CN207987648U - A kind of solution cavity construction site filled type geological disposal structure - Google Patents
A kind of solution cavity construction site filled type geological disposal structure Download PDFInfo
- Publication number
- CN207987648U CN207987648U CN201820162703.8U CN201820162703U CN207987648U CN 207987648 U CN207987648 U CN 207987648U CN 201820162703 U CN201820162703 U CN 201820162703U CN 207987648 U CN207987648 U CN 207987648U
- Authority
- CN
- China
- Prior art keywords
- solution cavity
- thermal insulation
- insulation board
- earth
- filled type
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Road Paving Structures (AREA)
Abstract
The utility model discloses a kind of solution cavity construction site filled type geological disposal structures,Including earth's surface,The inside of the earth's surface offers solution cavity,And the bottom of solution cavity has poured concrete,Reinforcing bar is installed above the concrete,And sand stone layer is equipped at the top of reinforcing bar,Smooth surface cement layer is provided at the top of the sand stone layer,The top of the earth's surface is equipped with thermal insulation board by fastening bolt,And the inside of thermal insulation board is equipped with heating tube,Control cabinet is installed at a side position of thermal insulation board in the earth's surface,The utility model is provided with the structure that multilayer pours fastening,The interior wall construction for solving solution cavity is unstable,The easy avalanche of solution cavity,The problem of leading to land subsidence,Be conducive to the steady of ground,It ensure that the safety of construction personnel,Provided with thermal insulation board,Solving filled type geological disposal structure protrusion earth's surface also has recess in underground,The problem of making troubles staff's walking,It carries out the work convenient for construction personnel.
Description
Technical field
The utility model belongs to solution cavity geological disposal technical field, and in particular to a kind of solution cavity construction site filled type geology
Processing structure.
Background technology
Solution cavity geological disposal is to handle the solution cavity on ground using processing methods such as filling, expansions, is carrying out road
When construction, solution cavity interferes construction personnel to carry out road construction, and solution cavity needs are filled, the most using filled type geological disposal method
Rationally, it needs to design filled type geological disposal structure progress solution cavity geological disposal at this time.
But solution cavity construction site filled type geological disposal structure currently on the market cannot meet requirement, when use
The interior wall construction of solution cavity is unstable, the easy avalanche of solution cavity, the problem of leading to land subsidence, and in use, filled type geological disposal
Structure, which is protruded earth's surface and also had, to be recessed in underground, makes troubles the construction of staff, the problem of based on appearing above, proposes one
Kind solution cavity construction site filled type geological disposal structure.
Utility model content
It is above-mentioned to solve the purpose of this utility model is to provide a kind of solution cavity construction site filled type geological disposal structure
The interior wall construction of the solution cavity proposed in background technology is unstable, the easy avalanche of solution cavity, the problem of leading to land subsidence, filled type geology
Processing structure protrudes earth's surface and also has recess in underground, the problem of making troubles the construction of staff.
To achieve the above object, the utility model provides the following technical solutions:A kind of solution cavity construction site filled type geology
The inside of processing structure, including earth's surface, the earth's surface offers solution cavity, and the bottom of solution cavity has poured concrete, the coagulation
The top of soil is equipped with reinforcing bar, and sand stone layer is equipped at the top of reinforcing bar, and smooth surface cement layer is provided at the top of the sand stone layer,
The top of the earth's surface is equipped with thermal insulation board by fastening bolt, and the inside of thermal insulation board is equipped with heating tube, and heating tube
Inside is equipped with heater strip, and one end of the heater strip is equipped with contact block, the bottom of the thermal insulation board open up it is fluted, it is described
Control cabinet is installed at a side position of thermal insulation board in earth's surface, and the surface of control cabinet is equipped with control button, the control
The inside of case processed is equipped with controller, and the heater strip is electrically connected with thermal insulation board, the control button and thermal insulation board with control
Device processed is electrically connected.
Preferably, the thermal insulation board is U-shaped structure.
Preferably, the reinforcing bar is at least provided with ten, and ten reinforcing bars rectangular array inside solution cavity is arranged.
Preferably, the thickness of the sand stone layer is more than the thickness of smooth surface cement layer.
Preferably, it is provided with rust-proof coating on the thermal insulation board.
Compared with prior art, the utility model has the beneficial effects that:
(1)The utility model pours the structure of fastening provided with multilayer, in use, first pouring upper coagulation in the bottom of solution cavity
Soil layer, is placed with the reinforced frame of reinforcing bar composition above concrete layer, then toward pouring into the sand stone layer for being mixed with cement on reinforced frame,
Again toward laying smooth surface cement layer in sand stone layer, the interior wall construction for solving solution cavity is unstable, and the easy avalanche of solution cavity leads to land subsidence
The problem of, be conducive to the steady of ground, ensure that the safety of construction personnel, avoid land subsidence, staff is absorbed in solution cavity
The problem of, enhance the stability inside solution cavity;
(2)The utility model is provided with thermal insulation board, the heating tube inside thermal insulation board distributes heat, and heat will have been poured just
Filled type geological disposal body structure surface is kept the temperature, while thermal insulation board by filled type geological disposal structure protrusion ground and is recessed on ground
Part-structure blocked, solve filled type geological disposal structure protrusion earth's surface also have be recessed in underground, to staff
It walking the problem of making troubles, carries out the work convenient for construction personnel, while ensure that and will not be stayed in filled type geological disposal structure
The lower marking.
Description of the drawings
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the structural schematic diagram of the utility model thermal insulation board band;
Fig. 3 is the structural schematic diagram of the utility model heater strip;
In figure:1- reinforcing bars;2- smooth surface cement layers;3- thermal insulation boards;4- sand stone layers;5- fastening bolts;6- control cabinets;7- is controlled
Button;8- controllers;9- earth's surfaces;10- concrete;11- heating tubes;12- grooves;13- solution cavities;14- contact blocks;15- heater strips.
Specific implementation mode
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
The every other embodiment obtained, shall fall within the protection scope of the present invention.
- 3 are please referred to Fig.1, the utility model provides the following technical solutions:A kind of solution cavity construction site filled type geological disposal
The inside of structure, including earth's surface 9, earth's surface 9 offers solution cavity 13, and the bottom of solution cavity 13 has poured concrete 10, solves molten
The interior wall construction in hole 13 is unstable, 13 easy avalanche of solution cavity, the problem of leading to land subsidence, is conducive to the steady of ground, ensure that
The top of the safety of construction personnel, concrete 10 is equipped with reinforcing bar 1, and the top of reinforcing bar 1 is equipped with sand stone layer 4, sand stone layer 4
Top is provided with smooth surface cement layer 2, and the top of earth's surface 9 is equipped with thermal insulation board 3 by fastening bolt 5, solves filled type geology
Processing structure protrudes earth's surface and also has recess to carry out convenient for construction personnel the problem of making troubles staff's walking in underground
Work, and the inside of thermal insulation board 3 is equipped with heating tube 11, and the inside of heating tube 11 is equipped with heater strip 15, heater strip 15
One end is equipped with contact block 14, and the bottom of thermal insulation board 3 opens up fluted 12, is arranged groove 12, thermal insulation board 3 not with smooth surface cement layer
2 contacts are conducive to the shape for protecting smooth surface cement layer 2, control cabinet are equipped at a side position of thermal insulation board 3 in earth's surface 9
6, and the surface of control cabinet 6 is equipped with control button 7, the inside of control cabinet 6 is equipped with controller 8, heater strip 15 and thermal insulation board 3
It is electrically connected, control button 7 and thermal insulation board 3 are electrically connected with controller 8, and controller 8 uses MX43 controllers.
For the ease of the installation of thermal insulation board 3, in the present embodiment, it is preferred that thermal insulation board 3 is U-shaped structure.
For the ease of fixed solution cavity 13, in the present embodiment, it is preferred that reinforcing bar 1 is at least provided with ten, and ten reinforcing bars 1
In 13 inside rectangular array arrangement of solution cavity.
In order to ensure the stability of reinforced frame, in the present embodiment, it is preferred that the thickness of sand stone layer 4 is more than smooth surface cement layer 2
Thickness.
For the ease of the antirust of thermal insulation board 3, in the present embodiment, it is preferred that be provided with rust-proof coating on thermal insulation board 3.
Utility model works flow:In use, user measures the depth and width of solution cavity 13, filling is determined
The number of material required for formula geological disposal structure, concrete 10 is poured into the interior bottom portion of solution cavity 13 by user, in concrete
Before 10 is not dry, preprepared reinforced frame is put into the top of 13 inner concrete layer of solution cavity, the bottom of reinforced frame by user
In portion's partial insertion concrete 10, user pours into the sandstone for being mixed with cement inside solution cavity 13, until sand stone layer 4 is more than reinforcing bar
When frame, user stops pouring into, and fine sand cement layer is cast in 4 top of sand stone layer and is formed by user by after fine sand blended cement
Thermal insulation board 3 is fixed on by fastening bolt 5 in earth's surface 9 by smooth surface cement layer 2, user, and thermal insulation board 3 is connected electricity by user
Source, user press control button 7, and controller 8 controls the heating tube 11 inside thermal insulation board 3 and works, adding inside heating tube 11
Heated filament 15 starts to generate heat after powering on, and thermal insulation board 3 keeps the temperature smooth surface cement layer 2.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art,
It is appreciated that can these embodiments be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaiied
Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.
Claims (5)
1. a kind of solution cavity construction site filled type geological disposal structure, including earth's surface(9), it is characterised in that:The earth's surface(9)'s
Inside offers solution cavity(13), and solution cavity(13)Bottom poured concrete(10), the concrete(10)Top installation
There is reinforcing bar(1), and reinforcing bar(1)Top be equipped with sand stone layer(4), the sand stone layer(4)Top be provided with smooth surface cement layer
(2), the earth's surface(9)Top pass through fastening bolt(5)Thermal insulation board is installed(3), and thermal insulation board(3)Inside be equipped with plus
Heat pipe(11), and heating tube(11)Inside heater strip is installed(15), the heater strip(15)One end contact block is installed
(14), the thermal insulation board(3)Bottom open up it is fluted(12), the earth's surface(9)Upper close thermal insulation board(3)A side position at
Control cabinet is installed(6), and control cabinet(6)Surface control button is installed(7), the control cabinet(6)Inside be equipped with
Controller(8), the heater strip(15)With thermal insulation board(3)It is electrically connected, the control button(7)And thermal insulation board(3)With control
Device processed(8)It is electrically connected.
2. a kind of solution cavity construction site filled type geological disposal structure according to claim 1, it is characterised in that:The guarantor
Warm plate(3)For U-shaped structure.
3. a kind of solution cavity construction site filled type geological disposal structure according to claim 1, it is characterised in that:The steel
Muscle(1)At least provided with ten, and ten reinforcing bars(1)In solution cavity(13)Internal rectangular array arrangement.
4. a kind of solution cavity construction site filled type geological disposal structure according to claim 1, it is characterised in that:The sand
Rock layers(4)Thickness be more than smooth surface cement layer(2)Thickness.
5. a kind of solution cavity construction site filled type geological disposal structure according to claim 1, it is characterised in that:The guarantor
Warm plate(3)On be provided with rust-proof coating.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820162703.8U CN207987648U (en) | 2018-01-31 | 2018-01-31 | A kind of solution cavity construction site filled type geological disposal structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820162703.8U CN207987648U (en) | 2018-01-31 | 2018-01-31 | A kind of solution cavity construction site filled type geological disposal structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207987648U true CN207987648U (en) | 2018-10-19 |
Family
ID=63821573
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820162703.8U Expired - Fee Related CN207987648U (en) | 2018-01-31 | 2018-01-31 | A kind of solution cavity construction site filled type geological disposal structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207987648U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110080805A (en) * | 2019-04-17 | 2019-08-02 | 黑龙江建筑职业技术学院 | The heat insulation and heating equipment and application method used under culvert low temperature environment |
-
2018
- 2018-01-31 CN CN201820162703.8U patent/CN207987648U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110080805A (en) * | 2019-04-17 | 2019-08-02 | 黑龙江建筑职业技术学院 | The heat insulation and heating equipment and application method used under culvert low temperature environment |
CN110080805B (en) * | 2019-04-17 | 2021-03-05 | 黑龙江建筑职业技术学院 | Heat preservation heating device used in culvert low-temperature environment and use method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103276916B (en) | A kind of building method of sealing light weight concrete construction board wall wall hole and filling plate | |
CN107288256A (en) | Light composite heat insulation outer wall plate, particular manufacturing craft and preparation method thereof | |
CN207987648U (en) | A kind of solution cavity construction site filled type geological disposal structure | |
CN206956959U (en) | Light composite heat insulation outer wall plate | |
CN107965138A (en) | A kind of aluminum alloy mould plate wall bottom caulking joint constructing structure | |
CN107338966A (en) | Large volume ultra-long concrete teletostage jointless construction conserves structure and construction and maintenance method | |
CN204001699U (en) | Building exterior wall heat preserving integrated template braced structures | |
CN206957042U (en) | Light composite heat insulation outer wall plate and particular manufacturing craft | |
CN208473219U (en) | A kind of mortar floor heating ground structure | |
CN209293184U (en) | A kind of arch lamina tecti brick mold structure of enclosed construction | |
CN207700444U (en) | Steel joist and the fixed heat preservation decoration integrative shear wall assembly system of outer armor | |
CN207513190U (en) | A kind of wall pouring can | |
CN109487790A (en) | A kind of concrete heat-insulating method suitable for the big temperature difference area of High aititude | |
CN207160286U (en) | A kind of architectural exterior insulation composite plate | |
CN206888329U (en) | A kind of autoclaved aerated building block of high intensity | |
CN206422499U (en) | Cold-proof outlet tunnel cable duct structure | |
CN106003398B (en) | A kind of PC components High Efficiency Thermal die station | |
CN108316531A (en) | A kind of laminated floor slab heat insulation prefabricated bottom plate and preparation method thereof | |
CN207144522U (en) | Large volume ultra-long concrete teletostage jointless construction conserves structure | |
CN207484827U (en) | A kind of efficiently measuring body roof truss beam precast concrete | |
CN207700245U (en) | A kind of concrete structure seam | |
CN207775725U (en) | A kind of special disposable light filling composite core mould of bridge | |
CN206289658U (en) | Mix the foam type relief platform of appropriate flyash | |
CN206722197U (en) | A kind of self locking type thermal insulation type concrete hollow block | |
CN206245606U (en) | A kind of EPS composite heat-insulation roofs |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |