CN208072813U - A kind of reinforced aluminium alloy railing - Google Patents

A kind of reinforced aluminium alloy railing Download PDF

Info

Publication number
CN208072813U
CN208072813U CN201820022651.4U CN201820022651U CN208072813U CN 208072813 U CN208072813 U CN 208072813U CN 201820022651 U CN201820022651 U CN 201820022651U CN 208072813 U CN208072813 U CN 208072813U
Authority
CN
China
Prior art keywords
column
fixed
foot
tubule
aluminium alloy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820022651.4U
Other languages
Chinese (zh)
Inventor
陈远伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Xinweixin Industrial Co ltd
Original Assignee
Guangdong New Wei Xin Industrial Co Ltd Suixi Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong New Wei Xin Industrial Co Ltd Suixi Branch filed Critical Guangdong New Wei Xin Industrial Co Ltd Suixi Branch
Priority to CN201820022651.4U priority Critical patent/CN208072813U/en
Application granted granted Critical
Publication of CN208072813U publication Critical patent/CN208072813U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a kind of reinforced aluminium alloy railings, including facial canal, column, upper lateral tube, lower transverse tubule, glass and reinforcement foot, the one end for reinforcing foot to be embedded in ground and be fixed with ground, and upper end and the facial canal of column are fixed, and lower end is fixed with foot is reinforced;Upper lateral tube and lower transverse tubule are connect with column, and upper lateral tube is equipped with downward opening upper mounting groove, and lower transverse tubule is equipped with opening up lower mounting groove, and the upper end of glass and the upper mounting groove of upper lateral tube are fixed, and the lower end of glass and the lower mounting groove of lower transverse tubule are fixed.The utility model remains the advantage of traditional welding, but is divided into facial canal, longitudinal tubule (L tubule).Reinforce foot and the aspect of longitudinal tubule (L tubule) module four, factory does not need integral solder, more efficient, avoids causing space waste and the high problem of transportation cost, installation effectiveness higher, reinforces foot and nuzzles armored concrete, keeps structure more firm.

Description

A kind of reinforced aluminium alloy railing
Technical field
The utility model is related to a kind of aluminium alloy railings.
Background technology
Currently, the aluminium alloy railing of existing industry make and install all be using assembling or aluminium welding by the way of, Component part is facial canal, column, manifold and aluminum fixinig plate.
The railing of welding procedure be utilized in factory's integral solder it is good after, completed using professional pre-treatment and spraying process Product, then transport building-site installation, complete installation after civil engineering again tiling or apply outer ring coating.The tradition of this railing is raw Production and mounting means are in implementation process, and from efficiency, loss, quality and secure context, all there is deficiencies:
(1) storage, transportation cost are high:Full welding railing compares occupied space when factory is fabricated to welding finished product, batch Production can be overstock finished product caused by the variation in building site often, cause storage cost higher;
(2) delay work loss:The installation of railing will with civil construction cross-operation and complete (i.e. civil engineering complete building main body Later, before the construction of exterior wall plaster, the installation of balcony balustrade is completed).During coordinating with civil construction, usually because It interacts and causes to delay work, cause various losses, also result in the production for influencing railing because working to tight deadlines and installation quality, Cause loss of doing over again;
(3) crossed construction damages:Traditional mounting means needs when installation while adjusting horizontal vertical parameter, efficiency more than Tear steel pipe scaffold (row's bank tube) open slowly, there are security risks for the balcony of no railing, so can only open steel pipe scaffold (row's grid torn Pipe) before railing is installed, therefore there are the particularity of crossed construction operation.Mounted railing is unable to get Reasonable Protection, meeting Because other parts engineering construction operation process not note that caused by the different degrees of damage of railing;
The finished product railing installed before not tearing steel pipe scaffold (row's bank tube) open is protected by packaged by plastic film, because intersecting Homework department's code insurance cuticula damage, drains at outside Wall Cleaning (oxalic acid cleaning) on railing, and cannot rinse in time, and oxalic acid is for a long time Aluminium alloy covered is corroded in packaging, paint is caused to aoxidize;
In steel pipe scaffold (row bank tube) on tearing external wall open, worker is mostly civilian worker, to the protective awareness of railing compared with Difference causes railing to have the damage of not high level.Such as railing pounds deformation by steel pipe, rubs off paint;
(4) it influences by power load:It is deep on coagulation soil matrix and is connected because will not install built-in fitting when mounted and is (big Part built-in fitting is installed on mortar protective layer) directly affect the stress standard (i.e. structural to be not up to strength criterion) of railing.
Utility model content
For overcome the deficiencies in the prior art, the purpose of this utility model is to provide a kind of reinforced aluminium alloy railing, It can solve the problems, such as that the aluminium alloy railing installation effectiveness of the prior art is low equal.
The purpose of this utility model is realized using following technical scheme:
A kind of reinforced aluminium alloy railing, including facial canal, column, upper lateral tube, lower transverse tubule, glass and reinforcement foot, reinforce foot One end be embedded in ground and fixed with ground, upper end and the facial canal of column are fixed, lower end with reinforce foot fix;Upper lateral tube is under Transverse tube is connect with column, and upper lateral tube is equipped with downward opening upper mounting groove, and lower transverse tubule is equipped with opening up lower mounting groove, glass The upper end of glass and the upper mounting groove of upper lateral tube are fixed, and the lower end of glass and the lower mounting groove of lower transverse tubule are fixed.
Preferably, the other end for reinforcing foot imbeds the lower end of column and forms fixation.
Preferably, reinforce foot the other end imbed the lower end of column after fixed by dovetail self-tapping screw.
Preferably, the upper end of column forms fixation by dovetail self-tapping screw and facial canal.
Preferably, aluminum fixinig plate is equipped between the upper surface and facial canal of column.
Preferably, the top and bottom of column offer slot position, and upper lateral tube and lower transverse tubule are respectively embedded into corresponding slot position In, and fixed with column by dovetail self-tapping screw.
Compared with prior art, the beneficial effects of the utility model are:
The utility model remains the advantage of traditional welding, but is divided into facial canal, longitudinal tubule (L tubule).Reinforce foot and longitudinal tubule (L tubule) module four Aspect, factory does not need integral solder, more efficient, avoids causing space waste and the high problem of transportation cost, installation effectiveness Higher reinforces foot and nuzzles armored concrete, keeps structure more firm.
Description of the drawings
Fig. 1 is a kind of structure chart of reinforced aluminium alloy railing of the utility model;
Fig. 2 is the A of Fig. 1 to structure chart.
In figure:1, facial canal;2, glass;3, reinforce foot;4, upper lateral tube;5, lower transverse tubule;6, column;7, armored concrete;8, Aluminum fixinig plate.
Specific implementation mode
In the following, in conjunction with attached drawing and specific implementation mode, the utility model is described further:
As depicted in figs. 1 and 2, the utility model provides a kind of reinforced aluminium alloy railing comprising facial canal 1, column 6, Upper lateral tube 4, lower transverse tubule 5, glass 2 and reinforcement foot 3, if railing is divided into several fractions, each section is right for one piece of railing Any one piece of railing in railing, then every piece of railing actually include facial canal 1, the two root posts 6 positioned at both sides, upper lateral tube 4, under Transverse tube 5, glass 2 and two reinforcement feet 3, reinforce foot 3 and are corresponded with column 6.There are one columns between two pieces of adjacent railings 6, it is to be used in conjunction with that one, which is reinforced foot 3,.In the utility model, the one end for reinforcing foot 3 is embedded in ground and is fixed with ground, column 6 upper end is fixed with facial canal 1, and lower end is fixed with foot 3 is reinforced;Upper lateral tube 4 and lower transverse tubule 5 are connect with column 6, and upper lateral tube 4 is set There are downward opening upper mounting groove, lower transverse tubule 5 to be equipped with opening up lower mounting groove, the upper end of glass 2 and the upper peace of upper lateral tube 4 Tankage is fixed, and the lower end of glass 2 is fixed with the lower mounting groove of lower transverse tubule 5.Ground in the utility model is, for example, reinforced concrete Soil 7.Reinforce foot 3 and complete installation of embedded parts before non-plaster, when installation adjusts horizontal vertical parameter, directly and armored concrete 7 structures connect.
It is that steel core reinforces foot to reinforce foot 3, and steel core reinforces foot and longitudinal tubule (L tubule) module is the batch in such a way that standardized production makes It produces (welding).The longitudinal tubule (L tubule) module of the utility model is transverse tube and glass 2.Railing is divided into four modules, has torn open and has poured in civil engineering After building mould, before not carrying out first round cement mortar plaster, first install steel core reinforce foot (mixing up horizontal vertical and spacing), directly with Reinforced concrete structure connects.Other modules follow installation, tear one layer of steel open when starting to tear steel pipe scaffold (row's bank tube) open Pin hand cradle (row's bank tube) fills one layer of railing.Due to early period steel core reinforce foot mixed up parameter, only need to according to site dimension into Row cutting, then with screw connection manner assembly, so efficiency when mounted can be than traditional welding aluminium alloy faster, while can have Effect avoids the damage brought by cross-operation particularity (burn into of oxalic acid is torn steel pipe open and smashed).Steel core reinforces foot not Installation of embedded parts is completed before plaster, is directly connect with reinforced concrete structure, than the installation of traditional integral solder aluminium alloy railing Mode is more firm, it is ensured that safe mass problem.
In the utility model, the other end for reinforcing foot 3 imbeds the lower end of column 6 and forms fixation.The other end for reinforcing foot 3 is embedding It is fixed by dovetail self-tapping screw after into the lower end of column 6.The upper end of column 6 is formed solid by dovetail self-tapping screw and facial canal It is fixed.Aluminum fixinig plate 8 is equipped between the upper surface and facial canal of column 6.The top and bottom of column 6 offer slot position, upper cross Pipe 4 and lower transverse tubule 5 are respectively embedded into corresponding slot position, and are fixed by dovetail self-tapping screw and column 6.
It will be apparent to those skilled in the art that technical solution that can be as described above and design, make various other Corresponding change and deformation, and all these changes and deformation should all belong to the protection of the utility model claims Within the scope of.

Claims (6)

1. a kind of reinforced aluminium alloy railing, which is characterized in that including facial canal, column, upper lateral tube, lower transverse tubule, glass and reinforcement Foot, the one end for reinforcing foot are embedded in ground and are fixed with ground, and upper end and the facial canal of column are fixed, and lower end is fixed with foot is reinforced; Upper lateral tube and lower transverse tubule are connect with column, and upper lateral tube is equipped with downward opening upper mounting groove, and lower transverse tubule is equipped with opening up Lower mounting groove, the upper end of glass and the upper mounting groove of upper lateral tube are fixed, and the lower end of glass and the lower mounting groove of lower transverse tubule are fixed.
2. reinforced aluminium alloy railing as described in claim 1, which is characterized in that the other end for reinforcing foot imbeds under column End, which is formed, to be fixed.
3. reinforced aluminium alloy railing as claimed in claim 2, which is characterized in that the other end for reinforcing foot imbeds under column It is fixed by dovetail self-tapping screw behind end.
4. reinforced aluminium alloy railing as described in claim 1, which is characterized in that the upper end of column passes through dovetail self-tapping screw Fixation is formed with facial canal.
5. reinforced aluminium alloy railing as claimed in claim 4, which is characterized in that be equipped between the upper surface and facial canal of column Aluminum fixinig plate.
6. reinforced aluminium alloy railing as described in claim 1, which is characterized in that the top and bottom of column offer slot Position, upper lateral tube and lower transverse tubule are respectively embedded into corresponding slot position, and are fixed with column by dovetail self-tapping screw.
CN201820022651.4U 2018-01-08 2018-01-08 A kind of reinforced aluminium alloy railing Active CN208072813U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820022651.4U CN208072813U (en) 2018-01-08 2018-01-08 A kind of reinforced aluminium alloy railing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820022651.4U CN208072813U (en) 2018-01-08 2018-01-08 A kind of reinforced aluminium alloy railing

Publications (1)

Publication Number Publication Date
CN208072813U true CN208072813U (en) 2018-11-09

Family

ID=64034849

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820022651.4U Active CN208072813U (en) 2018-01-08 2018-01-08 A kind of reinforced aluminium alloy railing

Country Status (1)

Country Link
CN (1) CN208072813U (en)

Similar Documents

Publication Publication Date Title
CN201217861Y (en) Assembly integral precast concrete shear wall
CN105089178B (en) A kind of pre-splicing Standard formula building of prefabricated steel reinforced concrete shear walls
CN206174146U (en) Assembly type structure's assembly node
CN106760110B (en) Based on BIM profiled sheet-armored concrete hollow sandwich floor construction engineering method
CN106149937B (en) Assembly concrete beam and its dry type connection method
CN204826308U (en) Structure assembly type structure is pieced together in advance to prefabricated shaped steel concrete shear force wall
CN108678172A (en) The steel carton and crate body connector of assembling frame
CN101603338A (en) Assembly integrated precast concrete shear wall and job practices
CN207003634U (en) A kind of balcony slab installs node
CN201202181Y (en) Connection structure for precast concrete board and beam and construction including the same
CN205875394U (en) Antidetonation concrete beam column that dry process is connected
CN208534081U (en) A kind of reconstruction structure of old building constructional column
CN108396892A (en) Assembled architecture curtain wall and installation method
CN107965139A (en) The plate face drop readily removable combined type of plate difference of height hangs die body system and construction method
CN208072813U (en) A kind of reinforced aluminium alloy railing
CN206128281U (en) Balcony board installation node
WO2017024844A1 (en) Bolt connection structure between column and beam in aluminum alloy house
CN208072814U (en) A kind of composite structure aluminium alloy railing
CN209468856U (en) A kind of assembly concrete column beam connecting node
CN208277144U (en) A kind of transfer device of concrete test block cured under same condition
CN208073107U (en) A kind of aluminium alloy railing
CN206428805U (en) A kind of concrete prefabricated balcony of assembled steel
CN106368445A (en) Existing building reinforcing and self-supporting thermal insulation integrated system and construction method
CN203412312U (en) Thermal-insulating integrated template wallboard construction building
CN207122021U (en) Assembled bolt connection concrete-filled steel tube shear wall

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200401

Address after: 524000 Suixi County, Zhanjiang, Guangdong Beizhen National Road 207 line south

Patentee after: Guangdong Xinweixin Industrial Co.,Ltd.

Address before: 524000 Suixi County, Zhanjiang, Guangdong Beizhen National Road 207 line south

Patentee before: GUANGDONG XINWEIXIN INDUSTRIAL CO.,LTD. SUIXI BRANCH

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: A reinforced aluminum alloy railing

Effective date of registration: 20231114

Granted publication date: 20181109

Pledgee: Guangdong Suixi Rural Commercial Bank Co.,Ltd. Lingbei Branch

Pledgor: Guangdong Xinweixin Industrial Co.,Ltd.

Registration number: Y2023980064803