CN208004779U - The preheating constant temperature oven of wire rope end and anchor head lockset automatic casting system - Google Patents

The preheating constant temperature oven of wire rope end and anchor head lockset automatic casting system Download PDF

Info

Publication number
CN208004779U
CN208004779U CN201820164302.6U CN201820164302U CN208004779U CN 208004779 U CN208004779 U CN 208004779U CN 201820164302 U CN201820164302 U CN 201820164302U CN 208004779 U CN208004779 U CN 208004779U
Authority
CN
China
Prior art keywords
wire rope
anchor head
furnace
fire door
preheating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820164302.6U
Other languages
Chinese (zh)
Inventor
崔健
米建忠
李丽荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuzhou Heng Machinery Technology Co Ltd
Original Assignee
Xuzhou Heng Machinery Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xuzhou Heng Machinery Technology Co Ltd filed Critical Xuzhou Heng Machinery Technology Co Ltd
Priority to CN201820164302.6U priority Critical patent/CN208004779U/en
Application granted granted Critical
Publication of CN208004779U publication Critical patent/CN208004779U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Vertical, Hearth, Or Arc Furnaces (AREA)

Abstract

The utility model discloses the preheating constant temperature ovens of a kind of wire rope end and anchor head lockset automatic casting system, including furnace body, fire door and preheating furnace electrical control mechanism;Furnace body includes the heating furnace of the cavity shape structure surrounded by furnace wall and the heating electrical equipment and temperature transducer that are arranged in heating furnace;Fire door is connect by the door opened mechanism that upper and lower directions is opened with furnace body;Preheating furnace electrical control mechanism includes controller, and controller is electrically connected with heating electrical equipment, temperature transducer and door opened mechanism respectively;Fire door bottom end middle position is open equipped with arch, and the edge placement of the bottom end of fire door and arch opening is equipped with the thermal insulation separation curtain made by flexible refractory material.This wire rope end can realize effective closing of fire door with the preheating constant temperature oven of anchor head lockset automatic casting system after being placed in the related steel wire rope anchor head lockset for having steel wire rope, pre-heating temperature elevation is fast, the pre- thermal efficiency is higher, especially suitable for wire rope end and anchor head lockset automatic casting system.

Description

The preheating constant temperature oven of wire rope end and anchor head lockset automatic casting system
Technical field
It is specifically a kind of to be automated for wire rope end and anchor head lockset the utility model is related to a kind of preheating constant temperature oven The preheating constant temperature oven of running gate system belongs to steel wire rope deep process technology field.
Background technology
Steel wire rope is that mechanical property and the satisfactory steel wire of geometric dimension are twisted together according to certain rule Helical form steel tendon, steel wire rope is by steel wire, wire rope core and grease composition.Steel wire rope is first to be twisted stock by multilayer steel wire, then with rope Centered on core, helically wound rope is twisted by certain amount stock.Steel wire rope can transmit the load of long range, can bear a variety of The effect of load and varying load has higher tensile strength, fatigue resistance and toughness, be suitable for drawing, pull, It various purposes such as ties up, is widely used in the necks such as metallurgy, mine, petroleum gas drilling, machinery, chemical industry, aerospace Domain.
Steel wire rope as promotion, traction, tension and load bearing component in use, being typically that the both ends of steel wire rope are passed through steel Cord anchor head lockset is connect with other equipment, and the connection type of steel wire rope anchor head lockset and wire rope end usually has cast and folder Tight riveting two ways, wherein the mode poured into a mould is penetrated after breaing up wire rope end in the connecting hole of steel wire rope anchor head lockset So as to there is melting gap, to connecting hole after blocking the connecting hole bottom position of steel wire rope anchor head lockset and preheating between each steel wire Middle casting molten metal (being usually kirsite), steel wire rope is connected as one with steel wire rope anchor head lockset after cooling.
In the prior art, casting process is typically to use manual operation, i.e., will manually wear and connect steel wire rope anchor head lockset It is preheated in wire rope end merging preheating furnace, wire rope end is taken out after being preheated to set temperature and is locked steel wire rope anchor head Tool is worn side by side to be connected on pourer and loads onto so that the cast end face of steel wire rope anchor head lockset is arranged upward, and pouring kettle is then manually used Dip the molten metal in molten bath and the successively casting molten metal into the cast end of steel wire rope anchor head lockset.This traditional people The mode of work operation has the following defects:
1, wire rope end is taken out after preheating and wears steel wire rope anchor head lockset side by side be connected on pourer and load onto, manually pour The process time of note is longer, and temperature reduces the steel wire rope anchor head lockset after preheating easily caused by the operating time is long, and then influences Casting quality, in the lower wire rope end for even needing to connect steel wire rope anchor head lockset to wearing of ambient temperature Again it is preheated;
2, manually the molten metal in molten bath is dipped with pouring kettle and poured successively into the cast end of steel wire rope anchor head lockset The mode of molten metal is noted there are larger security risk, operating personnel are easily burned;
3, not only production efficiency is relatively low for manually-operated mode, but also the human factors such as the technical ability of operating personnel and sense of responsibility It is affected to manufacturing schedule and quality;
4, the fire door of common preheating furnace is typically conventional rectangular configuration, due to being placed in the related steel wire for having steel wire rope Steel wire rope is exposed to outside fire door after line anchor head lockset, therefore causes fire door that can not be completely closed because of the blocking of steel wire rope, in turn Cause that pre-heating temperature elevation is slow, preheating is less efficient.
Invention content
In view of the above-mentioned problems of the prior art, a kind of wire rope end of the utility model offer and anchor head lockset are automatic Change the preheating constant temperature oven of running gate system, the effective of fire door can be realized after being placed in the related steel wire rope anchor head lockset for having steel wire rope It closes, pre-heating temperature elevation is fast, the pre- thermal efficiency is higher, especially suitable for wire rope end and anchor head lockset automatic casting system.
To achieve the goals above, the preheating constant temperature oven packet of this wire rope end and anchor head lockset automatic casting system Include furnace body, fire door and preheating furnace electrical control mechanism;Furnace body includes that the heating furnace of the cavity shape structure surrounded by furnace wall and setting are adding Heating electrical equipment in hot stove thorax and temperature transducer;Fire door is arranged outside furnace body, and fire door is opened by upper and lower directions Door opened mechanism is connect with furnace body;Preheating furnace electrical control mechanism includes controller, controller respectively with the heating in heating furnace The door opened mechanism of electrical equipment, temperature transducer and fire door is electrically connected;
Fire door bottom end middle position is open equipped with arch, and the edge placement of the bottom end of fire door and arch opening is equipped with by soft Property refractory material make thermal insulation separation curtain.
As the preferred embodiment of the utility model, the door opened mechanism includes leading screw and screw, leading screw upper and lower To being erected on furnace body, the shaft end of leading screw is additionally provided with decelerating motor, and screw cooperation is socketed on leading screw and screw is fixed with fire door Connection;The controller of preheating furnace electrical control mechanism is electrically connected with decelerating motor.
As further improvement of the utility model scheme, the position of bracket is corresponded on the baseplane of the heating furnace of furnace body Install the roller that front-rear direction rolls setting.
As a kind of embodiment of the utility model thermal insulation separation curtain, the thermal insulation separation curtain is asbestos material.
Compared with prior art, the preheating constant temperature oven of this wire rope end and anchor head lockset automatic casting system due to The bottom end middle position of fire door is open equipped with arch, and the edge placement of the bottom end of fire door and arch opening is equipped with by flexible resistance to The thermal insulation separation curtain that fiery material makes, thus be placed in it is related have the steel wire rope anchor head lockset of steel wire rope after, exposed when closing fire door Steel wire rope outside fire door can be open by the arch of fire door bottom end to be engaged, and bottom end that thermal insulation separation curtain can be to fire door and arch The edge placement of shape opening effectively seals barrier in real time, and then realizes effective closing of fire door, ensures preheating so as to realize Heating rate and the higher pre- thermal efficiency, especially suitable for wire rope end and anchor head lockset automatic casting system.
Description of the drawings
Fig. 1 is the structural schematic diagram of wire rope end and anchor head lockset automatic casting system;
Fig. 2 is the vertical view of Fig. 1;
Fig. 3 is wire rope end and structural schematic diagram of the anchor head lockset automatic casting system when workpiece preheats;
Fig. 4 is wire rope end and structural schematic diagram of the anchor head lockset automatic casting system when workpiece is poured into a mould;
Fig. 5 is the A direction views of Fig. 1.
In figure:1, constant temperature oven is preheated, 11, furnace body, 12, fire door, 2, workpiece transporter, 21, guide rail, 211, secondary guide rail, 22, bottom bracket, 221, idler wheel, 23, bracket, 231, anchor head lockset support shaft, 3, constant temperature pouring furnace, 31, support underframe, 32, Electric smelter, 321, molten bath, 322, runner boxing mouth, 323, runner boxing mouth opening-closing control mechanism.
Specific implementation mode
The utility model is described further below in conjunction with the accompanying drawings and (entire steel wire is located at this preheating constant temperature oven 1 below Rope rope end is described with the direction on anchor head lockset automatic casting system for front).
As shown in Figure 1 and Figure 2, the automatic casting system of wire rope end and anchor head lockset includes preheating constant temperature oven 1, work Part transfer device 2, constant temperature pouring furnace 3 and concentration electric control gear.
The preheating constant temperature oven 1 includes furnace body 11, fire door 12 and preheating furnace electrical control mechanism;Furnace body 11 includes being enclosed by furnace wall At cavity shape structure heating furnace and the heating electrical equipment and temperature transducer that are arranged in heating furnace;Fire door 12 is arranged Outside furnace body 11, fire door 12 is connect by the door opened mechanism that upper and lower directions is opened with furnace body 11, is opened by controlling fire door The open and close of fire door 12 may be implemented in the action for opening mechanism, as shown in figure 5,12 bottom end middle position of fire door is opened equipped with arch Mouthful, the edge placement of the bottom end of fire door 12 and arch opening is equipped with the thermal insulation separation curtain made by flexible refractory material, thermal insulation separation Curtain can be effectively close in real time to the edge placement of the bottom end of fire door 12 and arch opening when being placed in the related workpiece for having steel wire rope Packing keeps off and then ensures pre-heat effect and efficiency;Preheating furnace electrical control mechanism includes controller, controller respectively in heating furnace Heating electrical equipment, temperature transducer and fire door 12 the electrical connection of door opened mechanism.
The position that the workpiece transporter 2 corresponds to fire door 12 is arranged at the rear of furnace body 11, and workpiece transporter 2 wraps Include guide rail 21, work supporting block and workpiece transhipment electrical control mechanism;
The position that guide rail 21 corresponds to fire door 12 is arranged on the ground along the longitudinal direction;
Work supporting block includes bottom bracket 22 and bracket 23;Bottom bracket 22 is the support frame structure that rear end opens, subiculum The top plane of frame 22 is concordant with the baseplane of 11 heating furnace of furnace body to be arranged, and the position of the bottom corresponding rails 21 of bottom bracket 22 is set There is the idler wheel 221 coordinated with guide rail 21, stepping moving control mechanism before and after bottom bracket be additionally provided between bottom bracket 22 and guide rail 21, The front and back stepping on guide rail 21 of bottom bracket 22 may be implemented by the action of stepping moving control mechanism before and after control bottom bracket to move It is dynamic;Bracket 23 is also the support frame structure that rear end opens, and bracket 23 is set up mounted on the top of bottom bracket 22, and pop-up The flexible guiding sliding control machine of bracket of front-rear direction setting is equipped between the baseplane of frame 23 and the top plane of bottom bracket 22 By controlling the flexible action for being oriented to sliding control mechanism of bracket bracket 23 may be implemented on bottom bracket 22 forwards in structure It extend out to the inside of 11 heating furnace of furnace body or rearward retraction is located at the surface of bottom bracket 22, also along left and right in bracket 23 Direction level erection is equipped with multiple anchor head lockset support shafts 231 being uniformly arranged along the longitudinal direction, anchor head lockset support shaft 231 Outer diameter and steel wire rope anchor head lockset mounting hole internal diameter size clearance fit, wear the anchor head lock for connecting cable wire end Tool can be worn side by side to be connected in anchor head lockset support shaft 231;The bracket support section of bottom bracket 22 including portion disposed thereon and The bottom of the stepping support section before and after bottom bracket 22 is arranged in front and back stepping support section positioned at its bottom, idler wheel 221, on The flexible guiding sliding control mechanism of bracket is arranged flat in the baseplane of bracket 23 and the bracket support section top of bottom bracket 22 Between face, stepping moving control mechanism is connect with front and back stepping support section before and after bottom bracket, the bracket support of bottom bracket 22 It is equipped with the guiding slipping mechanism being arranged in left-right direction and automatically controlled detent mechanism between part and front and back stepping support section, is oriented to Slipping mechanism include be arranged front and back stepping support section top sliding guide rail and be equipped at bracket support section bottom The support wheel at end, the bracket support section and bracket 23 of bottom bracket 22 are respectively set to two sets, the front and back step of bottom bracket 22 It is set as a set of into support section, bracket support portion is additionally provided between the bracket support section and sliding guide rail of bottom bracket 22 Translation control mechanism, the controller that workpiece transports electrical control mechanism is divided to be translated respectively with automatically controlled detent mechanism and bracket support section Control mechanism is electrically connected;The left and right side position of 21 rear end of guide rail is equipped with the secondary guide rail that setting is moved towards perpendicular to guide rail 21 211, the guide level of guide rail is concordant is arranged for the guide level of secondary guide rail 211 and the sliding on front and back stepping support section top.It is logical The action for crossing control bracket support section translation control mechanism may be implemented the bracket support section of bottom bracket 22 and carry Stepping support portion before and after bottom bracket 22 is driven into or sails out of in movement to bracket 23 on sliding guide rail and secondary guide rail 211 in left-right direction Point, the action by controlling automatically controlled detent mechanism may be implemented before and after bracket support section and the bottom bracket 22 of bottom bracket 22 Stepping support section is located by connecting.The setting of the bracket support section and bracket 23, secondary guide rail 211 of two sets of bottom brackets 22 When two station settings, i.e. working condition may be implemented, bracket support section and bracket 23 setting of a set of bottom bracket 22 Before and after the bottom bracket 22 on stepping support section, the bracket support section of another set of bottom bracket 22 and the positioning of bracket 23 set It sets on the secondary guide rail 211 of left or right side, it can after the workpiece on the front and back stepping support section of bottom bracket 22 completes cast To translate the bracket support portion of the bottom bracket 22 after control mechanism action makes completion pour into a mould by controlling bracket support section Point and bracket 23 move to right side or left side secondary guide rail 211 on wait for workpiece cool down, and installed workpiece, be located at left side Or the bracket support section and bracket 23 of the bottom bracket 22 on the secondary guide rail 211 on right side are translatable to before and after bottom bracket 22 Continue to preheat on stepping support section and pour into a mould, and then may be implemented to improve cast efficiency, reduces and poured the anchor head being poured in The cooling stand-by period of lockset while the wasting of resources for preventing preheating constant temperature oven 1 and constant temperature pouring furnace 3;
Workpiece transhipment electrical control mechanism includes controller, controller respectively with stepping moving control mechanism before and after bottom bracket, on Bracket is flexible to be oriented to the electrical connection of sliding control mechanism.
The constant temperature pouring furnace 3 sets up the rear for being mounted on preheating constant temperature oven 1, and constant temperature pouring furnace 3 includes support underframe 31, electric smelter 32 and pouring furnace electrical control mechanism;
Support underframe 31 is portal-framed structure, and the support leg of portal-framed structure is mounted on ground relative to symmetrical set up of guide rail 21 On face, portal-framed structure being internally provided with along the longitudinal direction can allow bottom bracket 22 and bracket 23 entirely through space;
Electric smelter 32 is set up to be poured mounted on the top of support underframe 31, including molten bath 321, runner boxing mouth 322 and shunting Geat opening-closing control mechanism 323, molten bath 321 are internally provided with heating electrical equipment and temperature transducer, and runner boxing mouth 322 is arranged It is connected in the bottom end and being penetrated through with molten bath 321 in molten bath 321, heating electrical equipment, shunting also is provided with outside runner boxing mouth 322 Sprue gate 322 is uniformly arranged spacing dimension between multiple and multiple runner boxing mouths 322 and connects with wearing side by side in left-right direction Spacing dimension cooperation between multiple steel wire rope anchor head locksets in anchor head lockset support shaft 231, runner boxing mouth open and close control Mechanism 323 processed is arranged in the bottom end of runner boxing mouth 322, and the action by controlling runner boxing mouth opening-closing control mechanism 323 can To realize that control is opened or closing runner boxing mouth 322, heating electrical equipment can ensure molten bath 321 and runner boxing mouth 322 Internal molten metal remains within the scope of pourable temperature;
Pouring furnace electrical control mechanism includes controller, and controller is passed with heating electrical equipment, the thermometric inside molten bath 321 respectively Heating electrical equipment, runner boxing mouth opening-closing control mechanism 323 outside sensor, runner boxing mouth 322 are electrically connected.
The concentration electric control gear includes central controller, warm-up control circuit, electric smelter melting control loop, workpiece Control loop, cast control loop are transported, central controller is automatically controlled with the controller of preheating furnace electrical control mechanism, workpiece transhipment respectively The controller electrical connection of the controller, pouring furnace electrical control mechanism of mechanism.
In the initial state, fire door 12 is closed the automatic casting system of wire rope end and anchor head lockset, Bracket 23 is located at the position directly above of bottom bracket 22, and bottom bracket 22 is located at the rear of support underframe 31 across support underframe 31, Runner boxing mouth opening-closing control mechanism 323 is in the state of closing runner boxing mouth 322.
When needing to pour into a mould wire rope end and anchor head lockset, the enough metals that need to be melted are placed in molten by operating personnel Central controller is controlled after in pond 321 first and starts warm-up control circuit and electric smelter melting control loop, the automatically controlled machine of preheating furnace Structure is that the heating electrical equipment in the heating furnace for control furnace body 11 is powered on, the temperature transducer in furnace body 11 is in real time in It is that the heating electrical equipment controlled inside molten bath 321 leads to entreat the temperature in controller feedback heating furnace, pouring furnace electrical control mechanism Temperature transducer inside electricity work, molten bath 321 feeds back the temperature in molten bath 321 to central controller in real time;Then operator Member will wear the anchor head lockset that connects cable wire end, and left and right directions is worn be connected in each anchor head lockset support shaft 231 side by side successively, Since bracket 23 and bottom bracket 22 are the support frame structures that rear end opens, the anchor head lock for connecting cable wire end is worn Tool is worn be connected in anchor head lockset support shaft 231 after because own wt is in cast end face state upward.
After completing installation anchor head lockset, operating personnel control central controller and start workpiece transhipment control loop, center control The controller that device processed transports electrical control mechanism to workpiece sends instruction, and the controller that workpiece transports electrical control mechanism is before controlling bottom bracket Stepping moving control mechanism action afterwards makes bottom bracket 22 carry bracket 23 and wearing and connect the anchor head lockset of cable wire end to lead It is moved forward on rail 21 while the door opened mechanism action of the controller of preheating furnace electrical control mechanism control makes fire door 12 open, such as Shown in Fig. 3, after bottom bracket 22 moves forward to setting position and the stagnation at 11 rear of furnace body across support underframe 31, workpiece transhipment electricity The controller control bracket of control mechanism is flexible, which to be oriented to sliding control mechanism action, makes bracket 23 carry to wear and connect steel wire rope The anchor head lockset of head extend out to setpoint distance and enters inside the heating furnace of furnace body 11 forwards, wears connect cable wire end at this time Anchor head lockset under the position-limiting action of stockhole of 11 heating furnace of furnace body and the traction action of steel wire rope along anchor head lockset branch The axial line rotation of axis 231 is supportted in cast end face state forwards and then realizes and reduces space hold, then preheating furnace is automatically controlled The controller of mechanism, which controls door opened mechanism action, makes fire door 12 close, and the heating furnace of preheating constant temperature oven 1 is connected to wearing The anchor head lockset of cable wire end is preheated.
When the temperature in the temperature transducer feedback heating furnace in furnace body 11 has reached setting preheating temperature and molten bath When the temperature of molten metal in the molten bath 321 of temperature transducer feedback inside 321 has reached setting pouring temperature, center control Device processed sends out the door opened mechanism action of instruction control to the controller of preheating furnace electrical control mechanism first makes fire door 12 open, then Central controller sends out the flexible sliding control mechanism that is oriented to of instruction control bracket to the controller of workpiece transhipment electrical control mechanism and moves Make to make bracket 23 to carry wearing for preheating is completed to connect the anchor head lockset rearward retraction of cable wire end to setpoint distance position In the position directly above of bottom bracket 22, preheating is completed at this time wears the anchor head lockset for connecting cable wire end because own wt is extensive The multiple state in cast end face upward, under then controller transmission instruction of the central controller to workpiece transhipment electrical control mechanism makes The action of stepping moving control mechanism makes bottom bracket 22 carry bracket 23 and wearing for preheating is completed to connect steel wire rope before and after bracket The anchor head lockset of fag end is rearward moved to setting cast distance and is stagnated on guide rail 21, as shown in figure 4, being now placed in pop-up First anchor head lockset support shaft 231 of 23 rearmost end of frame is located at the underface of runner boxing mouth 322 and is located at first anchor head Each cast end difference face for wearing the anchor head lockset for connecting cable wire end that preheating is completed in lockset support shaft 231 is each A runner boxing mouth 322, then central controller is sent out to the controller of pouring furnace electrical control mechanism instructs control runner boxing mouth The action of opening-closing control mechanism 323 turns off after so that runner boxing mouth 322 is opened to setting time, the molten metal in molten bath 321 Each wearing for preheating is completed connects steel through what runner boxing mouth 322 exited into first anchor head lockset support shaft 231 The cast end of the anchor head lockset of cord fag end completes each wearing for preheating to be completed in first anchor head lockset support shaft 231 Connect the cast of the anchor head lockset of cable wire end;Then central controller refers to the controller transmission of workpiece transhipment electrical control mechanism Order makes before and after bottom bracket the action of stepping moving control mechanism that bottom bracket 22 be made one step pitch of rearward stepping and to stop on guide rail 21 It is stagnant, be now placed in 23 rear end of bracket second anchor head lockset support shaft 231 be located at runner boxing mouth 322 underface and What each in second anchor head lockset support shaft 231 was completed preheating wears pouring for the anchor head lockset for connecting cable wire end It notes end and distinguishes each runner boxing mouth 322 of face, then central controller sends out instruction to the controller of pouring furnace electrical control mechanism 323 action of control runner boxing mouth opening-closing control mechanism turns off after so that runner boxing mouth 322 is opened to setting time, molten bath Molten metal in 321 is each to be completed through what runner boxing mouth 322 exited into second anchor head lockset support shaft 231 The cast end for wearing the anchor head lockset for connecting cable wire end of preheating is completed each in second anchor head lockset support shaft 231 The cast for wearing the anchor head lockset for connecting cable wire end of preheating is completed;And so on, bottom bracket 22 on guide rail 21 backward Fang Yici steppings, runner boxing mouth opening-closing control mechanism 323 act after so that runner boxing mouth 322 is opened to setting time again successively Close, until complete in all anchor head lockset support shafts 231 it is each be completed preheating wear the anchor head for connecting cable wire end The cast of lockset.
After completing cast, the controller transmission instruction that central controller transports electrical control mechanism to workpiece makes bottom bracket 22 reset To original state, anchor head lockset can be removed from anchor head lockset support shaft 231 after the cooling of anchor head lockset.
Hydraulic pressure or pneumatic control may be used in the door opened mechanism, decelerating motor can also be used to drive leading screw silk Mother's control, since the former need to configure hydraulic pressure or pneumatic system, mechanism setting is not only complicated but also right in 1 heating process of preheating furnace Hydraulic pressure or pneumatic element can impact, influence service life, and the structure of the latter and control it is relatively easy, therefore preferably after Person, that is, as the preferred embodiment of the utility model, the door opened mechanism includes leading screw and screw, leading screw upper and lower directions It is erected on furnace body 11, the shaft end of leading screw is additionally provided with decelerating motor, and screw cooperation is socketed on leading screw and screw and fire door 12 are solid Fixed connection;The controller of preheating furnace electrical control mechanism is electrically connected with decelerating motor.
It extend out to setpoint distance forwards for the ease of bracket 23 and can smoothly enter into inside the heating furnace of furnace body 11, makees For further improvement of the utility model scheme, the position that bracket 23 is corresponded on the baseplane of the heating furnace of furnace body 11 is equipped with Front-rear direction rolls the roller of setting.During bracket 23 protrudes into the heating furnace inside of furnace body 11 forwards, Roller can ask load bracket 23 that bracket 23 is made to can smoothly enter into inside the heating furnace of furnace body 11.
As a kind of embodiment of the utility model thermal insulation separation curtain, the thermal insulation separation curtain is asbestos material.
The preheating constant temperature oven of this wire rope end and anchor head lockset automatic casting system is due in the bottom end of fire door 12 Position is entreated to be open equipped with arch, and the edge placement of the bottom end of fire door 12 and arch opening is equipped with and is made by flexible refractory material Thermal insulation separation curtain, therefore be placed in it is related have the steel wire rope anchor head lockset of steel wire rope after, close fire door 12 when be exposed to fire door 12 Outer steel wire rope can be open by the arch of 12 bottom end of fire door to be engaged, and bottom end that thermal insulation separation curtain can be to fire door 12 and arch The edge placement of opening effectively seals barrier in real time, and then realizes effective closing of fire door 12, ensures preheating so as to realize Heating rate and the higher pre- thermal efficiency, especially suitable for wire rope end and anchor head lockset automatic casting system.

Claims (4)

1. the preheating constant temperature oven of a kind of wire rope end and anchor head lockset automatic casting system, this preheating constant temperature oven (1) include Furnace body (11), fire door (12) and preheating furnace electrical control mechanism;Furnace body (11) includes the heating furnace of the cavity shape structure surrounded by furnace wall With the heating electrical equipment and temperature transducer being arranged in heating furnace;Fire door (12) setting is external in furnace body (11), fire door (12) the door opened mechanism opened by upper and lower directions is connect with furnace body (11);Preheating furnace electrical control mechanism includes controller, control Device processed is electrically connected with the door opened mechanism of heating electrical equipment, temperature transducer and fire door (12) in heating furnace respectively; It is characterized in that,
Fire door (12) bottom end middle position is open equipped with arch, and the edge placement of the bottom end of fire door (12) and arch opening is equipped with The thermal insulation separation curtain made by flexible refractory material.
2. the preheating constant temperature oven of wire rope end according to claim 1 and anchor head lockset automatic casting system, special Sign is that the door opened mechanism includes leading screw and screw, and leading screw upper and lower directions is erected on furnace body (11), the axis of leading screw End is additionally provided with decelerating motor, and screw cooperation is socketed on leading screw and screw is fixedly connected with fire door (12);Preheating furnace electrical control mechanism Controller be electrically connected with decelerating motor.
3. the preheating constant temperature oven of wire rope end according to claim 1 or 2 and anchor head lockset automatic casting system, It is characterized in that, the position that bracket (23) is corresponded on the baseplane of the heating furnace of furnace body (11) is equipped with front-rear direction rolling setting Roller.
4. the preheating constant temperature oven of wire rope end according to claim 1 or 2 and anchor head lockset automatic casting system, It is characterized in that, the thermal insulation separation curtain is asbestos material.
CN201820164302.6U 2018-01-31 2018-01-31 The preheating constant temperature oven of wire rope end and anchor head lockset automatic casting system Active CN208004779U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820164302.6U CN208004779U (en) 2018-01-31 2018-01-31 The preheating constant temperature oven of wire rope end and anchor head lockset automatic casting system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820164302.6U CN208004779U (en) 2018-01-31 2018-01-31 The preheating constant temperature oven of wire rope end and anchor head lockset automatic casting system

Publications (1)

Publication Number Publication Date
CN208004779U true CN208004779U (en) 2018-10-26

Family

ID=63884900

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820164302.6U Active CN208004779U (en) 2018-01-31 2018-01-31 The preheating constant temperature oven of wire rope end and anchor head lockset automatic casting system

Country Status (1)

Country Link
CN (1) CN208004779U (en)

Similar Documents

Publication Publication Date Title
CN202054731U (en) Automatic recurvation steel structure of toughening furnace
CN208004780U (en) The automatic casting system of wire rope end and anchor head lockset
CN208004779U (en) The preheating constant temperature oven of wire rope end and anchor head lockset automatic casting system
CN208004777U (en) The constant temperature pouring furnace of wire rope end and anchor head lockset automatic casting system
CN108145130A (en) A kind of wire rope end and anchor head lockset automatic casting system and its control method
CN208004778U (en) The workpiece transporter of wire rope end and anchor head lockset automatic casting system
CN107824775A (en) A kind of Auto-pouring System
CN214244508U (en) Heat treatment electric furnace for production of slurry pump
CN109014157B (en) Movable molten metal automatic casting device
CN208395234U (en) A kind of fast blow-on door of heat-treatment furnace open-close type
CN105689695B (en) A kind of steel ladle covering/uncovering device for being provided with incline track
CN212870764U (en) Furnace door lifting and automatic pressing mechanism
JP6804963B2 (en) Residue device
CN217275533U (en) Smelting intermediate frequency furnace for metal materials
CN110790119A (en) Special lifting appliance for large electric furnace body
CN207567293U (en) A kind of annealing furnace for having fire door automatic lifting function
CN109175311A (en) A kind of bimetal metallurgy combination composite seamless pipe pipe production technology and its device
CN218627720U (en) Heating copper melting inductor
CN208430203U (en) A kind of roller-bottom type medium temperature heat-treatment furnace
CN216298447U (en) Manufacturing equipment for bimetal composite wear-resisting plate
CN108608158A (en) A kind of cylinder seal plate welding work station of heating furnace production line
CN211060664U (en) Furnace cover rotary switch control device of medium-frequency induction melting furnace
KR100923879B1 (en) Fly away preventive device for blastfurnace tappinghole
CN214666043U (en) Automatic door opening and closing structure of smelting furnace
CN113624012B (en) Automatic opening device for top sealing of double-chamber heating furnace

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant