CN207987958U - A kind of pedestal of the tablet formula power equipment assembly foundation structure - Google Patents

A kind of pedestal of the tablet formula power equipment assembly foundation structure Download PDF

Info

Publication number
CN207987958U
CN207987958U CN201820256924.1U CN201820256924U CN207987958U CN 207987958 U CN207987958 U CN 207987958U CN 201820256924 U CN201820256924 U CN 201820256924U CN 207987958 U CN207987958 U CN 207987958U
Authority
CN
China
Prior art keywords
pedestal
column
steel
power equipment
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820256924.1U
Other languages
Chinese (zh)
Inventor
冯帅乔
张玉超
卫天星
彭达志
冯军
张丙涛
卫军辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Siping Electric Design Co Ltd
Original Assignee
Siping Electric Design Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Siping Electric Design Co Ltd filed Critical Siping Electric Design Co Ltd
Priority to CN201820256924.1U priority Critical patent/CN207987958U/en
Application granted granted Critical
Publication of CN207987958U publication Critical patent/CN207987958U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Foundations (AREA)

Abstract

The utility model belongs to power equipment basis mounting technology field, specially a kind of pedestal of the tablet formula power equipment assembly foundation structure.From bottom to up, successively include sole plate, pedestal, column and connection switch cap, bottom plate, based on bottom backing plate, concrete prefabricated molding;Pedestal, point upper and lower two layers integral preform molding, inside is provided with reinforcing bar;Upper layer platform is prefabricated into the cup-shaped with insert port, pre-buried angle steel set at insert port;Pedestal is fixed on bottom plate top;Column, armored concrete is pre-formed, pre-buried four foundation bolts in top, the pre-buried circle band steel hoop of waist under column;Column bottom inserted base inserts into the mouth, and column is fixed on pedestal;Switch cap is connected, is steel part welding fabrication, there is upper and lower two table tops, upper following table to be connected by a steel column.This programme is conducive to construct, and is conducive to environmental protection, does not have particular/special requirement, winter that can also construct installation environment, running environment is round-the-clock.

Description

A kind of pedestal of the tablet formula power equipment assembly foundation structure
Technical field
The utility model belongs to power equipment basis mounting technology field, specially a kind of pedestal of the tablet formula power equipment assembly base Plinth structure.
Background technology
Substation equipment structure bracket basis form is armored concrete staged isolated footing, and foundation construction is cast in situs Wet construction mode, the construction of traditional cast-in-place concrete structure system from scaffolding, formwork, pricks muscle, to concreting, Majority work is completed by hand labour.Template turnover consumption is big, and construction personnel is more, and hand labour is more, and labor intensity is big, and skilled Degree is more demanding;Speed of application is slow, and the construction period is long, big by effect of natural conditions;Concrete appearance and Control of Internal Quality It is difficult;The defects of construction material waste at scene is serious.Cast-in-place concrete structure site operation there is:Noise disturbs residents, and dust is dirty Dye, construction environment are undesirable.
With the needs that power engineering develops, to construction period, construction investment, social environment, more stringent requirements are proposed, Conventional wet operating type constrains the fast development to power engineering construction.
Utility model content
For tradition it is cast-in-place to build the construction period existing for concrete foundation long, operating expenses is high, construction environment is poor, it is basic not Recycling, the problem of the shortcomings of winter bad construction, the utility model provides a kind of assembled basis of pedestal of the tablet formula power equipment Structure, from bottom to up, successively include sole plate, pedestal, column and connection switch cap,
Bottom plate, based on bottom backing plate, concrete prefabricated molding;It can be unworthy of reinforcing bar, play levelling base.
Pedestal, point upper and lower two layers integral preform molding, inside is provided with reinforcing bar;Upper layer platform is prefabricated into insert port Cup-shaped, pre-buried angle steel set at insert port;Pedestal is fixed on bottom plate top, and basic pedestal plays support and stabilization.
Column, armored concrete is pre-formed, pre-buried four foundation bolts in top, and the pre-buried circle of waist is flat under column Stirrup;Column bottom inserted base inserts into the mouth, and column is fixed on pedestal;Basic stand column plays a supportive role, and is closed for shearing resistance Key position.In column inserted base cup aperture, it can fit whether situation needs reinforcement of weld.
Switch cap is connected, is steel part welding fabrication, there is upper and lower two table tops, upper following table to be connected by a steel column; It is set on the table top of lower part there are four screw hole, four screw holes cooperate with four bolts on column respectively, and connection is converted Cap is mounted on column top;Upper table surface can be designed with four screw holes of different eye distances simultaneously.Convenient for the different installation equipment of correspondence. Switch cap plays connection transformation.It is very convenient in electric power first-aid, it is not necessary to replace entire basis, only exchange upper cap.
As the improvement of scheme, the upper surface of the sole plate is designed for recessed surface, and firm effect is played to pedestal.
As the improvement of scheme, the steel column surface soldered is equipped with multiple nearly triangular support parts, the triangle branch The upper end edge of support member is fixed on the back of upper table surface, and vertical side is fixed on steel column surface, and bevel edge is outwardly.
As the improvement of scheme, after column is inserted into pedestal, band steel hoop and angle steel set can be welded and fixed.
As the improvement of scheme, horizontal vertical is welded with multiple steel plate convexes on the band steel hoop, in the steel Plate protrusion be equipped with bolt hole, while angle steel set upper water pingbian on correspondence also be provided with multiple bolts hole, by band steel hoop with Angle steel set carries out bolt and fixes.
This assembly basis has the following advantages that:
1, in-site installation short time limit, construction is fast, reduces the transit time that has a power failure.Since pin-connected panel basis makes in factory process It finishes, after transporting scene to, it is only necessary to which the ground of construction site is slightly handled, you can splicing installation pounds maintenance, significantly without pouring Shorten the foundation construction time.
2, use cost is low.Since pin-connected panel basis is that batch production is prefabricated, on-site consolidation may be reused, utilization rate Height, without installation all assembling reinforcement, formwork, cast-in-place concrete every time, to make amortization charge substantially reduce.
3, fundamental technology quality is high.Since pin-connected panel basis produces for factory normalization, specialized continuous productive process is realized, Make, curing condition it is superior, quality is reliably guaranteed, between component use high-strength prestressed flexible connection technology, make block with Seamless connection, bolt accurate positioning, good integrity are realized between block, thus product quality is reliably guaranteed.
4, high recycling rate.Fully consider recycling problem when design, old basis can dig out that move on to other places sharp again With.Basic engineering at common-mode, it can be used for the basis of distinct device, once certain is engineered, Equipment Foundations displacement is prefabricated Concrete assembly basis can be transported to new position.
5, basis is versatile.Pin-connected panel basic engineering just considers that basis will have the popularity of application, peace at the beginning of design The simplicity of dress, whole versatility.Whole general, the principle of partial diverse is determined.For the equipment of different lower margin specifications Holder, makes plurality of specifications top concrete modular, and when installation requires according to distinct device, only needs to change hat cone block, Lower part can directly use general basic module section.
6, meet the requirement of civilized construction and environmental protection.On-site consolidation does not have noise, airborne dust, is influenced on surrounding resident It is small;Product scene integral assembling is convenient for construction site organizing construction, be easier to realize keep the good operating environment in construction site, The fields of hygienic conditions, order of work and standard construction scene holds, and keeps the requirement of the clean and tidy health of operating environment, without wet construction, Do not generate building waste.
7, the extent of spreading amd application is wide.Precast splice type basis be suitable for 220kV and following each grade transformer substation switch, The equipment such as disconnecting link, CT, PT, arrester, bus bridge structure, bracket basis can pass through according to the transformation of structure, rack form and load Mechanics analysis adjusts pin-connected panel basic module.
Precast splice type basis can be widely used in life instead of the existing pouring construction method of tradition, timeliness higher, the achievement The overhaul of production, technology innovation project;Substation's construction project of capital construction;The fields such as the emergency work of accident maintenance.
Description of the drawings
Fig. 1 is the structural decomposition diagram of the utility model;
Fig. 2 is the combination diagram of the utility model;
Fig. 3 is the positional structure schematic diagram of steel plate convex part and band steel hoop;
Fig. 4 is the positional structure schematic diagram of angle steel set and upper layer platform;
Specific implementation mode
In order to make the purpose of the utility model, technical solutions and advantages more clearly understood, below in conjunction with attached drawing and implementation Example, the present invention will be further described in detail.It should be appreciated that specific embodiment described herein is only used to explain The utility model is not used to limit the utility model.
With reference to figure 1-4, the utility model provides a kind of pedestal of the tablet formula power equipment assembly foundation structure, from bottom to up, according to It is secondary include sole plate 1, pedestal 2, column 3 and connection switch cap 4,
Bottom plate 1, based on bottom backing plate, concrete prefabricated molding;It can be unworthy of reinforcing bar, play levelling base.
Pedestal 2, point upper and lower two layers integral preform molding, inside is provided with reinforcing bar;Upper layer platform 5 is prefabricated into insertion Mouthfuls 6 cup-shaped, pre-buried angle steel set 7 at insert port 6;Pedestal 2 is fixed on 1 top, and basic pedestal 2 plays support and stabilization.
Column 3, armored concrete is pre-formed, pre-buried four foundation bolts 8 in top, in 3 times waists of column pre-buried one Enclose band steel hoop 9;3 bottom of column is inserted into 2 insert port 6 of pedestal, and column 3 is fixed on the base 2;Basic stand column 3 plays support and makees With for shearing resistance key position.Column 3 is inserted into 2 insert port 6 of pedestal, can fit whether situation needs reinforcement of weld.
Switch cap 4 is connected, is steel part welding fabrication, there is upper table surface 41, following table 42, upper and lower table top to pass through a steel Column 43 connects;Set on lower part table top 41 there are four screw hole, four screw holes respectively with four bolt phase interworkings on column 3 It closes, connection switch cap peace 4 is mounted in 3 top of column;Upper table surface 41 can be designed with four screw holes of different eye distances simultaneously.Convenient for pair Answer different installation equipment.Switch cap plays connection transformation.It is very convenient in electric power first-aid, it is not necessary to replace entire base Plinth only exchanges upper cap.
As the improvement of scheme, the upper surface of the sole plate 1 is designed for recessed surface, and firm work is played to pedestal 2 With.
As the improvement of scheme, 43 surface soldered of steel column is equipped with multiple nearly triangular support parts 10, the triangular support The upper end edge of part 10 is fixed on 41 backs of appearing on the stage, and vertical side is fixed on 43 surface of steel column, and bevel edge is outwardly.
As the improvement of scheme, after column 3 is inserted into pedestal 2, band steel hoop 9 and angle steel set 7 can be welded It is fixed.
As the improvement of scheme, horizontal vertical is welded with multiple steel plate convexes 12 on band steel hoop 9, convex in the steel plate Rise 12 be equipped with bolt hole, while angle steel set 7 upper water pingbian on correspondence also be provided with multiple bolts hole, by band steel hoop 9 with 7 progress bolt of angle steel set is fixed.
As the improvement of scheme, when angle steel set 7 to be fixed at insert port 6, can be covered on 7 in angle steel, with upper layer platform 5 Contact position, the horizontal steel pipe 11 of welding one, steel pipe 11 is embedded to inside upper layer platform 5 and is fixed.Here angle steel set 7 cuts open Face is inverted L-shaped, and there are horizontal sides and vertical edges, horizontal sides to be embedded on the upper surface of upper layer platform 5.
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, all at this All any modification, equivalent and improvement etc., should be included in the utility model made by within the spirit and principle of utility model Protection domain within.

Claims (5)

1. a kind of pedestal of the tablet formula power equipment assembly foundation structure, it is characterised in that:From bottom to up, include successively sole plate, base Seat, column and connection switch cap,
Bottom plate, based on bottom backing plate, concrete prefabricated molding;
Pedestal, point upper and lower two layers integral preform molding, inside is provided with reinforcing bar;Upper layer platform is prefabricated into the cup with insert port Shape, pre-buried angle steel set at insert port;Pedestal is fixed on bottom plate top;
Column, armored concrete is pre-formed, pre-buried four foundation bolts in top, the pre-buried circle band steel of waist under column Hoop;Column bottom inserted base inserts into the mouth, and column is fixed on pedestal;
Switch cap is connected, is steel part welding fabrication, there is upper and lower two table tops, upper following table to be connected by a steel column;Lower part It is set on table top there are four screw hole, four screw holes cooperate with four bolts on column respectively, by connection switch cap peace Mounted in column top;Upper table surface can be designed with four screw holes of different eye distances simultaneously.
2. a kind of pedestal of the tablet formula power equipment assembly foundation structure as described in claim 1, it is characterised in that:The basic bottom The upper surface of plate is designed for recessed surface, and firm effect is played to pedestal.
3. a kind of pedestal of the tablet formula power equipment assembly foundation structure as described in claim 1, it is characterised in that:The steel column table Face welding is equipped with multiple nearly triangular support parts, and the upper end edge of the triangular support part is fixed on the back of upper table surface, vertically Side is fixed on steel column surface, and bevel edge is outwardly.
4. a kind of pedestal of the tablet formula power equipment assembly foundation structure as described in claim 1, it is characterised in that:Column is inserted into After in pedestal, band steel hoop and angle steel set can be welded and fixed.
5. a kind of pedestal of the tablet formula power equipment assembly foundation structure as described in claim 1, it is characterised in that:In the band steel Horizontal vertical is welded with multiple steel plate convexes on hoop, bolt hole is equipped on the steel plate convex, while in the upper of angle steel set Correspondence also is provided with multiple bolts hole in portion's horizontal sides, and band steel hoop is covered progress bolt with angle steel to be fixed.
CN201820256924.1U 2018-02-13 2018-02-13 A kind of pedestal of the tablet formula power equipment assembly foundation structure Expired - Fee Related CN207987958U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820256924.1U CN207987958U (en) 2018-02-13 2018-02-13 A kind of pedestal of the tablet formula power equipment assembly foundation structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820256924.1U CN207987958U (en) 2018-02-13 2018-02-13 A kind of pedestal of the tablet formula power equipment assembly foundation structure

Publications (1)

Publication Number Publication Date
CN207987958U true CN207987958U (en) 2018-10-19

Family

ID=63825758

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820256924.1U Expired - Fee Related CN207987958U (en) 2018-02-13 2018-02-13 A kind of pedestal of the tablet formula power equipment assembly foundation structure

Country Status (1)

Country Link
CN (1) CN207987958U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109252537A (en) * 2018-11-01 2019-01-22 国网宁夏电力有限公司检修公司 The adjustable disconnecting link basis of ultra-high voltage converter station valve hall
CN109403367A (en) * 2018-12-07 2019-03-01 华中科技大学 A kind of assembled case change basis and its component on site construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109252537A (en) * 2018-11-01 2019-01-22 国网宁夏电力有限公司检修公司 The adjustable disconnecting link basis of ultra-high voltage converter station valve hall
CN109403367A (en) * 2018-12-07 2019-03-01 华中科技大学 A kind of assembled case change basis and its component on site construction method
CN109403367B (en) * 2018-12-07 2024-04-05 华中科技大学 Assembled box transformer foundation and field construction method thereof

Similar Documents

Publication Publication Date Title
CN209384444U (en) A kind of fabricated shear wall vertical connection structure
CN207987958U (en) A kind of pedestal of the tablet formula power equipment assembly foundation structure
CN110273539A (en) A kind of combination set shaped steel formwork and its modeling method
CN204081478U (en) A kind of Novel steel structure cast-in-situ floor formwork erecting structure
CN205419600U (en) A base steel construction for constructing tower crane base accurate positioning installation
CN207143746U (en) Support beam template system under concrete support trestle plate
CN208934394U (en) One kind can turnover type hydraulic climbing formwork wall-attaching equipment
CN206233115U (en) A kind of supporting bracket of bridge construction
CN207144456U (en) Builder's jack I-steel built-in fitting
CN206189607U (en) Rag bolt location structure
CN206070404U (en) Oblique formwork support structure at the section haunch of box culvert top
CN205617664U (en) Prefabricated pier stud locating rack for steel reinforcement cage
CN109235709B (en) Full cast-in-place outer wall structure of building
CN204221941U (en) A kind of combined type sycon cable duct mould
CN114319929A (en) Integral jacking device for house
CN203128972U (en) Roadbed box for large-scale crawler crane
CN209228386U (en) A kind of lining of tunneling Subway Tunnel big cross section stop line two new type formwork trolley
CN208396295U (en) A kind of open-cut station construction stair formwork erecting structure
CN207863226U (en) A kind of built-in fabricated shear wall supported
CN111677336A (en) Temporary stair passageway device capable of being circulated on operation layer
CN206233578U (en) Inner corner trim reinforcing template and its formwork system
CN202559291U (en) U-typed aqueduct simulated test device
CN207244957U (en) A kind of modularization Prefabricated stacking floor for being used to drop plate region
CN206015685U (en) A kind of Collapsible Loess District deep basal pit diaphram wall inner support system
CN205918142U (en) Aligning device is assembled to shear force wall

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181019

Termination date: 20210213

CF01 Termination of patent right due to non-payment of annual fee