CN207989916U - A kind of subway work geomantic omen pipe support - Google Patents

A kind of subway work geomantic omen pipe support Download PDF

Info

Publication number
CN207989916U
CN207989916U CN201820216498.9U CN201820216498U CN207989916U CN 207989916 U CN207989916 U CN 207989916U CN 201820216498 U CN201820216498 U CN 201820216498U CN 207989916 U CN207989916 U CN 207989916U
Authority
CN
China
Prior art keywords
hack lever
geomantic omen
pipe support
fixed
subway work
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820216498.9U
Other languages
Chinese (zh)
Inventor
魏永亮
帅建兵
张旭林
安振超
曹国星
张佳男
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 12th Bureau Group Co Ltd
Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Original Assignee
China Railway 12th Bureau Group Co Ltd
Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 12th Bureau Group Co Ltd, Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd filed Critical China Railway 12th Bureau Group Co Ltd
Priority to CN201820216498.9U priority Critical patent/CN207989916U/en
Application granted granted Critical
Publication of CN207989916U publication Critical patent/CN207989916U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model is related to subway work corollary equipment technical fields, especially a kind of subway work geomantic omen pipe support, it is poor to solve conventional geomantic omen pipe support there are impression qualities, the problem that security risk is more and the construction maintenance expense in later stage is high, including frame body, frame body includes the horizontal hack lever that vertical hack lever is fixed on interval on vertical hack lever, it is provided with mounting hole on vertical hack lever, expansion bolt is provided in mounting hole, vertical hack lever is fixed on by expansion bolt in preliminary bracing or lining side wall, it is provided with card hole on horizontal hack lever, U-shaped card is plugged in card hole, geomantic omen pipe is fixed in U-shaped card.The utility model the utility model simple structure and reasonable design is realized the fixation of each geomantic omen pipe by the U-shaped card being arranged on the horizontal hack lever of different height, has prevented the generation of pipeline obscission, while having preferable impression quality.

Description

A kind of subway work geomantic omen pipe support
Technical field
The utility model is related to subway work corollary equipment technical field, especially a kind of subway work geomantic omen pipe support.
Background technology
Unavoidably to be related to a large amount of geomantic omen pipes during subway work, geomantic omen pipe refers to air hose and feed pipe, draining The general designation of pipe, geomantic omen pipe need to be arranged on the pipe support of geomantic omen.Conventional geomantic omen pipe support is with angle steel or reinforcing bar site welding in abutment wall Reserved steel bar is used only as support geomantic omen pipe, and security risk and the failure frequency are higher in not only constructing, and the construction maintenance in later stage It is costly.Simultaneously as the geomantic omen form of tubes being related to is multifarious so that conventional geomantic omen pipe support size differs, installation Rear line entirety perception is of poor quality, does not meet the requirement of civilized construction.
Invention content
That there are impression qualities in order to solve conventional geomantic omen pipe support is poor for the utility model, more than security risk and the construction in later stage The high problem of maintenance expense provides a kind of subway work geomantic omen pipe support.
The utility model is achieved by the following technical solution:A kind of subway work geomantic omen pipe support, including frame body, frame Body includes vertical hack lever and is spaced the horizontal hack lever being fixed on vertical hack lever, and mounting hole, mounting hole are provided on vertical hack lever It is inside provided with expansion bolt, vertical hack lever is fixed on by expansion bolt in preliminary bracing or lining side wall, is set on horizontal hack lever It is equipped with card hole, U-shaped card is plugged in card hole, geomantic omen pipe is fixed in U-shaped card.
Vertical hack lever and horizontal hack lever are all made of angle steel and are welded.
Mounting hole and card hole are slot hole.The setting of slot hole is easily installed the adjusting of positioning, with this better linear adjustment, Improve the installation quality of geomantic omen pipeline.
U-shaped card uses 6 millimeters of galvanized steel bar, the width of U-shaped card to be more than its fixed 2~5 millimeters of geomantic omen pipe outside diameter of institute.
Multiple subway work geomantic omens pipe support equidistantly, etc. height be fixed on preliminary bracing or lining side wall.
The utility model has an advantageous effect in that compared with prior art:
The utility model simple structure and reasonable design is realized by the U-shaped card being arranged on the horizontal hack lever of different height The fixation of each geomantic omen pipe, has prevented the generation of pipeline obscission;When to geomantic omen pipe fault repair, it is only necessary to remove and U-shaped card The nut of cooperation can be adjusted, convenient and efficient;Further, pass through the card hole and U-shaped card that are drilled in advance and card hole Cooperation, can by air hose, feed pipe, drainpipe it is well-balanced be distributed in arbitrary supporting point, it is right since card hole and mounting hole are slot hole The pipeline of line style shortcoming can create favorable conditions by left and right adjusting U-shaped card to adjust pipeline line style to civilized construction in hole;Frame Body fixation is all made of expansion bolt, not only convenient disassembly, but also from the point of view of long-term interest, and circulation material cycle can be used as to make With saving great amount of cost.
Description of the drawings
Fig. 1 is the structural schematic diagram of the utility model.
In figure:1- frame bodies 1, the vertical hack levers of 1.1-, the horizontal hack levers of 1.2-, 2- mounting holes, 3- expansion bolts, 4-U type cards, 5- Card hole, 6- gaskets, 7- nuts.
Specific implementation mode
The utility model is further elaborated referring to Fig.1, a kind of subway work geomantic omen pipe support, including frame body 1, frame Body 1 includes vertical hack lever 1.1 and is spaced the horizontal hack lever 1.2 being fixed on vertical hack lever 1.1, is provided on vertical hack lever 1.1 Mounting hole 2 is provided with expansion bolt 3 in mounting hole 2, and vertical hack lever 1.1 is fixed on preliminary bracing or lining cutting by expansion bolt 3 On abutment wall, it is provided with card hole 5 on horizontal hack lever 1.2, U-shaped card 4 is plugged in card hole 5, geomantic omen pipe is fixed in U-shaped card 4.
In the utility model embodiment, a kind of subway work geomantic omen pipe support, including frame body 1, mounting hole 2, expanding screw Bolt 3, U-shaped card 4, card hole 5, gasket 6 and nut 7;The quantity of horizontal hack lever 1.2 in frame body 1 can be wanted according to specific construction It asks and is configured, horizontal hack lever 1.2 and vertical hack lever 1.1 are to be welded and fixed.Expansion bolt 3 is interior by frame through mounting hole 2 Body 1 is fixed on preliminary bracing or lining side wall;U-shaped card 4 passes through card hole 5, can be fixed on geomantic omen pipe by gasket 6 and nut 7 In card hole 5;Mounting hole 2 and card hole 5 are slot hole, are adjusted in right amount to pipeline position when being easily installed positioning.
Wherein, the specification of U-shaped card depends on geomantic omen pipe size, and vertical hack lever 1.1 and horizontal hack lever 1.2 are all made of angle steel weldering It connects and forms and brushing antirust paint, U-shaped card 4 is more than the fixed geomantic omen pipe of its institute using 6 millimeters of galvanized steel bar, the width of U-shaped card 4 2~5 millimeters of outer diameter can not only reach effective fixed requirement, but also can prevent corrosion, substantially prolong service life.
It before the pipe support installation of the utility model geomantic omen, needs to carry out unwrapping wire on supporting in the early stage or lining side wall, determine each The specific installation site of geomantic omen pipe support, finally so that multiple subway work geomantic omens pipe support equidistantly, etc. height fixation in the early stage In supporting or lining side wall.

Claims (5)

1. a kind of subway work geomantic omen pipe support, including frame body(1), it is characterised in that:Frame body(1)Including vertical hack lever(1.1) It is fixed on vertical hack lever with interval(1.1)On horizontal hack lever(1.2), vertical hack lever(1.1)On be provided with mounting hole(2), peace Fill hole(2)Inside it is provided with expansion bolt(3), vertical hack lever(1.1)Pass through expansion bolt(3)It is fixed on preliminary bracing or lining cutting side On wall, horizontal hack lever(1.2)On be provided with card hole(5), card hole(5)Inside it is plugged with U-shaped card(4), U-shaped card(4)Inside it is fixed with wind Water pipe.
2. a kind of subway work geomantic omen pipe support according to claim 1, it is characterised in that:Vertical hack lever(1.1)And water Flatrack bar(1.2)Angle steel is all made of to be welded.
3. a kind of subway work geomantic omen pipe support according to claim 2, it is characterised in that:Mounting hole(2)And card hole(5) It is slot hole.
4. a kind of subway work geomantic omen pipe support according to claim 1 or 2, it is characterised in that:U-shaped card(4)Using 6 millis The galvanized steel bar of rice, U-shaped card(4)Width be more than its fixed 2~5 millimeters of geomantic omen pipe outside diameter of institute.
5. a kind of subway work geomantic omen pipe support according to claim 1, it is characterised in that:Multiple subway work geomantic omen pipes Frame equidistantly, etc. height be fixed on preliminary bracing or lining side wall.
CN201820216498.9U 2018-02-07 2018-02-07 A kind of subway work geomantic omen pipe support Expired - Fee Related CN207989916U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820216498.9U CN207989916U (en) 2018-02-07 2018-02-07 A kind of subway work geomantic omen pipe support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820216498.9U CN207989916U (en) 2018-02-07 2018-02-07 A kind of subway work geomantic omen pipe support

Publications (1)

Publication Number Publication Date
CN207989916U true CN207989916U (en) 2018-10-19

Family

ID=63823115

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820216498.9U Expired - Fee Related CN207989916U (en) 2018-02-07 2018-02-07 A kind of subway work geomantic omen pipe support

Country Status (1)

Country Link
CN (1) CN207989916U (en)

Similar Documents

Publication Publication Date Title
CN204164500U (en) A kind of tunnel pipeline fixing bracket
CN205446924U (en) Pipeline support's mounting structure can be dismantled to utility tunnel bolt formula
CN205577327U (en) Metal clad sheet system is hung futilely to wall body
CN106639225B (en) Super large plate width stone wall surface dried hanging method
CN102359242A (en) Vertical-face stone dry-hanging mounting structure
CN201901964U (en) Three-dimensional adjustable and disconnectable curtain wall
CN207989916U (en) A kind of subway work geomantic omen pipe support
CN102312540A (en) Vertical dry-hanging mounting structure of stone
CN204534892U (en) A kind of Bidirectional adjustable air conditioner support
CN206233264U (en) For the rear-mounted adjustable support of piping lane
CN203755501U (en) Concrete beam based glass curtain wall supporting structure
CN207277630U (en) A kind of stone curtain wall that can be mounted and dismounted from outside
CN203628030U (en) Assembly type cable holder of substation
CN109441025A (en) A kind of fabricated roofing cornice support rod component, support unit and installation method
CN210532664U (en) Air conditioner is support bracket for water pipe
CN204828929U (en) Vertical hot and cold water pipeline supporting assembly of high -rise building
CN204986023U (en) Pipeline fix the support frame for building
CN206669120U (en) A kind of flexible iron drain-pipe road suspension bracket
CN202164779U (en) Dry-hanging installation structure for vertical faces of stone materials
CN207514385U (en) A kind of support of pipelines for lightweight wall plate
CN209310150U (en) A kind of fixed device of easy-to-mount hanging outdoor unit of air conditioner
CN102352607A (en) Full water stopping side wall template system
CN207149366U (en) Transformer and JP cabinet mounting structures
CN205206368U (en) Instrument formula floor protector
CN108086562A (en) Detachable carving aluminium sheet ceiling system and its installation method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181019

Termination date: 20220207