CN207960058U - Asphalt station - Google Patents

Asphalt station Download PDF

Info

Publication number
CN207960058U
CN207960058U CN201820278804.1U CN201820278804U CN207960058U CN 207960058 U CN207960058 U CN 207960058U CN 201820278804 U CN201820278804 U CN 201820278804U CN 207960058 U CN207960058 U CN 207960058U
Authority
CN
China
Prior art keywords
aggregate
building
toter
asphalt station
station according
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820278804.1U
Other languages
Chinese (zh)
Inventor
贺杰
王艳军
刘栋玉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sany Automobile Manufacturing Co Ltd
Original Assignee
Sany Automobile Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sany Automobile Manufacturing Co Ltd filed Critical Sany Automobile Manufacturing Co Ltd
Priority to CN201820278804.1U priority Critical patent/CN207960058U/en
Application granted granted Critical
Publication of CN207960058U publication Critical patent/CN207960058U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Machines (AREA)

Abstract

The utility model is related to pitch processing technique fields, more particularly, to a kind of asphalt station.It cannot meet airport, the requirement of industrial park and workshop formula arrangement and the higher technical problem of complete machine cost to alleviate asphalt station in the prior art.The asphalt station includes main building, secondary building and toter;Main building is used for the aggregate after toter input metering;The both ends of toter are connected to the top of the bottom of main building and secondary building respectively, for the aggregate transporting after measuring to secondary building;Secondary building receives the aggregate after metering, and the aggregate after metering is formed pitch finished product with powder stirring.Asphalt station provided by the utility model effectively reduces height, disclosure satisfy that the requirement on airport, industrial park and workshop formula arrangement, reduces complete machine cost.

Description

Asphalt station
Technical field
The utility model is related to pitch processing technique fields, more particularly, to a kind of asphalt station.
Background technology
Traditional asphalt station owner building arrangement is from top to bottom:Vibrating screen 001, hot aggregate storage bin 002, metering stirring system 003, finished product bin 004, unload the bed of material 005 etc., whole height is higher, and asphalt station has nearly 28 meters.
When traditional asphalt station is arranged near airports or there is an overall height requirement in industrial park or workshop formula asphalt station, Traditional asphalt station height is higher, cannot reach airport and industrial park and require, and workshop formula asphalt station is due to the higher increase of whole station height More workshop expense.Therefore, so that asphalt station is met the requirement on airport, industrial park and workshop formula arrangement, reduce complete machine cost, The technical issues of being faced as those skilled in the art.
Utility model content
The purpose of this utility model is to provide a kind of asphalt stations, cannot meet machine to alleviate asphalt station in the prior art Field, the requirement of industrial park and workshop formula arrangement and the higher technical problem of complete machine cost.
Technical solution provided by the utility model is:
A kind of asphalt station, including main building, secondary building and toter;
The main building and the secondary building are independently arranged, the both ends of the toter respectively with the bottom of the main building and institute The top in the buildings Shu Fu is connected to,
The main building will input the toter after aggregate measuring, the aggregate after metering is delivered to by the toter The pair building, the pair building mix aggregate with powder to form pitch finished product.
Further,
The toter includes carrying platform and conveying mechanism;
The carrying platform is located at the bottom end of the main building, for accepting the aggregate exported by the main building;
The conveying mechanism, both ends are separately connected the carrying platform and the secondary roof end, for the carrying is flat Aggregate on platform is input to the secondary roof end.
Further,
The conveying mechanism is set as belt slope machine, and the belt slope machine has closed conveying space.
Further,
The conveying mechanism is set as vertical elevator.
Further,
The bottom of the main building is provided with aggregate measuring bucket, and aggregate is exported to the delivery after the aggregate measuring bucket and filled The carrying platform set.
Further,
The top of the aggregate measuring bucket is provided with hot aggregate storage bin and vibrating screen, and the vibrating screen is set to the aggregate meter Batch box top, aggregate former material are input to the hot aggregate storage bin after putting into the vibrating screen.
Further,
The pair roof portion is provided with temporary storing bin, and the temporary storing bin is for accepting the aggregate inputted by the toter.
Further,
The pair roof portion is provided with powder/pitch metering system.
Further,
It is provided with stirring system below the pair roof and the powder/pitch metering system, the stirring system is used for Accept and stir the aggregate inputted by the temporary storing bin and by the material of the powder/pitch metering system input.
Further,
It is provided with finished product bin below the stirring system and unloads the bed of material,
The bed of material that unloads is set to below the finished product bin, and the bed of material that unloads is for accepting and exporting by the finished product material The pitch finished product of storehouse output.
In conjunction with above-mentioned technical proposal, the advantageous effect that the utility model can be realized is:
Asphalt station provided in this embodiment, to toter, toter receives above-mentioned the aggregate after main building output metering Metering after aggregate, then by the aggregate transporting after metering to secondary roof end, secondary roof end receives the aggregate after above-mentioned metering, Then the aggregate after metering is formed into pitch finished product with powder stirring.
Compared with the existing asphalt station from top to bottom arranged, the asphalt station in the present embodiment is dripped by existing " one " formula Green station is changed into " two " formula asphalt station, and " two " formula asphalt station is by main building, secondary building, and connects the delivery dress in main building and secondary building Set composition.Asphalt station whole height provided in this embodiment is greatly lowered, and disclosure satisfy that airport, industrial park and workshop formula arrangement Requirement, reduce complete machine cost.
Description of the drawings
It, below will be right in order to illustrate more clearly of specific embodiment of the present invention or technical solution in the prior art Specific implementation mode or attached drawing needed to be used in the description of the prior art are briefly described, it should be apparent that, it is described below In attached drawing be that some embodiments of the utility model are not paying creativeness for those of ordinary skill in the art Under the premise of labour, other drawings may also be obtained based on these drawings.
Fig. 1 is the structural schematic diagram of asphalt station in the prior art;
Fig. 2 is the structural schematic diagram for the asphalt station that the utility model embodiment provides.
Icon:001- vibrating screens;002- hot aggregate storage bins;003- measures stirring system;004- finished product bins;005- Unload the bed of material;100- main buildings;200- pairs building;300- toters;310- carrying platforms;320- conveying mechanisms;110- aggregates Weighing hopper;120- hot aggregate storage bins;130- vibrating screens;210- temporary storing bins;220- powders/pitch metering system;230- stirring systems; 240- finished product bins;250- unloads the bed of material.
Specific implementation mode
The technical solution of the utility model is clearly and completely described below in conjunction with attached drawing, it is clear that described Embodiment is the utility model a part of the embodiment, instead of all the embodiments.Based on the embodiments of the present invention, originally The every other embodiment that field those of ordinary skill is obtained without making creative work, belongs to this practicality Novel protected range.
It is in the description of the present invention, it should be noted that term "center", "upper", "lower", "left", "right", " perpendicular Directly ", the orientation or positional relationship of the instructions such as "horizontal", "inner", "outside" is to be based on the orientation or positional relationship shown in the drawings, and is only The utility model and simplifying describes for ease of description, do not indicate or imply the indicated device or element must have it is specific Orientation, with specific azimuth configuration and operation, therefore should not be understood as limiting the present invention.In addition, term " the One ", " second ", " third " are used for description purposes only, and are not understood to indicate or imply relative importance.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " is pacified Dress ", " connected ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integrally Connection;It can be mechanical connection, can also be electrical connection;Can be directly connected, can also indirectly connected through an intermediary, It can be the connection inside two elements.For the ordinary skill in the art, it can understand above-mentioned art with concrete condition The concrete meaning of language in the present invention.
Embodiment 1 and embodiment 2 are described in detail below in conjunction with the accompanying drawings:
Fig. 1 is the structural schematic diagram of asphalt station in the prior art;Fig. 2 is the asphalt station that the utility model embodiment provides Structural schematic diagram.
Embodiment 1
A kind of asphalt station please refers to Fig. 2, including main building 100, secondary building 200 and toter 300;
Main building 100 is used for the aggregate after the input metering of toter 300;
The both ends of toter 300 are connected to the top of the bottom of main building 100 and secondary building 200 respectively, for after measuring Aggregate transporting to secondary building 200;
Secondary building 200 receives the aggregate after metering, and the aggregate after metering is formed pitch finished product with powder stirring.
Asphalt station provided in this embodiment, main building 100 export the aggregate after metering to toter 300, toter 300 The aggregate after above-mentioned metering is received, then by the aggregate transporting after metering to 200 top of secondary building, on 200 top of secondary building receives The aggregate after metering is stated, the aggregate after metering is then formed into pitch finished product with powder stirring.Pitch provided by the utility model Station effectively reduces height, disclosure satisfy that the requirement on airport, industrial park and workshop formula arrangement, reduces complete machine cost.
Compared with the existing asphalt station from top to bottom arranged, the asphalt station in the present embodiment is dripped by existing " one " formula Green station is changed into " two " formula asphalt station, and " two " formula asphalt station is by main building 100, secondary building 200, and connection main building 100 and pair The toter 300 in building 200 forms.Asphalt station provided in this embodiment effectively reduces the height of existing asphalt station.
In the alternative of the present embodiment, more preferably,
Toter 300 includes carrying platform 310 and conveying mechanism 320;
Carrying platform 310 is located at the bottom end of main building 100, for accepting the aggregate exported by main building 100;
Conveying mechanism 320,200 top of connection carrying platform 310 and secondary building, for the aggregate on carrying platform 310 is defeated 200 top of the buildings Ru Zhifu.
In the alternative of the present embodiment, more preferably,
Carrying platform 310 is set as totebox, and totebox has bearing space, the bottom of main building 100 is transported in totebox When end, the discharge port of the feed inlet face main building 100 of totebox, the aggregate measured through main building 100 inputs in totebox.Then, Totebox is transported to 200 top of secondary building by conveying mechanism 320.After totebox reaches 200 top of secondary building, totebox is rotated to incline The aggregate in totebox, after the completion of toppling over, totebox is repositioned to initial position, then under the drive of conveying mechanism 320 to The movement of 100 direction of main building completes a working cycles up to arriving again at 100 bottom of main building with this.Further, for reality Now work continuously, multiple toteboxs can be set, such as be provided with the first totebox and the second totebox, the first totebox from During main building 100 moves up to secondary building 200, the second totebox moves downwardly to main building 100 from secondary building 200.Alternatively, During first totebox is transported to main building 100 downwards from secondary building 200, the second totebox moves up to pair from main building 100 Building 200.First totebox and the second totebox form continuous working cycles, improve work efficiency.
In the alternative of the present embodiment, more preferably,
Conveying mechanism 320 includes delivery track, is set to delivery track both ends transports idler wheel is set in transport idler wheel Chain, the actuator for driving idler wheel to operate.Idler wheel operating is transported in actuator driving, and the operating for transporting idler wheel drives chain fortune Turn, the operating of chain drives the movement of carrying platform 310, to realize carrying platform 310 between main building 100 and secondary building 200 Movement.
In the alternative of the present embodiment, more preferably,
The spiral pushing bar that toter 300 may be arranged as groove body and be set in groove body, the both ends point of groove body Not Lian Jie 100 bottom end of main building and secondary 200 top of building, the bone after metering of the spiral pushing bar for that will be exported by 100 bottom end of main building Material is delivered to 200 top of secondary building.
In the alternative of the present embodiment, more preferably,
Conveying mechanism 320 is set as belt slope machine, and belt slope machine has closed conveying space.Above-mentioned is closed Conveying space can effectively keep the temperature hot aggregate.
In the alternative of the present embodiment, more preferably,
Conveying mechanism 320 is set as vertical elevator.The fortune of hot aggregate equally may be implemented by way of linear transport It is defeated.
In the alternative of the present embodiment, more preferably,
The bottom of main building 100 is provided with aggregate measuring bucket 110, and aggregate exports after aggregate measuring bucket 110 to toter 300 carrying platform 310.Further, aggregate measuring bucket 110 is provided with weighing sensor and closing device.It is weighing Under state, closing device is closed, and the outlet port of aggregate measuring bucket 110 is closed, and the weight of aggregate is detected in weighing sensor When meeting preset value, closing device is opened, and the aggregate after weighing drops to toter 300.
In the alternative of the present embodiment, more preferably,
The top of aggregate measuring bucket 110 is provided with hot aggregate storage bin.Hot aggregate storage bin is for storing aggregate.Further, exist The outlet port of hot aggregate storage bin is provided with closing device, in the case where aggregate measuring bucket 110 is in metering state, the folding of hot aggregate storage bin Device is opened, and the aggregate in hot aggregate storage bin continues into aggregate measuring bucket 110.After the completion of aggregate measuring, in hot aggregate storage bin Closing device is closed, and with the opening of locking hot aggregate storage bin, aggregate is avoided to go successively to aggregate measuring bucket 110.Above-mentioned setting side Formula can ensure the accuracy of the aggregate in amount in aggregate measuring bucket 110.
In the alternative of the present embodiment, more preferably,
The top of hot aggregate storage bin is provided with vibrating screen 130, and hot aggregate storage bin is input to after aggregate former material input vibrating screen 130. Vibrating screen 130 is used to carry out vibration processing to aggregate raw material, to improve the uniformity of aggregate, and screens out the bone of off grade size Material.
In the alternative of the present embodiment, more preferably,
200 top of secondary building is provided with temporary storing bin 210, and temporary storing bin 210 is for accepting the aggregate inputted by toter 300. The setting of temporary storing bin 210 can continuously receive the aggregate of toter transmission, can also ensure that secondary building 200 has certain aggregate Deposit, to ensure continuous output aggregate.
In the alternative of the present embodiment, more preferably,
200 top of secondary building is additionally provided with powder/pitch metering system 220.Powder/pitch metering system 220 is used for powder The materials such as material, pitch are measured, and powder, pitch of the metering after qualified are exported under powder/pitch metering system 220 The stirring system 230 in portion.
In the alternative of the present embodiment, more preferably,
Temporary storing bin 210 and 220 lower section of powder/pitch metering system are provided with stirring system 230, and stirring system 230 is used for Accept and stir the aggregate inputted by temporary storing bin 210 and the objects such as the powder inputted by powder/pitch metering system 220 and pitch Material.Specifically, when needing to add aggregate, 210 lower openings of temporary storing bin are opened, the aggregate in temporary storing bin 210 is fallen to down The stirring system 230 in portion, then 210 lower openings of temporary storing bin be closed, meanwhile, toter 300 by after weighing aggregate transport To temporary storing bin 210, make aggregate abundance in temporary storing bin 210, that is to say, that asphalt station provided in this embodiment can be at each Working cycles keep temporary storing bin 210 to be in full load condition, and production efficiency can preferably be ensured.
In the alternative of the present embodiment, more preferably,
230 lower section of stirring system is provided with finished product bin 240, and finished product bin 240 is for storing pitch finished product.
In the alternative of the present embodiment, more preferably,
240 lower section of finished product bin, which is provided with, unloads the bed of material 250, unloads the bed of material 250 for accepting and exporting defeated by finished product bin 240 The pitch finished product gone out.
Finally it should be noted that:The above various embodiments is only to illustrate the technical solution of the utility model, rather than limits it System;Although the utility model has been described in detail with reference to the foregoing embodiments, those skilled in the art should Understand:It still can be with technical scheme described in the above embodiments is modified, either to which part or whole Technical characteristic carries out equivalent replacement;And these modifications or replacements, this practicality that it does not separate the essence of the corresponding technical solution are new The range of each embodiment technical solution of type.

Claims (10)

1. a kind of asphalt station, which is characterized in that including main building (100), secondary building (200) and toter (300);
The main building (100) and the secondary building (200) are independently arranged, the both ends of the toter (300) respectively with the master The bottom in building (100) is connected to the top of the secondary building (200),
The main building (100) will input the toter (300) after aggregate measuring, after the toter (300) will measure Aggregate be delivered to the secondary building (200), the pair building (200) mixes aggregate with powder to form pitch finished product.
2. asphalt station according to claim 1, which is characterized in that
The toter (300) includes carrying platform (310) and conveying mechanism (320);
The carrying platform (310) is located at the bottom end of the main building (100), for accepting the bone exported by the main building (100) Material;
The conveying mechanism (320), both ends are separately connected the carrying platform (310) and described secondary building (200) top, and being used for will Aggregate on the carrying platform (310) is input to described secondary building (200) top.
3. asphalt station according to claim 2, which is characterized in that
The conveying mechanism (320) is set as belt slope machine, and the belt slope machine has closed conveying space.
4. asphalt station according to claim 2, which is characterized in that
The conveying mechanism (320) is set as vertical elevator.
5. asphalt station according to claim 2, which is characterized in that the bottom of the main building (100) is provided with aggregate measuring It struggles against (110), aggregate is exported after the aggregate measuring bucket (110) to the carrying platform of the toter (300) (310).
6. asphalt station according to claim 5, which is characterized in that
The top of the aggregate measuring bucket (110) is provided with hot aggregate storage bin and vibrating screen (130), vibrating screen (130) setting In aggregate measuring bucket (110) top, aggregate former material is input to the hot aggregate storage bin after putting into the vibrating screen (130).
7. asphalt station according to claim 1, which is characterized in that
Temporary storing bin (210) is provided at the top of the pair building (200), the temporary storing bin (210) is for accepting by the toter (300) aggregate inputted.
8. asphalt station according to claim 7, which is characterized in that
It is provided with powder/pitch metering system (220) at the top of the pair building (200).
9. asphalt station according to claim 8, which is characterized in that
It is provided with stirring system (230) below the temporary storing bin (210) and the powder/pitch metering system (220), it is described to stir System (230) is mixed for accepting and stirring the aggregate inputted by the temporary storing bin (210) and by the powder/pitch metering system The material of system (220) input.
10. asphalt station according to claim 9, which is characterized in that
It is provided with finished product bin (240) below the stirring system (230) and unloads the bed of material (250),
The bed of material (250) that unloads is set to below the finished product bin (240), and the bed of material (250) that unloads is for accepting and exporting The pitch finished product exported by the finished product bin (240).
CN201820278804.1U 2018-02-27 2018-02-27 Asphalt station Active CN207960058U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820278804.1U CN207960058U (en) 2018-02-27 2018-02-27 Asphalt station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820278804.1U CN207960058U (en) 2018-02-27 2018-02-27 Asphalt station

Publications (1)

Publication Number Publication Date
CN207960058U true CN207960058U (en) 2018-10-12

Family

ID=63740319

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820278804.1U Active CN207960058U (en) 2018-02-27 2018-02-27 Asphalt station

Country Status (1)

Country Link
CN (1) CN207960058U (en)

Similar Documents

Publication Publication Date Title
CN204412193U (en) Automatic batching system
CN102233613B (en) Movable type concrete stirring device and concrete stirring method thereof
CN209552139U (en) A kind of concrete feeding and agitating device
CN105773845A (en) Intermittent cement stability-concrete integrated station
CN205461887U (en) Full -automatic high accuracy compounding device
CN206034248U (en) Formula of pressure asphalt mixture stirring device
CN108858722A (en) A kind of production line and its technique for magnesia carbon brick product
CN209125989U (en) A kind of production line for magnesia carbon brick product
CN205651516U (en) Dry powder mortar automated production manufacturing equipment
CN206678185U (en) With reference to the sunk type concrete mixing plant in stock ground
CN109732778A (en) Mortar blending device and mortar mixing plant
WO2020258752A1 (en) Moisture content detection system for material, moisture content detection method for material, and mixing station
CN207960058U (en) Asphalt station
CN208372956U (en) Fertilizer compounding machine
CN203726632U (en) Wet mortar and concrete dual-purpose agitator system
CN206765104U (en) Sunk type sandstone blending station
CN213833769U (en) Feeding system of submerged arc furnace
CN210186900U (en) Smelt dust compounding humidification system
CN206678184U (en) With the sunk type stabilized soil mixing station that stock ground is combined
CN107902444A (en) A kind of quantifying and loading device and quantifying and loading method
CN207713033U (en) A kind of quantifying and loading device
CN202088302U (en) Nuclear power engineering concrete production system
CN207682674U (en) A kind of container-type concrete mixing plant
CN213005910U (en) Mixing station
CN206765100U (en) Sunk type concrete mixing plant

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant