CN207933897U - A kind of bridge pier overmolded method form removable device - Google Patents

A kind of bridge pier overmolded method form removable device Download PDF

Info

Publication number
CN207933897U
CN207933897U CN201820098779.9U CN201820098779U CN207933897U CN 207933897 U CN207933897 U CN 207933897U CN 201820098779 U CN201820098779 U CN 201820098779U CN 207933897 U CN207933897 U CN 207933897U
Authority
CN
China
Prior art keywords
thick stick
section template
auxiliary boom
lower section
body thick
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820098779.9U
Other languages
Chinese (zh)
Inventor
钟长海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 5 Co Ltd
Original Assignee
Sinohydro Bureau 5 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 5 Co Ltd filed Critical Sinohydro Bureau 5 Co Ltd
Priority to CN201820098779.9U priority Critical patent/CN207933897U/en
Application granted granted Critical
Publication of CN207933897U publication Critical patent/CN207933897U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a kind of bridge pier overmolded method form removable devices, including one end to be connected on section template bottom level back of the body thick stick, horizontally disposed auxiliary boom beam;The top layer that the auxiliary boom beam other end is connected thereto Pai Beigang and lower section template by steel wire rope respectively carries on the back thick stick;One side formwork is at least provided with two auxiliary boom beams;Hand-held jack is provided between upper and lower section template, more than hand-held jack section template is supporting point, and other end setting is on lower section template top layer back of the body thick stick;The steel wire rope being connect with the top layer back of the body thick stick of lower section template is also connected with the suspension hook in tower crane;The utility model is simple in structure, low cost, safe and reliable, can meet construction requirement.

Description

A kind of bridge pier overmolded method form removable device
Technical field
The utility model is related to a kind of bridge abutment moulding plates to remove device, and in particular to a kind of bridge pier overmolded method form removable dress It sets.
Background technology
In the construction of science of bridge building thin-walled hollow pier stud, usually carry out turning over method constructing and overhanging model using segmented, i.e.,:Concrete pours Form removal is layered after the completion of building from bottom to top, the reserved section template in top installs partial node Pier Formwork, template as bearing layer Peace is torn machinery open and is mainly completed with tower crane;Common construction problem is that Demolition Construction personnel's auxiliary tool lacks, operational procedure Fuzzy remove dangerous larger, construction operation platform transaction damage, arbitrariness is also big in real time, there are larger security risk, Standard haul constructions degree is low;To solve above to be topic, meets construction needs, take a kind of bridge pier overmolded method form removable side Method can meet construction requirement.
Utility model content
The utility model provides a kind of bridge pier overmolded method form removable device flexible, convenient to assemble and disassemble simple in structure, mobile.
The technical solution adopted in the utility model is:A kind of bridge pier overmolded method form removable device, including one end are connected to On upper section template bottom level back of the body thick stick, horizontally disposed auxiliary boom beam;The auxiliary boom beam other end is connected by steel wire rope respectively Meet Pai Beigang thereon and the top layer back of the body thick stick of lower section template;One side formwork is at least provided with two auxiliary boom beams;Upper and lower section template Between be provided with hand-held jack, more than hand-held jack section template is supporting point, and the other end is arranged on lower section template top On layer back of the body thick stick;The steel wire rope being connect with the top layer back of the body thick stick of lower section template is also connected with the suspension hook in tower crane.
Further, the auxiliary boom beam is F type structures, and the upper end is connected to section template bottom level back of the body thick stick.
Further, the auxiliary boom beam length is more than job platform width.
Further, section template bottom level back of the body thick stick one end connects the back of the body by HOOK BOLTS in the auxiliary boom beam connection Thick stick.
Further, the steel wire rope connects back of the body thick stick by grapple.
The utility model has the beneficial effects that:
(1)The utility model is Demolition Construction personnel's auxiliary tool, can reduce the generation of safety accident;
(2)The utility model is simple in structure, low cost, safe and reliable, can meet construction requirement.
Description of the drawings
Fig. 1 is the utility model vertical view.
Fig. 2 is the utility model structure diagram.
In figure:1- auxiliary boom beams, 2- grapples, 3- carry on the back thick stick, 4- split bolts, 5- HOOK BOLTSs, 6- job platforms, 7- steel Cord, 8- tower cranes, 9- suspension hooks, 10- hand-held jack.
Specific implementation mode
The utility model is described further in the following with reference to the drawings and specific embodiments.
As shown in Figs. 1-2, a kind of bridge pier overmolded method form removable device, including one end are connected to section template bottom level It carries on the back on thick stick 3, horizontally disposed auxiliary boom beam 1;1 other end of auxiliary boom beam carries on the back thick stick 3 by 7 row of being connected thereto of steel wire rope respectively Thick stick 3 is carried on the back with the top layer of lower section template;One side formwork is at least provided with two auxiliary boom beams 1;It is provided between upper and lower section template Hand-held jack 10, it is supporting point that 10 or more hand-held jack, which saves template, and other end setting carries on the back thick stick 3 in lower section template top layer On;The steel wire rope 7 being connect with the top layer back of the body thick stick 3 of lower section template is also connected with the suspension hook 9 in tower crane 8.
Further, the auxiliary boom beam 1 is F type structures, and the upper end is connected to section template bottom level back of the body thick stick 3.
Further, the auxiliary boom beam length is more than 6 width of job platform.
Further, 3 one end of section template bottom level back of the body thick stick is connected by HOOK BOLTS 5 in the connection of auxiliary boom beam 1 Connect back of the body thick stick 3.
Further, the steel wire rope 7 connects back of the body thick stick 3 by grapple 2.
In use, Thin-Wall Piers turn over method constructing and overhanging model using derrick crane be vertical transportation machinery, template follow from bottom to top, Symmetrically, unilateral gradually to be removed;Installation F type auxiliary booms beam 1, unilateral mould first on upper section template bottom level back of the body thick stick 3 Plate is at least arranged two;Upper part is fixed on upper section template bottom level back of the body thick stick 3 using HOOK BOLTS 5;Auxiliary boom beam 1 Length is more than the width of job platform 6, and job platform 6 is collided when can prevent template from lifting by crane;In 1 end set of auxiliary boom beam, 1 other end of auxiliary boom beam is connected thereto the top layer of row's back of the body thick stick 3 and lower section template by upper and lower grapple 2 by lower grapple 2 respectively Carry on the back thick stick 3;Steel wire rope 7 is arranged between grapple 2 and auxiliary boom beam 1 to connect;In use, first removing one side formwork connects bolt, One side formwork both ends are installed by hand-held jack 10, one side formwork installation no less than two;10 or more hand-held jack saves mould Plate is supporting point, and the other end withstands lower section template top layer back of the body thick stick 3 and carries out form removable operation;Hand-held jack 10 has certain Tilt angled down, operating personnel stand on upper section job platform 6;When one side formwork is detached from concrete surface with F type auxiliary booms Liang1Ding When holding stress, after tower crane lift hook 9 is in place, the steel wire rope 7 in template is hung on suspension hook 9, lifting tower crane is completed to remove Operation;The form removable of other sides is completed according to procedure above.
Auxiliary boom beam 1, grapple 2 and the HOOK BOLTS 5 used are process using round steel;Thick stick 3 is carried on the back to weld using channel steel It makes, split bolt 4 is made of fining twisted steel;Job platform 6 is made of angle steel, steel pipe and steel wire;This practicality is new Type solves Demolition Construction personnel's auxiliary tool present in construction at present and lacks, operational procedure is fuzzy remove it is dangerous compared with Greatly, the problem of construction operation platform is more fragile, arbitrariness is also big in real time;And solve presently, there are security risk, standard It is all high, the simple in structure, low cost of chemical conversion, safe and reliable, meet construction requirement.

Claims (5)

1. a kind of bridge pier overmolded method form removable device, which is characterized in that be connected to the upper section template bottom level back of the body including one end On thick stick (3), horizontally disposed auxiliary boom beam (1);Auxiliary boom beam (1) other end is connected thereto by steel wire rope (7) respectively The top layer back of the body thick stick (3) of row's back of the body thick stick (3) and lower section template;One side formwork is at least provided with two auxiliary boom beams (1);Upper and lower section Hand-held jack (10) is provided between template, more than hand-held jack (10) section template is supporting point, other end setting On lower section template top layer back of the body thick stick (3);The steel wire rope (7) being connect with the top layer back of the body thick stick (3) of lower section template is also connected in tower crane (8) Suspension hook (9).
2. a kind of bridge pier overmolded method form removable device according to claim 1, which is characterized in that the auxiliary boom beam (1) it is F type structures, the upper end is connected to section template bottom level back of the body thick stick (3).
3. a kind of bridge pier overmolded method form removable device according to claim 1, which is characterized in that the auxiliary boom beam Length is more than job platform (6) width.
4. a kind of bridge pier overmolded method form removable device according to claim 1, which is characterized in that the auxiliary boom beam (1) template bottom level back of the body thick stick (3) one end is saved in connection, and back of the body thick stick (3) is connected by HOOK BOLTS (5).
5. a kind of bridge pier overmolded method form removable device according to claim 1, which is characterized in that the steel wire rope (7) Back of the body thick stick (3) is connected by grapple (2).
CN201820098779.9U 2018-01-22 2018-01-22 A kind of bridge pier overmolded method form removable device Expired - Fee Related CN207933897U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820098779.9U CN207933897U (en) 2018-01-22 2018-01-22 A kind of bridge pier overmolded method form removable device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820098779.9U CN207933897U (en) 2018-01-22 2018-01-22 A kind of bridge pier overmolded method form removable device

Publications (1)

Publication Number Publication Date
CN207933897U true CN207933897U (en) 2018-10-02

Family

ID=63649258

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820098779.9U Expired - Fee Related CN207933897U (en) 2018-01-22 2018-01-22 A kind of bridge pier overmolded method form removable device

Country Status (1)

Country Link
CN (1) CN207933897U (en)

Similar Documents

Publication Publication Date Title
CN104695337B (en) Self-lifting sliding and turnover construction system and construction method
CN106012852B (en) Support integrally falls frame construction method
CN104975719A (en) Novel material distribution device and floor concrete casting construction method of novel material distribution device
CN113387267B (en) Safe hoisting and lowering method for underground diaphragm wall reinforcement cage
CN108862081A (en) A kind of chain block crane boom and the application in the adjusting of beam steel protective layer thickness
CN213836318U (en) Bridge floor wet joint hangs mould structure
CN103132702A (en) Longspan pipe truss pulling bar lifting and overhead rotating emplacing construction method
CN208167536U (en) A kind of operation platform removed for bridge temporary support
CN206887771U (en) A kind of small across footpath plate-beam construction platform structure
CN106284097B (en) The installation method that pier K is supportted on a kind of tubular arch bridge arch
CN202990427U (en) Climbing discharging platform
CN207933897U (en) A kind of bridge pier overmolded method form removable device
CN111519545A (en) Pier and capping beam integrated construction platform and construction method thereof
CN102767282A (en) Assembly-type high-formwork construction method for cantilever of oversized special-shaped conversion layer
CN110172915A (en) A kind of high tower shaped form crossbeam Joint Re-bar Construction
CN210685282U (en) Prefabricated rail top air duct assembly structure
CN215885996U (en) F-shaped prefabricated T-beam template hoisting device
CN212893594U (en) Super high-rise building movable arm tower crane bottom protection and operation platform that climbs
CN110217684A (en) A kind of box beam bottom web reinforcement lifting device
CN215755926U (en) Diameter-variable hoisting tool for steel reinforcement cage
CN219490682U (en) Basket hanging device for prestress construction of light T-pier cantilever cap beam
CN211547404U (en) Movable type formwork mounting and dismounting rack for bridge anti-collision guardrail
CN219792145U (en) Hanging bracket device for hoisting prefabricated T-beam
CN220664643U (en) T-shaped beam steel reinforcement framework lifting appliance
CN215055454U (en) Prestressed tendon tensioning and lifting device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181002

CF01 Termination of patent right due to non-payment of annual fee