CN208010037U - The special integral fastening system of pneumatic membrane building - Google Patents

The special integral fastening system of pneumatic membrane building Download PDF

Info

Publication number
CN208010037U
CN208010037U CN201820342962.9U CN201820342962U CN208010037U CN 208010037 U CN208010037 U CN 208010037U CN 201820342962 U CN201820342962 U CN 201820342962U CN 208010037 U CN208010037 U CN 208010037U
Authority
CN
China
Prior art keywords
membrane
maxilla
mandibular
card slot
fastening system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820342962.9U
Other languages
Chinese (zh)
Inventor
焦亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201820342962.9U priority Critical patent/CN208010037U/en
Application granted granted Critical
Publication of CN208010037U publication Critical patent/CN208010037U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a kind of special integral fastening system of pneumatic membrane building, including collar tie beam basis, body of maxilla, mandibular body, membrane body, bolt, reinforcement backing plate, body of maxilla and mandibular body are bonded together, and centre is formed with mandibular body engagement card slot and membrane body fixed card slot;Bolt passes through body of maxilla and mandibular body, is fixed on the basis of collar tie beam, the upper end of bolt is provided with the reinforcement backing plate for being close to body of maxilla;Membrane body passes through membrane body fixed card slot, and membrane body is fixed in the end of membrane body with fake or rubber bar edge sealing.The mechanism can be anchored on the lateral surface on collar tie beam basis, it can also be anchored in collar tie beam basic plane, keep the anchor system of air film building structure more reasonable, keep the civil construction of pneumatic membrane building more convenient, the all extraordinary solution of the problem of anchor system infiltration and dust accumulation, membrane body service life also greatly prolong, and need not punch on the position of membrane material sealing, the integral strength of membrane body is considerably increased, the overall security of pneumatic membrane building greatly improves.

Description

The special integral fastening system of pneumatic membrane building
Technical field
The utility model is related to a kind of pneumatic membrane building devices, more particularly, to a kind of special integral fastening system of pneumatic membrane building System is the hermetically sealed anchor system with body of maxilla and mandibular body.
Background technology
Pneumatic membrane building anchorage part is always the place to denounce by owner, and anchoring piece is influenced by native Construction Quality, And unsafe condition can not be installed or be installed to the anchoring piece occurred;Can also leak, infiltration frequent occurrence, bottom membrane material when anchoring The case where tearing, uncompacted situation that connect with collar tie beam that in addition plane anchoring generates also are very difficult to solve.This invention Occur solving problem above very well.
Utility model content
The utility model provides a kind of special integral fastening system of pneumatic membrane building, solves problems described above, skill Art scheme is as described below:
A kind of special integral fastening system of pneumatic membrane building, including collar tie beam basis, body of maxilla, mandibular body, membrane body, bolt, plus Strong backing plate, body of maxilla and mandibular body are bonded together, and centre is formed with mandibular body engagement card slot and membrane body fixed card slot;Bolt It across body of maxilla and mandibular body, is fixed on the basis of collar tie beam, the upper end of bolt is provided with the reinforcement backing plate for being close to body of maxilla;Membrane body Across membrane body fixed card slot, membrane body is fixed in the end of membrane body with fake or rubber bar edge sealing.
Body of maxilla is provided with recess portion, and mandibular body is provided with protrusion, and recess portion and protrusion are oppositely arranged, and mandibular body engages in formation Card slot.
Body of maxilla and mandibular body are bonded together by trip bolt.
Mandibular body is provided with slot, the film side serving for placing membrane body.
The body of maxilla and mandibular body are using the zinc-plated steel tank component or aluminum alloy trough component Jing Guo preservative treatment.
The contact site of membrane body fixed card slot and membrane body is padded using soft body, and soft body uses high-density sponge or rubber Glue gasket.
The special integral fastening system of pneumatic membrane building described in the utility model changes previous pre-embedded bolt can not with standard component Very well the problem of installation, paperback can be used and side is filled with and the form of angle mount, keep original air film building structure more reasonable, this The problem of device makes the safety of the installation position of pneumatic membrane building greatly improve, anchor system infiltration and dust accumulation all extraordinary solution Certainly, the membrane body service life also substantially prolongs, and need not punch on the position of membrane material sealing, considerably increases the entirety of membrane body The overall security of intensity, pneumatic membrane building greatly improves.
Description of the drawings
Fig. 1 is the structural schematic diagram of the special integral fastening system of the pneumatic membrane building.
Specific implementation mode
The special integral fastening system of pneumatic membrane building provided by the utility model, as shown in Figure 1, including collar tie beam basis 8, the upper jaw Body 1, rubber pad 6, membrane body 5, bolt 9, reinforces backing plate 12, mandibular body 2 and the standard component body that body of maxilla 1 is the whole series at mandibular body 2, Body of maxilla 1 and mandibular body 2 are bonded together by trip bolt 10, and centre is formed with mandibular body engagement card slot 3 and membrane body is solid Determine card slot 4.Body of maxilla 1 is provided with recess portion, and mandibular body 2 is provided with protrusion, and recess portion and protrusion are oppositely arranged, and mandibular body connects in formation Close card slot 3.Mandibular body 2 is provided with slot, the film side serving 7 for placing membrane body 5.Slot can reinforce bond strength and be also possible to prevent Water inlet and gas leakage, the body of maxilla being arranged with the top of 5 contact site of membrane body, for making anchoring piece fix safer jail with membrane body Gu.
The lower section of body of maxilla 1 and mandibular body 2 is collar tie beam basis 8, and the bolt 9 can be individually fixed on collar tie beam basis 8, It can also be fixed on collar tie beam basis 8 in conjunction with mandibular body 2.The bolt 9 passes through body of maxilla 1 and mandibular body 2, is fixed on collar tie beam base On plinth 8, upper end, which is provided with, reinforces backing plate 12, and is fastened using nut, and reinforcement backing plate 12 is made to be tightly attached to the top of body of maxilla 1.
The membrane body 5 divides for outer membrane and inner membrance, and the inner membrance is arranged as required to, and the end of the membrane body 5 is to restrict Then circle or rubber bar edge sealing form film side serving 7.
Corrode in order to prevent, the body of maxilla 1, mandibular body 2 of the utility model use the zinc-plated steel tank structure Jing Guo preservative treatment Part, or aluminum alloy trough component.
On the membrane body fixed card slot 4 that body of maxilla 1 and mandibular body 2 are formed, membrane body 5 passes through membrane body fixed card slot 4, under arrival The contact site of the slot that jaw body 2 is arranged, the membrane body 5 and membrane body fixed card slot 4 is served as a contrast using high-density sponge or rubber sheet gasket 6 Pad prevents from making film 5 impaired when fastening.Play closed and safety protection, effectively preventing pneumatic membrane building anchoring piece gas leakage and The problem of leak.
It is padded using rubber pad in the present embodiment, including upper rubber pad and lower rubber pad, upper rubber pad are provided with lug, It is fixed on body of maxilla 1 by lug;Lower rubber pad is also equipped with lug, is fixed on mandibular body 2 by lug.
After the fastening of bolt 9, the rubber bar of the end of membrane body 5 is compressed in slot, and such membrane body 5 is without works such as punchings Industry, membrane body 5 and anchoring piece cooperation are solid and safe, to fix membrane body.
Lateral surface and plane of the bolt 9 on collar tie beam basis 8 can be carried out anchoring, and the bolt 9 and mandibular body 2 can It is pre-buried in advance into inside collar tie beam basis 8.
The utility model has the following advantages:On the one hand civil construction can in advance by anchor bolt and mandibular body integral built-in into In strip footing, facilitates construction, anchoring piece is made not influenced by civil construction.Pass through anchoring when rainwater outflows on another aspect membrane body It is expelled directly out in the gap of system, remains the dry condition of membrane material component in anchorage part, for being most afraid of damp and hot membrane body For, this anchor system greatly extends the service life of membrane material;In addition, membrane body done with anchoring piece contact portion it is extraordinary Protection, keeps membrane body safer, and the event that not will produce damage membrane body occurs:Third, when anchoring, avoid previous anchorage style and exist The drawbacks of membrane body bottom edge drills, remains the integrality of pneumatic membrane building membrane body, will not reduce the whole tensile strength of membrane body.Institute There is the anchoring piece of anchor system all to do zinc-plated Deng preservative treatments, substantially improves pneumatic membrane building space and safety.
Exterior wall side, which had both may be used, in the utility model, which carries out anchoring, can also use plane or side to anchor, very flexibly Convenient, and carry out not on membrane body the operation such as punching, the bulk life time of membrane body greatly prolongs, and the tensile strength of membrane body will not be by It influences.The problem of side anchoring effectively avoids pneumatic membrane building dust stratification and roof leaking, oozes rain occurs.

Claims (6)

1. a kind of special integral fastening system of pneumatic membrane building, it is characterised in that:Including collar tie beam basis, body of maxilla, mandibular body, film Body, reinforces backing plate at bolt, and body of maxilla and mandibular body are bonded together, and centre is formed with mandibular body engagement card slot and membrane body is solid Determine card slot;Bolt passes through body of maxilla and mandibular body, is fixed on the basis of collar tie beam, and the upper end of bolt, which is provided with, is close to adding for body of maxilla Strong backing plate;Membrane body passes through membrane body fixed card slot, and membrane body is fixed in the end of membrane body with fake or rubber bar edge sealing.
2. the special integral fastening system of pneumatic membrane building according to claim 1, it is characterised in that:Body of maxilla is provided with recessed Portion, mandibular body are provided with protrusion, and recess portion and protrusion are oppositely arranged, and mandibular body engages card slot in formation.
3. the special integral fastening system of pneumatic membrane building according to claim 1, it is characterised in that:Body of maxilla and mandibular body are logical Cross fastening screw engagement together.
4. the special integral fastening system of pneumatic membrane building according to claim 1, it is characterised in that:Mandibular body is provided with slot, Film side serving for placing membrane body.
5. the special integral fastening system of pneumatic membrane building according to claim 1, it is characterised in that:The body of maxilla and lower jaw Body is using the zinc-plated steel tank component or aluminum alloy trough component Jing Guo preservative treatment.
6. the special integral fastening system of pneumatic membrane building according to claim 1, it is characterised in that:Membrane body fixed card slot and film The contact site of body is padded using soft body, and soft body uses high-density sponge or rubber sheet gasket.
CN201820342962.9U 2018-03-13 2018-03-13 The special integral fastening system of pneumatic membrane building Expired - Fee Related CN208010037U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820342962.9U CN208010037U (en) 2018-03-13 2018-03-13 The special integral fastening system of pneumatic membrane building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820342962.9U CN208010037U (en) 2018-03-13 2018-03-13 The special integral fastening system of pneumatic membrane building

Publications (1)

Publication Number Publication Date
CN208010037U true CN208010037U (en) 2018-10-26

Family

ID=63887712

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820342962.9U Expired - Fee Related CN208010037U (en) 2018-03-13 2018-03-13 The special integral fastening system of pneumatic membrane building

Country Status (1)

Country Link
CN (1) CN208010037U (en)

Similar Documents

Publication Publication Date Title
CN202298564U (en) Anti-seismic and water-stopping structure for concrete face rock-fill dam
CN210263442U (en) Deformation joint leakage repair structure
CN205975389U (en) Reinforcing structure for road and bridge crack
CN211006777U (en) Basement prevention of seepage structure
CN203684167U (en) Concrete joint waterstop device
CN208010037U (en) The special integral fastening system of pneumatic membrane building
CN207003685U (en) A kind of connecting node of Side fascia and floor
CN205296993U (en) Special side direction anchor system of air film building
CN210977065U (en) Antiseep door and window mounting structure
CN209958531U (en) Deformation joint leakage repairing structure
JP4582585B2 (en) Fasteners for joint members
CN204919483U (en) Power station seam stagnant water structure
CN210530849U (en) Sealing device for station structure wall and shield tunnel portal
CN203361484U (en) Deformable joint structure of concrete roof and metal plate roof
CN203755469U (en) Waterproof concrete wall combined water stopping system
CN209195487U (en) Shield service channel protects gate-type device
CN220504195U (en) Post-pouring strip advanced sealing structure
CN206721667U (en) A kind of bridge expanssion joint waterstop
CN220100229U (en) Post-pouring belt ponding prevention structure
CN206034708U (en) Side fascia installation node
CN103352517B (en) The deformable connected structure of concrete roof and sheet-metal roofing
CN209369415U (en) A kind of swimming pool waterproof roll closing in construction
CN110230326A (en) A kind of underground connecting pipeline structure waterproofing of movement joints construction
CN107034928A (en) A kind of advanced water-stopping isolation structure of later poured band for basement
CN206468189U (en) A kind of joint filling adhesive tape special of door and window aluminium alloy decorative cover

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181026

CF01 Termination of patent right due to non-payment of annual fee