CN207986492U - A kind of heat exchanger integral hoisting tooling - Google Patents
A kind of heat exchanger integral hoisting tooling Download PDFInfo
- Publication number
- CN207986492U CN207986492U CN201721922035.6U CN201721922035U CN207986492U CN 207986492 U CN207986492 U CN 207986492U CN 201721922035 U CN201721922035 U CN 201721922035U CN 207986492 U CN207986492 U CN 207986492U
- Authority
- CN
- China
- Prior art keywords
- heat exchanger
- lifting lug
- crane
- flange
- lifting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Jib Cranes (AREA)
Abstract
A kind of heat exchanger integral hoisting tooling, including heat exchanger tube body, lifting lug, peripheral frame and crane, the tube body end set flange, four groups of lifting lugs are equipped on end face of flange, each lifting lug is connected to by connector on end face of flange, the heat exchanger is located in frame, and side is equipped with crane outside frame;The crane is equipped with arm bar;The self-control lifting lug of the utility model can be fixedly attached on heat exchanger tube sheet flange face, can guarantee that heat exchanger gravity balance, heat exchanger can rotate vertically in hoisting process;The tension of lifting lug, shear behavior reduce the base plate size of lifting lug in order to avoid lifting lug damages heat exchanger tube connector by pressure while meeting safty hoisting and needing;By calculating tension, the shear behavior of lifting lug, hoisting rig load and crane lifting curve are calculated;Using the main lifting of 100 tons of cranes, 25 tons of crane auxiliary liftings, realizes heat exchanger cylinder and safely change.
Description
Technical field
The utility model is related to a kind of dismounting of chemical industry equipment, displacement toolings, are specifically related to a kind of heat exchanger and integrally hang
Dress tooling belongs to maintenance of equipment field specific to the lifting of vertical plate heat exchanger in aromatisation.
Background technology
In aromatisation benzene heat exchanger processed be it is vertical fill fixed tubular sheet heat exchanger, limited by process conditions, be averaged 14 months and change
Hot device tube bank (band cylinder) can scrap replacement because of seriously corroded, since tube bank weight reaches 22 tons, and be in 23 meters of high-altitudes, change
Spread all over production technology pipeline around hot device, lifting more changes jobs, and risk is big, difficulty is high.
Invention content
In view of defect existing for above-mentioned technology, the purpose of this utility model is to provide a kind of heat exchanger integral hoisting tooling,
The tooling realizes safely changing for heat exchanger cylinder by using self-control lifting lug using main lifting and auxiliary lifting.
To achieve the goals above, technical solution used by the utility model is:A kind of heat exchanger integral hoisting tooling,
Including heat exchanger tube body, lifting lug, peripheral frame and crane, the tube body end set flange is equipped with four on end face of flange
Group lifting lug, each lifting lug are connected to by connector on end face of flange, and the heat exchanger is located in frame, and side is equipped with outside frame
Crane;The crane is equipped with arm bar;
The heat exchanger tube body is equipped with tube bank bearing;
Four groups of lifting lugs are on end face of flange, and centered on the flange center of circle, 4 lines are square;The lifting lug
Including rectangle bottom plate, it is uniformly provided with two bolts hole on bottom plate, is correspondingly provided with a triangle respectively in the long side of bottom plate and connects
Beam is connect, the position between two bolts hole of the heart is equipped with intermediate beam in the soleplate, sets that there are one be tied hole on intermediate beam;
The length of the triangle joint beam is less than the length of bottom plate, and triangle joint depth of beam is less than the height of intermediate beam
Degree;
The self-control lifting lug of the utility model can be fixedly attached on heat exchanger tube sheet flange face, can guarantee in hoisting process
Heat exchanger gravity balance, heat exchanger can rotate vertically;The tension of lifting lug, shear behavior while meeting safty hoisting and needing,
The base plate size of lifting lug is reduced in order to avoid lifting lug damages heat exchanger tube connector by pressure;By calculating tension, the shear behavior of lifting lug, core
Calculate hoisting rig load and crane lifting curve;Using the main lifting of 100 tons of cranes, 25 tons of crane auxiliary liftings, heat exchange is realized
Device cylinder safely changes.
Description of the drawings
Fig. 1 is the structural schematic diagram of the utility model.
Fig. 2 is the side view of Fig. 1.
Fig. 3 is the utility model shackle structure schematic diagram.
Fig. 4 is the vertical view of Fig. 3.
Fig. 5 is the side view of Fig. 3.
Fig. 6 is heat exchanger integral hoisting schematic diagram.
In figure, 1, tube body, 2, lifting lug, 3, frame, 4, crane, 5, flange, 6, connector, 7, arm bar, 8, bottom plate, 9, bolt
Hole, 10, triangle joint beam, 11, intermediate beam, 12, be tied hole.
Specific implementation mode
The utility model is described in detail below in conjunction with the accompanying drawings.
A kind of heat exchanger integral hoisting tooling, including heat exchanger tube body 1, lifting lug 2, peripheral frame 3 and crane 4, it is described
1 end set flange 5 of tube body, is equipped with four groups of lifting lugs 2 on 5 end face of flange, and each lifting lug 2 is connected to 5 end face of flange by connector 6
On, the heat exchanger is located in frame 3, and crane 4 is equipped in 3 outside side of frame;
The crane 4 is equipped with arm bar 7;
The heat exchanger tube body is equipped with tube bank bearing;
Four groups of lifting lugs 2 are on 5 end face of flange, and centered on the flange center of circle, 4 lines are square;
The lifting lug 2 includes rectangle bottom plate 8, two bolts hole 9 is uniformly provided on bottom plate 8, in the long side of bottom plate 8
It is correspondingly provided with a triangle joint beam 10 respectively, the position between the bolt hole 9 of two, 8 center of bottom plate is equipped with intermediate beam 11, in
Between set that there are one be tied hole 12 on beam 11;
The length of the triangle joint beam 10 is less than the length of bottom plate 8, and the height of triangle joint beam 10 is less than intermediate beam
11 height;
On-site hoisting operation specific embodiment:
A, lifting lug 2 is installed:Upper flange 5 is restrained on E2403,4 groups of prefabricated lifting lugs is uniformly installed, each lifting lug is with 2 groups
8.8 grades of high-strength bolts connection fastening of M36 × 240, amounts to 8 groups;
B, crane is in place:100 tons of truck cranes press designated position erect-position, and 7 rotation of arm bar fastens rope to 2 top of E2403 lifting lugs
Hook, and rigging is tightened to 10 or so of lifting strength in advance, determine that hoisting rig and crane run rope without deflection;
C, rope examination is played to hang:Crane plays rope, and E2403 tube banks are vertically sling, and tube bank bearing is made to be higher by basis top plane 300mm
Afterwards, stop lifting, check that Lift-on/Lift-off System includes each position stressing conditions such as crane, erect-position point, lifting lug, rigging, if any exception, stand
It will restrain to put down and be handled;
D, after errorless on inspection, traction crane slowly plays rope, when restraining bearing and being promoted under upper cover platform, stopping
It is promoted, tube bank is rotated into 45 degree of angles, tube bank bearing is enable to pass through from the space after upper brace cutting;Commander's crane hangs tube bank
It after rising, lies on the vacant lot of ground, tube bank lower part is good with tie plate in advance;The performance parameter value of the lifting lug is calculated:Lifting lug is drawn
Stress calculation
σ=P/A=monaurals lift heavy/< (shackle plate wide-lifting lug aperture) × lifting lug plate thickness >
=(22/4 × 103Kgf)/<(10cm-5cm)×2cm>
=0.55 × 103Kgf/cm2 is less than [σ]=1.6 × 103Kgf/cm2
Therefore lifting requirements can be met;
Lifting lug Calculation Shear
Shear stress τ=P/A
=monaural lift heavy/< (shackle plate circular arc outer diameter-lifting lug hole outer diameter) lifting lug plate thickness >
=(22/4 × 103Kgf)/<(14.5cm-8.5cm-2.5cm)×2cm>
=0.785 × 103Kgf/cm2 is less than [τ]=0.98 × 103Kgf/cm2
Therefore lifting requirements can be met
High-strength bolt is calculated
The path of M36 high-strength bolts (grade 8.8) Nominal Tensile 800MPa, M36 bolt is 30mm;Its maximum fracture
T=800MPa*3.14*30^2/4=565200N=56.5 tons of pulling force;Hoisting Security COEFFICIENT K selects 5, therefore the high-strength spiral shells of single M36
The safe pulling force of bolt is 11.3 tons, and the safe pulling force of 8 high-strength bolts is 90.4 tons, and significantly larger than 22 tons of lifting is heavy, because
This calculates safety;
Safe wire cable is calculated
Steel wire rope selects Φ 32, rupture pull force 380KN, fracture safety coefficient to select 5, therefore the safe pulling force of single wire rope
It is 76KN=7.75 tons;
It is 31 tons that E403 liftings, which use 4 32 steel wire ropes of Φ, safe pulling force, is more than 22 tons of lift heavy;Crane lifting ability is selected
With accounting
E403 is restrained:G=22t, 100t truck crane:Go out pole length=36.9m;Operating radius=12m;Crane rated load
For Q volumes=23.5t
Q volume > P, therefore safety is checked, crane meets Lifting Capacity.
Claims (6)
1. a kind of heat exchanger integral hoisting tooling, it is characterised in that including heat exchanger tube body, lifting lug, peripheral frame and crane, institute
The tube body end set flange stated is equipped with four groups of lifting lugs on end face of flange, and each lifting lug is connected to by connector on end face of flange,
The heat exchanger is located in frame, and side is equipped with crane outside frame.
2. a kind of heat exchanger integral hoisting tooling according to claim 1, it is characterised in that the crane is equipped with arm
Bar.
3. a kind of heat exchanger integral hoisting tooling according to claim 1, it is characterised in that set on the heat exchanger tube body
There is tube bank bearing.
4. a kind of heat exchanger integral hoisting tooling according to claim 1, it is characterised in that four groups of lifting lugs are in flange
On end face, centered on the flange center of circle, 4 lines are square.
5. a kind of heat exchanger integral hoisting tooling according to claim 1, it is characterised in that the lifting lug includes rectangular
Shape bottom plate is uniformly provided with two bolts hole on bottom plate, a triangle joint beam is correspondingly provided with respectively in the long side of bottom plate, the bottom of at
Position between the bolt hole of two, plate center is equipped with intermediate beam, sets that there are one be tied hole on intermediate beam.
6. a kind of heat exchanger integral hoisting tooling according to claim 5, it is characterised in that the triangle joint beam
Length is less than the length of bottom plate, and triangle joint depth of beam is less than intermediate depth of beam.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721922035.6U CN207986492U (en) | 2017-12-29 | 2017-12-29 | A kind of heat exchanger integral hoisting tooling |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721922035.6U CN207986492U (en) | 2017-12-29 | 2017-12-29 | A kind of heat exchanger integral hoisting tooling |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207986492U true CN207986492U (en) | 2018-10-19 |
Family
ID=63818526
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721922035.6U Active CN207986492U (en) | 2017-12-29 | 2017-12-29 | A kind of heat exchanger integral hoisting tooling |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207986492U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109648513A (en) * | 2019-01-15 | 2019-04-19 | 中盐安徽红四方股份有限公司 | Horizontal U-shaped heat exchange of heat pipe restrains method for dismounting |
-
2017
- 2017-12-29 CN CN201721922035.6U patent/CN207986492U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109648513A (en) * | 2019-01-15 | 2019-04-19 | 中盐安徽红四方股份有限公司 | Horizontal U-shaped heat exchange of heat pipe restrains method for dismounting |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105438960B (en) | A kind of hanging method using U-shaped movable hood type hanger erection tower kind equipment | |
CN101966965A (en) | Special hanger with guide cover wheel hub and turning and hanging method | |
CN105621280B (en) | The apparatus and method for mounting and dismounting crane arm | |
CN106429791B (en) | A kind of the Special-purpose hanger rigging and hanging method of nuclear power station CR10 and reinforcing bar composite module | |
CN207986492U (en) | A kind of heat exchanger integral hoisting tooling | |
EP3569550B1 (en) | Lift | |
CN203715054U (en) | 3,000t combinable lifting balance beam | |
CN105129604B (en) | Paper roll suspender | |
CN203112390U (en) | Boom guying device of crane and whole ground crane | |
CN205527435U (en) | Installation and device of dismantling jib loading boom | |
CN203035165U (en) | Anti-falling emergency brake | |
CN107574442A (en) | A kind of vertical tensioning fixing device of composite rope | |
CN205527294U (en) | Cross hanging beam | |
CN107720569A (en) | One kind is removed inner climbing crane tower and hung with masts type roofing | |
CN206767440U (en) | A kind of metallurgical casting crane that can effectively avoid breaking off relations | |
CN202063655U (en) | Anti-tilting safe device of tower type crane | |
CN202625662U (en) | Self-balancing amplitude modulation hold pole | |
CN202558444U (en) | Steel penstock hoisting balance beam device | |
CN106861882A (en) | The method that ball mill has bad luck lifting in building | |
CN201207602Y (en) | Stator iron core turnover apparatus | |
CN107389366A (en) | Big pull test platform | |
CN106329389B (en) | A kind of lifting device of large-tonnage live wire | |
CN112299232B (en) | Method for hoisting tower top L-shaped tower-attached pipeline of large-scale tower equipment by single main lifting lug | |
CN107311060A (en) | A kind of mechanical whole freight weight limit power-off protection apparatus and its ground jack of application | |
CN105398934B (en) | A kind of large-scale test run hanger for container counterweight |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||