CN208055882U - Hoop bracket for cast-in-place board-like bridge superstructure construction - Google Patents
Hoop bracket for cast-in-place board-like bridge superstructure construction Download PDFInfo
- Publication number
- CN208055882U CN208055882U CN201820356513.XU CN201820356513U CN208055882U CN 208055882 U CN208055882 U CN 208055882U CN 201820356513 U CN201820356513 U CN 201820356513U CN 208055882 U CN208055882 U CN 208055882U
- Authority
- CN
- China
- Prior art keywords
- bridge
- anchor ear
- connecting plate
- cast
- wood
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model is related to a kind of hoop brackets for cast-in-place board-like bridge superstructure construction, a upper anchor ear is separately installed on each bridge pier of board-like bridge, mounting height of each upper anchor ear on bridge pier is consistent, and the connecting plate of each upper anchor ear is along bridge to setting;Direction across bridge is on the connecting plate of each upper anchor ear of bridge pier the same side, level sets up a spandrel girder, along bridge to a distribution beam is set up at spacing intervals between two spandrel girders, in distribution beam, a bowl buckle holder is set up, the lower end of each upright bar of bowl buckle holder is supported in distribution beam, the upright bar upper end of bowl buckle holder, direction across bridge sets up the more lateral lumps of wood, at the top of the lateral lumps of wood, along bridge to one layer of longitudinal lumps of wood is laid with, formwork for placing is laid at the top of longitudinal lumps of wood.
Description
Technical field
The utility model belongs to bridge construction field, especially cast-in-place board-like bridge construction, and in particular to Yi Zhongyong
In the hoop bracket of cast-in-place board-like bridge superstructure construction.
Background technology
Board-like bridge superstructure construction generally uses supporting structure at present.Holder by its construction generally include column,
Beam type and beam-column type bracket, above-mentioned holder generally existing rod piece consumption is big, long in time limit, foundation bearing capacity requires height, component stupid
The problems such as weight;And in Mid and minor spans board-like bridge (single hole across footpath<40 meters) if construction also needs to meet flood passage, navigation, continuous
Stream requires, then Superstructure Construction using above-mentioned holder problem as more protruded.
Invention content
The purpose of this utility model is to provide one kind be suitable for across footpath less, headroom is higher, geological conditions is bad, river water
The holder of board-like bridge superstructure construction under the unfavorable geological conditions such as deeper.
The technical solution of the utility model is as follows:
A kind of hoop bracket for cast-in-place board-like bridge superstructure construction, it is characterised in that:In the lid of board-like bridge
A upper anchor ear is separately installed with below beam on each bridge pier, each upper anchor ear includes two and half circular boops, and the two of each half circular boop
Side is equipped with connecting plate, and on bridge pier, the connecting plate of two halves circular boop is bolted two and half circular boop make-ups, by two halves circular boop
It is securedly mounted on bridge pier;Mounting height of each upper anchor ear on bridge pier is consistent, and the connecting plate of each upper anchor ear is along bridge to setting
It sets;For direction across bridge on the connecting plate of each upper anchor ear of bridge pier the same side, level sets up a spandrel girder, the spandrel girder and anchor ear
Welding at the top of connecting plate;Along bridge between two spandrel girders, setting up a distribution beam, every distribution beam two at spacing intervals
It is welded with the load-bearing top surface of the beam at end;In the distribution beam, a bowl buckle holder, each upright bar of the bowl buckle holder are set up
Lower end be supported in the distribution beam, in the upper end of the upright bar of bowl buckle holder, direction across bridge sets up the more lateral lumps of wood, described
At the top of the lateral lumps of wood, along bridge to one layer of longitudinal lumps of wood is laid with, formwork for placing is laid at the top of longitudinal lumps of wood.
It is identical as upper hooping structure further can to install one in the lower section of the upper anchor ear on each bridge pier for above-mentioned hoop bracket
Lower anchor ear, the bottom of each lower anchor ear is supported on the binder of board-like bridge, the connecting plate setting direction of lower anchor ear with upper armful
The connecting plate direction of hoop is consistent, is connected by a supporting rod between lower anchor ear and the connecting plate of upper anchor ear.
The utility model uses hoop bracket, and simple in structure, rod piece dosage is few, and temporary load(ing) is directly transmitted to pier stud, over the ground
Base is without any requirement;The mounting height of anchor ear can with pier stud height change, can meet lower section flood passage, navigation, do not stop requirement, keep away
The security risk caused by flood season construction obstruction river is exempted from.Hoop bracket operability is strong, construction is simple, conveniently, is showed
Board-like bridge superstructure construction is poured, prospective quality safety requirements has been reached.
Description of the drawings
It is anchor ear mounting means direction across bridge side view figure shown in Fig. 1;
Fig. 2 is the vertical view of anchor ear installation;
Fig. 3 is the direction across bridge structural schematic diagram of the utility model;
Fig. 4 is the suitable bridge of the utility model to structural schematic diagram.
Specific implementation mode
As shown in Figure 1 and Figure 2, the utility model is separately installed with one below the bent cap 1 of board-like bridge on each bridge pier 2
A upper anchor ear 3, each upper anchor ear 3 includes two and half circular boops, and the both sides of each half circular boop are equipped with connecting plate 31, two and half circular boops
To being buckled on bridge pier 2, the connecting plate 31 of two halves circular boop is bolted, and two semicircular band tightener is mounted on bridge pier;It is each
Mounting height of the upper anchor ear 3 on bridge pier 2 is consistent, and the connecting plate 31 of each upper anchor ear is along bridge to setting.
As shown in Figure 3, Figure 4, for direction across bridge on the connecting plate 31 of each upper anchor ear 3 of 2 the same side of bridge pier, level sets up one
It is welded at the top of spandrel girder 4, the spandrel girder 4 and anchor ear connecting plate;Along bridge between two spandrel girders 4, at spacing intervals
A distribution beam 5 is set up, every 5 both ends of distribution beam are welded with the load-bearing top surface of the beam;In the distribution beam 5, one bowl is set up
Detain holder 6, the lower end of each upright bar of the bowl buckle holder 6 is supported in the distribution beam, in the upright bar of bowl buckle holder
Upper end, direction across bridge set up more 7 lumps of wood of transverse direction, at 7 top of the lateral lumps of wood, along bridge to one layer of longitudinal lumps of wood 8 is laid with, in institute
It states and is laid with formwork for placing 9 at the top of longitudinal lumps of wood.
In a specific embodiment of the utility model, bent cap of the elevation of top away from board-like bridge of the upper anchor ear 3
Lower section 2.56-2.69m.
To ensure that upper anchor ear 3 is stablized in use, also one can be installed in the lower section of the upper anchor ear 3 on each bridge pier
The bottom of lower anchor ear 10 identical with upper hooping structure, each lower anchor ear 10 is supported on the binder 11 of board-like bridge, lower anchor ear
Connecting plate setting direction it is consistent with the connecting plate direction of upper anchor ear, between lower anchor ear and the connecting plate of upper anchor ear pass through one support
Bar 12 connects.I20a I-steel can be used in supporting rod between the lower anchor ear and upper anchor ear.
The utility model is when it is implemented, δ=16mm can be used in the upper anchor ear, thickness Q235 steel plates roll, diameter
1000mm, height 1.2m.Anchor ear interior wall liner 0.3cm rubber, convenient for holding bridge pier tightly, and increases frictional force, prevents from gliding.Even
The bolt for connecing anchor ear connecting plate uses M30-10.9 grades of high-strength bolts.
When it is implemented, I56a I-steel can be used in the spandrel girder.The distribution beam can be used I40a I-steel, and every two
Spacing between root distribution beam is 60 centimetres.
Because bowl buckle holder is erected in distribution beam, spacing between two distribution beams is 60cm, therefore bowl buckle holder
Direction across bridge step pitch (spacing between two upright bars) is also 60cm;Along bridge 30cm is set as to step pitch.
The lateral lumps of wood of bowl buckle cradle top and longitudinal lumps of wood specification are 10 × 10cm.The spacing and bowl buckle of the lateral lumps of wood
The suitable bridge of holder is consistent to step pitch, is 30cm, the spacing of longitudinal lumps of wood is 10cm.Longitudinal lumps of wood is fixed on the lateral lumps of wood with iron nail
On, so that two layers of lumps of wood is connected to become an entirety.
Claims (7)
1. a kind of hoop bracket for cast-in-place board-like bridge superstructure construction, it is characterised in that:In the bent cap of board-like bridge
A upper anchor ear is separately installed on each bridge pier in lower section, each upper anchor ear includes two and half circular boops, the both sides of each half circular boop
It is equipped with connecting plate, on bridge pier, the connecting plate of two halves circular boop is bolted two and half circular boop make-ups, by two semicircular banding
Guan County is on bridge pier;Mounting height of each upper anchor ear on bridge pier is consistent, and the connecting plate of each upper anchor ear is along bridge to setting;
For direction across bridge on the connecting plate of each upper anchor ear of bridge pier the same side, level sets up a spandrel girder, and the spandrel girder connects with anchor ear
Welding at the top of fishplate bar;Along bridge between two spandrel girders, setting up a distribution beam, every distribution beam both ends at spacing intervals
It is welded with the load-bearing top surface of the beam;In the distribution beam, a bowl buckle holder is set up, each upright bar of the bowl buckle holder
Lower end is supported in the distribution beam, and in the upper end of the upright bar of bowl buckle holder, direction across bridge sets up the more lateral lumps of wood, in the cross
At the top of to the lumps of wood, along bridge to one layer of longitudinal lumps of wood is laid with, formwork for placing is laid at the top of longitudinal lumps of wood.
2. the hoop bracket according to claim 1 for cast-in-place board-like bridge superstructure construction, it is characterised in that:Institute
State 2.56-2.69m below bent cap of the elevation of top of anchor ear away from board-like bridge.
3. the hoop bracket according to claim 1 for cast-in-place board-like bridge superstructure construction, it is characterised in that:?
A lower anchor ear identical with upper hooping structure is installed in the lower section of upper anchor ear on each bridge pier, and the bottom of each lower anchor ear is supported on
On the binder of board-like bridge, the connecting plate setting direction of lower anchor ear is consistent with the connecting plate direction of upper anchor ear, lower anchor ear with upper armful
It is connected by a supporting rod between the connecting plate of hoop.
4. the hoop bracket according to claim 1 for cast-in-place board-like bridge superstructure construction, it is characterised in that:Institute
It states anchor ear to roll using δ=16mm, thickness Q235 steel plates, diameter 1000mm, height 1.2m, inner liner 0.3cm rubber, even
The bolt for connecing anchor ear connecting plate uses M30-10.9 grades of high-strength bolts.
5. the hoop bracket according to claim 1 for cast-in-place board-like bridge superstructure construction, it is characterised in that:Institute
It states spandrel girder and uses I56a I-steel.
6. the hoop bracket according to claim 1 for cast-in-place board-like bridge superstructure construction, it is characterised in that:Institute
It states distribution beam and uses I40a I-steel, the spacing between every two distribution beams is 60 centimetres.
7. the hoop bracket according to claim 3 for cast-in-place board-like bridge superstructure construction, it is characterised in that:Institute
The supporting rod stated between lower anchor ear and upper anchor ear uses I20a I-steel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820356513.XU CN208055882U (en) | 2018-03-15 | 2018-03-15 | Hoop bracket for cast-in-place board-like bridge superstructure construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820356513.XU CN208055882U (en) | 2018-03-15 | 2018-03-15 | Hoop bracket for cast-in-place board-like bridge superstructure construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208055882U true CN208055882U (en) | 2018-11-06 |
Family
ID=63988731
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820356513.XU Active CN208055882U (en) | 2018-03-15 | 2018-03-15 | Hoop bracket for cast-in-place board-like bridge superstructure construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208055882U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110184934A (en) * | 2019-06-03 | 2019-08-30 | 安徽省新路建设工程集团有限责任公司 | Cast-in-place Bent Cap formwork system and construction method |
-
2018
- 2018-03-15 CN CN201820356513.XU patent/CN208055882U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110184934A (en) * | 2019-06-03 | 2019-08-30 | 安徽省新路建设工程集团有限责任公司 | Cast-in-place Bent Cap formwork system and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107841953B (en) | High-altitude oblique crossing Liang Doupo side span cast-in-situ section construction support and construction method | |
CN108442232B (en) | Assembled steel temporary bridge structure and construction method thereof | |
CN205857032U (en) | The toughened internal stress Construction Support device that a kind of floor stand combines with shelf bracket | |
CN112411391A (en) | Single-column capping beam steel pipe column Bailey beam construction supporting system and construction method thereof | |
CN110387822A (en) | Cast-in-place Bent Cap assembled steel pipe holder and its construction method | |
CN105350458A (en) | Construction method of composite structure platform for construction of Y-shaped pier of bridge | |
KR101527782B1 (en) | Management and reverse displacement of composite bridge composite inclined support installation method | |
CN111560837A (en) | Lifting type river-crossing bridge structure and using method thereof | |
CN205242278U (en) | A triangle string basket method is hanged and is watered device for deck bridge construction | |
CN208055882U (en) | Hoop bracket for cast-in-place board-like bridge superstructure construction | |
CN109440724B (en) | Installation method of cast-in-place beam template suspension support system of high-pile wharf | |
CN206607506U (en) | A kind of through type adds the capping construction support of passive stress trapezoid block | |
CN211472207U (en) | Suspension beam system for hoisting prefabricated section box girder | |
CN112627055A (en) | Bridge bent cap formwork support adjusting device and bridge bent cap construction method | |
CN209194354U (en) | High-altitude long-span binder base-supporting shellfish thunder support construction | |
CN100497834C (en) | Construction equipment for integral roof-holding highway bridge top structure | |
CN217149897U (en) | Cast-in-place support of steel pipe bailey beam bridge | |
CN208328660U (en) | The U-shaped girder construction of the Two bors d's oeuveres of combined bridge | |
CN110593110A (en) | Box girder cast-in-place support suitable for curves and longitudinal and transverse slopes and construction method thereof | |
CN215482366U (en) | Double-line continuous beam bracket structure | |
CN207277211U (en) | Large steel pipe truss for bent cap cast-in-place construction | |
CN205242263U (en) | Integrated configuration platform is used in construction of bridge Y type mound | |
CN209906223U (en) | Beam gantry crane | |
CN210712576U (en) | Multi-hoop truss supporting bailey bracket for cast-in-situ large-span box girder | |
CN106381810A (en) | Beam-and-column type bracket and method for casting-in-place cantilever perfusion beam with beam-and-column type bracket |