CN208039148U - Fish pass import moisturizing attracting experimental trough - Google Patents

Fish pass import moisturizing attracting experimental trough Download PDF

Info

Publication number
CN208039148U
CN208039148U CN201820463058.3U CN201820463058U CN208039148U CN 208039148 U CN208039148 U CN 208039148U CN 201820463058 U CN201820463058 U CN 201820463058U CN 208039148 U CN208039148 U CN 208039148U
Authority
CN
China
Prior art keywords
fish pass
moisturizing
fish
channel
experimental trough
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820463058.3U
Other languages
Chinese (zh)
Inventor
罗凯强
夏威
金志军
王岑
蒋永强
余英俊
谭军均
石小涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Three Gorges University CTGU
Original Assignee
China Three Gorges University CTGU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Three Gorges University CTGU filed Critical China Three Gorges University CTGU
Priority to CN201820463058.3U priority Critical patent/CN208039148U/en
Application granted granted Critical
Publication of CN208039148U publication Critical patent/CN208039148U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A40/00Adaptation technologies in agriculture, forestry, livestock or agroalimentary production
    • Y02A40/60Ecological corridors or buffer zones

Abstract

A kind of fish pass import moisturizing attracting experimental trough, including return water sink, experimental trough is mounted on by holder in return water sink, experimental trough interior side is separated into fish pass side moisturizing channel and fish pass import moisturizing channel by partition board, pass through open communication between fish pass side moisturizing channel and fish pass import moisturizing channel, fish pass side is equipped with the first honeycomb screen and airflow fence in moisturizing channel, fish pass import moisturizing is equipped with the second honeycomb screen and airflow fence in channel, it is equipped with sliding slot in experimental trough on the outside of fish pass import moisturizing channel, the open fish pass bypass road moisturizing channel being made of partition board of end face is slidably connected with sliding slot, fish pass bypass road moisturizing is equipped with third honeycomb screen and airflow fence in channel.Fish pass import moisturizing attracting experimental trough provided by the utility model, fish can be observed and trace back track, moisturizing sink area and flow are analyzed to fish pass into the influence for fish effect of making a slip of the tongue, the advantage and disadvantage of different water supplementing methods is determined, finds the optimal position of moisturizing and best flow.

Description

Fish pass import moisturizing attracting experimental trough
Technical field
The utility model is related to hydraulic engineering field, especially a kind of fish pass import moisturizing attracting experimental trough.
Background technology
In this year, with dam, the connectivity of the construction on weir and sluice, river is destroyed.The stock of fish is reduced year by year, River ecosystem is resulted in go wrong.Therefore in order to protect the integrality of river ecosystem, more and more water conservancy projects to set Meter persons propose to build the stabilization of the fish migration path protection stock of fish.In China in the dam built, to have many Engineering have begun or be completed fish migration channel.For example, the Cui Jia battalion power station built up on Han River, using tabula Board-like fish pass, finds that its effect is fine in crossing fish monitoring to it, and a good example is provided for country's fish pass construction.? In the construction on the two river mouth power station dams Deng Gao of Yalongjiang River, dam was helped using fish lift etc., some smaller engineerings will also start Fish migration is helped using fish pass structures such as fish locks.As helping fish to cross the important component on dam, but most fish The effect is unsatisfactory in road Practical Project.The main reason is that the effect is unsatisfactory for the attraction of fish pass import, cause fish on dam Under get lost, reduce fish pass import cross fish efficiency, keep the operational effect of entire fish pass undesirable.
The reason that fish pass import attracts the efficiency of effect undesirable, which is mainly fish pass import, does not have suitable attracting flow to have Close, this is related with the flow of fish pass entrance with the complex flowfield under dam, so often designed in Practical Project one it is auxiliary Help water system(Auxiliary water system)To provide additional flow or setting individually attraction for fish pass import Stream(Attraction flow)The attraction effect for reinforcing fish pass import, improved fish efficiency.Therefore understand fish pass inlet flow rate with The correlation of refill flow and influence set transformation and its transformation side of the individual attracting flow to micro flow field under dam Formula attracts fish pass import the quality of influential effect, is the emphasis that fish pass workers study from now on.Existing document proposes at present Above both of which promotes the attraction effect of fish pass import.Although domestic and foreign scholars did largely fish pass import Research, but assist probing into for water charging system less in fish pass, just from the point of view of current research, only know and use this in engineering Method can improve the success rate of fish pass import, all be supported without detailed experiment to its principle.Currently, laboratory and field It tests to probe into its moisturizing form and does not form corresponding ripe research system and experimental program, especially attracting flow and fish The experiment of road import, most of at present is all to use for reference Practical Project generally to change fish pass import, and come with some shortcomings place on the whole:
1, in recent years, it although fish pass import attracting flow is increasingly paid close attention to by vast fish pass builder, individually lures The research of the moisturizing form in fish channel is still weak link.
2, the channel of fish pass import moisturizing, at present build in be rarely employed, reason with the independent benefit to fish pass import The principles such as water form are not known.Although there is engineering experience foundation on the spot, for different engineering geological conditions, different fishes Type, create flow field effect have significant limitation, can not effectively promote.
3, it tests on the spot there are certain risk and uncertainty, the form of moisturizing, fish pass goes out stream with different downstreams Water level conditions have apparent difference, and the then measurement of the hydraulic indexes such as measurement of dam Fluid field has certain difficulty and wind Danger, and put fish and test limited and technological means and fund etc., it is difficult to carry out prototype experiment in laboratory.
4, laboratory experiment is tested, maximum problem can only select stock of fish amount nearby in the selection with fish species.And The rare stock of fish in prolonged transportational process it is difficult to ensure that keep its vigor, and in the experiment fingerling in laboratory due to life Dis environment etc. can not survive, and secondary injury is carried out to stock of fish amount.So being tested in laboratory, if not nearby The stock of fish, can cause prodigious experimental error, experimental provision applicability that can have a greatly reduced quality.
Invention content
The technical problem to be solved by the utility model is to provide a kind of fish pass import moisturizing attracting experimental troughs, can solve Certainly fish pass import moisturizing channel is few, the problem of lacking experimental data, can observe fish and trace back track, analyze moisturizing sink area The advantage and disadvantage of different water supplementing methods are determined into the influence for fish effect of making a slip of the tongue to fish pass with flow, find the optimal position of moisturizing and Best flow.Sink easy disassembly and transport can reuse to be appropriate for field trial.
In order to solve the above technical problems, technical solution used by the utility model is:A kind of fish pass import moisturizing attracting Experimental trough, including return water sink, experimental trough are mounted on by holder in return water sink,
Experimental trough interior side is separated into fish pass side moisturizing channel and fish pass import moisturizing channel by partition board, and fish pass side is mended By open communication between aquaporin and fish pass import moisturizing channel, the first honeycomb screen is installed in the moisturizing channel of fish pass side and is led Grid are flowed, the second honeycomb screen and airflow fence, the experiment water on the outside of fish pass import moisturizing channel are installed in fish pass import moisturizing channel Sliding slot is equipped in slot, the open fish pass bypass road moisturizing channel being made of partition board of end face is slidably connected with sliding slot, by fish pass Road is equipped with third honeycomb screen and airflow fence in moisturizing channel;
The end face opposite with fish pass side moisturizing channel is opened wide on experimental trough, is provided with the second block, the first block And second block between region constitute adapt to area;
Pipeline one end with the first water pump is connected to return water sink, and the other end is connected to fish pass import moisturizing channel;
Pipeline one end with the second water pump is connected to return water sink, and the other end is connected to fish pass side moisturizing channel;
Pipeline one end with third water pump is connected to return water sink, and the other end is connected to fish pass bypass road moisturizing channel.
Block sliding slot is installed, the first block is slidably connected by sliding slot of blocking with experimental trough on experimental trough inner wall.
In holder, first support is set to below the experimental trough of the second block lower part, second support be set to fish pass into It is connect with experimental trough below the experimental trough of mouth moisturizing beneath galleries and by jack.
Each pipeline is made of the splicing of removable PVC pipeline.
Fish pass import moisturizing attracting experimental trough provided by the utility model, has the beneficial effect that:
1, it is the moisturizing of fish pass side and bypass road moisturizing to devise two kinds of water supplementing methods, both modes cover current work substantially The water supplementing method of journey design, ensure that the diversity of experiment condition.
2, the adaptation area being arranged provides the region for adapting to sink for fish, and it is to adapt to area to adapt to flow that can make fish now State, to keep experimental data more accurate.
3, the design of jack, realizes and is easily become slope to experimental trough, can be according to different experiment conditions Different base slopes is designed, different flow conditions is met.
4, each component is detachable, easily can make and overlap, and can also can be easier according to different operating modes Experimental provision is transformed, different design requirements is met.
It can solve the problem of that fish pass import moisturizing channel is few and lack experimental data, fish can be observed and trace back track, point Moisturizing sink area and flow are analysed to fish pass into the influence for fish effect of making a slip of the tongue, the advantage and disadvantage of different water supplementing methods is determined, finds benefit The optimal position of water and best flow.Sink easy disassembly and transport can repeat profit to be appropriate for field trial With.
Description of the drawings
The utility model is described in further detail with reference to the accompanying drawings and examples:
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the vertical view of the utility model;
Fig. 3 is the schematic diagram for the second support that the utility model is equipped with jack.
Specific implementation mode
As shown in Figure 1-Figure 3, a kind of fish pass import moisturizing attracting experimental trough, including return water sink 1, experimental trough 2 are logical Holder 3 is crossed in return water sink 1,
2 interior side of experimental trough is separated into fish pass side by partition board and mends water channel 8 and fish pass import moisturizing channel 9, fish pass Side is mended by 19 connection of opening between water channel 8 and fish pass import moisturizing channel 9, and fish pass side mends in water channel 8 and is equipped with first Honeycomb screen and airflow fence 7, the second honeycomb screen and airflow fence 17 are equipped in fish pass import moisturizing channel 9, and fish pass import moisturizing is logical Be equipped with sliding slot 11 in the experimental trough 2 in the outside of road 9, the open fish pass bypass road moisturizing channel 10 being made of partition board of end face with Sliding slot 11 is slidably connected, and third honeycomb screen and airflow fence 18 are equipped in fish pass bypass road moisturizing channel 10;
The opposite end face of water channel 8 is mended with fish pass side to open wide, be provided with the second block 14 on experimental trough 2, first Region between block 13 and the second block 14, which is constituted, adapts to area 20;
Pipeline one end with the first water pump 4 is connected to return water sink 1, and the other end is connected to fish pass import moisturizing channel 9;
Pipeline one end with the second water pump 5 is connected to return water sink 1, and the other end is mended water channel 8 with fish pass side and is connected to;
Pipeline one end with third water pump 6 is connected to return water sink 1, and the other end connects with fish pass bypass road moisturizing channel 10 It is logical.
Block sliding slot 12 is installed, the first block 13 is slided by sliding slot 12 of blocking with experimental trough 2 on 2 inner wall of experimental trough Dynamic connection.
In holder 3, first support is set to 2 lower section of experimental trough of 14 lower part of the second block, and second support 16 is set to 2 lower section of experimental trough of 9 lower part of fish pass import moisturizing channel is simultaneously connect by jack 15 with experimental trough 2.
Each pipeline is made of the splicing of removable PVC pipeline, can at any time be adjusted according to required length, simple and convenient.
The course of work of the utility model is as follows:
First water pump 4, the second water pump 5 and third water pump 6, give fish pass side moisturizing 8, fish pass import 9 and moisturizing water respectively 10 3 channels of slot are supplied water, and way of supplying water uses periodical feeding, i.e., draws water in return flume and then flowed by device end Return flume, water cycle inside and outside realization device.
The promising fish pass import carries out moisturizing channel 8 and the fish pass side moisturizing 10 of moisturizing.
Each honeycomb screen and airflow fence can obtain the uniform flow being consistent with Practical Project with smooth flow.
13 and second block 14 of described first block, major function be prevent fish escape and experiment start before be fish Adaptation zone is provided.In order to ensure the accuracy of experiment, fish emergency reaction is offset.First block, which is opened, can start reality It tests.
The gradient of experimental trough entirety is controlled to increase the height of experimental provision front end by jack 15.Steel The weight of frame can ensure the stability of holder.
First support and second support 16 are preferably steel bracket.
Experimental provision early period, the maintenance of device is carried out, ensures the normal operation of each component, determines the gradient of experimental trough 2, The experiment condition of determining device slides moisturizing sink, determines moisturizing position.
The determining device depth of water, device start water storage, and devices water storage is waited to complete, and after opening the waterflow stabilizations such as water pump, then put Set the first block 13 and second block 14.
Experimental subjects is chosen, is placed on and adapts to area, adaptation time is determined according to experiment, is less than 30 points within generally higher than 15 minutes Clock.
Adaptation time is completed, and is opened block and is tested.
The above embodiments are only the optimal technical scheme of the utility model, and are not construed as the limit for the utility model System, the features in the embodiments and the embodiments of the present application in the absence of conflict, mutually can be combined arbitrarily.This practicality is new Technical characteristic in the technical solution that the protection domain of type should be recorded with claim, including the technical solution of claim record Equivalents are protection domain.Equivalent replacement i.e. within this range is improved, also the scope of protection of the utility model it It is interior.

Claims (4)

1. a kind of fish pass import moisturizing attracting experimental trough, including return water sink(1), experimental trough(2)Pass through holder(3)Installation In return water sink(1)It is interior, it is characterised in that:
Experimental trough(2)Interior side is separated into fish pass side moisturizing channel by partition board(8)With fish pass import moisturizing channel(9), fish Road side moisturizing channel(8)With fish pass import moisturizing channel(9)Between pass through opening(19)Connection, fish pass side moisturizing channel(8)It is interior First honeycomb screen and airflow fence are installed(7), fish pass import moisturizing channel(9)Second honeycomb screen and airflow fence are inside installed (17), fish pass import moisturizing channel(9)The experimental trough in outside(2)Inside it is equipped with sliding slot(11), end face is open by partition board The fish pass bypass road moisturizing channel of composition(10)With sliding slot(11)It is slidably connected, fish pass bypass road moisturizing channel(10)Third is inside installed Honeycomb screen and airflow fence(18);
Experimental trough(2)Upper and fish pass side moisturizing channel(8)Opposite end face is opened wide, and the second block is provided with(14), the One block(13)With the second block(14)Between region constitute adapt to area(20);
With the first water pump(4)Pipeline one end and return water sink(1)Connection, the other end and fish pass import moisturizing channel(9)Even It is logical;
With the second water pump(5)Pipeline one end and return water sink(1)Connection, the other end and fish pass side moisturizing channel(8)Connection;
With third water pump(6)Pipeline one end and return water sink(1)Connection, the other end and fish pass bypass road moisturizing channel(10)Even It is logical.
2. fish pass import moisturizing attracting experimental trough according to claim 1, it is characterised in that:Experimental trough(2)Inner wall On block sliding slot is installed(12), the first block(13)Pass through sliding slot of blocking(12)With experimental trough(2)It is slidably connected.
3. fish pass import moisturizing attracting experimental trough according to claim 1, it is characterised in that:Holder(3)In, first Erection is placed in the second block(14)The experimental trough of lower part(2)Lower section, second support(16)It is set to fish pass import moisturizing channel (9)The experimental trough of lower part(2)Lower section simultaneously passes through jack(15)With experimental trough(2)Connection.
4. fish pass import moisturizing attracting experimental trough according to claim 1, it is characterised in that:Each pipeline is by removable PVC pipeline splicing composition.
CN201820463058.3U 2018-04-03 2018-04-03 Fish pass import moisturizing attracting experimental trough Expired - Fee Related CN208039148U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820463058.3U CN208039148U (en) 2018-04-03 2018-04-03 Fish pass import moisturizing attracting experimental trough

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820463058.3U CN208039148U (en) 2018-04-03 2018-04-03 Fish pass import moisturizing attracting experimental trough

Publications (1)

Publication Number Publication Date
CN208039148U true CN208039148U (en) 2018-11-02

Family

ID=63946839

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820463058.3U Expired - Fee Related CN208039148U (en) 2018-04-03 2018-04-03 Fish pass import moisturizing attracting experimental trough

Country Status (1)

Country Link
CN (1) CN208039148U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109371897A (en) * 2018-11-21 2019-02-22 中水东北勘测设计研究有限责任公司 A kind of fish pass import moisturizing energy dissipating model test apparatus and test method
CN110999844A (en) * 2019-12-13 2020-04-14 三峡大学 Full-automatic modularized fish ethology experimental device
CN112616752A (en) * 2020-12-09 2021-04-09 三峡大学 Device and method for simulating influence of water inlet contraction accelerated flow of hydropower station on fish body

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109371897A (en) * 2018-11-21 2019-02-22 中水东北勘测设计研究有限责任公司 A kind of fish pass import moisturizing energy dissipating model test apparatus and test method
CN110999844A (en) * 2019-12-13 2020-04-14 三峡大学 Full-automatic modularized fish ethology experimental device
CN110999844B (en) * 2019-12-13 2022-02-01 三峡大学 Full-automatic modularized fish ethology experimental device
CN112616752A (en) * 2020-12-09 2021-04-09 三峡大学 Device and method for simulating influence of water inlet contraction accelerated flow of hydropower station on fish body
CN112616752B (en) * 2020-12-09 2022-05-20 三峡大学 Device and method for simulating influence of water inlet contraction accelerated flow of hydropower station on fish body

Similar Documents

Publication Publication Date Title
CN208039148U (en) Fish pass import moisturizing attracting experimental trough
Fischer et al. Observations of transport to surface waters from a plunging inflow to lake mead 1
CN104264622B (en) The device and method that the migration of tide simulation reversing current pollution of river thing and salt solution trace back
CN104792945B (en) A kind of rockfill washes away analogue experiment installation and experimental data acquisition method
CN205102879U (en) Weir of simultaneous observation hillside surface runoff and interflow
CN204064628U (en) A kind of douche test macro
CN104594320A (en) Fish-passing type lock and fish-passing method
CN104480914A (en) Fish pass facility and method with fish ladder and navigation lock combined
CN207944416U (en) A kind of sink for field fish pass import experiment
CN108018824B (en) Braided river flow physical simulation test system
CN104594321A (en) Fish collecting and fish luring system and fish collecting and fish luring method of fish-passing type lock
CN109469030A (en) A kind of transporting something containerized fish system for water channeling type power generation high dam
CN204356755U (en) Cross the fish gathering attracting system of fish formula ship lock
WO2023284229A1 (en) River model test system and test method for microflorae in river confluences, branches and bends
CN104514215A (en) Fish blocking system and fish blocking method for fish pass type ship lock
CN105588928A (en) Method for promoting releasing of supersaturated total dissolved gas through water blocking media
CN108871727A (en) One kind opening a sluice gate formula and persistently enters the dual-purpose density current experimental rig of streaming and method
CN204199236U (en) The device that the migration of tide simulation reversing current pollution of river thing and salt solution trace back
CN109526814A (en) Fish are temporarily supported, structure is tested in swimming behavior observation and Burden-Swimming Ability of KM
CN109077004A (en) A kind of fish constellation effect traces back the pilot system of locus model with fish
CN106370587B (en) High-speed water flow test device for rock-soil impact resistance test
CN208350320U (en) It opens a sluice gate formula and persistently enters the dual-purpose density current experimental rig of streaming
CN207248662U (en) A kind of field riverbank in-situ testing device
CN109085005A (en) A kind of agricultural filter performance synthesis test platform
CN202522430U (en) Experimental model for tunnel rainwater collection

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181102