CN101481910B - Construction method of foundation pit slope supported independent pile tower crane foundation - Google Patents

Construction method of foundation pit slope supported independent pile tower crane foundation Download PDF

Info

Publication number
CN101481910B
CN101481910B CN200910029015XA CN200910029015A CN101481910B CN 101481910 B CN101481910 B CN 101481910B CN 200910029015X A CN200910029015X A CN 200910029015XA CN 200910029015 A CN200910029015 A CN 200910029015A CN 101481910 B CN101481910 B CN 101481910B
Authority
CN
China
Prior art keywords
pile
tower crane
foundation
independent
support pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN200910029015XA
Other languages
Chinese (zh)
Other versions
CN101481910A (en
Inventor
朱国梁
吴碧桥
朱学农
张传捷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Huajian Construction Co Ltd
Original Assignee
Jiangsu Huajian Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Huajian Construction Co Ltd filed Critical Jiangsu Huajian Construction Co Ltd
Priority to CN200910029015XA priority Critical patent/CN101481910B/en
Publication of CN101481910A publication Critical patent/CN101481910A/en
Application granted granted Critical
Publication of CN101481910B publication Critical patent/CN101481910B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses a method for constructing an independent pile tower crane foundation supported on an excavation slope. The steps are as follows: geologic drilling analysis is carried out on the excavation slope to draw up a construction scheme; according to the scheme, holes are dug on the excavation slope, water is pumped during the operation of digging the holes, retaining wall mouldingboards are supported, and concrete retaining walls are cast. The diameter of each hole bottom is enlarged, and backing concrete is cast to form an expansion head. Independent supporting piles and thetower crane bearing foundation are cast by the concrete, the diameter of the independent supporting pile is equal to or larger than 1.42 times of the side length of each standard knot of a tower body, the depth of the independent supporting pile is equal to or larger than 1.5 times of the height of a pile foundation suspension arm, and the top face of the tower crane bearing foundation is lower than a natural terrace. The construction method has the advantages of low production cost, reliable quality, simple machines and equipment, convenient construction and operation and higher single-pile bearing force, thereby meeting the requirement of casting the tower crane bearing platform foundation; and the construction method has no noise during construction, no discharge of mud solution, little effect on ambient environment and buildings and small space occupation.

Description

The construction method on the independent pile tower crane basis of excavation slope place supporting
Technical field
The present invention relates to the tower crane of the independent stake of a kind of excavation slope place supporting, also relate to its design and construction method simultaneously, belong to technical field of building construction.
Background technology
The lagging pile of common deep foundation pit support, main functions of use are in construction period opposing soil lateral pressure, prevent landslide of excavation slope soil layer and slip, and its axial bearing capacity and resistance to capsizing are all lower, can not be as the basis usefulness of tower crane.When limited by geology and site condition, in the time of can't in foundation ditch and near the foundation ditch limit tower crane being set, in the lagging pile of excavation slope, the part is chosen one and is adopted artificial digging pile bored concrete pile supporting foundation pit, and utilize the independent stake of this root as tower crane, also there are many problems to need to solve.Because of the independent pile tower crane basis affords the axial force of large eccentricity, the travelling load of repetition and the influence of earth pressure, its design and construction all will fully take into account the influence of the bearing capacity of the axial force of pattern foundation pit supporting structure, large eccentricity and antifatigue, so the building operation of excavation slope place tower crane has many problems to research and solve.
Summary of the invention
The present invention wants the technical solution problem to be: all lower at lagging pile design axial bearing capacity and resistance to capsizing, a kind of axial force that can overcome earth pressure, afford large eccentricity is proposed, the technical scheme on the independent pile tower crane basis of the excavation slope place supporting of energy antifatigue under the travelling load effect that repeats.
Technical scheme of the present invention is that the construction method on the independent pile tower crane basis of excavation slope place supporting comprises the steps:
(1) carries out the geological drilling analysis at the excavation slope place, formulate arrangement and method for construction;
(2) at excavation slope place borehole, draw water, support dado template, the casting concrete retaining wall while digging;
When (3) borehole reached projected depth, diameter at the bottom of the expanded hole will be cleaned out at the bottom of the hole, drain ponding after, cast bottom concrete and enlarged footing;
(4) cement concrete pours into independent support pile, on independent support pile top cast tower crane cushion cap basis, the diameter of independent support pile is equal to or greater than 1.42 times of the length of side of body of the tower standard knot, the degree of depth of independent support pile (at the bottom of the foundation ditch to enlarged footing) is equal to or greater than 1.5 times of the independent support pile cantilever height height H of tower crane cushion cap basis end face (at the bottom of the foundation ditch to), and tower crane cushion cap basis end face is lower than the nature terrace.
The present invention adopts independent manually digging hole to pour into independent support pile and tower crane cushion cap basis is formed, by the technology of at present existing various tower cranes has been carried out research and analysis respectively, at pattern foundation pit supporting structure, the retaining wall pile foundation, many-sides such as the design of tower crane and construction method have carried out finding after the exploratory experiment: the lagging pile of directly selecting supporting foundation pit, its axial bearing capacity and resistance to capsizing are all lower, utilize the many piles of platoon as tower crane, employing reasonable building structure, though the construction method of grasp science can be as the basis of tower crane, antidumping, antifatigue and carrying all have certain risk.The present invention is at the excavation slope place, and artificial digging pile bored concrete pile supporting foundation pit is adopted in the part, and utilizes this independent support pile as tower crane.According to design calculation, adopt rational arrangement of reinforcement and construction measure, improve lagging pile design axial bearing capacity and resistance to capsizing, guarantee that independent support pile tower crane can bear the travelling load and the earth pressure of the axial force of large eccentricity, repetition.This construction method cost is low, reliable in quality, and plant is simple, and constructing operation is convenient, and bearing capacity of pile is than higher, the construction noiselessness, no mud is discharged, and surrounding environment and building is influenced little, and occupied ground is little.
Description of drawings
Fig. 1 is the independent pile tower crane basic design scheme drawing of excavation slope of the present invention place's supporting;
Fig. 2 is an independent support pile force analysis scheme drawing of the present invention;
Fig. 3 is a working face scheme drawing of the present invention;
Among the figure: at the bottom of 1 independent support pile, 2 enlarged footings, 3 tower crane cushion cap bases, 4 tower cranes, 5 natural terraces, 6 independent support pile cantilevers, 7 foundation ditches, 8 buildings, 9 subterranean rooies, 10 side slopes.
The specific embodiment
As Fig. 1, Fig. 2, shown in Figure 3, carry out the geological drilling analysis at excavation slope 10 places of building 8 and subterranean room 9 earlier, formulate arrangement and method for construction; , draw water at excavation slope place borehole according to scheme, support dado template, the casting concrete retaining wall while digging; When borehole reached projected depth, diameter at the bottom of the expanded hole will be cleaned out at the bottom of the hole, drain ponding after, the cast bottom concrete forms enlarged footing 2; Begin to pour into independent support pile 1 from the bottom with cement concrete, on the tower crane cushion cap basis 3 that tower crane 4 is installed in the cast of independent support pile top, the diameter of independent support pile is equal to or greater than 1.42 times of the length of side of body of the tower standard knot, the degree of depth of independent support pile is equal to or greater than 1.5 times of independent support pile cantilever 6 height, and guaranteeing has enough length at the bottom of independent support pile is embedded in foundation ditch below 7.Tower crane cushion cap basis end face is lower than nature terrace 5.The independent support pile on excavation slope place supporting independent pile tower crane basis and structure, size and the arrangement of reinforcement on tower crane cushion cap basis are according to the design calculation data configuration.
The independent pile tower crane Base Design of excavation slope place supporting is calculated:
1. constructional loading calculates
The axial design payload values:
N=1.2(N 1+N 2+N 3)+1.4N 4
N: axial design payload values (KN),
N 1: tower crane deadweight standard value (KN),
N 2: tower crane cushion cap deadweight standard value (KN),
N 2=a * b * h * 25.5; A, b, h are respectively the length on basis, and be wide, and high (m),
N 3: independent support pile deadweight standard value (KN),
N 3 = 1 4 π D 2 × L × 25.1 , D and L are respectively the diameter and the stake long (m) of independent pile body,
N 4: the maximum lifting weight standard value (KN) of tower crane,
The capsizing moment design value,
M=1.4M 1+1.2M 2
M: under the least favorable state, capsizing moment design value (KNm),
M 1: maximum capsizing moment standard value (KNm) under tower crane work or the off working state,
M 2: slope retaining place active earth pressure, under the horizontal thrust effect, the capsizing moment standard value (KNm) of formation,
M 2 = 1 3 H · D · Ea ,
H: foundation depth (m),
E a: the total active earth pressure of foundation ditch unit length (KN/m),
Figure G200910029015XD00043
R: the average density (KN/m of soil layer behind the foundation ditch skirt piles 3),
φ: the angle of internal friction of soil layer behind the foundation ditch skirt piles,
C: the binding force (KN/m of soil layer behind the foundation ditch skirt piles 2).
2. independent support pile checking of bearing capacity
The pile end groundwork checking of bearing capacity:
R≥N,
R: independent support pile axial design bearing capacity (KN),
R = 1 4 π D 2 f αy ,
f α y: bearing course at pile end bearing capacity of foundation design value (KN/m 2),
2.2 independent support pile tower crane antidumping checking computations,
Figure G200910029015XD00051
Wherein: cos45 ° of D for the pile body center of circle in connect the distance on square limit.With this moment fulcrum as antidumping.
2.3. independent support pile Design of Bearing Capacity,
N ≤ α α 1 fcA ( 1 - Sin 2 πα 2 πα ) + ( α - αt ) fyAs ,
Nη e i ≤ 2 3 α 1 fcAr Sin 3 πα π + fyAsγs Sinπα + Sinπ α t π ,
αt=1.25-2α,
e i=e 0+e a
A: independent support pile round section is long-pending
Figure G200910029015XD00054
As: the sectional area (mm of whole longitudinal reinforcements 2),
γ: the radius (m of independent support pile round section 2),
γ s: the radius (m of longitudinal reinforcement center of gravity place circumference 2),
e 0: the eccentric throw (m) of axle pressure pair cross-section center of gravity e 0 = M N ,
e a: accidental eccentricity, its value should be got 1/30 higher value (mm) among both of the independent stake of 20mm and eccentric direction diameter dimension,
α: corresponding to the central angle (rad) of pressure zone concrete-pile sectional area and the ratio of 2 π.
α t: the ratio of the whole longitudinal reinforcement sectional areas of longitudinal tensile area of reinforcement and pile body, when α>0.625, get α t=0,
Fc: independent support pile concrete crushing strength design value (N/mm 2),
Fy: independent support pile longitudinal stress reinforcing bar tensile strength design value (N/mm 2),
Annotate: the longitudinal stress bar diameter should not be less than φ 12, and all the ratio of reinforcement of longitudinal reinforcement should not must not be less than 0.6% greater than 5%.
η: independent support pile eccentric compression member, consider the axle pressure amplified coefficient of eccentricity that Order Moment influences
η = 1 + 1 1400 ei / γ + γ s ( H D ) 2 · ζ 1 · ζ 2 ,
ζ 1 = 0.5 fcA N ,
ζ 2 = 1.15 - 0.01 H D ,
ζ 1: the sectional curvature coefficient of correction of eccentric compression independence support pile, work as ζ 1, get ζ at>1 o'clock 1=1,
ζ 2: the influence coefficient of independent support pile slenderness ratio pair cross-section curvature, when H D < 17.5 The time, get ζ 2=1,
2.4 the checking computations of independent support pile cross section shear strength,
τ max≤[τ],
&tau; max = 4 F s 3 A ,
τ Max: cross section maximum shear stress (KN/m 2),
[τ]: cross section allowable shearing stress (KN/m 2),
F s: the suffered shearing in cross section, i.e. the active earth pressure E of slope retaining place a(KN),
Figure G200910029015XD00066
A: independent support pile round section is long-pending
Figure G200910029015XD00067

Claims (1)

1. the construction method on an excavation slope place supporting independent pile tower crane basis is characterized in that comprising the steps:
(1) carries out the geological drilling analysis at the excavation slope place, formulate arrangement and method for construction;
(2) at excavation slope place borehole, draw water, support dado template, the casting concrete retaining wall while digging;
When (3) borehole reached projected depth, diameter at the bottom of the expanded hole will be cleaned out at the bottom of the hole, drain ponding after, cast bottom concrete and enlarged footing;
(4) cement concrete pours into independent support pile, on independent support pile top cast tower crane cushion cap basis, the diameter of independent support pile is equal to or greater than 1.42 times of the length of side of body of the tower standard knot, the degree of depth of independent support pile is equal to or greater than 1.5 times of independent support pile cantilever height, and tower crane cushion cap basis end face is lower than the nature terrace.
CN200910029015XA 2009-01-09 2009-01-09 Construction method of foundation pit slope supported independent pile tower crane foundation Active CN101481910B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200910029015XA CN101481910B (en) 2009-01-09 2009-01-09 Construction method of foundation pit slope supported independent pile tower crane foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200910029015XA CN101481910B (en) 2009-01-09 2009-01-09 Construction method of foundation pit slope supported independent pile tower crane foundation

Publications (2)

Publication Number Publication Date
CN101481910A CN101481910A (en) 2009-07-15
CN101481910B true CN101481910B (en) 2010-07-07

Family

ID=40879186

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200910029015XA Active CN101481910B (en) 2009-01-09 2009-01-09 Construction method of foundation pit slope supported independent pile tower crane foundation

Country Status (1)

Country Link
CN (1) CN101481910B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102888847B (en) * 2012-10-19 2014-12-24 中国二十二冶集团有限公司 Construction method free from lowering water level for local deep foundation pit of elevator shaft
CN106759442A (en) * 2017-01-05 2017-05-31 中建三局第二建设工程有限责任公司 A kind of single-pile elevated bearing-platform and anchor cable tower-crane foundation structure and its construction method
CN115305944A (en) * 2022-09-02 2022-11-08 中建八局第三建设有限公司 Construction method for supporting pile serving as tower crane foundation pile

Also Published As

Publication number Publication date
CN101481910A (en) 2009-07-15

Similar Documents

Publication Publication Date Title
CN108842791B (en) Detachable load pile anchor multistage supporting structure and construction method
CN110820763A (en) Truss type cast-in-situ bored pile supporting method for mucky soil deep foundation pit
CN104532868B (en) High abrupt change shape sloped region bridge anchor pull-type high cap pile group basis construction method
CN101408023A (en) Method for supporting and protecting row pile pit
CN103485363A (en) Three-dimensional continuous frame type reinforced concrete structure retaining wall
CN106869138A (en) A kind of load retaining wall Retaining Structure with Double-row Piles and its foundation ditch excavation method
CN103485347A (en) Batter pile used for building foundation pit support and construction method thereof
CN101481910B (en) Construction method of foundation pit slope supported independent pile tower crane foundation
CN108360535A (en) Foundation pit supporting construction based on campshed and inner support and its construction method
CN113235638A (en) Construction method of composite pile foundation with long pile and short pile integrated
CN202187340U (en) Socketed pile with concrete-filled steel tube core column
CN201144425Y (en) Mini pile tower foundation
CN201459749U (en) Stable structure for construction platform of deep water steel pipe pile
CN111501739A (en) Structure for limiting horizontal displacement of pile foundation in deformable rock formation and construction method
CN106120833A (en) A kind of underground truss-like pile foundation and construction method thereof
CN216839478U (en) Non-closed arc interlock pile foundation pit supporting construction of complicated topography geology in mountain area
CN102286971A (en) Concrete-filled steel tube core column socketed pile
CN109989346A (en) Bridge major diameter precast concrete tubular column basis and its construction method
CN209923935U (en) Co-location combined pile wall supporting structure in upper-soft and lower-hard stratum
CN102116024B (en) Static pressure multilayer radial enlarging grouting pile and construction method thereof
CN212656218U (en) Heavy pile machine load underpinning structure
CN208996052U (en) The drilling tool of supporting construction and use that foundation pit anchor wall draws anchor supporting to be formed
CN201411707Y (en) Tower cane foundation
CN220486413U (en) Microporous bored concrete pile rock anchor rod composite foundation of photovoltaic power station
CN217734094U (en) Reinforced structure of old retaining wall

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant