CN207987917U CN201820368127.2U CN201820368127U CN207987917U CN 207987917 U CN207987917 U CN 207987917U CN 201820368127 U CN201820368127 U CN 201820368127U CN 207987917 U CN207987917 U CN 207987917U
Authority
CN
China
Prior art keywords
pipe pile
float
frost
steel
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820368127.2U
Other languages
Chinese (zh)
Inventor
侯兆隆
田连民
杨元海
张雨宾
张铮
朱丹丹
邱伟超
刘志峰
周伟根
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Road and Bridge International Co Ltd
China Communications Road and Bridge North China Engineering Co Ltd
Original Assignee
Road and Bridge International Co Ltd
China Communications Road and Bridge North China Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Road and Bridge International Co Ltd, China Communications Road and Bridge North China Engineering Co Ltd filed Critical Road and Bridge International Co Ltd
Priority to CN201820368127.2U priority Critical patent/CN207987917U/en
Application granted granted Critical
Publication of CN207987917U publication Critical patent/CN207987917U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model is related to a kind of frost-cracking-preventing steel-pipe piles suitable for frost zone bridge subaqueous work, including steel pipe pile body, steel pipe pile body lower end inserting piling is in water-bed rock stratum, there is the water level of certain altitude in steel pipe pile body, a float floated in water is equipped in steel pipe pile body, the float is that have the soft impermeable material of the column of certain length, the top surface of float is higher than certain altitude on water level in steel-pipe pile, bottom surface is located in steel-pipe pile certain depth under the water surface, which is frost zone maximum gauge ice sheet bottom surface or less.

Description

A kind of frost-cracking-preventing steel-pipe pile suitable for frost zone bridge subaqueous work
Technical field
The utility model is related to technical field of bridge construction, and in particular to a kind of suitable for the antifreeze of frost zone bridge construction Split steel-pipe pile.
Background technology
When bridge subaqueous work, to set up the falseworks such as steel trestle, steel platform and construct for bridge substructure.Temporarily The construction of holder is mainly steel-pipe pile+main spandrel girder+distribution beam+floorings, and wherein steel-pipe pile is usually located at water (river, river, lake) In, lower end inserting piling enters in water-bed rock stratum, and upper end protrudes from the water surface, supports spandrel girder, there is the water level of certain altitude in steel-pipe pile. In the area construction for having ice period, the water surface can freeze in winter, form ice sheet.Since the water in steel-pipe pile can equally freeze, Under the action of frost-heave force, brittle break can be generated to steel-pipe pile, steel-pipe pile spalling can be led to steel pipe pile bearing capacity when serious And falsework structural stability declines, and generates security risk.
Invention content
The purpose of this utility model is that being provided a kind of suitable for frost zone by the present situation of bursting by freezing for frost zone steel-pipe pile The frost-cracking-preventing steel-pipe pile of bridge subaqueous work.
The technical solution of the utility model is as follows:
A kind of frost-cracking-preventing steel-pipe pile suitable for frost zone bridge subaqueous work, including steel pipe pile body, steel pipe pile body Lower end inserting piling is in the water level for having certain altitude in water-bed projected depth, steel pipe pile body, it is characterised in that:The steel pipe pile body It is inside equipped with a float floated in water, the float is that have the soft impermeable material of the column of certain length, the float Higher than certain altitude on the water surface in steel pipe pile body, certain depth under the water surface is goed deep into steel pipe pile body in bottom surface for top surface.
The utility model is provided with the float of soft impermeable material in steel-pipe pile, the water freezing expansion in steel-pipe pile When, soft impermeable material is squeezed collapsible by ice sheet, thus gives ice sheet enough expansion space, it is possible to prevente effectively from ice sheet to Outer expansion causes brittle break and bursting by freezing phenomenon to steel-pipe pile, has ensured the stable structure of steel pipe pile bearing capacity and falsework Property.
Description of the drawings
Fig. 1 is the vertical structure sectional view of the utility model;
Fig. 2 is a kind of overlooking structure diagram figure of embodiment of the utility model.
Specific implementation mode
As shown in Figure 1, the utility model includes steel pipe pile body 1,1 lower end inserting piling of steel pipe pile body is deep in bottom design It spends, there is the water level of certain altitude in steel pipe pile body.Height of water level inside and outside usual steel pipe pile body is consistent, so that steel pipe pile pipe Inside and outside hydraulic pressure suffered by wall is consistent.A float 2 floated in water is equipped in steel pipe pile body, the float 2, which is one section, to be had centainly The soft impermeable material of column of height, the top surface of the float is higher than certain altitude on the water surface in steel pipe pile body, bottom surface Go deep into steel pipe pile body certain depth under the water surface.
The utility model is when it is implemented, the depth under the water surface in steel pipe pile body is goed deep into float bottom surface, according to construction When the freezed in winter of frost zone depending on the maximum gauge of ice sheet 3, it is ensured that float bottom surface is located at a depthkeeping under most thick ice sheet bottom surface Degree.The ice sheet maximum gauge of frost zone can be obtained according to construction area winter climate investigation over the years.
Facility work area ice sheet maximum gauge is H, and the length that float is located at the water surface (ice face) or more is h1, and float bottom surface is goed deep into Length under most thick ice sheet bottom is h2, then the total length L of float should be:L=h1+H+h2
When it is implemented, float top surface is generally made to be higher by steel pipe pile body the more than the water surface at least 20cm, float bottom surface position In water surface depth below, it is traditionally arranged to be less than at least 20cm below 3 maximum gauge bottom surface of ice sheet.
Float uses soft impermeable material, can be shunk when being to be squeezed by ice sheet, ice sheet is made inwardly to expand, avoided Expansion damages steel-pipe pile to ice sheet outward.To give ice sheet enough inside expansion spaces, sky may be configured as in the middle part of float The heart.
The cross section of float may be configured as round, polygon or quincunx.As shown in Fig. 2, the float of quincunx cross section It is more advantageous to when being squeezed to contract.
As shown in Figure 1, to make float that enough length be kept to be located at the water surface hereinafter, a weight can be connected in the bottom of float 4.The gravity of the weight 4 is equal to the buoyancy of float in water.Plummet can be used in weight, can also be with mixed with the quality such as plummet Solidifying soil block.
To keep float position in steel-pipe pile placed in the middle, can be welded less than at float upper end in the steel-pipe pile inner body wall One upper limit hoop 5, higher than welding position-limited hoop 6 at float lower end, the upper limit hoop and lower limit hoop be all include one by The annulus that reinforcing bar or steel plate turn to, annulus outside are welded with steel-pipe pile inner wall, and uniform welding 4 is distinguished into steel-pipe pile in inside The gag lever post facing each other 7 that the heart extends, 7 length of each gag lever post is identical, every two opposite the distance between 7 front ends of gag lever post Equal to or more than the diameter of float.
The utility model is constructed for frost zone, in winter, when the water freezing in steel-pipe pile, since float is soft material Material, ice sheet can inwardly squeeze float when expanding, without outside expansion damage steel-pipe pile, to prevent steel-pipe pile bursting by freezing.

Claims (6)

1. a kind of frost-cracking-preventing steel-pipe pile suitable for frost zone bridge subaqueous work, including steel pipe pile body, under steel pipe pile body Hold inserting piling in the water level for having certain altitude in water-bed projected depth, steel pipe pile body, it is characterised in that:In the steel pipe pile body Float in water is floated on equipped with one, the float is that have the soft impermeable material of the column of certain length, the top of the float Higher than certain altitude on the water surface in steel pipe pile body, certain depth under the water surface is goed deep into steel pipe pile body in bottom surface in face.
2. the frost-cracking-preventing steel-pipe pile according to claim 1 suitable for frost zone bridge subaqueous work, it is characterised in that:Institute It states float top surface and is higher by steel pipe pile body more than water level at least 20cm, it is less than ice that float bottom surface, which is located at water surface depth below, Freeze area maximum gauge ice sheet bottom surface or less at least 20cm.
3. the frost-cracking-preventing steel-pipe pile according to claim 1 suitable for frost zone bridge subaqueous work, it is characterised in that:Institute The middle part for stating float is hollow.
4. the frost-cracking-preventing steel-pipe pile according to claim 1 suitable for frost zone bridge subaqueous work, it is characterised in that:Institute The cross section for stating float is round, polygon or quincunx.
5. the frost-cracking-preventing steel-pipe pile according to claim 1 suitable for frost zone bridge subaqueous work, it is characterised in that:Institute The bottom for stating float connects a weight, and the gravity of the weight is equal to the buoyancy of float in water.
6. the frost-cracking-preventing steel-pipe pile according to claim 1 suitable for frost zone bridge subaqueous work, it is characterised in that: Less than a upper limit hoop is welded at float upper end in the steel-pipe pile inner body wall, higher than one lower limit of welding at float lower end It binds round, 4 isometric limits facing each other extended to steel pipe pile center of uniform welding is distinguished on the upper limit hoop and lower limit hoop Position bar, the distance between every two opposite gag lever post front ends are equal to or more than the diameter of float.
CN201820368127.2U 2018-03-17 2018-03-17 A kind of frost-cracking-preventing steel-pipe pile suitable for frost zone bridge subaqueous work Active CN207987917U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820368127.2U CN207987917U (en) 2018-03-17 2018-03-17 A kind of frost-cracking-preventing steel-pipe pile suitable for frost zone bridge subaqueous work

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820368127.2U CN207987917U (en) 2018-03-17 2018-03-17 A kind of frost-cracking-preventing steel-pipe pile suitable for frost zone bridge subaqueous work

Publications (1)

Publication Number Publication Date
CN207987917U true CN207987917U (en) 2018-10-19

Family

ID=63828274

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820368127.2U Active CN207987917U (en) 2018-03-17 2018-03-17 A kind of frost-cracking-preventing steel-pipe pile suitable for frost zone bridge subaqueous work

Country Status (1)

Country Link
CN (1) CN207987917U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108360503A (en) * 2018-03-17 2018-08-03 中交路桥建设有限公司 A kind of frost-cracking-preventing steel-pipe pile suitable for frost zone bridge subaqueous work

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108360503A (en) * 2018-03-17 2018-08-03 中交路桥建设有限公司 A kind of frost-cracking-preventing steel-pipe pile suitable for frost zone bridge subaqueous work

Similar Documents

Publication Publication Date Title
CN203034464U (en) Truss type foundation pit supporting structure
CN104652475B (en) A kind of truss-like retaining wall
CN103485363A (en) Three-dimensional continuous frame type reinforced concrete structure retaining wall
CN107700366A (en) Deep water high-block bridge degree the bridge construction naked rock river bed trestle of hard stone and construction method
CN102677592A (en) Method for erecting deepwater steel trestle and platform on exposed bedrock in shallow sea
CN105839651A (en) Roadbed slope assembly type deformation self-adaptive protective framework and splicing method thereof
US20110299937A1 (en) Pre-stressed concrete foundation for a marine building structure
CN109667273A (en) A kind of construction method of deep foundation pit supporting structure
CN106120803A (en) Base pit stand construction in the case of artesian water
CN209891191U (en) Building foundation reinforcing pile
CN207987917U (en) A kind of frost-cracking-preventing steel-pipe pile suitable for frost zone bridge subaqueous work
CN204898717U (en) Shaft major structure of built -in lattice stand
CN211665773U (en) Unloading plate type supporting structure
US3255591A (en) Horizontally stabilized foundation
CN211174126U (en) Open cut tunnel structure
CN205653804U (en) Slope assembled warp self -adaptation protection skeleton
CN210104765U (en) High and large retaining structure of soft geological side slope
CN111005389A (en) Construction method of unloading plate type supporting structure
CN209194552U (en) A kind of combined cofferdam for bridge foundation construction
CN111622234A (en) Unloading type thin-wall box-type retaining wall supported by obliquely and vertically combined steel pipe pile and construction process
CN101481910B (en) Construction method of foundation pit slope supported independent pile tower crane foundation
CN204059361U (en) A kind of braced structures adopting resistance to plucking PHC pile tube to do column
CN108589701A (en) The antifreeze cracking method of steel-pipe pile suitable for frost zone bridge subaqueous work
CN108360503A (en) A kind of frost-cracking-preventing steel-pipe pile suitable for frost zone bridge subaqueous work
CN203270588U (en) Mini-pile antiskid structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant