CN208058080U - A kind of pressure relief device - Google Patents

A kind of pressure relief device Download PDF

Info

Publication number
CN208058080U
CN208058080U CN201820086709.1U CN201820086709U CN208058080U CN 208058080 U CN208058080 U CN 208058080U CN 201820086709 U CN201820086709 U CN 201820086709U CN 208058080 U CN208058080 U CN 208058080U
Authority
CN
China
Prior art keywords
pressure
relief pipeline
valve
relief
monitoring point
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820086709.1U
Other languages
Chinese (zh)
Inventor
彭安民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ganzhou Haisheng Hard Alloy Co Ltd
Original Assignee
Ganzhou Haisheng Hard Alloy Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ganzhou Haisheng Hard Alloy Co Ltd filed Critical Ganzhou Haisheng Hard Alloy Co Ltd
Priority to CN201820086709.1U priority Critical patent/CN208058080U/en
Application granted granted Critical
Publication of CN208058080U publication Critical patent/CN208058080U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model is related to a kind of pressure relief devices, including sintering furnace, main gas tube and relief pipeline;Sintering furnace bottom end is equipped with pedestal, and PLC controller is arranged on the right side of sintering furnace, air inlet pipe is equipped on the right side of main gas tube, air inlet pipe is equipped with the first high-voltage switch gear, the first electronic high voltage valve and first pressure monitoring point successively from top to bottom;It is equipped with sealing flange on the left of institute's main gas tube, outlet pipe is equipped on the right side of sealing flange;Relief pipeline includes the first relief pipeline, the second relief pipeline and third relief pipeline, and the first relief pipeline is equipped with the first high pressure check valve, second pressure monitoring point, the second high-voltage switch gear and the second electronic high voltage valve successively;Second relief pipeline is equipped with the second high pressure check valve, third pressure monitoring point, third high-voltage switch gear and third electronic high voltage valve successively;Third relief pipeline is equipped with the 4th pressure monitoring point, the 4th high-voltage switch gear and the 4th electronic high voltage valve successively.The utility model noise is small, and production efficiency is high, is worthy to be popularized.

Description

A kind of pressure relief device
Technical field
The utility model is related to sintering furnace pressure release field more particularly to a kind of pressure relief devices.
Background technology
Currently existing sintering furnace pressure release is by high pressure valve releasing pressure automatically, caliber 40mm, when producing at night, pressure release Noise is big, there is the phenomenon that disturbs residents, and in order not to disturb residents, when producing pressure release at night, compression relief cock is transferred to minimum, to ensure that sound exists Under 60 decibels, but venting duration is long, influences manufacturing schedule.
Utility model content
In view of this, it is necessary to provide it is a kind of do not disturb residents, a kind of pressure relief device that pressure release is efficient.
A kind of pressure relief device, including sintering furnace, main gas tube and relief pipeline;The sintering furnace bottom end is equipped with pedestal, burns PLC controller is set on the right side of freezing of a furnace, air inlet pipe is equipped on the right side of the main gas tube, described air inlet pipe one end connects sintering furnace, separately One end connects main gas tube, and the air inlet pipe is equipped with the first high-voltage switch gear, the first electronic high voltage valve and first successively from top to bottom Pressure monitoring point;It is equipped with sealing flange on the left of the main gas tube, outlet pipe is equipped on the right side of the sealing flange;The pressure release Pipeline includes the first relief pipeline, the second relief pipeline and third relief pipeline, and first relief pipeline is equipped with first successively High pressure check valve, second pressure monitoring point, the second high-voltage switch gear and the second electronic high voltage valve;Second relief pipeline is set successively There are the second high pressure check valve, third pressure monitoring point, third high-voltage switch gear and third electronic high voltage valve;The third relief pipeline It is equipped with the 4th pressure monitoring point, the 4th high-voltage switch gear and the 4th electronic high voltage valve successively.
Further, the PLC controller connects high-voltage switch gear, electronic high voltage valve, the height on relief pipeline by conducting wire Press the first high-voltage switch gear and the first electronic high voltage valve on check valve and safety valve and admission line on outlet pipe.
Further, the outlet pipe connects main gas tube, and safety valve, the safety nearby is arranged close to main gas tube Valve is nearby equipped with the 5th pressure monitoring point, and the 5th pressure monitoring point is used to monitor the pressure in outlet pipe.
Further, described relief pipeline one end connects main gas tube, and the other end connects outlet pipe, the second pressure Monitoring point, third pressure monitoring point, the 4th pressure monitoring point are for monitoring pressure condition when pressure release in relief pipeline.
Further, electronic high voltage valve both ends are equipped with gasket, and relief pipeline is bolted.
Compared with the prior art, the beneficial effects of the utility model are to be changed by the pressure relief device to sintering furnace It makes, high pressure check valve and electronic high voltage valve is set on relief pipeline, pass through the control of PLC controller, when producing at night, PLC The first relief pipeline and the second relief pipeline are opened in controller control, open the first high pressure check valve and the second high pressure check valve handle For pressure release sound at 60 decibels hereinafter, venting duration was can be controlled in 50 minutes has let out, equipment needs 3 three hours before, lets out at night The pressure time shortens 130 minutes, and production efficiency is also ensured.
Description of the drawings
Fig. 1 is the pressure relief device structural schematic diagram of the utility model embodiment.
Specific implementation mode
The utility model is described in detail below with reference to specific embodiments and the drawings.
Referring to Fig. 1, a kind of embodiment of the utility model is shown, a kind of pressure relief device 10, including sintering furnace 20, main gas Pipeline 23 and relief pipeline 30;20 bottom end of the sintering furnace is equipped with pedestal 21, and PLC controller 22, institute is arranged in 20 right side of sintering furnace It states 23 right side of main gas tube and is equipped with air inlet pipe 24,24 one end of the air inlet pipe connects sintering furnace 20, and the other end connects main gas tube 23, the air inlet pipe 24 is equipped with the first high-voltage switch gear 25, the first electronic high voltage valve 26 and first pressure monitoring successively from top to bottom Point 27;23 left side of the main gas tube is equipped with sealing flange 28, and 28 right side of the sealing flange is equipped with outlet pipe 29;It is described to let out Pressure pipeline 30 includes the first relief pipeline 31, the second relief pipeline 32 and third relief pipeline 33, first relief pipeline 31 It is equipped with the first high pressure check valve 34, second pressure monitoring point 39, the second high-voltage switch gear 40 and the second electronic high voltage valve 41 successively;Institute It states the second relief pipeline 32 and is equipped with the second high pressure check valve 35, third pressure monitoring point 42, third high-voltage switch gear 43 and the successively Three electronic high voltage valves 44;The third relief pipeline 33 is equipped with the 4th pressure monitoring point 45, the 4th high-voltage switch gear 46 and the successively Four electronic high voltage valves 47.
Further, as the preferred of this implementation, the PLC controller 22 connects the height on relief pipeline 30 by conducting wire On safety valve 48 and the admission line 24 to compress switch on 37, electronic high voltage valve 38, high pressure check valve 52 and outlet pipe 29 First high-voltage switch gear 25 and the first electronic high voltage valve 26.
Further, as the preferred of this implementation, the outlet pipe 29 connects main gas tube 23, close to main gas tube 23 Setting safety valve 48 nearby, the safety valve 48 are nearby equipped with the 5th pressure monitoring point 49, and the 5th pressure monitoring point 49 is used Pressure in monitoring outlet pipe.
Further, as the preferred of this implementation, 30 one end of the relief pipeline connects main gas tube 23, other end connection Outlet pipe 29, the second pressure monitoring point 39, third pressure monitoring point 42, the 4th pressure monitoring point 45 are for monitoring pressure release Pressure condition in pipeline when pressure release.
Further, as the preferred of this implementation, 38 both ends of electronic high voltage valve are equipped with gasket 50, are connected by bolt 51 Connect relief pipeline 30.
The operation principle of the utility model, PLC controller setting control program, is divided into daytime and at night two periods, First relief pipeline, the second relief pipeline and the fully open carry out pressure release of third relief pipeline when daytime, third pressure release when evening Closedown of pipeline, the first relief pipeline and the second relief pipeline, which are opened, carries out pressure release, in the work of electronic high voltage valve and high pressure check valve Under, sound is at 60 decibels hereinafter, venting duration is can be controlled in 50 minutes has let out when pressure release, and equipment needs 3 three hours before, evening Upper venting duration shortens 130 minutes, and production efficiency is also ensured.
It should be noted that the utility model is not limited to the above embodiment, creation essence according to the present utility model God, those skilled in the art can also make other variations, these variations done according to the creative spirit of the utility model, all It should be within the scope of the utility model be claimed.

Claims (5)

1. a kind of pressure relief device, including sintering furnace, main gas tube and relief pipeline;It is characterized in that:The sintering furnace bottom end is set There is pedestal, PLC controller is set on the right side of sintering furnace, air inlet pipe, air inlet pipe one end connection are equipped on the right side of the main gas tube Sintering furnace, the other end connect main gas tube, and the air inlet pipe is equipped with the first high-voltage switch gear, the first electronic high voltage successively from top to bottom Valve and first pressure monitoring point;It is equipped with sealing flange on the left of the main gas tube, outlet pipe is equipped on the right side of the sealing flange; The relief pipeline includes the first relief pipeline, the second relief pipeline and third relief pipeline, and first relief pipeline is successively Equipped with the first high pressure check valve, second pressure monitoring point, the second high-voltage switch gear and the second electronic high voltage valve;Second relief tube Road is equipped with the second high pressure check valve, third pressure monitoring point, third high-voltage switch gear and third electronic high voltage valve successively;The third Relief pipeline is equipped with the 4th pressure monitoring point, the 4th high-voltage switch gear and the 4th electronic high voltage valve successively.
2. pressure relief device as described in claim 1, it is characterised in that:The PLC controller is connected by conducting wire on relief pipeline High-voltage switch gear, electronic high voltage valve, the first high pressure on high pressure check valve and safety valve and admission line on outlet pipe Switch and the first electronic high voltage valve.
3. pressure relief device as described in claim 1, it is characterised in that:The outlet pipe connects main gas tube, close to main tracheae Safety valve is nearby arranged in road, and the safety valve is nearby equipped with the 5th pressure monitoring point.
4. pressure relief device as described in claim 1, it is characterised in that:Described relief pipeline one end connects main gas tube, the other end Connect outlet pipe.
5. pressure relief device as described in claim 1, it is characterised in that:Electronic high voltage valve both ends are equipped with gasket, pass through bolt Connect relief pipeline.
CN201820086709.1U 2018-01-18 2018-01-18 A kind of pressure relief device Active CN208058080U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820086709.1U CN208058080U (en) 2018-01-18 2018-01-18 A kind of pressure relief device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820086709.1U CN208058080U (en) 2018-01-18 2018-01-18 A kind of pressure relief device

Publications (1)

Publication Number Publication Date
CN208058080U true CN208058080U (en) 2018-11-06

Family

ID=63995434

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820086709.1U Active CN208058080U (en) 2018-01-18 2018-01-18 A kind of pressure relief device

Country Status (1)

Country Link
CN (1) CN208058080U (en)

Similar Documents

Publication Publication Date Title
CN203423032U (en) On-line intelligent oil supplementation device for transformer
CN103440962A (en) Intelligent on-line oil filling vehicle for transformer and oil filling method
CN107013717A (en) A kind of automatic decompression device for relief valve
CN208058080U (en) A kind of pressure relief device
CN204664477U (en) Non-transformer Combined water level control valve
CN204493196U (en) A kind of two-stage helical-lobe compressor exhaust pressure stabilizer
CN203534912U (en) Pipeline pressure test device
CN205155542U (en) Modified torch gas divides fluid reservoir to press liquid system
CN204646587U (en) Pressurized air self-draining arrangement
CN101368394B (en) Non-negative pressure frequency conversion water supply facility
CN208652139U (en) Full-automatic gas shield dam fills row's control device
CN206458450U (en) A kind of well group condensate tapping equipment
CN208500339U (en) A kind of multifunctional fuel oil transportation system
CN205614221U (en) High -efficient welder residual water processing apparatus
CN206130941U (en) Automatic equipment of control steam volume
CN202074089U (en) Ultra-high pressure proportional pressure-reducing valve
CN204151310U (en) Synthetic ammonia producer gas generator blowing out quick pressure relief device
CN207307298U (en) A kind of filter press automatic cycle feed system
CN203892875U (en) Safety release and recovery system for liquefied coal-bed gas low-temperature pipeline
CN203779341U (en) Double gas circuit input linkage system of compressed air shotblasting machine
CN202497871U (en) Normal safety exhaust pipeline of reaction kettle
CN220624966U (en) Mist cooling synergistic system of indirect air cooling system of thermal generator set
CN207282924U (en) Intelligent heat dissipation power distribution cabinet
CN202381998U (en) Safety cut-off device for natural gas
CN209101015U (en) Full-automatic pipeline timing releasing water air control unit

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: A pressure relief device

Effective date of registration: 20230823

Granted publication date: 20181106

Pledgee: Everbright Xinglong Trust Co.,Ltd.

Pledgor: GANZHOU HAISHENG CEMENTED CARBIDE CO.,LTD.

Registration number: Y2023980053601

PE01 Entry into force of the registration of the contract for pledge of patent right