CN208010037U - The special integral fastening system of pneumatic membrane building - Google Patents
The special integral fastening system of pneumatic membrane building Download PDFInfo
- Publication number
- CN208010037U CN208010037U CN201820342962.9U CN201820342962U CN208010037U CN 208010037 U CN208010037 U CN 208010037U CN 201820342962 U CN201820342962 U CN 201820342962U CN 208010037 U CN208010037 U CN 208010037U
- Authority
- CN
- China
- Prior art keywords
- membrane
- maxilla
- mandibular
- card slot
- fastening system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model provides a kind of special integral fastening system of pneumatic membrane building, including collar tie beam basis, body of maxilla, mandibular body, membrane body, bolt, reinforcement backing plate, body of maxilla and mandibular body are bonded together, and centre is formed with mandibular body engagement card slot and membrane body fixed card slot;Bolt passes through body of maxilla and mandibular body, is fixed on the basis of collar tie beam, the upper end of bolt is provided with the reinforcement backing plate for being close to body of maxilla;Membrane body passes through membrane body fixed card slot, and membrane body is fixed in the end of membrane body with fake or rubber bar edge sealing.The mechanism can be anchored on the lateral surface on collar tie beam basis, it can also be anchored in collar tie beam basic plane, keep the anchor system of air film building structure more reasonable, keep the civil construction of pneumatic membrane building more convenient, the all extraordinary solution of the problem of anchor system infiltration and dust accumulation, membrane body service life also greatly prolong, and need not punch on the position of membrane material sealing, the integral strength of membrane body is considerably increased, the overall security of pneumatic membrane building greatly improves.
Description
Technical field
The utility model is related to a kind of pneumatic membrane building devices, more particularly, to a kind of special integral fastening system of pneumatic membrane building
System is the hermetically sealed anchor system with body of maxilla and mandibular body.
Background technology
Pneumatic membrane building anchorage part is always the place to denounce by owner, and anchoring piece is influenced by native Construction Quality,
And unsafe condition can not be installed or be installed to the anchoring piece occurred;Can also leak, infiltration frequent occurrence, bottom membrane material when anchoring
The case where tearing, uncompacted situation that connect with collar tie beam that in addition plane anchoring generates also are very difficult to solve.This invention
Occur solving problem above very well.
Utility model content
The utility model provides a kind of special integral fastening system of pneumatic membrane building, solves problems described above, skill
Art scheme is as described below:
A kind of special integral fastening system of pneumatic membrane building, including collar tie beam basis, body of maxilla, mandibular body, membrane body, bolt, plus
Strong backing plate, body of maxilla and mandibular body are bonded together, and centre is formed with mandibular body engagement card slot and membrane body fixed card slot;Bolt
It across body of maxilla and mandibular body, is fixed on the basis of collar tie beam, the upper end of bolt is provided with the reinforcement backing plate for being close to body of maxilla;Membrane body
Across membrane body fixed card slot, membrane body is fixed in the end of membrane body with fake or rubber bar edge sealing.
Body of maxilla is provided with recess portion, and mandibular body is provided with protrusion, and recess portion and protrusion are oppositely arranged, and mandibular body engages in formation
Card slot.
Body of maxilla and mandibular body are bonded together by trip bolt.
Mandibular body is provided with slot, the film side serving for placing membrane body.
The body of maxilla and mandibular body are using the zinc-plated steel tank component or aluminum alloy trough component Jing Guo preservative treatment.
The contact site of membrane body fixed card slot and membrane body is padded using soft body, and soft body uses high-density sponge or rubber
Glue gasket.
The special integral fastening system of pneumatic membrane building described in the utility model changes previous pre-embedded bolt can not with standard component
Very well the problem of installation, paperback can be used and side is filled with and the form of angle mount, keep original air film building structure more reasonable, this
The problem of device makes the safety of the installation position of pneumatic membrane building greatly improve, anchor system infiltration and dust accumulation all extraordinary solution
Certainly, the membrane body service life also substantially prolongs, and need not punch on the position of membrane material sealing, considerably increases the entirety of membrane body
The overall security of intensity, pneumatic membrane building greatly improves.
Description of the drawings
Fig. 1 is the structural schematic diagram of the special integral fastening system of the pneumatic membrane building.
Specific implementation mode
The special integral fastening system of pneumatic membrane building provided by the utility model, as shown in Figure 1, including collar tie beam basis 8, the upper jaw
Body 1, rubber pad 6, membrane body 5, bolt 9, reinforces backing plate 12, mandibular body 2 and the standard component body that body of maxilla 1 is the whole series at mandibular body 2,
Body of maxilla 1 and mandibular body 2 are bonded together by trip bolt 10, and centre is formed with mandibular body engagement card slot 3 and membrane body is solid
Determine card slot 4.Body of maxilla 1 is provided with recess portion, and mandibular body 2 is provided with protrusion, and recess portion and protrusion are oppositely arranged, and mandibular body connects in formation
Close card slot 3.Mandibular body 2 is provided with slot, the film side serving 7 for placing membrane body 5.Slot can reinforce bond strength and be also possible to prevent
Water inlet and gas leakage, the body of maxilla being arranged with the top of 5 contact site of membrane body, for making anchoring piece fix safer jail with membrane body
Gu.
The lower section of body of maxilla 1 and mandibular body 2 is collar tie beam basis 8, and the bolt 9 can be individually fixed on collar tie beam basis 8,
It can also be fixed on collar tie beam basis 8 in conjunction with mandibular body 2.The bolt 9 passes through body of maxilla 1 and mandibular body 2, is fixed on collar tie beam base
On plinth 8, upper end, which is provided with, reinforces backing plate 12, and is fastened using nut, and reinforcement backing plate 12 is made to be tightly attached to the top of body of maxilla 1.
The membrane body 5 divides for outer membrane and inner membrance, and the inner membrance is arranged as required to, and the end of the membrane body 5 is to restrict
Then circle or rubber bar edge sealing form film side serving 7.
Corrode in order to prevent, the body of maxilla 1, mandibular body 2 of the utility model use the zinc-plated steel tank structure Jing Guo preservative treatment
Part, or aluminum alloy trough component.
On the membrane body fixed card slot 4 that body of maxilla 1 and mandibular body 2 are formed, membrane body 5 passes through membrane body fixed card slot 4, under arrival
The contact site of the slot that jaw body 2 is arranged, the membrane body 5 and membrane body fixed card slot 4 is served as a contrast using high-density sponge or rubber sheet gasket 6
Pad prevents from making film 5 impaired when fastening.Play closed and safety protection, effectively preventing pneumatic membrane building anchoring piece gas leakage and
The problem of leak.
It is padded using rubber pad in the present embodiment, including upper rubber pad and lower rubber pad, upper rubber pad are provided with lug,
It is fixed on body of maxilla 1 by lug;Lower rubber pad is also equipped with lug, is fixed on mandibular body 2 by lug.
After the fastening of bolt 9, the rubber bar of the end of membrane body 5 is compressed in slot, and such membrane body 5 is without works such as punchings
Industry, membrane body 5 and anchoring piece cooperation are solid and safe, to fix membrane body.
Lateral surface and plane of the bolt 9 on collar tie beam basis 8 can be carried out anchoring, and the bolt 9 and mandibular body 2 can
It is pre-buried in advance into inside collar tie beam basis 8.
The utility model has the following advantages:On the one hand civil construction can in advance by anchor bolt and mandibular body integral built-in into
In strip footing, facilitates construction, anchoring piece is made not influenced by civil construction.Pass through anchoring when rainwater outflows on another aspect membrane body
It is expelled directly out in the gap of system, remains the dry condition of membrane material component in anchorage part, for being most afraid of damp and hot membrane body
For, this anchor system greatly extends the service life of membrane material;In addition, membrane body done with anchoring piece contact portion it is extraordinary
Protection, keeps membrane body safer, and the event that not will produce damage membrane body occurs:Third, when anchoring, avoid previous anchorage style and exist
The drawbacks of membrane body bottom edge drills, remains the integrality of pneumatic membrane building membrane body, will not reduce the whole tensile strength of membrane body.Institute
There is the anchoring piece of anchor system all to do zinc-plated Deng preservative treatments, substantially improves pneumatic membrane building space and safety.
Exterior wall side, which had both may be used, in the utility model, which carries out anchoring, can also use plane or side to anchor, very flexibly
Convenient, and carry out not on membrane body the operation such as punching, the bulk life time of membrane body greatly prolongs, and the tensile strength of membrane body will not be by
It influences.The problem of side anchoring effectively avoids pneumatic membrane building dust stratification and roof leaking, oozes rain occurs.
Claims (6)
1. a kind of special integral fastening system of pneumatic membrane building, it is characterised in that:Including collar tie beam basis, body of maxilla, mandibular body, film
Body, reinforces backing plate at bolt, and body of maxilla and mandibular body are bonded together, and centre is formed with mandibular body engagement card slot and membrane body is solid
Determine card slot;Bolt passes through body of maxilla and mandibular body, is fixed on the basis of collar tie beam, and the upper end of bolt, which is provided with, is close to adding for body of maxilla
Strong backing plate;Membrane body passes through membrane body fixed card slot, and membrane body is fixed in the end of membrane body with fake or rubber bar edge sealing.
2. the special integral fastening system of pneumatic membrane building according to claim 1, it is characterised in that:Body of maxilla is provided with recessed
Portion, mandibular body are provided with protrusion, and recess portion and protrusion are oppositely arranged, and mandibular body engages card slot in formation.
3. the special integral fastening system of pneumatic membrane building according to claim 1, it is characterised in that:Body of maxilla and mandibular body are logical
Cross fastening screw engagement together.
4. the special integral fastening system of pneumatic membrane building according to claim 1, it is characterised in that:Mandibular body is provided with slot,
Film side serving for placing membrane body.
5. the special integral fastening system of pneumatic membrane building according to claim 1, it is characterised in that:The body of maxilla and lower jaw
Body is using the zinc-plated steel tank component or aluminum alloy trough component Jing Guo preservative treatment.
6. the special integral fastening system of pneumatic membrane building according to claim 1, it is characterised in that:Membrane body fixed card slot and film
The contact site of body is padded using soft body, and soft body uses high-density sponge or rubber sheet gasket.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820342962.9U CN208010037U (en) | 2018-03-13 | 2018-03-13 | The special integral fastening system of pneumatic membrane building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820342962.9U CN208010037U (en) | 2018-03-13 | 2018-03-13 | The special integral fastening system of pneumatic membrane building |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208010037U true CN208010037U (en) | 2018-10-26 |
Family
ID=63887712
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820342962.9U Expired - Fee Related CN208010037U (en) | 2018-03-13 | 2018-03-13 | The special integral fastening system of pneumatic membrane building |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208010037U (en) |
-
2018
- 2018-03-13 CN CN201820342962.9U patent/CN208010037U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202298564U (en) | Anti-seismic and water-stopping structure for concrete face rock-fill dam | |
CN210263442U (en) | Deformation joint leakage repair structure | |
CN205975389U (en) | Reinforcing structure for road and bridge crack | |
CN211006777U (en) | Basement prevention of seepage structure | |
CN203684167U (en) | Concrete joint waterstop device | |
CN208010037U (en) | The special integral fastening system of pneumatic membrane building | |
CN207003685U (en) | A kind of connecting node of Side fascia and floor | |
CN205296993U (en) | Special side direction anchor system of air film building | |
CN210977065U (en) | Antiseep door and window mounting structure | |
CN209958531U (en) | Deformation joint leakage repairing structure | |
JP4582585B2 (en) | Fasteners for joint members | |
CN204919483U (en) | Power station seam stagnant water structure | |
CN210530849U (en) | Sealing device for station structure wall and shield tunnel portal | |
CN203361484U (en) | Deformable joint structure of concrete roof and metal plate roof | |
CN203755469U (en) | Waterproof concrete wall combined water stopping system | |
CN209195487U (en) | Shield service channel protects gate-type device | |
CN220504195U (en) | Post-pouring strip advanced sealing structure | |
CN206721667U (en) | A kind of bridge expanssion joint waterstop | |
CN220100229U (en) | Post-pouring belt ponding prevention structure | |
CN206034708U (en) | Side fascia installation node | |
CN103352517B (en) | The deformable connected structure of concrete roof and sheet-metal roofing | |
CN209369415U (en) | A kind of swimming pool waterproof roll closing in construction | |
CN110230326A (en) | A kind of underground connecting pipeline structure waterproofing of movement joints construction | |
CN107034928A (en) | A kind of advanced water-stopping isolation structure of later poured band for basement | |
CN206468189U (en) | A kind of joint filling adhesive tape special of door and window aluminium alloy decorative cover |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181026 |
|
CF01 | Termination of patent right due to non-payment of annual fee |