CN207944910U - It is a kind of cross cable cross gas pipeline packer - Google Patents

It is a kind of cross cable cross gas pipeline packer Download PDF

Info

Publication number
CN207944910U
CN207944910U CN201820351644.9U CN201820351644U CN207944910U CN 207944910 U CN207944910 U CN 207944910U CN 201820351644 U CN201820351644 U CN 201820351644U CN 207944910 U CN207944910 U CN 207944910U
Authority
CN
China
Prior art keywords
gas pipeline
packing element
cable
top connection
supported head
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820351644.9U
Other languages
Chinese (zh)
Inventor
解伟
叶成明
王明明
李小杰
冯建月
何计彬
王营超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Center for Hydrogeology and Environmental Geology CGS
Original Assignee
Center for Hydrogeology and Environmental Geology CGS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Center for Hydrogeology and Environmental Geology CGS filed Critical Center for Hydrogeology and Environmental Geology CGS
Priority to CN201820351644.9U priority Critical patent/CN207944910U/en
Application granted granted Critical
Publication of CN207944910U publication Critical patent/CN207944910U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

It is a kind of cross cable cross gas pipeline packer, axisymmetricly type shape, including pipe nipple, top connection, central tube, packing element and air supported head;The top connection upper end is connect with the pipe nipple by tubing thread, lower end is inside and outside double-layer structure, and internal layer lower end is connect with the central tube top by tubing thread, and outer layer lower end passes through screwed connection with the packing element top, the packing element is set in the central tube surface layer, is concentric type structure;The air supported head is similarly inside and outside double-layer structure, and internal layer, by tolerance fit, is sealed with the central tube using sealing ring, and outer layer passes through screwed connection with the packing element bottom end;It is equipped with the first high-pressure air pipe wire terminal at the top of the top connection, is communicated with the packing element, which is connected to the ground table pressure supply equipment by the first high pressure gas pipeline.The utility model carries out layering bailing test, can not only simplify hole structure, reduces layering bailing test difficulty of construction and construction cost, and insulate reliably, the hydrogeological parameter of acquisition is more accurate.

Description

It is a kind of cross cable cross gas pipeline packer
Technical field
The utility model belongs to survey for the purpose of locating hydrogeological resources exploration engineering field more particularly to a kind of cable of crossing crosses gas pipeline packing Device.
Background technology
Currently, China just carries out high-precision survey for the purpose of locating hydrogeological resources in China, meticulous depiction aquifer structure is needed, Understand the detailed hydrogeological parameter in water-bearing layer, recognizes the ground water circulation rule in water-bearing layer, exact evaluation groundwater resources.
Bailing test is to carry out the essential means of high-precision survey for the purpose of locating hydrogeological resources.Layering is carried out to water-bearing layer to reconnoitre, According to hydrogeological hole at well construction, traditional layering bailing test method is divided into 2 kinds.
1. if drilling carries out reducing in water-bearing layer purpose section, pipe inner pallet sealing is carried out in drilling reducer, it is then real Apply layering bailing test.Its disadvantage is mainly:(1) at well construction complexity, construction cost is larger, and water-bearing layer is layered limited amount; (2) water-stagnating effect is unstable, and hydrogeological parameter reliability is poor;(3) SEA LEVEL VARIATION for the target zone that draws water cannot be monitored in real time.
2. if one diameter of drilling is on earth, without reducing, then using in pallet+hydro-expansive rubber+clay ball progress hole points Then layer sealing implements layering bailing test.Compared to the first layering pumping method, this method hole structure is fairly simple, But expanded rubber expansion is slower, and non-cutting time is long, and efficiency is low, and water-stagnating effect is also unstable, and hydrogeological parameter is not yet Reliably, meanwhile, 2 layers or more of layering bailing test can not be implemented, the SEA LEVEL VARIATION for the target zone that draws water can not be monitored in real time.
It is limited by packing utensil, the traditional layering pumping method enforcement difficulty of above two is high, of high cost, while temporarily only Water effect is also unreliable, and the water-bearing layer hydrogeological parameter accuracy of acquisition is relatively low.
Utility model content
The purpose of this utility model is to provide a kind of cable of crossing and crosses gas pipeline packer, and carrying out layering using it draws water examination It tests, can not only simplify hole structure, reduce layering bailing test difficulty of construction and construction cost, and insulate reliable, acquisition Hydrogeological parameter it is more accurate.
To achieve the above object, the utility model takes following technical scheme:
A kind of cable of crossing crosses gas pipeline packer, axisymmetricly type shape, including pipe nipple, top connection, central tube, packing element and floating Dynamic head;
It is connected by tubing thread between the pipe nipple and the central tube;The top connection is set in the tubing thread periphery;The packing element It is set in the middle part of the central tube, with the top connection by screwed connection, the packing element other end is logical with the air supported head for the packing element one end Screwed connection is crossed, which seals with the central tube by tolerance fit, and by sealing ring;
The top connection upper end is connect with the pipe nipple by tubing thread, lower end be inside and outside double-layer structure, internal layer lower end with this in Heart tube top end is connected by tubing thread, and with the packing element top by screwed connection, which is set in the central tube for outer layer lower end Surface layer is concentric type structure;The air supported head is similarly inside and outside double-layer structure, and internal layer, by tolerance fit, is used with the central tube Sealing ring seals, and outer layer passes through screwed connection with the packing element bottom end.
It is equipped with the first high-pressure air pipe wire terminal at the top of the top connection, is communicated with the packing element, the first high-pressure air pipe wire terminal It is connected to the ground table pressure supply equipment by the first high pressure gas pipeline.
Further, the top connection top, the air supported head bottom are equipped with submersible pump cable connector, cable penetration institute State top connection, the cavity of the packing element and the air supported head;The cable top is connected to for electric installation, and lower part connects immersible pump electricity Machine.
Further, the top connection top, the air supported head bottom are equipped with monitoring probe data wire terminal, data line Through the top connection, the cavity of the packing element and the air supported head, which is connected to computer, lower part connection monitoring Probe.
Further, at the top of the top connection, the air supported head bottom is equipped with the second high-pressure air pipe wire terminal, the two it Between connected by the second high pressure gas pipeline, the second high pressure gas pipeline is through the top connection, the cavity of the packing element and described Air supported head;The second high pressure gas pipeline one end connects earth's surface pressure supply equipment, and another cable of crossing of other end connection crosses gas pipeline packing First high-pressure air pipe wire terminal of device.
The utility model has the beneficial effects that:
1) the utility model crosses cable and crosses gas pipeline packer with reliable, off-load is insulated conveniently, and operability waits by force spies Point;
2) the utility model crosses cable and crosses the repeatable utilization of gas pipeline packer, reduces production cost;
3) the utility model crosses cable and crosses gas pipeline packer for being layered bailing test, can observe lower part water-bearing layer in real time Water lever fluctuating judges packing water-stagnating effect, meanwhile, facilitate technical staff to control bailing test progress, reduces bailing test Activity duration;
4) it is 2 that the utility model, which crosses cable and crosses gas pipeline packer quantity, can easily carry out 3 layers of hydrogeological hole layering A certain water-bearing layer is individually studied in bailing test, realization, can be also directed to hydrogeological hole and be carried out segmentation well-flushing, provide bailing test Parameters precision.
Description of the drawings
Fig. 1 is the structural schematic diagram that the utility model crosses that cable crosses gas pipeline packer.
Specific implementation mode
Below in conjunction with the accompanying drawings and specific embodiment is described further the utility model.
As shown in Figure 1, the utility model, which provides a kind of cable of crossing, crosses gas pipeline packer, axisymmetricly type shape, including it is short Section 1, top connection 2, central tube 3, packing element 4 and air supported head 5.2 upper end of top connection is connect with the pipe nipple 1 by tubing thread, lower end For inside and outside double-layer structure, internal layer lower end is connect with 3 top of central tube by tubing thread, and outer layer lower end is logical with 4 top of packing element Screwed connection is crossed, which is set in 3 surface layer of central tube, is concentric type structure;The air supported head 5 is similarly inside and outside two layers of knot Structure, internal layer, by tolerance fit, are sealed with the central tube 3 using sealing ring, and outer layer passes through screwed connection with 4 bottom end of packing element.
2 top of top connection is equipped with the first high-pressure air pipe wire terminal 21, is communicated with the packing element 4, the first high pressure gas pipeline Connector 21 is connected to earth's surface pressure supply equipment by the first high pressure gas pipeline 22, and unpacking pressure, unpacking pressure are provided for packer work Power is 0.6-0.8Mpa, and the first high-pressure air pipe wire terminal 21 is screwed connection with top connection 2.
2 top of top connection, 5 bottom of air supported head are equipped with submersible pump cable connector 23, and cable 24 runs through the top connection 2, the cavity of the packing element 4 and the air supported head 5.24 top of cable is connected to for electric installation, and lower part connects motor for submerged pump, is latent Pump working provides power.
2 top of top connection, 5 bottom of air supported head are equipped with monitoring probe data wire terminal 25, and data line 26 runs through should Top connection 3, the packing element 4 cavity and the air supported head 5, which is connected to computer, observation probe data record, under Portion's connection monitoring probe, transmission of monitoring data and power supply.
Further, the utility model can also include two or more packers, for example, when including two packers When, 2 top of top connection, 5 bottom of air supported head are equipped with the second high-pressure air pipe wire terminal 27, pass through the second high pressure therebetween Gas pipeline 28 connects, and the second high pressure gas pipeline 28 is through the top connection 2, the cavity and the air supported head 5 of the packing element 4.This second 28 one end of high pressure gas pipeline connects earth's surface pressure supply equipment, and the other end connects another the first high pressure crossed cable and cross gas pipeline packer Tracheae wire terminal 21 crosses the work of gas pipeline packer for second mistake cable and provides unpacking pressure, and unpacking pressure is 0.6- 0.8Mpa。
It is described in the utility model through packer top connection, the cavity of packing element and air supported head the second high pressure gas pipeline, Monitoring probe data line and submersible pump cable connector are both needed to be sealed, and prevent packing element internal pressure leakage, cause to insulate Device can not work.It is described to run through packer top connection, the second high pressure gas pipeline of the cavity of packing element and air supported head, monitoring probe number The cavity through packing element is needed according to line and submersible pump cable, subjects elevated pressures.
The utility model, which crosses cable and crosses the mechanism of gas pipeline packer, is:It, will on the basis of drilling is layered sealing Cheng Jing Packer and immersible pump are sent by drill string in drilling, so that packer is existed to packer conveying high-pressure gas by pressure supply equipment Sealing position is broken seal, and the target zone that will draw water is isolated with other water-bearing layers, carries out layering bailing test.If immersible pump is on packer Water pump cable then power supply unit is then directly carried out upper layer bailing test by portion;If immersible pump is in packer lower part, by water Pump cable is connected to packer cable, is then connected to earth's surface power supply unit, carries out lower layer's bailing test;If there are 2 to cross cable mistake 3 layers of bailing test then can be achieved in gas pipeline packer.
Packer is initially applied to oil field, for insulating annular space between tubing string and wellbore, and completely cuts off payzone, with Control production (note) liquid, implements oil recovery, water filling or oil formation improvement.Packer is used for hydrogeologic prospecting field, is still belonged at home For the first time.The packing of the utility model sealing is reliable, and water extraction way is flexible, can not only simplify layering bailing test difficulty of construction, drop Low construction cost, and the hydrogeological parameter obtained is more accurate, for accurately portraying aquifer structure provides technical support.
The above is the preferred embodiment of the utility model and its technical principle used, for the technology of this field It is any to be based on technical solutions of the utility model base without departing substantially from the spirit and scope of the utility model for personnel Equivalent transformation, simple replacement on plinth etc. obviously change, and belong within scope of protection of the utility model.

Claims (4)

1. a kind of cable of crossing crosses gas pipeline packer, it is characterised in that:Axisymmetricly type shape, including pipe nipple, top connection, center Pipe, packing element and air supported head;The top connection upper end is connect with the pipe nipple by tubing thread, and lower end is inside and outside double-layer structure, under internal layer End is connect with the central tube top by tubing thread, and with the packing element top by screwed connection, which is set in for outer layer lower end The central tube surface layer is concentric type structure;The air supported head is similarly inside and outside double-layer structure, and internal layer is matched with the central tube by tolerance It closes, is sealed using sealing ring, outer layer passes through screwed connection with the packing element bottom end;
It is equipped with the first high-pressure air pipe wire terminal at the top of the top connection, is communicated with the packing element, which passes through First high pressure gas pipeline is connected to the ground table pressure supply equipment.
2. cable according to claim 1 of crossing crosses gas pipeline packer, it is characterised in that:At the top of the top connection, it is described Air supported head bottom is equipped with submersible pump cable connector, top connection, the cavity of the packing element and the air supported head described in cable penetration; The cable top is connected to for electric installation, and lower part connects motor for submerged pump.
3. cable according to claim 2 of crossing crosses gas pipeline packer, it is characterised in that:At the top of the top connection, it is described Air supported head bottom is equipped with monitoring probe data wire terminal, and data line is through the top connection, the cavity of the packing element and described Air supported head, the data line top are connected to computer, lower part connection monitoring probe.
4. cable according to claim 3 of crossing crosses gas pipeline packer, it is characterised in that:At the top of the top connection, it is described Air supported head bottom is equipped with the second high-pressure air pipe wire terminal, is connected by the second high pressure gas pipeline therebetween, second high pressure Gas pipeline runs through the top connection, the cavity of the packing element and the air supported head;The second high pressure gas pipeline one end connects earth's surface Pressure supply equipment, the other end connect another the first high-pressure air pipe wire terminal crossed cable and cross gas pipeline packer.
CN201820351644.9U 2018-03-15 2018-03-15 It is a kind of cross cable cross gas pipeline packer Expired - Fee Related CN207944910U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820351644.9U CN207944910U (en) 2018-03-15 2018-03-15 It is a kind of cross cable cross gas pipeline packer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820351644.9U CN207944910U (en) 2018-03-15 2018-03-15 It is a kind of cross cable cross gas pipeline packer

Publications (1)

Publication Number Publication Date
CN207944910U true CN207944910U (en) 2018-10-09

Family

ID=63698007

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820351644.9U Expired - Fee Related CN207944910U (en) 2018-03-15 2018-03-15 It is a kind of cross cable cross gas pipeline packer

Country Status (1)

Country Link
CN (1) CN207944910U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110984965A (en) * 2019-11-19 2020-04-10 四川省蜀通岩土工程公司 Air bag type layered water pumping test system and method for drilling holes in same diameter
CN112664178A (en) * 2020-12-31 2021-04-16 核工业北京地质研究院 Underground fixing device and method for drilling layered test sensor

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110984965A (en) * 2019-11-19 2020-04-10 四川省蜀通岩土工程公司 Air bag type layered water pumping test system and method for drilling holes in same diameter
CN112664178A (en) * 2020-12-31 2021-04-16 核工业北京地质研究院 Underground fixing device and method for drilling layered test sensor

Similar Documents

Publication Publication Date Title
CN108049847A (en) A kind of twin packer layering water plug and method
CN207647494U (en) A kind of twin packer layering water plug
CN103953330A (en) Deep well hydrocarbon reservoir temperature and pressure on-line integrated monitoring device and method
CN207944910U (en) It is a kind of cross cable cross gas pipeline packer
CN104265242A (en) Terrestrial heat extraction method of geothermal well
CN207847605U (en) Hydrogeologic drilling is the same as the multiple water plug of diameter
CN203164441U (en) Portable air bag isolation drilling pressured water tester
CN209012798U (en) Shale gas pipe detection mechanism
CN205422694U (en) Formation pressure rapid survey appearance
CN207944911U (en) It is a kind of cross cable cross gas pipeline centering type packer
CN208313646U (en) Separate zone stimulation system in a kind of underground water multilayer monitoring well
CN107489394A (en) A kind of three oval experimental provision of open hole packer
CN111722300B (en) Method for testing instantaneous water pumping type micro water in inner layer of drilling hole
CN104500981B (en) Natural gas pipe detecting tool
CN203685169U (en) Offshore pressure measurement system with capillary tube
CN204804819U (en) Dynamic logging technology pole tubular column is carried to horizontal well pole
CN207093043U (en) Tubing string is adopted in a kind of coal bed gas and compact sandstone gas underground altogether
CN115848883A (en) Saline water layer carbon dioxide geological sealing test well forming structure and process
CN205225206U (en) A pumping device for beam -pumping unit well surveying well
CN105386743A (en) Swabbing device for well logging of rod pumped well and well logging method based on device
CN104912545A (en) Well testing system combining electric control type oil pipe inner packer and direct reading pressure meter and well testing method combining electric control type oil pipe inner packer and direct reading pressure meter
CN205823264U (en) Layering is with adopting test string
CN203626689U (en) Shaft mouth protection, seal and connection device
CN204064557U (en) A kind of wellhead traversing device pick-up unit
CN112360438A (en) Underground rapid water exploration test pipe column and using method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181009