CN208023603U CN201721508721.9U CN201721508721U CN208023603U CN 208023603 U CN208023603 U CN 208023603U CN 201721508721 U CN201721508721 U CN 201721508721U CN 208023603 U CN208023603 U CN 208023603U
Authority
CN
China
Prior art keywords
cast
situ bored
bored pile
cutting
retaining wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721508721.9U
Other languages
Chinese (zh)
Inventor
叶世斌
陈伟志
冉令
雷洋
葛学军
孙晓
贾坤
龚建辉
吴沛沛
李井元
庄颖茜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Eryuan Engineering Group Co Ltd CREEC
Original Assignee
China Railway Eryuan Engineering Group Co Ltd CREEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Eryuan Engineering Group Co Ltd CREEC filed Critical China Railway Eryuan Engineering Group Co Ltd CREEC
Priority to CN201721508721.9U priority Critical patent/CN208023603U/en
Application granted granted Critical
Publication of CN208023603U publication Critical patent/CN208023603U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

A kind of bar planting barricade construction of cutting cast-in-situ bored pile cooperates with supporting and retaining system with the limitation and cast-in-situ bored pile and retaining wall that solve the problems, such as artificial digging pile.Gravity retaining wall is set by line side in the longitudinally spaced setting cast-in-situ bored pile in cutting closing slope side, and in cast-in-situ bored pile, cast-in-situ bored pile, gravity retaining wall are integrated by connecting bar connecting.

Description

A kind of bar planting barricade construction of cutting cast-in-situ bored pile
Technical field
The utility model is related to geotechnical engineering retaining structure technical fields, more particularly to the bar planting gear of cutting cast-in-situ bored pile Wall construction.
Technical background
Railway, the common closing slope retaining structure in highway cutting location include Gravity Retaining Wall, pile plate wall, retaining wall between piles Deng artificial digging pile of these retaining structures frequently with rectangular section.However, for stratum of loosening the soil such as severe cold region, sandy soils Execution conditions, artificial digging pile should not use, and should use mechanized construction as far as possible;Cast-in-situ bored pile has mechanized construction Condition can preferably solve above-mentioned problem.But when cast-in-situ bored pile is applied to railway, highway cutting location supporting and retaining system, cast-in-situ bored pile With the solution for cooperateing with supporting and retaining system problem not effective and reasonable of retaining wall.
Therefore, in view of the above problems, a kind of bar planting barricade construction of cutting cast-in-situ bored pile is proposed, to solve people The limitation of work caisson and cast-in-situ bored pile cooperate with supporting and retaining system problem with retaining wall.
Utility model content
The technical problem to be solved by the utility model is to provide a kind of bar planting barricade of cutting cast-in-situ bored pile construction, with The limitation and cast-in-situ bored pile and retaining wall for solving the problems, such as artificial digging pile cooperate with supporting and retaining system.
It is as follows that the utility model solves the technical solution that above-mentioned technical problem is taken:
A kind of bar planting barricade of cutting cast-in-situ bored pile of the utility model constructs, it is characterized in that:In cutting closing slope side Longitudinally spaced setting cast-in-situ bored pile, and gravity retaining wall, cast-in-situ bored pile, again are set by line side in cast-in-situ bored pile Power formula retaining wall is integrated by connecting bar connecting.
The utility model has the beneficial effects that can effectively solve artificial digging pile there are the drawbacks of and cast-in-situ bored pile and gear The collaboration supporting and retaining system problem of cob wall, the mechanized construction on stratum of loosening the soil suitable for severe cold region, sandy soils etc.;With it is simple in structure, It is easy for construction, construction efficiency is high, reduce casualties, investment reduction, it is upright beautiful the features such as, be difficult to carry out in artificial digging pile Area have broad prospect of application.
Description of the drawings
This specification includes following two width attached drawing:
The cross-sectional view of the bar planting barricade construction of Fig. 1 the utility model cutting cast-in-situ bored piles;
The plan view of the bar planting barricade construction of Fig. 2 the utility model cutting cast-in-situ bored piles.
Component, toponym and corresponding label are shown in figure:Cast-in-situ bored pile 1, gravity retaining wall 2 connect steel Muscle 3, cutting D.
Specific implementation mode
The utility model is further illustrated below by specific embodiment and in conjunction with attached drawing.
Referring to Fig.1, a kind of bar planting barricade construction of cutting cast-in-situ bored pile of the utility model is in cutting D closing slopes side Longitudinally spaced setting cast-in-situ bored pile 1, and gravity retaining wall 2, cast-in-situ bored pile are set by line side in cast-in-situ bored pile 1 1, gravity retaining wall 2 is connected as one by connecting reinforcing bar 3, so that stake is formed overall structure with retaining wall and is resisted jointly above side To soil pressure.
Referring to Fig.1, the transfer mode of cutting D side slopes soil lateral pressure includes that cantilever transmits, anchor is drawn plus cantilever transmits, dead weight It resists.Cantilever transmission refers to that the part soil pressure of cutting D closing slopes side is transferred to deep foundation base by cast-in-situ bored pile 1.Anchor, which is drawn, to be added Cantilever transmission refers to that the part soil pressure of cutting D closing slopes side first acts on gravity retaining wall 2, then the anchor by connecting reinforcing bar 3 Drawing effect is transferred to cast-in-situ bored pile 1 and is transferred to deep foundation base.It refers to that gravity retaining wall 2 relies on its own gravity that dead weight, which is resisted, Undertake part soil pressure.On the other hand, gravity retaining wall 2 can also provide a part of drag to cast-in-situ bored pile 1.
The utility model by abovementioned technology efficiently solve artificial digging pile there are the drawbacks of and cast-in-situ bored pile Supporting and retaining system problem is cooperateed with retaining wall, the mechanized construction on stratum of loosening the soil suitable for severe cold region, sandy soils etc..
With reference to Fig. 2, the connection reinforcing bar 3 is arranged along 1 vertical equidistant interval of cast-in-situ bored pile, is put into cast-in-situ bored pile 1 It is squeezed into when steel reinforcement cage.
The above is only using the bar planting barricade construction for illustrating a kind of cutting cast-in-situ bored pile of the utility model Some principles are not intended to the utility model being confined in shown and described concrete structure and the scope of application, therefore every institute It is possible that the corresponding modification being utilized and equivalent, belong to the apllied the scope of the claims of the utility model.

Claims (2)

1. a kind of bar planting barricade of cutting cast-in-situ bored pile constructs, it is characterized in that:It sets cutting (D) closing slope side is longitudinally spaced Set cast-in-situ bored pile (1), and in cast-in-situ bored pile (1) by line side setting gravity retaining wall (2), cast-in-situ bored pile (1), again Power formula retaining wall (2) is connected as one by connecting reinforcing bar (3).
2. a kind of bar planting barricade construction of cutting cast-in-situ bored pile as described in claim 1, it is characterized in that:The connection reinforcing bar (3) it along the vertical equidistant interval setting of cast-in-situ bored pile (1), is squeezed into when cast-in-situ bored pile (1) is put into steel reinforcement cage.
CN201721508721.9U 2017-11-13 2017-11-13 A kind of bar planting barricade construction of cutting cast-in-situ bored pile Active CN208023603U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721508721.9U CN208023603U (en) 2017-11-13 2017-11-13 A kind of bar planting barricade construction of cutting cast-in-situ bored pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721508721.9U CN208023603U (en) 2017-11-13 2017-11-13 A kind of bar planting barricade construction of cutting cast-in-situ bored pile

Publications (1)

Publication Number Publication Date
CN208023603U true CN208023603U (en) 2018-10-30

Family

ID=63897923

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721508721.9U Active CN208023603U (en) 2017-11-13 2017-11-13 A kind of bar planting barricade construction of cutting cast-in-situ bored pile

Country Status (1)

Country Link
CN (1) CN208023603U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114396071A (en) * 2022-01-14 2022-04-26 中铁二院工程集团有限责任公司 Soil retaining assembly and connecting and bar planting anchoring method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114396071A (en) * 2022-01-14 2022-04-26 中铁二院工程集团有限责任公司 Soil retaining assembly and connecting and bar planting anchoring method thereof

Similar Documents

Publication Publication Date Title
CN202466620U (en) Reinforced concrete buttress retaining wall
CN208633136U (en) Novel fabricated Screw Anchor composite foundation
CN202323962U (en) Composite supporting structure of drainage pipe pile and soil nailing wall
CN204898672U (en) Discard device of pulling out of pile foundation
CN208023603U (en) A kind of bar planting barricade construction of cutting cast-in-situ bored pile
CN202031104U (en) Composite pile
CN200964585Y (en) All-bushing perfusion stake bitten cement earth stake
CN201581394U (en) Large pile toe grout-injection precast pile
CN109537588A (en) A kind of novel practical anchor pile
CN203768914U (en) Foundation pit bracing diagonal support pile structure
CN203284795U (en) Buttressed retaining wall with anchor board
CN209066456U (en) Squeeze into the superpower concrete tubular pile breast wall type packaged combination anti-slide pile structure of prestressing force
CN202492856U (en) Reinforced concrete pile type buttress retaining wall
CN204456182U (en) Vertical anchorage pile retaining wall
CN204023580U (en) The double steel sheet piling pit supporting construction of a kind of inclination assembling
CN203361182U (en) Unequal-length bottom-expanded rock anchor pile of power transmission pole tower
CN203684222U (en) Pile-anchor combined supporting structure with rotary jet enlarging head pre-stressed anchor rods
CN202672161U (en) Cement-soil mixing drum sheet-pile united slope structure with soil nails
CN202369993U (en) Oppositely pulled type filling pile base pit supporting structure
CN201162229Y (en) Anti-floating pit structure
CN214301763U (en) Green supporting construction that interim excavation supporting and permanent side slope support combined together
CN204959793U (en) Soil layer stake board counterfort combination formula retaining wall
CN210395244U (en) Ecological bank protection of environment-friendly dyke
CN203160258U (en) Digging pile soil nail type retaining wall structure
CN208830300U (en) A kind of ruggedized construction for passive zone of pit weak soil

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant