CN207992009U - The erosion test model equipment of selenolite and underground water to concrete - Google Patents

The erosion test model equipment of selenolite and underground water to concrete Download PDF

Info

Publication number
CN207992009U
CN207992009U CN201721218492.7U CN201721218492U CN207992009U CN 207992009 U CN207992009 U CN 207992009U CN 201721218492 U CN201721218492 U CN 201721218492U CN 207992009 U CN207992009 U CN 207992009U
Authority
CN
China
Prior art keywords
concrete
water
desiccation
coagulation soil
babinet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721218492.7U
Other languages
Chinese (zh)
Inventor
罗健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Highway Engineering Co Ltd
Original Assignee
CCCC First Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Highway Engineering Co Ltd filed Critical CCCC First Highway Engineering Co Ltd
Priority to CN201721218492.7U priority Critical patent/CN207992009U/en
Application granted granted Critical
Publication of CN207992009U publication Critical patent/CN207992009U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Testing Resistance To Weather, Investigating Materials By Mechanical Methods (AREA)

Abstract

The utility model discloses selenolite and underground water to the erosion test model equipment of concrete, and the air duct of air inlet and air outlet composition cycle in gypsum case, air duct is in contact with desiccation concrete is waited for;Selenolite and wait for that the changes in contact situation of desiccation concrete is modeled record in efflorescence.Treatment water coagulation soil is isolated between water tank by plastic foil, and before not being punctured, the hydraulic pressure for the treatment of water coagulation soil and the hydraulic pressure of water tank are balanced plastic foil;After meeting the pressure balance between water coagulation soil and water tank, needle plate is driven by cylinder piston and pricker is driven to puncture plastic foil, the water and treatment water coagulation soil in water tank are contacted, and the erosion situation of change for the treatment of water coagulation soil in the case of water is met in simulation.Wait for that desiccation concrete and treatment water coagulation soil are the concrete of same model, by being compared with the former concrete among babinet, and then the case where analyze the weathering for waiting for desiccation concrete and treatment water coagulation soil and chance water erosion.

Description

The erosion test model equipment of selenolite and underground water to concrete
Technical field
The utility model discloses a kind of selenolite and underground water to the erosion test model equipment of concrete, belongs to concrete Technical field of construction.
Background technology
Concrete structure is to be widely used a kind of general structure type, but due to its structure itself and use environment Feature so that there are serious endurance issues for concrete.The durability of concrete refer to concrete under active usage conditions Resist the long-term ability for keeping intensity and complete appearance of effect of various destructive factors.
For a long time, concrete is most wide as purposes in civil engineering, one of maximum construction material of dosage, in last 100 years Development in, intensity be continuously improved.But while proposing high intensity, the endurance issues of concrete structure are also more come More of interest by people.People are always to be very durable material for concrete, until phase late 1970s prosperity state Family just gradually finds that premature breakdown occurs in some environments in the infrastructure project originally built up.The coagulation in many cities in the U.S. Earth foundation facilities engineering and port engineering build up after 20~30 years, or even in the period of shorter in occur as soon as deterioration.It is domestic most Number industrial building needs overhaul after using 25~30 years, the building service life only 15~20 under harsh environment Year.The use environment of civil buildings and public building is relatively preferable, can generally maintain 50 years or more, but the balcony of outdoor, canopy Service life etc. outdoor component usually only has 30~40 years.The endurance issues of the infrastructure projects such as bridge, harbour are more Seriously, since concrete cover to reinforcement is excessively thin and density is poor, many engineerings build up occur as soon as within latter several years steel bar corrosion,
Concrete cracking.Sea port dock was generally just cracked and flaked off because of concrete along muscle using 10 years or so, and overhaul is needed. African Territories concrete structure durability is horizontal less than China and developed countries, and the selenolite geology that African Territories blazon And great rodent underground water, concrete structure durability is had a serious impact, therefore, it is durable to improve concrete Property, extend engineering service life, it is the key that building trade the Implement of sustainable development strategy to reduce repair reconstruction expenses to the greatest extent.
Utility model content
The purpose of this utility model is that devising gneiss settlement of foundation model configuration, is simulated and tied by the settlement of foundation Structure can effectively simulate gneiss ground, to promote the construction quality of gneiss ground.
To achieve the above object, the technical solution adopted in the utility model is the erosion of selenolite and underground water to concrete Pilot model apparatus, the device include babinet 1, wait for desiccation concrete 2, treatment water coagulation soil 3, gypsum case 4, water fender 5, water tank 6, pricker 7, needle plate 8, cylinder 9, cylinder piston 10 and plastic foil 11;The centre of babinet 1 is equipped with twice partition board, and babinet 1 is by twice Partition board is divided into three parts, and the concrete of same model is separately placed the three parts in babinet 1, and the side of babinet 1 is to wait doing Change concrete 2, the other side of babinet 1 is treatment water coagulation soil 3, and the centre of babinet 1 is former concrete, and former concrete is to wait for desiccation The comparison of concrete 2 and treatment water coagulation soil 3 is with reference to concrete;Wait for that desiccation concrete 2 is in contact with gypsum case 4, gypsum case 4 Top be equipped with air inlet 4.1, the side of gypsum case 4 is equipped with air outlet 4.2, selenolite, selenolite is filled in gypsum case 4 It is in contact with desiccation concrete 2 is waited for;Treatment water coagulation soil 3 is connected with water tank 6;The outside of water tank 6 is equipped with water fender 5, water blocking The centre of plate 5 is equipped with needle plate 8, and pricker 7 is equipped with side by side on needle plate 8;It is equipped with plastic foil between treatment water coagulation soil 3 and water tank 6 11;Needle plate 8 is connect with cylinder piston 10, and cylinder piston 10 is driven by cylinder 9.
The main innovation point of utility model device is:1) wind of the air inlet in gypsum case and air outlet composition cycle Road, air duct are in contact with desiccation concrete is waited for;Selenolite and wait for the changes in contact situation of the desiccation concrete quilt in efflorescence Analog record.
2) treatment water coagulation soil is isolated between water tank by plastic foil, and plastic foil is not before being punctured, treatment water The hydraulic pressure of concrete and the hydraulic pressure of water tank are balanced;After meeting the pressure balance between water coagulation soil and water tank, lived by cylinder Plug driving needle plate simultaneously drives pricker to puncture plastic foil, and the water and treatment water coagulation soil in water tank are contacted, and regimen condition is met in simulation The erosion situation of change of lower treatment water coagulation soil.
3) wait for that desiccation concrete and treatment water coagulation soil are the concrete of same model, by with the former coagulation among babinet The case where soil is compared, and then analysis waits for the weathering of desiccation concrete and treatment water coagulation soil and meets water erosion.
Description of the drawings
Fig. 1 is the structure chart of the utility model.
Specific implementation mode
As shown in Figure 1, the erosion test model equipment of selenolite and underground water to concrete, the device include babinet 1, wait for Desiccation concrete 2, treatment water coagulation soil 3, gypsum case 4, water fender 5, water tank 6, pricker 7, needle plate 8, cylinder 9, cylinder piston 10 With plastic foil 11;The centre of babinet 1 is equipped with twice partition board, and babinet 1 is divided into three parts, the concrete of same model by twice partition board The three parts being separately placed in babinet 1, the side of babinet 1 are to wait for desiccation concrete 2, and the other side of babinet 1 is treatment water The centre of concrete 3, babinet 1 is former concrete, and former concrete is the comparison ginseng for waiting for desiccation concrete 2 and treatment water coagulation soil 3 According to concrete;Wait for that desiccation concrete 2 is in contact with gypsum case 4, the top of gypsum case 4 is equipped with air inlet 4.1, the side of gypsum case 4 Portion is equipped with air outlet 4.2, is filled with selenolite in gypsum case 4, selenolite is in contact with desiccation concrete 2 is waited for;Treatment water coagulation Soil 3 is connected with water tank 6;The outside of water tank 6 is equipped with water fender 5, and the centre of water fender 5 is equipped with needle plate 8, is set side by side on needle plate 8 There is pricker 7;It is equipped with plastic foil 11 between treatment water coagulation soil 3 and water tank 6;Needle plate 8 is connect with cylinder piston 10, cylinder piston 10 are driven by cylinder 9.
The main innovation point of utility model device is:1) wind of the air inlet in gypsum case and air outlet composition cycle Road, air duct are in contact with desiccation concrete is waited for;Selenolite and wait for the changes in contact situation of the desiccation concrete quilt in efflorescence Analog record.
4) treatment water coagulation soil is isolated between water tank by plastic foil, and plastic foil is not before being punctured, treatment water The hydraulic pressure of concrete and the hydraulic pressure of water tank are balanced;After meeting the pressure balance between water coagulation soil and water tank, lived by cylinder Plug driving needle plate simultaneously drives pricker to puncture plastic foil, and the water and treatment water coagulation soil in water tank are contacted, and regimen condition is met in simulation The erosion situation of change of lower treatment water coagulation soil.
5) wait for that desiccation concrete and treatment water coagulation soil are the concrete of same model, by with the former coagulation among babinet The case where soil is compared, and then analysis waits for the weathering of desiccation concrete and treatment water coagulation soil and meets water erosion.

Claims (1)

1. selenolite and underground water are to the erosion test model equipment of concrete, it is characterised in that:The device include babinet (1), Wait for desiccation concrete (2), treatment water coagulation native (3), gypsum case (4), water fender (5), water tank (6), pricker (7), needle plate (8), Cylinder (9), cylinder piston (10) and plastic foil (11);The centre of babinet (1) is equipped with twice partition board, and babinet (1) is by twice partition board It is divided into three parts, the concrete of same model is separately placed the three parts in babinet (1), and the side of babinet (1) is to wait doing Change concrete (2), the other side of babinet (1) is that treatment water coagulation is native (3), and the centre of babinet (1) is former concrete, former concrete To wait for the comparison of desiccation concrete (2) and treatment water coagulation native (3) with reference to concrete;Wait for desiccation concrete (2) and gypsum case (4) It is in contact, the top of gypsum case (4) is equipped with air inlet (4.1), and the side of gypsum case (4) is equipped with air outlet (4.2), gypsum case (4) selenolite is filled in, selenolite is in contact with desiccation concrete (2) is waited for;Treatment water coagulation native (3) is connected with water tank (6) It connects;The outside of water tank (6) is equipped with water fender (5), and the centre of water fender (5) is equipped with needle plate (8), thorn is equipped with side by side on needle plate (8) Needle (7);It is equipped with plastic foil (11) between treatment water coagulation native (3) and water tank (6);Needle plate (8) is connect with cylinder piston (10), gas The cylinder piston (10) is driven by cylinder (9).
CN201721218492.7U 2017-09-22 2017-09-22 The erosion test model equipment of selenolite and underground water to concrete Expired - Fee Related CN207992009U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721218492.7U CN207992009U (en) 2017-09-22 2017-09-22 The erosion test model equipment of selenolite and underground water to concrete

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721218492.7U CN207992009U (en) 2017-09-22 2017-09-22 The erosion test model equipment of selenolite and underground water to concrete

Publications (1)

Publication Number Publication Date
CN207992009U true CN207992009U (en) 2018-10-19

Family

ID=63804340

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721218492.7U Expired - Fee Related CN207992009U (en) 2017-09-22 2017-09-22 The erosion test model equipment of selenolite and underground water to concrete

Country Status (1)

Country Link
CN (1) CN207992009U (en)

Similar Documents

Publication Publication Date Title
Du et al. A model characterizing deterioration at earthen sites of the Ming Great Wall in Qinghai Province, China
CN204007582U (en) A kind of concrete joint surface roughness measuring device
CN106092868B (en) A kind of experimental provision for simulating salinized soil environment road structure layer Mechanism of Deformation And Failure
CN202081909U (en) Dynamic monitoring simulating device for influence radius during coal bed methane well extraction
CN211602719U (en) Stope mine pressure three-dimensional physical simulation test platform of multi-functional top bottom plate gushing water
CN204759883U (en) Impervious curtain's test model between simulation concrete and basement rock
CN108776098A (en) A kind of wall anti-permeability performance on-site detecting device
CN201653876U (en) Indoor soil corrosion simulator
Zhang et al. Quantitative assessment method of structural safety for complex timber structures with decay diseases
CN105118363A (en) Method and model for simulated testing antiseepage curtain between concrete and bedrock
CN206907330U (en) A kind of goaf filling analogue experiment installation
CN207992009U (en) The erosion test model equipment of selenolite and underground water to concrete
CN103063562A (en) Sulphate dry-wet cycle testing machine
CN102926486A (en) Grass-wood-soil wall
CN102749278A (en) Method for testing depth of influence of acid rain on red clay on the basis of pH value test
CN205670113U (en) A kind of concrete durability experiment device of simulation medium pressure influence
CN209495830U (en) A kind of wave current close coupling simulation test pond
CN102607910B (en) Preparation device and application method of triaxial test sample provided with structure in contact with soil
CN104805875B (en) Long-term composite stiffness prediction method for coastal cement-soil piles
CN204343563U (en) The building in the style of the ancients cornice node that a kind of wooden construction is combined with concrete structure
CN206339559U (en) A kind of experimental provision for simulating salinized soil environment road structure layer Mechanism of Deformation And Failure
Marghella et al. Comparison between in situ experimental data and Italian code standard values
Jia et al. Study of characters and formation mechanism of hard crust on tidal flat of Yellow River estuary
CN110185072A (en) A kind of foundation is anti-to dial load-carrying properties detection method
CN204287005U (en) A kind of test unit of concrete sulphate corrosion

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 100024 Beijing, Guanzhuang, Chaoyang District, Zhou

Patentee after: CCCC FIRST HIGHWAY ENGINEERING GROUP Co.,Ltd.

Address before: 100024 Beijing, Guanzhuang, Chaoyang District, Zhou

Patentee before: CCCC FIRST HIGHWAY ENGINEERING Co.,Ltd.

CP01 Change in the name or title of a patent holder
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181019

CF01 Termination of patent right due to non-payment of annual fee