CN208072650U - Pipe waterproof crack resistence structure is hidden in a kind of toilet - Google Patents
Pipe waterproof crack resistence structure is hidden in a kind of toilet Download PDFInfo
- Publication number
- CN208072650U CN208072650U CN201820367935.7U CN201820367935U CN208072650U CN 208072650 U CN208072650 U CN 208072650U CN 201820367935 U CN201820367935 U CN 201820367935U CN 208072650 U CN208072650 U CN 208072650U
- Authority
- CN
- China
- Prior art keywords
- layer
- wire casing
- hidden
- pipe
- crack resistence
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Revetment (AREA)
Abstract
The utility model discloses a kind of toilets to hide pipe waterproof crack resistence structure, it is related to decorations field, its key points of the technical solution are that including wall, the wall includes former cement basic layer, wire casing is offered on the original cement basic layer, is evenly arranged with first layer flexible waterproof material on the former cement basic layer on the wire casing and its periphery, feed pipe is mounted in the wire casing, wire casing is filled up by anticracking grout, and the outer layer of the anticracking grout is provided with second layer flexible waterproof material.Pipe waterproof crack resistence structure is hidden in the toilet of the utility model can prevent wall later stage cracking, leak, to keep wall more smooth.
Description
Technical field
The utility model is related to decorations field, more particularly to pipe waterproof crack resistence structure is hidden in a kind of toilet.
Background technology
After building constructions agent structure, masonry project comprehensively completion, wall plastering decoration stage is got in, to health
Between carry out steel pipe buried in advance during, filled up usually using cement mortar, but strength of cement mortar is inadequate, can not be given with PP-R
Water pipe effectively wraps up consolidation, and because of the influence of the factors such as temperature difference contraction and thinner thickness, is easy to cause wall and flakes, crack
Phenomenon is detached from base.
Utility model content
The purpose of this utility model is to provide a kind of toilets to hide pipe waterproof crack resistence structure, it can prevent wall
Later stage cracking, leak, to keep wall more smooth.
The above-mentioned purpose of the utility model technical scheme is that:
Pipe waterproof crack resistence structure, including wall are hidden in a kind of toilet, and the wall includes former cement basic layer, the original
It offers wire casing on cement basic layer, first layer flexible water material is evenly arranged on the former cement basic layer on the wire casing and its periphery
Material is mounted with feed pipe in the wire casing, and wire casing is filled up by anticracking grout, and the outer layer of the anticracking grout is provided with the
Double-layer flexible waterproof material.
By using above-mentioned technical proposal, second layer flexible waterproof material coordinates with first layer flexible waterproof material by water supply
Pipe coats, when preventing feed pipe from leaking by water penetration outside wall;Anticracking grout is with by polymer emulsion and additive
Manufactured antimitotic agent, cement and sand add by a certain percentage can meet certain deformation and keep indehiscent sand made of water stirring
Slurry, is filled up thereby using anticracking grout, to weaken the influence for generating cracking, hollowing because of material temperature deformation;Finally reach
To the effect of wall waterproof crack resistence, keep wall more smooth.
The utility model is further arranged to:Finished surface after the anticracking grout is filled up is put down with raw water mud substrate surface
Together.
By using above-mentioned technical proposal, keep the outer surface of former cement basic layer more smooth, to convenient soft with the second layer
Property waterproof material connection, increase water proofing property.
The utility model is further arranged to:The feed pipe is selected as PP-R pipes.
By using above-mentioned technical proposal, PP-R pipes have many advantages, such as energy conservation and environmental protection, corrosion-resistant, inner wall smooth non-scaling,
Carrying out water delivery using PP-R pipes, the service life is longer, to reduce maintenance frequency.
The utility model is further arranged to:The width of the second layer flexible waterproof material is wider than the width of wire casing.
By using above-mentioned technical proposal, second layer flexible waterproof material is made to block more comprehensively, makes wall waterproof effect
More preferably.
The utility model is further arranged to:The outer layer of the second layer flexible waterproof material carries out plug-in anti-crack fiber cloth
Processing.
By using above-mentioned technical proposal, anti-crack fiber cloth has good flexibility and through broadwise high resistance pulling force,
Outer layer in wire casing is set, drawknot effect is primarily served, caused by effectively avoiding overall surface tension from shrinking and external force
Cracking improves the crack resistence effect of wire casing repairing.
The utility model is further arranged to:The width of the width and second layer flexible waterproof material of the anti-crack fiber cloth
Adaptation.
By using above-mentioned technical proposal, anti-crack fiber cloth is distributed in the both sides of wire casing, and the drawknot played the role of is more preferable.
The utility model is further arranged to:Third layer flexible waterproof material is arranged in the outer layer of the anti-crack fiber cloth.
By using above-mentioned technical proposal, the humidity for preventing anti-crack fiber cloth from being influenced to become by external water source influences drawknot
Effect.
The utility model is further arranged to:The feed pipe is fixed by clip.
By using above-mentioned technical proposal, spool is fixed in wire casing, when anticracking grout is poured into wire casing not
Spool can be impacted, mending course is more smooth.
In conclusion the utility model has the advantages that:
1, by the way that first layer flexible waterproof material is arranged in wire casing, then be filled with anticracking grout, the second layer it is flexible
Waterproof material is coated, and is not only weakened wire casing and has been generated the influence of cracking, hollowing because material deforms, but also has increased its water proofing property
Can, it is influenced so as to avoid wall by cracking, seeping water;
2, by the way that anti-crack fiber cloth is arranged in the outside of wire casing, to play the role of drawknot, to effectively avoid overall surface
Tension is shunk and the caused cracking of external force, improves the crack resistence effect of wire casing repairing;
3, by the way that third layer flexible waterproof material is arranged in anti-crack fiber cloth, cracking resistance fiber cloth is blocked, it is prevented
By the humidity that external water source is influenced to become, drawknot effect is influenced.
Description of the drawings
Fig. 1 is the axonometric drawing that pipe waterproof crack resistence structure is hidden in toilet in embodiment 1.
In figure, 1, former cement basic layer;11, wire casing;2, first layer flexible waterproof material;3, feed pipe;4, anticracking grout;5,
Second layer flexible waterproof material;6, anti-crack fiber cloth;7, third layer flexible waterproof material.
Specific implementation mode
The utility model is described in further detail below in conjunction with attached drawing.
Embodiment 1:Pipe waterproof crack resistence structure is hidden in a kind of toilet, as shown in Figure 1, including wall, wall includes original
Cement basic layer 1 offers wire casing 11 on former cement basic layer 1;
Former cement basic layer 1 is rinsed with tap water in repairing 11 the previous day of wire casing, former cement basic layer 1 is made fully to soak, and
And clean out the dust of former cement basic layer 1, floating sand etc., for there is loose position that must clean up;It is right on the day of repairing
In there is being cleaned out using hairbrush for sundries, patch work is then carried out.
When repairing first first layer flexible waterproof material 2 is evenly arranged on the former cement basic layer 1 on wire casing 11 and periphery(Such as
Waterproof coiled material, coating waterproofing etc.)The access of water is blocked, to achieve the purpose that waterproof or increase the ability of anti-leakage;Then will
Pass through clip in wire casing 11(It is not shown in figure)It is mounted with feed pipe 3, feed pipe 3 is selected as PP-R pipes.
Fill up work using anticracking grout 4 in wire casing 11, anticracking grout 4 fill up after finished surface and former cement basic layer
1 flush, in the outer layer setting second layer flexible waterproof material 5 of anticracking grout 4, the width of second layer flexible waterproof material 5
It is wider than the width of wire casing 11, is coordinated with first layer flexible waterproof material 2 by second layer flexible waterproof material 5 and wrap feed pipe 3
It covers, when preventing feed pipe 3 from leaking by water penetration outside wall;Anticracking grout 4 is with by polymer emulsion and additive system
At antimitotic agent, cement and sand add by a certain percentage water stirring made of can meet centainly deform and keep indehiscent mortar,
It is that a kind of tension degree is high, the high-quality environment-friendly materials for anti-freezing of easily constructing are filled up thereby using anticracking grout 4, to weaken
The influence of cracking, hollowing is generated because of material temperature deformation.
The crack resistence effect that wire casing 11 is repaired in order to further increase is carried out in the outer layer of second layer flexible waterproof material 5
Plug-in anti-crack fiber cloth 6 is handled, and the width of anti-crack fiber cloth 6 is adapted to the width of second layer flexible waterproof material 5, anti-crack fiber
Cloth 6 has good flexibility and through broadwise high resistance pulling force, is distributed in the both sides of wire casing 11, primarily serves drawknot effect,
Cracking caused by effectively avoid overall surface tension from shrinking and external force.
In the outer layer setting third layer flexible waterproof material 7 of anti-crack fiber cloth 6, prevent anti-crack fiber cloth 6 by external water
Source influences the humidity become, influences drawknot effect.For the normal use of anticracking grout 4, the operating ambient temperature for mending slot construction should be 5
DEG C or more.
This specific embodiment is only the explanation to the utility model, is not limitations of the present invention, ability
Field technique personnel can as needed make the present embodiment the modification of not creative contribution after reading this specification, but
As long as all being protected by Patent Law in the right of the utility model.
Claims (8)
1. pipe waterproof crack resistence structure, including wall are hidden in a kind of toilet, the wall includes former cement basic layer (1), special
Sign is:The former cement basic layer (1) of wire casing (11), the wire casing (11) and its periphery is offered on the original cement basic layer (1)
On be evenly arranged with first layer flexible waterproof material (2), feed pipe (3), wire casing (11) are mounted in the wire casing (11)
It is filled up by anticracking grout (4), the outer layer of the anticracking grout (4) is provided with second layer flexible waterproof material (5).
2. pipe waterproof crack resistence structure is hidden in toilet according to claim 1, it is characterised in that:The anticracking grout
(4) finished surface after filling up and former cement basic layer (1) flush.
3. pipe waterproof crack resistence structure is hidden in toilet according to claim 1, it is characterised in that:The feed pipe (3)
It is selected as PP-R pipes.
4. pipe waterproof crack resistence structure is hidden in toilet according to claim 1, it is characterised in that:The second layer is flexible
The width of waterproof material (5) is wider than the width of wire casing (11).
5. pipe waterproof crack resistence structure is hidden in toilet according to claim 1, it is characterised in that:The second layer is flexible
The outer layer of waterproof material (5) carries out plug-in anti-crack fiber cloth (6) processing.
6. pipe waterproof crack resistence structure is hidden in toilet according to claim 5, it is characterised in that:The anti-crack fiber cloth
(6) width is adapted to the width of second layer flexible waterproof material (5).
7. pipe waterproof crack resistence structure is hidden in toilet according to claim 5, it is characterised in that:The anti-crack fiber cloth
(6) outer layer setting third layer flexible waterproof material (7).
8. pipe waterproof crack resistence structure is hidden in toilet according to claim 1, it is characterised in that:The feed pipe (3)
It is fixed by clip.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820367935.7U CN208072650U (en) | 2018-03-16 | 2018-03-16 | Pipe waterproof crack resistence structure is hidden in a kind of toilet |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820367935.7U CN208072650U (en) | 2018-03-16 | 2018-03-16 | Pipe waterproof crack resistence structure is hidden in a kind of toilet |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208072650U true CN208072650U (en) | 2018-11-09 |
Family
ID=64047473
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820367935.7U Active CN208072650U (en) | 2018-03-16 | 2018-03-16 | Pipe waterproof crack resistence structure is hidden in a kind of toilet |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208072650U (en) |
-
2018
- 2018-03-16 CN CN201820367935.7U patent/CN208072650U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101691818A (en) | Building strengthening method | |
CN110093989A (en) | A kind of interior waterproof construction and its construction method | |
CN101736825A (en) | Method for construction of outer wall external heat preservation system | |
CN104481018A (en) | Home decoration toilet pipe-side floor drain treatment process | |
CN101560777A (en) | Waterproof construction method for bottom plate of basement with anti-float anchor rod | |
KR20160125654A (en) | Repairing Method for Crack of Concrete Structure | |
CN208072650U (en) | Pipe waterproof crack resistence structure is hidden in a kind of toilet | |
CN113550451A (en) | Waterproof construction method for building outer wall | |
CN210767302U (en) | Enhanced vertical-filament rock wool board external wall insulation system | |
CN112392157A (en) | Toilet waterproof structure, construction process and protection process thereof | |
JP2005193142A (en) | Method for coating surface of concrete structure and surface-coated structure of concrete structure | |
CN112746678A (en) | Kitchen and bathroom waterproof system and construction process thereof | |
CN216276503U (en) | Multifunctional heat-preservation and heat-insulation roof decoration integrated plate and assembled roof structure | |
CN215630186U (en) | Basement high water level precast pile head waterproof construction | |
CN201908415U (en) | Wall decorative board layer structure | |
CN108951904A (en) | A kind of steel core concrete column outsourcing pea gravel concreten fireprotection layer construction | |
CN112431989B (en) | Method for quickly repairing leakage of pipe orifice of PE (polyethylene) solid-wall drain pipe | |
CN204401809U (en) | Surface has the skin insulation layer of simulated decorative effect | |
CN208009830U (en) | One kind hiding spool crack resistence and mends slot structure | |
CN104343137B (en) | Underground waterproof engineering construction method | |
KR20120077760A (en) | The waterproofing method of buildings | |
CN206418678U (en) | A kind of waterproof and heat-insulating accessible roof system | |
CN208815932U (en) | A kind of water leakage through exterior wall repairerment system | |
CN207863199U (en) | A kind of waterproof and insulation integrated plate | |
CN202188236U (en) | Structure for preventing fire and stagnant water when pipeline passes through building storey |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |