CN207987997U - Timber for Historical Buildings repairs structure - Google Patents
Timber for Historical Buildings repairs structure Download PDFInfo
- Publication number
- CN207987997U CN207987997U CN201721691702.4U CN201721691702U CN207987997U CN 207987997 U CN207987997 U CN 207987997U CN 201721691702 U CN201721691702 U CN 201721691702U CN 207987997 U CN207987997 U CN 207987997U
- Authority
- CN
- China
- Prior art keywords
- pin
- connecting plate
- supporting rod
- reparation
- historical buildings
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Working Measures On Existing Buildindgs (AREA)
Abstract
The utility model provides a kind of timber reparation structure for Historical Buildings, including original pedestal and repair pin, connection structure is provided between the original pedestal and the reparation pin, the original pedestal is fixedly connected with the reparation pin by the connection structure.Timber provided by the utility model for Historical Buildings repairs structure and enables to rehabilitation cost low.
Description
Technical field
The utility model belongs to building field, is related to repairing structure for the timber of Historical Buildings.
Background technology
Existing ancient building (referring to newly-built timber structure pseudo-classic architecture or the wood-structure old building of reparation) pin basis way is:
Drum-shaped stone blocks stone steps is placed on the basis of ground lower part concrete or building stones, standing tree column on drum-shaped stone blocks stone steps makes pin bottom be above the ground level, avoids wood
Column immersion is rotted, and drum-shaped stone blocks stone steps passes through mortise-tenon joint with pin.This is the usual way of ancient building in history.But drum-shaped stone blocks stone steps with
Pin is by mortise-tenon joint, and not enough securely, situations such as encountering earthquake, strong wind or vehicle collision can make pin inclination movement cause room
Room is destroyed or is toppled.
A kind of ancient building pin of Chinese patent basis with a Publication No. CN202718134U is tied currently on the market
Structure, it includes the first reinforced concrete base part, the second reinforced concrete base part, connector and drum-shaped stone blocks stone steps;First reinforced concrete base
Part locates below ground level, and the second reinforced concrete base part is located at ground or more, and the first reinforced concrete base part and the second reinforcing bar
Concrete foundation part is fixedly connected;The hole of perforation is opened in the middle part of the drum-shaped stone blocks stone steps, the cross section in hole is transversal with the second reinforced concrete base part
Face shape cooperation, the drum-shaped stone blocks stone steps are sheathed on outside the second reinforced concrete base part;The connector is steel construction, one end and the
Two reinforced concrete base parts are fixedly connected, and the other end is fixedly connected with pin, although enabling to the company between drum-shaped stone blocks stone steps and pin
Stability is connect, but needs to remove original support base before construction, then pours the first reinforced concrete base part and the again
Two reinforced concrete base parts thus need more cost input, rehabilitation cost high.
Utility model content
The purpose of this utility model is to provide the timbers for Historical Buildings to repair structure, it is intended to solve rehabilitation cost
High problem.
In order to solve the above technical problems, the utility model provides a kind of timber reparation structure for Historical Buildings,
Including original pedestal and pin is repaired, connection structure, the original are provided between the original pedestal and the reparation pin
Primordium seat is fixedly connected with the reparation pin by the connection structure.
The utility model is further arranged to, and the connection structure includes supporting rod, supports concrete and be fixedly connected on institute
The connecting plate for repairing pin end is stated, the supporting rod is between the connecting plate and the original pedestal, the support concrete
Positioned at the periphery of the supporting rod, and the support concrete is used to support the reparation pin with the supporting rod.
The utility model is further arranged to, and the supporting rod is welded with the connecting plate.
The utility model is further arranged to, and the connecting plate is fixedly installed connection close to the side for repairing pin
Part, the connector are located in the reparation pin and are fixedly connected with the reparation pin.
The utility model is further arranged to, and the connector is evenly arranged with several on the periphery of the connecting plate
It is a.
The utility model is further arranged to, and the reparation pin end offers and the matched placement of the connecting plate
Slot, the connecting plate are located in the placing groove.
The utility model is further arranged to, and one end of the supporting rod is connect with the connecting plate, and other end fixation is set
It is equipped with support plate, and contacts at the upper end of the original pedestal by the support plate.
Compared with prior art, the utility model is provided repairs structure for the timber of Historical Buildings, to pin
It is to remove the aerial part of original pedestal, and the under ground portion of original pedestal is left first, then when reparation
The reparation of pin, i.e. reparation pin of the connection for reparation are carried out on the part left;Wherein since do not need will be original
Original pedestal dig out removal, while also the support construction for repairing pin need not be built again, be allowed in this way to wood
The rehabilitation cost of column substantially reduces;Simultaneously because the use of direct progress has been carried out to the part of original pedestal underground, so
So that the repair time to pin shortens, man power and material is also saved.
Description of the drawings
Fig. 1 is the structural schematic diagram that a kind of timber for Historical Buildings of the utility model repairs one embodiment of structure.
Wherein, 1, original pedestal;2, connecting plate;3, supporting rod;4, concrete is supported;5, connector;6, support plate.
Specific implementation mode
Below in conjunction with the drawings and specific embodiments to the utility model proposes the timber reparation knot for Historical Buildings
Structure is described in further detail.According to following explanation and claims, will be become apparent from feature the advantages of the utility model.It needs
Illustrate, attached drawing is all made of very simplified form and uses non-accurate ratio, only to convenient, lucidly auxiliary is said
The purpose of bright the utility model embodiment.
A kind of timber for Historical Buildings repairs structure, as shown in Figure 1, including original pedestal 1 and repairing pin
(not marked in figure) is provided with connection structure, the original pedestal 1 and institute between the original pedestal 1 and the reparation pin
Reparation pin is stated to be fixedly connected by the connection structure.
Wherein, the connection structure includes being fixedly connected on the connecting plate 2 of the reparation pin end and positioned at described
Supporting rod 3 between connecting plate 2 and the original pedestal 1, the supporting rod 3 is for propping up the connecting plate 2 when repairing
The periphery of support, the supporting rod 3 is provided with support concrete 4, and the support concrete 4 is for carrying out the reparation pin after the completion of repairing
Support is supported the package of concrete 4 among repairing the structure for completing only have connecting plate 2 also to be located at support concrete 4.The support
Bar 3 is welded with the connecting plate 2.One end of the supporting rod 3 is connect with the connecting plate 2, and the other end is fixedly installed support
Plate 6, and contact at by the support plate 6 upper end of the original pedestal 1.
The connecting plate 2 is fixedly installed connector 5 close to the side for repairing pin, and the connector 5 is located at institute
It states and repairs in pin and be fixedly connected with the reparation pin.The connector 5 is uniformly arranged on the periphery of the connecting plate 2
There are several.The reparation pin end is offered is located at institute with 2 matched placing groove of the connecting plate, the connecting plate 2
It states in placing groove.
In conclusion the timber provided by the utility model for Historical Buildings repairs structure, when repairing due to original
The original pedestal 1 for carrying out pillar is also kept and, so when repairing, can not only be needed as the brace foundation for repairing pin
Original pedestal 1 is removed, while need not also build new brace foundation, the cost for so allowing for repairing substantially reduces, and repaiies
Multiple efficiency is improved, and manpower and materials are all reduced, highly practical.
Pin will be repaired when being connected on original pedestal 1, be that temporary branch is carried out by supporting rod 3 and connecting plate 2 first
Then support forms support concrete 4, mainly by support concrete 4 to repairing pin after forming in 3 periphery casting concrete of supporting rod
Weight is supported;It is wherein temporarily supported by connecting plate 2 to repairing pin due to supporting rod 3, so passing through company
Fishplate bar 2 increases supporting rod 3 and repairs the contact area between pin, and pressure is big between reducing supporting rod 3 and repairing pin
It is small, it is therefore prevented that repair pin and deform upon, repair safe;Moreover, due to repairing pin bottom end with placement
Slot so can preferably keep the positional stability of connecting plate 2 by placing groove, prevent it from sliding etc. occurs, and repair and stablize
Property it is high, and since connecting plate 2 is to be located in placing groove, thus repair complete after can also prevent connecting plate 2 exposed
It is external so that the shape for repairing pin is guaranteed, and repairing quality is high;The bottom end of supporting rod 3 is supported on by support plate 6
On original pedestal 1, the bearing area of supporting rod 3 is so just increased, can preferably prevent supporting rod 3 from toppling over,
It prevents that accident occurs in repair process.
It is fixedly connected by several connectors 5 between connecting plate 2 and reparation pin, so allows for connecting plate 2
Connection it is more stable, moreover, after supporting concrete 4 to shape, support concrete 4 is fixed with connecting plate 2 and supporting rod 3 respectively to be connected
It connects, simultaneously because connecting plate 2 is all fixedly connected respectively with supporting rod 3 and supporting rod 3 with pin is repaired, also increases in this way
It repairs pin and supports the connective stability between concrete 4, that is, improve the positional stability for repairing pin.
It should be noted that each embodiment is described by the way of progressive in this specification, each embodiment emphasis is said
Bright is all difference from other examples, and just to refer each other for identical similar portion between each embodiment.
Foregoing description is only the description to the utility model preferred embodiment, not to any limit of the scope of the utility model
Calmly, any change, the modification that the those of ordinary skill in the utility model field does according to the disclosure above content, belong to right and want
Seek the protection domain of book.
Claims (6)
1. a kind of timber for Historical Buildings repairs structure, which is characterized in that including original pedestal and repair pin, institute
It states and is provided with connection structure between original pedestal and the reparation pin, the original pedestal passes through described with the reparation pin
Connection structure is fixedly connected, and the connection structure includes supporting rod, supports concrete and be fixedly connected on the reparation pin end
Connecting plate, for the supporting rod between the connecting plate and the original pedestal, the support concrete is located at the supporting rod
Periphery, and the support concrete and the supporting rod are used to support the reparation pin.
2. the timber according to claim 1 for Historical Buildings repairs structure, which is characterized in that the supporting rod with
The connecting plate welding.
3. the timber according to claim 1 or 2 for Historical Buildings repairs structure, which is characterized in that the connection
Plate is fixedly installed connector close to the side for repairing pin, the connector be located in the reparation pin and with it is described
Pin is repaired to be fixedly connected.
4. the timber according to claim 3 for Historical Buildings repairs structure, which is characterized in that the connector exists
It is evenly arranged with several on the periphery of the connecting plate.
5. the timber according to claim 1 for Historical Buildings repairs structure, which is characterized in that the reparation pin
End, which is offered, to be located at the matched placing groove of the connecting plate, the connecting plate in the placing groove.
6. the timber according to claim 1 for Historical Buildings repairs structure, which is characterized in that the supporting rod
One end is connect with the connecting plate, and the other end is fixedly installed support plate, and contacts at the original base by the support plate
The upper end of seat.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721691702.4U CN207987997U (en) | 2017-12-07 | 2017-12-07 | Timber for Historical Buildings repairs structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721691702.4U CN207987997U (en) | 2017-12-07 | 2017-12-07 | Timber for Historical Buildings repairs structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207987997U true CN207987997U (en) | 2018-10-19 |
Family
ID=63803940
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721691702.4U Active CN207987997U (en) | 2017-12-07 | 2017-12-07 | Timber for Historical Buildings repairs structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207987997U (en) |
-
2017
- 2017-12-07 CN CN201721691702.4U patent/CN207987997U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105544396A (en) | Steel arc distributive girder structure of rod type bracket for cast-in-place arch bridge and construction method | |
CN208870047U (en) | The Retaining Structures in Excavation Engineering of building construction | |
CN110965474A (en) | Construction method of cable tower cross beam | |
CN204060020U (en) | A kind of Reinforced Concrete Reinforcement structure | |
CN215760673U (en) | Temporary supporting structure for shuttle-shaped column | |
CN108755439B (en) | Universal telescopic support frame suitable for V-shaped bridge pier and installation method | |
CN104452775B (en) | Pre-loaded support struts and construction method for foundation ditch | |
CN207987997U (en) | Timber for Historical Buildings repairs structure | |
CN110318344B (en) | Novel steel box girder No. 0 block support and No. 0 block erection construction method | |
CN206034265U (en) | Steel reinforced concrete of bridge combines section | |
CN114032784B (en) | Transverse lifting light convenient beam structure for jacking railway frame bridge and construction method | |
CN108005403A (en) | The restorative procedure and reparation structure of the pin of historical building | |
CN215976895U (en) | Self-balancing type inverted T-shaped front auxiliary supporting leg of three-leg bridge girder erection machine | |
CN115419101A (en) | Existing foundation bolt reinforcing device for power transmission line tower and construction method thereof | |
CN101749035B (en) | Ready-packaged arch timbering steel frame of round tunnel urgent repairing | |
CN204282371U (en) | A kind of pre-loaded support struts for foundation ditch | |
CN204663027U (en) | For the bracing or strutting arrangement that rack is installed | |
CN205205680U (en) | Cast -in -place arched bridge member formula support steel arc distribution beam construction | |
CN104404885B (en) | The device of pre-jacking force is applied for pier prestressed cap beam with extra length in water | |
CN204715362U (en) | A kind of deep foundation ditch embedded column base bracing frame | |
CN209652976U (en) | Fashioned iron Force transmission parts | |
CN204401462U (en) | For the support of pier prestressed cap beam with extra length Construction Supporting System in water | |
CN210152680U (en) | Prestressing force strutting arrangement who uses when tunnel connection passageway excavates | |
CN106758881A (en) | Bridge maintenance rail steel structural support arm | |
KR101214531B1 (en) | A lifting apparatus of upper structure of bridge and lifting method of upper structure of bridge by using |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |