it is ensured that the stabilization and peace of constructing tunnel and operation Quan Xing, and prevent in operation railway roadbed ponding polluted underground water in tunnel.
Technical solution is as follows used by the utility model solves its technical problem:
The diplopore hollow, rectangular section load bearing beam road cutting type protecting arched tunnel liner structure of the utility model, including arch wall initial stage Supporting construction, arch wall secondary liner structure and arch wall range waterproof layer, further include drainage system, it is characterized in that:The arch wall two The longeron consolidated therewith is arranged in secondary liner structure both sides abutment wall bottom, and longeron is with top longitudinal direction cavity, lower part longitudinal direction cavity Rectangular section;The longeron not only bearing structure as arch wall preliminary bracing structure and arch wall secondary liner structure, but also conduct Tunnel longitudinal drainage channel;The setting of tunnel bottom fills out basis by changing of constituting of basic surface layer, subfoundation between the longeron;The draining System includes internal excretory system and external excretory system, and railway roadbed ponding in tunnel is introduced the longitudinal sky in top by internal excretory system Intracavitary, external excretory system introduce arch wall range drainage system and tunnel bottom drainage system charge for remittance in the cavity of lower part longitudinal direction.
The basis surface layer is not less than the graded broken stone filling technology of 40cm by thickness, and subfoundation is filled by A, B group filler.
The arch wall range drainage system includes circle draining blind pipe and abutment wall tapping pipe, and the circle draining blind pipe is along tunnel It excavates direction interval and is laid between non-woven geotextile and splash guard and is introduced directly into the cavity of lower part longitudinal direction in abutment wall lower part in road;Institute It states abutment wall tapping pipe to lay along tunnel excavation direction interval, country rock certain length is stretched into one end, and it is longitudinal empty that the other end introduces lower part In chamber, with drainage abutment wall range underground water and pressure release.
Tunnel bottom drainage system includes drainage blanket and drainage blanket tapping pipe, and the drainage blanket is located at subfoundation lower part, Medium coarse sand using thickness not less than 15cm fills, to collect tunnel bottom underground water and prevent underground water from washing away sapping tunnel bottom country rock; The drainage blanket tapping pipe is laid in along tunnel excavation direction interval in longeron, by the underground water ejectment collected in drainage blanket under In the cavity of portion longitudinal direction.
The internal excretory system includes railway roadbed ponding tapping pipe and basic surface layer tapping pipe, basis surface layer tapping pipe It is laid in longeron along tunnel excavation direction interval, it will be in possible ponding ejectment to top longitudinal direction cavity in basic surface layer;Institute It states railway roadbed ponding tapping pipe to be laid in longeron along tunnel excavation direction interval, by railway roadbed ponding ejectment to top longitudinal direction cavity In.
The beneficial effects of the utility model are mainly reflected in following aspects:
1, tunnel bottom is not provided with structure sheaf and excavates basic horizontal, overcomes traditional lining types inverted arch foundation excavation curvature not The problems such as easy to control, it is more convenient to excavate operation.It is compared to the liner structure that traditional tunnel bottom is inverted arch form, saves Building wood Material, effectively reduces engineering construction investment;
2, tunnel bottom is not provided with structure sheaf, and only setting, which is changed, fills out basis.It is not required to apply Concrete Filled body thereon, effectively prevent Traditional song wall band inverted arch lining cutting is filled out since underground water enters between inverted arch and inverted arch blind to squeeze to destroy by inverted arch construction joint Body is filled, track structure is caused to destroy;
3, bearing structure of the hollow longeron as arch wall secondary lining is arranged in tunnel bottom both sides, and bending stiffness can be greatly improved. Weak surrounding rock location is locally lain in for tunnel side wall bottom, can effectively control arch wall supporting construction sedimentation and deformation;To karst area Tunnel can effectively cross over the Karst Features (molten chamber, filling solution cavity, corroded breaking zone etc.) of certain size range;
4, longeron uses diplopore hollow, rectangular section, can save bricklaying first;Using longeron upper cavity as the roads Dong Nei Bed ponding drain passage, lower cavity realize in hole sewage and underground moisture from excretion as external ground water discharge channel, with Avoid underground water contaminated;Drain cavern in traditional underground water development Tunnel Engineering design may replace using the liner structure form, It is more than 10,000,000 that average every kilometer of Tunnel Engineering, which can save project cost, and economic benefit is very notable;
5, the separate type drainage system of the utility model setting realizes sewage and underground moisture in hole and is avoided from excretion Underground water is contaminated;Drainability is stronger, can effectively drainage arch wall range and tunnel bottom underground water, avoid traditional liner structure because of ground Lining cutting structure crack destroys after lower water drainage difficulty or heavy rain season groundwater run off abruptly increase lead to inverted arch.
The utility model changes tunnel bear building-up by being transformed to conventional tunnel lining cutting tunnel bottom structure form and drainage system Structure stress form and drainage system eliminate effect of the underground water to tunnel-liner bottom structure, effectively solve karst or underground water The problem of regional tunnel inverted arch floating deformation of development or tunnel bottom structure cracking destruction, it is ensured that the stabilization and peace of constructing tunnel and operation Quan Xing, and prevent in operation railway roadbed ponding polluted underground water in tunnel.
Description of the drawings
This specification includes following two width attached drawing:
Fig. 1 is the schematic diagram of the utility model diplopore hollow, rectangular section load bearing beam road cutting type protecting arched tunnel liner structure;
Fig. 2 is the enlarged drawing of the parts A in Fig. 1.
Component, toponym and corresponding label are shown in figure:Top longitudinal direction cavity B1, lower part longitudinal direction cavity B2, arch wall Preliminary bracing structure 10, arch wall shotcrete layer 10a, arch wall steelframe 10b, arch wall system anchor bolt 10c, screed-coat 11, arch wall Range waterproof layer 20, geotextiles 20a, splash guard 20b, tunnel bottom waterproof layer 21, circle draining blind pipe 31a, abutment wall tapping pipe 31b, 31c, it drainage blanket 32a, drainage blanket tapping pipe 32b, arch wall secondary liner structure 40, basis surface layer 41b, subfoundation 41a, indulges Beam 42.
Specific implementation mode
The utility model is described in detail with reference to the accompanying drawings and examples.
Referring to Fig.1, the utility model diplopore hollow, rectangular section load bearing beam road cutting type protecting arched tunnel liner structure, including arch Wall preliminary bracing structure 10, arch wall secondary liner structure 40 and arch wall range waterproof layer 20, further include drainage system 30.The arch 40 both sides abutment wall bottom of wall secondary liner structure is arranged the longeron 42 that consolidates therewith, longeron 42 be with top longitudinal direction cavity B1, The rectangular section of lower part longitudinal direction cavity B2.The longeron 42 is both used as arch wall preliminary bracing structure 10 and arch wall secondary lining knot The bearing structure of structure 40, and as tunnel longitudinal drainage channel.Bending stiffness can be greatly improved in setting 42, for tunnel side wall bottom Weak surrounding rock location is locally lain in, arch wall supporting construction sedimentation and deformation can be effectively controlled, and save bricklaying, to karst area tunnel Road can effectively cross over the Karst Features (molten chamber, filling solution cavity, corroded breaking zone etc.) of certain size range.The drainage system Including internal excretory system and external excretory system, railway roadbed ponding in tunnel is introduced top and indulges each cavity by internal excretory system In B1, external excretory system introduces arch wall range drainage system and tunnel bottom drainage system charge for remittance in the cavity B2 of lower part longitudinal direction.Profit Use longeron top longitudinal direction cavity B1 as railway roadbed ponding drain passage in hole, lower part longitudinal direction cavity B2 is as external ground water discharge Channel realizes that sewage and underground moisture are contaminated to avoid underground water from excretion in hole.It may replace using the liner structure form Drain cavern in traditional underground water development Tunnel Engineering design, it is more than 1,000 that average every kilometer of Tunnel Engineering, which can save project cost, Ten thousand.
Referring to Fig.1, the setting of 42 tunnel bottoms of the longeron fills out basis by changing of constituting of basic surface layer 41b, subfoundation 41a, Without setting structure layer, basic surface layer 41b can by thickness be not less than 40cm graded broken stone filling technology, subfoundation 41a can by A, B group fillers fill.Basic horizontal is excavated at tunnel bottom, is overcome not easy to control lead etc. of traditional lining types inverted arch foundation excavation curvature and is asked It is more convenient to excavate operation for topic.Tunnel excavation amount can be reduced, construction material is saved, effectively reduce engineering construction investment.
Referring to Figures 1 and 2, the arch wall range drainage system includes circle draining blind pipe 31a and abutment wall tapping pipe 31b, The circle draining blind pipe 31a is laid in along tunnel excavation direction interval between non-woven geotextile 20a and splash guard 20b and in abutment wall Lower part is introduced directly into the cavity B2 of lower part longitudinal direction.The abutment wall tapping pipe 31b is laid along tunnel excavation direction interval, and one end is stretched into Country rock certain length, the other end are introduced into the cavity B2 of lower part longitudinal direction, with drainage abutment wall range underground water and pressure release.
Referring to Figures 1 and 2, tunnel bottom drainage system includes drainage blanket 32a and drainage blanket tapping pipe 32b, the draining Layer 32a is located at the lower parts subfoundation 41a, and the medium coarse sand using thickness not less than 15cm fills, to collect tunnel bottom underground water and prevent Only underground water washes away sapping tunnel bottom country rock.The drainage blanket tapping pipe 32b is laid in along tunnel excavation direction interval in longeron 42, It will be in the underground water ejectment to lower part longitudinal direction cavity B2 collected in drainage blanket 32a.
Referring to Figures 1 and 2, the internal excretory system includes railway roadbed ponding tapping pipe 33a and basic surface layer tapping pipe 33b, the basis surface layer tapping pipe 33b are laid in along tunnel excavation direction interval in longeron 42, will be possible in basic surface layer 41b Ponding ejectment to top longitudinal direction cavity B1 in.The railway roadbed ponding tapping pipe 33a is laid in vertical along tunnel excavation direction interval It, will be in railway roadbed ponding ejectment to top longitudinal direction cavity B1 in beam 42.
Referring to Figures 1 and 2, tunnel bottom waterproof layer 21 is set between the basis surface layer 41b and subfoundation 41a.The arch wall Range waterproof layer 20 includes the geotextiles of internal layer between arch wall preliminary bracing structure 10 and arch wall secondary liner structure 40 The splash guard 20b of 20a and outer layer.The arch wall preliminary bracing structure 10 includes the arch wall shotcrete layer of covering arch wall country rock 10a and arch wall system anchor bolt 10c along arch wall quincuncial arrangement.Along tunnel excavation side in the arch wall shotcrete layer 10a Arch wall steelframe 10b is laid to interval, bar-mat reinforcement is added in arch wall shotcrete layer 10a.
Referring to Fig.1, screed-coat 11 can be arranged in 42 bottom of the longeron.The top longitudinal direction cavity B1 of the longeron 42 and lower part Longitudinal cavity B2 sectional dimensions can be adjusted according to draining and stress demand.
The above is the utility model diplopore hollow, rectangular section load bearing beam road cutting type protecting arched tunnel that explains through diagrams Some principles of liner structure are not intended to for the utility model to be confined to shown and described concrete structure and the scope of application It is interior, therefore every corresponding modification for being possible to be utilized and equivalent, belong to the apllied the scope of the claims of the utility model.

Claims (9)

1. diplopore hollow, rectangular section load bearing beam road cutting type protecting arched tunnel liner structure, including arch wall preliminary bracing structure (10), Arch wall secondary liner structure (40) and arch wall range waterproof layer (20) they further include drainage system (30), it is characterized in that:The arch wall The longeron (42) consolidated therewith is arranged in secondary liner structure (40) both sides abutment wall bottom, and longeron (42) is with top longitudinal direction cavity (B1), the rectangular section of lower part longitudinal direction cavity (B2);The longeron (42) is both used as arch wall preliminary bracing structure (10) and arch wall The bearing structure of secondary liner structure (40), and as tunnel longitudinal drainage channel;Tunnel bottom is arranged by base between the longeron (42) Plinth surface layer (41b), changing for subfoundation (41a) composition fill out basis;The drainage system includes internal excretory system and external row Let out system, railway roadbed ponding in tunnel is introduced top and indulged in each cavity (B1) by internal excretory system, and external excretory system is by arch wall Range drainage system and tunnel bottom drainage system charge for remittance introduce in lower part longitudinal direction cavity (B2).
2. diplopore hollow, rectangular as described in claim 1 section load bearing beam road cutting type protecting arched tunnel liner structure, it is characterized in that: The basis surface layer (41b) is not less than the graded broken stone filling technology of 40cm by thickness, and subfoundation (41a) is filled by A, B group filler.
3. diplopore hollow, rectangular as described in claim 1 section load bearing beam road cutting type protecting arched tunnel liner structure, it is characterized in that: The arch wall range drainage system includes circle draining blind pipe (31a) and abutment wall tapping pipe (31b), the circle draining blind pipe (31a) is laid between non-woven geotextile (20a) and splash guard (20b) along tunnel excavation direction interval and directly draws in abutment wall lower part Enter in lower part longitudinal direction cavity (B2);The abutment wall tapping pipe (31b) is laid along tunnel excavation direction interval, and country rock one is stretched into one end Measured length, the other end are introduced into lower part longitudinal direction cavity (B2), with drainage abutment wall range underground water and pressure release.
4. diplopore hollow, rectangular as described in claim 1 section load bearing beam road cutting type protecting arched tunnel liner structure, it is characterized in that: Tunnel bottom drainage system includes drainage blanket (32a) and drainage blanket tapping pipe (32b), and the drainage blanket (32a) is located at basic bottom Layer lower part (41a), the medium coarse sand using thickness not less than 15cm are filled, are drawn with collecting tunnel bottom underground water and preventing underground water from washing away Lose tunnel bottom country rock;The drainage blanket tapping pipe (32b) is laid in along tunnel excavation direction interval in longeron (42), by drainage blanket In the underground water ejectment to lower part longitudinal direction cavity (B2) collected in (32a).
5. diplopore hollow, rectangular as described in claim 1 section load bearing beam road cutting type protecting arched tunnel liner structure, it is characterized in that: The internal excretory system includes railway roadbed ponding tapping pipe (33a) and basic surface layer tapping pipe (33b), and the basis surface layer sluices Pipe (33b) is laid in along tunnel excavation direction interval in longeron (42), and possible ponding ejectment in basic surface layer (41b) is supreme In portion longitudinal direction cavity (B1);The railway roadbed ponding tapping pipe (33a) is laid in along tunnel excavation direction interval in longeron (42), will In railway roadbed ponding ejectment to top longitudinal direction cavity (B1).
6. diplopore hollow, rectangular as described in claim 1 section load bearing beam road cutting type protecting arched tunnel liner structure, it is characterized in that: Setting tunnel bottom waterproof layer (21) between the basis surface layer (41b) and subfoundation (41a);Arch wall range waterproof layer (20) position Between arch wall preliminary bracing structure (10) and arch wall secondary liner structure (40), include the geotextiles (20a) and outer layer of internal layer Splash guard (20b).
7. diplopore hollow, rectangular as described in claim 1 section load bearing beam road cutting type protecting arched tunnel liner structure, it is characterized in that: The arch wall preliminary bracing structure (10) includes covering the arch wall shotcrete layer (10a) of arch wall country rock and quincunx along arch wall The arch wall system anchor bolt (10c) of arrangement;In the arch wall shotcrete layer (10a) arch wall is laid along tunnel excavation direction interval Steelframe (10b), arch wall shotcrete layer (10a) is interior to add bar-mat reinforcement.
8. diplopore hollow, rectangular as described in claim 1 section load bearing beam road cutting type protecting arched tunnel liner structure, it is characterized in that: Longeron (42) the bottom setting screed-coat (11).
9. diplopore hollow, rectangular section as described in claim 1 load bearing beam road cutting type protecting arched tunnel liner structure, it is characterized in that: The top longitudinal direction cavity (B1) and lower part longitudinal direction cavity (B2) sectional dimension of the longeron (42) can be according to draining and stress demands Adjustment.
CN201721856618.3U 2017-12-27 2017-12-27 Diplopore hollow, rectangular section load bearing beam road cutting type protecting arched tunnel liner structure Withdrawn - After Issue CN208073499U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721856618.3U CN208073499U (en) 2017-12-27 2017-12-27 Diplopore hollow, rectangular section load bearing beam road cutting type protecting arched tunnel liner structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721856618.3U CN208073499U (en) 2017-12-27 2017-12-27 Diplopore hollow, rectangular section load bearing beam road cutting type protecting arched tunnel liner structure

Publications (1)

Publication Number Publication Date
CN208073499U true CN208073499U (en) 2018-11-09

Family

ID=64033247

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721856618.3U Withdrawn - After Issue CN208073499U (en) 2017-12-27 2017-12-27 Diplopore hollow, rectangular section load bearing beam road cutting type protecting arched tunnel liner structure

Country Status (1)

Country Link
CN (1) CN208073499U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107905809A (en) * 2017-12-27 2018-04-13 中铁二院工程集团有限责任公司 Diplopore hollow, rectangular section load bearing beam road cutting type protecting arched tunnel liner structure and separate type drainage system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107905809A (en) * 2017-12-27 2018-04-13 中铁二院工程集团有限责任公司 Diplopore hollow, rectangular section load bearing beam road cutting type protecting arched tunnel liner structure and separate type drainage system
CN107905809B (en) * 2017-12-27 2024-01-19 中铁二院工程集团有限责任公司 Double-hole hollow rectangular section beam bearing cutting type arched tunnel lining structure

Similar Documents

Publication Publication Date Title
CN105927272B (en) Bottom plate anchors restricted type tunnel lining structure
CN107905811A (en) The hollow longeron of foundation carries domes without the lining cutting of inverted arch type and its drainage system
CN208310794U (en) The tunnel-liner of haunch floor type and the drainage system of leaked oil is arranged in tunnel bottom
CN107965327A (en) Arcuately tunnel bottom liner structure and its drainage system
CN108468555A (en) A kind of lining cutting of single-track railway floor type and its drainage system construction that inspection shaft is set using refuge chamber
CN208220818U (en) The external dewatering type lining cutting of buried lateral sulcus and its drainage system
CN208073504U (en) The hollow compound arch tunnel-liner in type tunnel bottom and its drainage system construction of falling from power
CN208310807U (en) A kind of single-track railway floor type lining structure using refuge chamber setting inspection shaft
CN108222963A (en) The not contour longeron carrying stalk floor type lining cutting of tunnel bottom setting longitudinal direction collection drainage gallery and its drainage system construction
CN206016853U (en) Base plate anchors restricted type tunnel lining structure
CN107905810A (en) Boot last pedestal combed tunnel bottom liner structure and its drainage system
CN208073501U (en) Foundation base type is without inverted arch type tunnel lining structure and its drainage system
CN208310793U (en) Mirror holder type entirety tunnel bottom arch lining structure
CN208073499U (en) Diplopore hollow, rectangular section load bearing beam road cutting type protecting arched tunnel liner structure
CN108194096A (en) Foundation base type is without inverted arch type tunnel lining structure and its drainage system
CN208073508U (en) The not contour longeron of the longitudinal collection drainage gallery of tunnel bottom setting carries stalk floor type lining structure
CN108222975A (en) Big skewback floor type lining cutting and its drainage system construction
CN108005677A (en) The bottom arch lining cutting of mirror holder type entirety tunnel and its drainage system
CN208073498U (en) The hollow longeron of foundation carries domes without the lining cutting of inverted arch type and its drainage system
CN208073480U (en) Arcuately tunnel bottom liner structure and its drainage system
CN107905812A (en) The hollow compound arch tunnel-liner in type tunnel bottom and its drainage system construction of falling from power
CN208073502U (en) The foundation carrying of falling groove-shaped longitudinal beam is without tunnel bottom structure arch lining structure
CN208073520U (en) Boot last pedestal domes are without the lining cutting of inverted arch type and its drainage system
CN208073503U (en) Boot last pedestal combed tunnel bottom liner structure and its drainage system
CN208310791U (en) Box pedestal separates bearing type liner structure with bridge-type tunnel bottom structure sound

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20181109

Effective date of abandoning: 20240119

AV01 Patent right actively abandoned

Granted publication date: 20181109

Effective date of abandoning: 20240119

AV01 Patent right actively abandoned
AV01 Patent right actively abandoned