CN208005076U - Sledge fills Separated explosion-proof equipment inner canister skeleton welding auxiliary equipment - Google Patents

Sledge fills Separated explosion-proof equipment inner canister skeleton welding auxiliary equipment Download PDF

Info

Publication number
CN208005076U
CN208005076U CN201820347273.7U CN201820347273U CN208005076U CN 208005076 U CN208005076 U CN 208005076U CN 201820347273 U CN201820347273 U CN 201820347273U CN 208005076 U CN208005076 U CN 208005076U
Authority
CN
China
Prior art keywords
fixedly connected
plate
spring
telescopic rod
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820347273.7U
Other languages
Chinese (zh)
Inventor
邹彬彬
崔宏雅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liaoning Yitong Intelligent Equipment Manufacturing Co ltd
Original Assignee
Liaoning Yitong Petrochemical Equipment Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Liaoning Yitong Petrochemical Equipment Manufacturing Co Ltd filed Critical Liaoning Yitong Petrochemical Equipment Manufacturing Co Ltd
Priority to CN201820347273.7U priority Critical patent/CN208005076U/en
Application granted granted Critical
Publication of CN208005076U publication Critical patent/CN208005076U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Arc Welding In General (AREA)

Abstract

The utility model discloses sledges to fill Separated explosion-proof equipment inner canister skeleton welding auxiliary equipment, including bottom plate, the four corners of the bottom plate lower surface have been fixedly connected with pillar, the upper surface of the bottom plate is fixedly connected with the first fixed plate, the front of first fixed plate offers the first sliding groove, the right side opening of the plate upper surface is equipped with groove, and the left side and right side of the groove inner wall are fixedly connected with the left end of slide bar and right end respectively.The sledge fills Separated explosion-proof equipment inner canister skeleton welding auxiliary equipment, first clamping plate is pulled by worker to the right so that first clamping plate clamps sealing plate, worker pulls second clamping plate so that second clamping plate clamps keel, after the completion of keel welding, pull handle reduces labour required when welding, saves welding cost so that movable plate moves right required position worker to the right, simultaneously in such a way that moving active plate continues to weld keel and gusset, to more convenient and safe.

Description

Sledge fills Separated explosion-proof equipment inner canister skeleton welding auxiliary equipment
Technical field
The utility model is related to industrial production technology fields, specially sledge dress Separated explosion-proof equipment inner canister skeleton welding auxiliary Equipment.
Background technology
Sledge dress refers to that functional unit is integrated on a unsplit bedplate, can be with the integrated side of one kind of integral installation, movement Formula.So-called skid can be easily carried out by the movement of equipment, in place using crowbar, although all using lifting equipment now , it is the main body frame that sledge fills Separated explosion-proof equipment that sledge, which fills the skeleton in Separated explosion-proof equipment inner canister,.
Traditional inner canister skeleton processing method is first to do inner canister crust and then docked and welded, and entire addition process is numerous Trivial, conventional method is sling by overhead traveling crane when welding is then docked, and sling skeleton again to skeleton carry out welding exist it is certain Security risk, while the welding of traditional skeleton needs several worker's common operationals, to increase the cost of skeleton welding, makes At the waste of labour.
Utility model content
(One)The technical issues of solution
In view of the deficiencies of the prior art, it is auxiliary to provide a kind of sledge dress Separated explosion-proof equipment inner canister skeleton welding for the utility model Equipment is helped, it is first to do inner canister crust and then docked and welded to solve traditional inner canister skeleton processing method, entire addition Process is cumbersome, and conventional method is sling by overhead traveling crane when welding is then docked, and slings skeleton and carry out welding to skeleton again and deposit In some potential safety problems, while traditional skeleton welding needs several worker's common operationals, to increase skeleton welding Cost causes the waste of labour.The problem of.
(Two)Technical solution
To achieve the above object, the utility model provides the following technical solutions:A kind of sledge dress Separated explosion-proof equipment inner canister bone The four corners of frame welding auxiliary equipment, including bottom plate, the bottom plate lower surface have been fixedly connected with pillar, the upper table of the bottom plate Face is fixedly connected with the first fixed plate, and the front of first fixed plate offers the first sliding groove, the right side of the plate upper surface Side opens up fluted, and the left side and right side of the groove inner wall are fixedly connected with the left end of slide bar and right end respectively, described The right side of first fixed plate is overlapped with sealing plate, and the right side of the sealing plate is fixedly connected with gusset, the right side of the gusset It is fixedly connected with keel, the right side of the keel and the left side of movable plate overlap, and the front of the movable plate offers the The front of two sliding slots, the movable plate is fixedly connected with connecting plate, and the left side of the connecting plate is fixedly connected with the second clamping The left end of device, the second clamping device is fixedly connected with the second threaded post, and the inner thread of second threaded post is connected with The outer surface of two thread caps, second thread cap is connected with second clamping plate, and the right side of the second clamping plate is overlapped on keel Left side, the front of first fixed plate is fixedly connected with link block, and the right side of the link block is fixedly connected with The right end of one clamping device, first clamping device is fixedly connected with first clamping plate, the left side of the first clamping plate and envelope The right side of plate overlaps, and the lower surface of the movable plate is fixedly connected with sliding sleeve, and the inner wall of the sliding sleeve is socketed in the outer of slide bar Surface.
The inner wall of the first sliding groove slidably connects the first sliding block, and the front of first sliding block is fixedly connected with activity Bar, is fixedly connected with riser on the left of the motion bar back side, and the left side of the riser is connected with the first thread cap, and described The inner thread of one thread cap is connected with the first threaded post, and the right end of first threaded post is fixedly connected with plectane, the circle The right side of plate is overlapped on the left side of the first fixed plate.
The inner wall of the second sliding slot slidably connects the second sliding block, and the front of second sliding block is fixedly connected with connection The right end of bar, the connecting rod is fixedly connected with the second fixed plate, and the left side of second fixed plate is fixedly connected with braking The left end of device, the brake apparatus is fixedly connected with fixed block, and the left side of the fixed block is overlapped on the right side of movable plate The back side of face, the motion bar and connecting rod has been fixedly connected with cross bar, and the one end at the cross bar back side is fixedly connected with U-shaped The front of plate, the U-board inner wall is fixedly connected with gripping mechanism, and described positive one end of gripping mechanism is fixedly connected with card The front of plate, the snap-gauge is overlapped on the back side of gusset, and the back side of the U-board and the front of gusset overlap.
Preferably, first clamping device includes the first spring and the first telescopic rod, and first spring is socketed in the The left end of the outer surface of one telescopic rod, first spring and the first telescopic rod is fixedly connected in the right side of link block, institute The right end for stating the first spring and the first telescopic rod is fixedly connected in the left side of first clamping plate.
Preferably, second clamping device includes second spring and the second telescopic rod, and the second spring is socketed in The left end of the outer surface of two telescopic rods, the second spring and the second telescopic rod is fixedly connected with the right end in the second threaded post, The right end of the second spring and the second telescopic rod is fixedly connected in the left side of connecting plate.
Preferably, the brake apparatus includes third spring and third telescopic rod, and the third spring is socketed in third and stretches The left end of the outer surface of contracting bar, the third spring and third telescopic rod is fixedly connected in the left side of fixed block, and described The right end of three springs and third telescopic rod is fixedly connected in the left side of the second fixed plate.
Preferably, the gripping mechanism includes the 4th spring and the 4th telescopic rod, and the 4th spring is socketed in the 4th and stretches The outer surface of contracting bar, the 4th spring and the 4th positive one end of telescopic rod are fixedly connected at the back side of snap-gauge, and described The one end at four springs and the 4th telescopic rod back side is fixedly connected at the back side of U-board inner wall.
Preferably, the gripping mechanism includes the 4th spring and the 4th telescopic rod, and the 4th spring is socketed in the 4th and stretches The outer surface of contracting bar, the 4th spring and the 4th positive one end of telescopic rod are fixedly connected at the back side of snap-gauge, and described The one end at four springs and the 4th telescopic rod back side is fixedly connected at the back side of U-board inner wall.
Preferably, the right side of the movable plate is fixedly connected with handle, and the shape of the handle is U-shaped, the fixation The upper surface of block is fixedly connected with pull rod, and the shape of the pull rod is L-shaped, and the left side of first threaded post upper surface, which is fixed, to be connected Be connected to rotating bar, the shape of the rotating bar is L-shaped, first sliding block, the first sliding groove, the second sliding block and second sliding slot shape Shape is T shapes.
(Three)Advantageous effect
The utility model provides a kind of sledge dress Separated explosion-proof equipment inner canister skeleton welding auxiliary equipment, has following beneficial Effect:
(1), the sledge fill Separated explosion-proof equipment inner canister skeleton welding auxiliary equipment, pulled to the right by worker first clamping plate from And so that first clamping plate clamps sealing plate, and then gusset is stuck in U-board by worker, after sealing plate and gusset welding, worker Pull second clamping plate so that second clamping plate clamp keel, when keel welding after the completion of, worker to the right pull handle to make It obtaining movable plate and moves right required position, the required gusset of welding is clamped in U-board continues to weld again by worker at this time, By way of being welded again after this fixing closing plate, gusset and keel, reduce labour required when welding, saves welding Cost, while in such a way that moving active plate continues to weld keel and gusset, to more convenient and safe.
(2), the sledge fill Separated explosion-proof equipment inner canister skeleton welding auxiliary equipment, by be arranged handle, to facilitate worker The movement of movable plate is controlled by pull handle so that more convenient when worker's moving active plate.
(3), the sledge fill Separated explosion-proof equipment inner canister skeleton welding auxiliary equipment, by be arranged plectane so that plectane When being contacted with the first fixed plate, the braking to motion bar, and the utility model which has a compact structure and a reasonable design are realized, it is highly practical.
Description of the drawings
Fig. 1 is the cross-sectional view that the utility model is faced;
Fig. 2 is the structural schematic diagram that the utility model plectane is overlooked;
Fig. 3 is the structural schematic diagram that the utility model U-board right side regards;
Fig. 4 is the structural schematic diagram of the portions the utility model A amplification.
In figure:1 pillar, 2 bottom plates, 3 first fixed plates, 4 the first sliding grooves, 5 sealing plates, 6 gussets, 7 keel, 8 movable plates, 9 connect Connect block, 10 first clamping devices, 101 first springs, 102 first telescopic rods, 11 first clamping plates, 12 connecting plates, 13 second clampings Device, 131 second springs, 132 second telescopic rods, 14 second threaded posts, 15 second thread caps, 16 second clamping plates, 17 motion bars, 18 risers, 19 first threaded posts, 20 plectanes, 21 first thread caps, 22 second sliding slots, 23 second sliding blocks, 24 connecting rods, 25 second Fixed plate, 26 U-boards, 27 sliding sleeves, 28 slide bars, 29 grooves, 30 cross bars, 31 snap-gauges, 32 gripping mechanisms, 321 the 4th telescopic rods, 322 the 4th springs, 33 brake apparatus, 331 third springs, 332 third telescopic rods, 34 fixed blocks, 35 pull rods, 36 handles, 37 turns Lever, 38 first sliding blocks.
Specific implementation mode
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work The every other embodiment obtained, shall fall within the protection scope of the present invention.
As shown in Figs 1-4, the utility model provides a kind of technical solution:A kind of sledge dress Separated explosion-proof equipment inner canister skeleton weldering Ancillary equipment, including bottom plate 2 are connect, the four corners of 2 lower surface of bottom plate have been fixedly connected with pillar 1, and the upper surface of bottom plate 2, which is fixed, to be connected It is connected to the first fixed plate 3, the front of the first fixed plate 3 offers the first sliding groove 4, by the way that the first sliding groove 4 is arranged, so that the The movement of one sliding block 38 is more steady smooth, and the right side opening of 2 upper surface of bottom plate is equipped with groove 29, by the way that groove 29 is arranged, to So that groove 29, which is slide bar 28, provides fixed space, the normal operation of sliding sleeve 27, the left side and the right side of 29 inner wall of groove ensure that Side is fixedly connected with the left end of slide bar 28 and right end respectively, by the way that slide bar 28 is arranged, so that the movement of sliding sleeve 27 is more Steady smooth, the right side of the first fixed plate 3 is overlapped with sealing plate 5, and the right side of sealing plate 5 is fixedly connected with gusset 6, gusset 6 Right side is fixedly connected with keel 7, and the right side of keel 7 is overlapped with the left side of movable plate 8, and the right side of movable plate 8 is fixed It is connected with handle 36, by the way that handle 36 is arranged, the movement of movable plate 8 is controlled to facilitate the worker to pass through operating handle 36, The shape of hand 36 is U-shaped, and the upper surface of fixed block 34 is fixedly connected with pull rod 35, by the way that pull rod 35 is arranged, to lead to for worker It crosses pull rod 35 to provide a convenient to control the movement of fixed block 34, the shape of pull rod 35 is L-shaped, 19 upper surface of the first threaded post Left side is fixedly connected with rotating bar 37, by the way that rotating bar 37 is arranged, rotates rotating bar 37 to facilitate worker to pass through and controls the The shape of the rotation of one threaded post 19, rotating bar 37 is L-shaped, and the first sliding block 38, the first sliding groove 4, the second sliding block 23 and second are slided The shape of slot 22 is T shapes, by the way that the first sliding block 38, the first sliding groove 4, the second sliding block 23 and the second sliding slot 22 of T shapes is arranged, from And when avoiding motion bar 17 and connecting rod 24 and moving, the first sliding block 38 and the second sliding block 23 fall off, and the front of movable plate 8 is opened Equipped with second sliding slot 22, by the way that second sliding slot 22 is arranged, so that the movement of the second sliding block 23 is more smooth, movable plate 8 Front is fixedly connected with connecting plate 12, and the left side of connecting plate 12 is fixedly connected with the second clamping device 13, the second clamping device 13 include second spring 131 and the second telescopic rod 132, and second spring 131 is socketed in the outer surface of the second telescopic rod 132, passes through Second spring 131 is set, so that second spring 131 provides for second clamping plate 16 drives to the right pulling force, ensure that the second folder The left end of clamping of the plate 16 to keel 7, second spring 131 and the second telescopic rod 132 is fixedly connected in the second threaded post 14 Right end, by the way that the second telescopic rod 132 is arranged, so that the movement of second clamping plate 16 is more steady, second spring 131 and second The right end of telescopic rod 132 is fixedly connected in the left side of connecting plate 12, and the left end of the second clamping device 13 is fixedly connected with The inner thread of two threaded posts 14, the second threaded post 14 is connected with the second thread cap 15, by the way that the second threaded post 14 and the is arranged Two thread caps 15, so that worker can rotate second clamping plate 16 so that movable plate 8 can be moved right normally, the second spiral shell The outer surface of line cap 15 is connected with second clamping plate 16, and the right side of second clamping plate 16 is overlapped on the left side of keel 7, and first fixes The front of plate 3 is fixedly connected with link block 9, and the right side of link block 9 is fixedly connected with the first clamping device 10, and first clamps dress It includes the first spring 101 and the first telescopic rod 102 to set 10, and the first spring 101 is socketed in the outer surface of the first telescopic rod 102, is led to The first spring 101 of setting is crossed, so that the first spring 101, which is first clamping plate 11, provides pulling force to the left, ensure that the first folder The left end of fixation of the plate 11 to sealing plate 5, the first spring 101 and the first telescopic rod 102 is fixedly connected on the right side of link block 9 The right end of face, the first spring 101 and the first telescopic rod 102 is fixedly connected in the left side of first clamping plate 11, passes through setting the One telescopic rod 102, so that the first telescopic rod 102 plays fixed function to first clamping plate 11, the first clamping device 10 Right end is fixedly connected with first clamping plate 11, and the left side of first clamping plate 11 is overlapped with the right side of sealing plate 5, the following table of movable plate 8 Face is fixedly connected with sliding sleeve 27, by the way that sliding sleeve 27 is arranged, so that the movement of movable plate 8 is more smooth, the inner wall of sliding sleeve 27 It is socketed in the outer surface of slide bar 28.
The inner wall of the first sliding groove 4 slidably connects the first sliding block 38, and the front of the first sliding block 38 is fixedly connected with motion bar 17, riser 18 is fixedly connected on the left of 17 back side of motion bar, and the left side of riser 18 is connected with the first thread cap 21, by setting The first thread cap 21 is set, so that the first threaded post 19 itself can to the left or to the right move when the first threaded post 19 rotates, The inner thread of first thread cap 21 is connected with the first threaded post 19, and the right end of the first threaded post 19 is fixedly connected with plectane 20, By the way that plectane 20 is arranged, so that when plectane 20 and the first fixed plate 3 contact, the braking to motion bar 17, plectane 20 are realized Right side be overlapped on the left side of the first fixed plate 3.
The inner wall of second sliding slot 22 slidably connects the second sliding block 23, and the front of the second sliding block 23 is fixedly connected with connecting rod 24, the right end of connecting rod 24 is fixedly connected with the second fixed plate 25, and the left side of the second fixed plate 25 is fixedly connected with braking dress 33 are set, brake apparatus 33 includes third spring 331 and third telescopic rod 332, and third spring 331 is socketed in third telescopic rod 332 Outer surface, by be arranged third spring 331 so that third spring 331 be fixed block 34 elastic force to the left is provided, realize The left end of braking of the fixed block 34 to connecting rod 24, third spring 331 and third telescopic rod 332 is fixedly connected in fixed block The right end of 34 left side, third spring 331 and third telescopic rod 332 is fixedly connected in the left side of the second fixed plate 25, By the way that third telescopic rod 332 is arranged, so that third telescopic rod 332 plays fixed function, brake apparatus 33 to fixed block 34 Left end be fixedly connected with fixed block 34, by be arranged fixed block 34 so that fixed block 34 is realized when being overlapped with movable plate 8 Braking to connecting rod 24, the left side of fixed block 34 are overlapped on the right side of movable plate 8, the back of the body of motion bar 17 and connecting rod 24 Face has been fixedly connected with cross bar 30, and the one end at 30 back side of cross bar is fixedly connected with U-board 26, and the front of 26 inner wall of U-board is fixed It is connected with gripping mechanism 32, gripping mechanism 32 includes the 4th spring 322 and the 4th telescopic rod 321, and the 4th spring 322 is socketed in the The outer surface of four telescopic rods 321, by the way that the 4th spring 322 is arranged, so that the 4th spring 322, which is snap-gauge 31, provides elastic force, 31 clamping gusset 6 of snap-gauge, the 4th spring 322 and 321 positive one end of the 4th telescopic rod are fixedly connected in snap-gauge The one end at 31 back side, the 4th spring 322 and 321 back side of the 4th telescopic rod is fixedly connected at the back side of 26 inner wall of U-board, is led to It crosses the 4th telescopic rod 321 of setting and ensure that snap-gauge 31 so that the 4th telescopic rod 321 plays fixed function to snap-gauge 31 Movement is more steady, and 32 positive one end of gripping mechanism is fixedly connected with snap-gauge 31, by the way that snap-gauge 31 is arranged, so that snap-gauge 31 pairs of gussets 6 play snap action, and the front of snap-gauge 31 is overlapped on the back side of gusset 6, and the back side of U-board 26 and gusset 6 are just Face overlaps.
In use, worker pulls first clamping plate 11 so that the first spring 101 and the first telescopic rod 102 extend, then Sealing plate 5 is placed between first clamping plate 11 and the first fixed plate 3 by worker, and worker unclamps first clamping plate 11 at this time, in the first spring So that first clamping plate 11 moves downward under 101 pulling force effect, first clamping plate 11 moves downward so that first clamping plate 11 clamp sealing plates 5, and worker stirs snap-gauge 31 backward so that the 4th spring 322 and the 4th telescopic rod 321 are shunk, then worker Between gusset 6 is placed on 26 inner wall of snap-gauge 31 and U-board, worker unclamp snap-gauge 31 the 4th spring 322 elastic force effect under from And so that snap-gauge 31 clamps gusset 6, worker rotates rotating bar 37 so that the rotation of the first threaded post 19, the first spiral shell to worker at this time To drive plectane 20 to rotate, the first threaded post 19 rotates so that the first threaded post 19 itself is transported to the left the rotation of line column 19 Dynamic, the first threaded post 19 moves downward that plectane 20 is driven to move downward, after plectane 20 is moved downward to appropriate location, work People stops operating rotating bar 37, and worker pulls pull rod 35 to the right so that fixed block 34 moves right, when fixed block 34 to the right After moving to appropriate location, worker stops drag pull rod 35, and worker pushes up gusset 6 to drive U-board 26 upward at this time Movement, U-board 26 move upwards that motion bar 17 and connecting rod 24 is driven to move upwards, and motion bar 17 moves upwards to band Dynamic riser 18, the first threaded post 19 and plectane 20 move upwardly together, and connecting plate 12 moves upwards to drive the second fixed plate 25, third telescopic rod 332, third spring 331 and fixed block 34 move upwards, after gusset 6 moves upward to appropriate location, work People stops pushing gusset 6, and worker's releasing lever 35 is under the elastic force effect of third spring 331 so that fixed block 34 and activity Plate 8 overlap, worker rotate rotating bar 37 again so that the first threaded post 19 rotate, the first threaded post 19 rotation so that Plectane 20 moves right, and worker stops operating rotating bar 37 after plectane 20 and the first fixed plate 3 overlap, and then worker is to Zola Dynamic second clamping plate 16 is so that keel 7 are placed on second clamping plate 16 by second spring 131 and the elongation of the second telescopic rod 132, worker Between movable plate 8, worker unclamps second clamping plate 16 under the pulling force effect of second spring 131 so that second clamping plate 16 is pressed from both sides Tight keel 7, at this time worker sealing plate 5, gusset 6 and keel 7 are welded, when the welding is completed worker rotate second clamping plate 16 from And so that the back side of second clamping plate 16 turns to lower section, worker pulls pull rod 35 again so that fixed block 34 and movable plate 8 It is detached from, then worker pulls back gusset 6 so that U-board 26 is detached from gusset 6, and then worker pushes down on connecting rod 24 So that U-board 26 moves to appropriate location, worker's releasing lever 35 makes fixed block 34 move to original place at this time, then work So that movable plate 8 moves right, movable plate 8 moves right to drive sliding sleeve 27 in slide bar 28 pull handle 36 people to the right On move right, worker stops drag handle 36 after movable plate 8 is moved right to appropriate location.
It can to sum up obtain,(1), the sledge fill Separated explosion-proof equipment inner canister skeleton welding auxiliary equipment, pulled to the right by worker First clamping plate 11 so that first clamping plate 11 clamp sealing plate 5, then worker gusset 6 is stuck in U-board 26, when sealing plate 5 with After gusset 6 welds, worker pulls second clamping plate 16 so that second clamping plate 16 clamps keel 7, when keel 7 weld completion Afterwards, pull handle 36 is so that movable plate 8 moves right required position to worker to the right, and worker again will be needed for welding at this time Gusset 6 be clamped in U-board 26 and continue to weld, by way of being welded again after this fixing closing plate 5, gusset 6 and keel 7, Reduce labour required when welding, saves welding cost, while welding keel 7 and muscle are continued by moving active plate 8 The mode of plate 6, to more convenient and safe.
(2), the sledge fill Separated explosion-proof equipment inner canister skeleton welding auxiliary equipment, by be arranged handle 36, to facilitate work People controls the movement of movable plate 8 by pull handle 36 so that more convenient when worker's moving active plate 8.
(3), the sledge fill Separated explosion-proof equipment inner canister skeleton welding auxiliary equipment, by be arranged plectane 20 so that circle When plate 20 and the first fixed plate 3 contact, the braking to motion bar 17, and the utility model which has a compact structure and a reasonable design are realized, it is real It is strong with property.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is appreciated that can these embodiments be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (6)

1. a kind of sledge fills Separated explosion-proof equipment inner canister skeleton welding auxiliary equipment, including bottom plate(2), it is characterised in that:The bottom Plate(2)The four corners of lower surface have been fixedly connected with pillar(1), the bottom plate(2)Upper surface be fixedly connected with the first fixation Plate(3), first fixed plate(3)Front offer the first sliding groove(4), the bottom plate(2)The right side opening of upper surface is equipped with Groove(29), the groove(29)The left side and right side of inner wall respectively with slide bar(28)Left end be fixedly connected with right end, First fixed plate(3)Right side be overlapped with sealing plate(5), the sealing plate(5)Right side be fixedly connected with gusset(6), The gusset(6)Right side be fixedly connected with keel(7), the keel(7)Right side and movable plate(8)Left side take It connects, the movable plate(8)Front offer second sliding slot(22), the movable plate(8)Front be fixedly connected with connecting plate (12), the connecting plate(12)Left side be fixedly connected with the second clamping device(13), the second clamping device(13)Left end It is fixedly connected with the second threaded post(14), second threaded post(14)Inner thread be connected with the second thread cap(15), institute State the second thread cap(15)Outer surface be connected with second clamping plate(16), the second clamping plate(16)Right side be overlapped on keel (7)Left side, first fixed plate(3)Front be fixedly connected with link block(9), the link block(9)Right side It is fixedly connected with the first clamping device(10), first clamping device(10)Right end be fixedly connected with first clamping plate(11), The first clamping plate(11)Left side and sealing plate(5)Right side overlap joint, the movable plate(8)Lower surface be fixedly connected with Sliding sleeve(27), the sliding sleeve(27)Inner wall be socketed in slide bar(28)Outer surface;
The first sliding groove(4)Inner wall slidably connect the first sliding block(38), first sliding block(38)Front fixed connect It is connected to motion bar(17), the motion bar(17)Riser is fixedly connected on the left of the back side(18), the riser(18)Left side Face is connected with the first thread cap(21), first thread cap(21)Inner thread be connected with the first threaded post(19), described First threaded post(19)Right end be fixedly connected with plectane(20), the plectane(20)Right side be overlapped on the first fixed plate (3)Left side;
The second sliding slot(22)Inner wall slidably connect the second sliding block(23), second sliding block(23)Front fixed connect It is connected to connecting rod(24), the connecting rod(24)Right end be fixedly connected with the second fixed plate(25), second fixed plate (25)Left side be fixedly connected with brake apparatus(33), the brake apparatus(33)Left end be fixedly connected with fixed block (34), the fixed block(34)Left side be overlapped on movable plate(8)Right side, the motion bar(17)And connecting rod(24) The back side be fixedly connected with cross bar(30), the cross bar(30)The one end at the back side is fixedly connected with U-board(26), the U-shaped Plate(26)The front of inner wall is fixedly connected with gripping mechanism(32), the gripping mechanism(32)Positive one end is fixedly connected with card Plate(31), the snap-gauge(31)Front be overlapped on gusset(6)The back side, the U-board(26)The back side and gusset(6)Just Face overlaps.
2. sledge according to claim 1 fills Separated explosion-proof equipment inner canister skeleton welding auxiliary equipment, it is characterised in that:It is described First clamping device(10)Including the first spring(101)With the first telescopic rod(102), first spring(101)It is socketed in One telescopic rod(102)Outer surface, first spring(101)With the first telescopic rod(102)Left end be fixedly connected with even Connect block(9)Right side, first spring(101)With the first telescopic rod(102)Right end be fixedly connected in first clamping plate (11)Left side.
3. sledge according to claim 1 fills Separated explosion-proof equipment inner canister skeleton welding auxiliary equipment, it is characterised in that:It is described Second clamping device(13)Including second spring(131)With the second telescopic rod(132), the second spring(131)It is socketed in Two telescopic rods(132)Outer surface, the second spring(131)With the second telescopic rod(132)Left end be fixedly connected with Two threaded posts(14)Right end, the second spring(131)With the second telescopic rod(132)Right end be fixedly connected in connecting plate (12)Left side.
4. sledge according to claim 1 fills Separated explosion-proof equipment inner canister skeleton welding auxiliary equipment, it is characterised in that:It is described Brake apparatus(33)Including third spring(331)With third telescopic rod(332), the third spring(331)Third is socketed in stretch Contracting bar(332)Outer surface, the third spring(331)With third telescopic rod(332)Left end be fixedly connected in fixed block (34)Left side, the third spring(331)With third telescopic rod(332)Right end be fixedly connected in the second fixed plate (25)Left side.
5. sledge according to claim 1 fills Separated explosion-proof equipment inner canister skeleton welding auxiliary equipment, it is characterised in that:It is described Gripping mechanism(32)Including the 4th spring(322)With the 4th telescopic rod(321), the 4th spring(322)The 4th is socketed in stretch Contracting bar(321)Outer surface, the 4th spring(322)With the 4th telescopic rod(321)Positive one end is fixedly connected in card Plate(31)The back side, the 4th spring(322)With the 4th telescopic rod(321)The one end at the back side is fixedly connected in U-board (26)The back side of inner wall.
6. sledge according to claim 1 fills Separated explosion-proof equipment inner canister skeleton welding auxiliary equipment, it is characterised in that:It is described Movable plate(8)Right side be fixedly connected with handle(36), the handle(36)Shape be U-shaped, the fixed block(34)'s Upper surface is fixedly connected with pull rod(35), the pull rod(35)Shape be L-shaped, first threaded post(19)A left side for upper surface Side is fixedly connected with rotating bar(37), the rotating bar(37)Shape be L-shaped, first sliding block(38), the first sliding groove (4), the second sliding block(23)And second sliding slot(22)Shape be T shapes.
CN201820347273.7U 2018-03-14 2018-03-14 Sledge fills Separated explosion-proof equipment inner canister skeleton welding auxiliary equipment Active CN208005076U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820347273.7U CN208005076U (en) 2018-03-14 2018-03-14 Sledge fills Separated explosion-proof equipment inner canister skeleton welding auxiliary equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820347273.7U CN208005076U (en) 2018-03-14 2018-03-14 Sledge fills Separated explosion-proof equipment inner canister skeleton welding auxiliary equipment

Publications (1)

Publication Number Publication Date
CN208005076U true CN208005076U (en) 2018-10-26

Family

ID=63888665

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820347273.7U Active CN208005076U (en) 2018-03-14 2018-03-14 Sledge fills Separated explosion-proof equipment inner canister skeleton welding auxiliary equipment

Country Status (1)

Country Link
CN (1) CN208005076U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111889909A (en) * 2020-08-06 2020-11-06 刘秀娟 Forming and welding process for steel structure embedded foundation bolts
CN113649485A (en) * 2021-08-31 2021-11-16 江苏高科物流科技股份有限公司 Pallet fork locking device
CN114352041A (en) * 2021-12-22 2022-04-15 北京建院装饰工程设计有限公司 Special-shaped curved surface ceiling mounting, switching and adjusting device

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111889909A (en) * 2020-08-06 2020-11-06 刘秀娟 Forming and welding process for steel structure embedded foundation bolts
CN113649485A (en) * 2021-08-31 2021-11-16 江苏高科物流科技股份有限公司 Pallet fork locking device
CN113649485B (en) * 2021-08-31 2023-12-22 江苏高科物流科技股份有限公司 Fork locking device
CN114352041A (en) * 2021-12-22 2022-04-15 北京建院装饰工程设计有限公司 Special-shaped curved surface ceiling mounting, switching and adjusting device
CN114352041B (en) * 2021-12-22 2022-09-16 北京建院装饰工程设计有限公司 Special-shaped curved surface ceiling mounting, switching and adjusting device

Similar Documents

Publication Publication Date Title
CN208005076U (en) Sledge fills Separated explosion-proof equipment inner canister skeleton welding auxiliary equipment
CN206637183U (en) It is a kind of to turn to controllable tapered pipeline robot
CN206519905U (en) A kind of pressure type pin removal
CN107215665A (en) A kind of Tubular centrifuge drum captures car
CN104593855B (en) Electroplating cleaning apparatus
CN106079530A (en) Squeezing cage, Squeeze Production Line and production line for condiments
CN208895458U (en) A kind of welding equipment of lattice column
CN109551147A (en) A kind of hardware frame welding fixed frame
CN206998122U (en) One kind carries vehicle carriage handling gripper
CN207267802U (en) A kind of box gearbox shafting switching mechanism
CN207409401U (en) A kind of power switch being easily installed
CN105033992A (en) Power-assisted transferring system for automobile seat framework
CN101401705B (en) Novel pressure cooker
CN212192016U (en) Steering axle needle bearing installer
CN102889061A (en) Combined lift sub
CN206680069U (en) A kind of offline suspender of vehicle body
CN209023828U (en) A kind of interior basket blanking device
CN203017840U (en) Quick-open type press filter
CN205630227U (en) A foldable auxiliary device that is used for wall polisher mill to push up
CN106112350B (en) Section bar column positioning tool and the positioning table using the positioning tool
CN217323042U (en) Template overhead hoist is used in hydraulic engineering construction
CN105942449A (en) Squeezing production line and squeezing production process
CN215097589U (en) Isolator and sterilizer butt joint system
CN221866490U (en) Upper limb lifting exercise rehabilitation device
CN209296475U (en) A kind of portable road and bridge construction reinforcing bar toughness detection device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: No. 127, Punan Road, Shenbei New District, Shenyang, 110000 Liaoning

Patentee after: Liaoning Yitong Intelligent Equipment Manufacturing Co.,Ltd.

Address before: 110000 gongshitun village, Daoyi Town, Shenbei New District, Shenyang City, Liaoning Province

Patentee before: LIAONING YITONG PETROCHEMICAL EQUIPMENT MANUFACTURING Co.,Ltd.

CP03 Change of name, title or address