CN207921480U - A kind of fixing hoop for the fixed multi-pipeline for being embedded in underground - Google Patents

A kind of fixing hoop for the fixed multi-pipeline for being embedded in underground Download PDF

Info

Publication number
CN207921480U
CN207921480U CN201721867400.8U CN201721867400U CN207921480U CN 207921480 U CN207921480 U CN 207921480U CN 201721867400 U CN201721867400 U CN 201721867400U CN 207921480 U CN207921480 U CN 207921480U
Authority
CN
China
Prior art keywords
pipeline
fixed
snap ring
clip
underground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721867400.8U
Other languages
Chinese (zh)
Inventor
梁军起
樊向阳
吴飞飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Sankai Engineering Consulting Co., Ltd.
Original Assignee
Shanghai Smart Building Technology Co Ltd
Triumphant Implementation Management Advisory Co Ltd In Shanghai Three
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Smart Building Technology Co Ltd, Triumphant Implementation Management Advisory Co Ltd In Shanghai Three filed Critical Shanghai Smart Building Technology Co Ltd
Priority to CN201721867400.8U priority Critical patent/CN207921480U/en
Application granted granted Critical
Publication of CN207921480U publication Critical patent/CN207921480U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a kind of fixing hoop for the fixed multi-pipeline for being embedded in underground, including substrate, the substrate is equipped with sliding rail, several clip bodies are installed on sliding rail, and the clip body can slide along sliding rail and lock its position on sliding rail by the first lock-bit component;Each clip body includes clip pedestal and snap ring, and the snap ring is Ω type structures, and one end and one end of clip pedestal are hinged, and the other end is fixed on the other end of clip pedestal by the second lock-bit component;There is the arc groove that coordinate with pipeline arc on the clip pedestal, open up blind hole immediately below the arc groove, equipped with Buffer Unit in blind hole, external force that the Buffer Unit is subject to the pipeline being fixed in snap ring is into row buffering.This clip can parallel pipeline be fixed to being embedded in the multiple tracks of underground, precisely adjusts, and the preferable fixed pipeline being mutually parallel, this structure overcomes the problems, such as that pipeline causes deformation even damaged because receiving outer force effect, assists the service life for improving pipeline.

Description

A kind of fixing hoop for the fixed multi-pipeline for being embedded in underground
Technical field
The utility model belongs to technical field of building construction, is related to pipeline and fixes, and in particular to one kind is for fixed embedded In the fixing hoop of the multi-pipeline of underground.
Background technology
In construction, many pipeline needs, which are bought, to be located in the ground, such as is supplied water, gas supply pipeline, to ensure that its work is steady It is qualitative, it generally requires and pipeline is fixed using fixing hoop, lock its position.The development of Process of Urbanization Construction at present is increasingly Rapidly, the service of residential block is usually that multiple tracks parallelpiped is arranged, and is needed during construction to these pipelines It fixes one by one, existing fixing hoop is usually independent, and a clip is only capable of fixing a pipeline, on the one hand increases construction Workload, on the other hand because the independence of each clip is fixed, it is easy to cause should pipeline disposed in parallel there is fixed error, Cause pipeline deformity locally occur, with the increase of use time, is susceptible to pipeline and is damaged the problem of even rupturing, influence pipe Road normally supplies operation, in addition, being embedded in the pipeline of underground, often by external motive power is come from, Fixed pipeline can not cope with these active forces, and pipeline is caused to be ruptured by external force;Therefore it needs to be directed to be embedded in the more of underground The fixing hoop of pipeline is improved.
Invention content
Goal of the invention:The utility model aim is in view of the deficiencies of the prior art, to provide a kind of good fixing effect, can Contribute to the fixing hoop for the fixed multi-pipeline for being embedded in underground for assisting pipeline that external forces is overcome to influence.
Technical solution:A kind of fixing hoop for the fixed multi-pipeline for being embedded in underground described in the utility model, including Substrate, the substrate are equipped with sliding rail, several clip bodies are installed on sliding rail, and the clip body can slide and by first along sliding rail Lock-bit component locks its position on sliding rail;Each clip body includes clip pedestal and snap ring, and the snap ring is Ω Type structure, one end and one end of clip pedestal are hinged, and the other end is fixed on the another of clip pedestal by the second lock-bit component End;There is the arc groove coordinated with pipeline arc on the clip pedestal, blind hole, blind hole are opened up immediately below the arc groove Interior that Buffer Unit is housed, the external force that the Buffer Unit is subject to the pipeline being fixed in snap ring is into row buffering.
Further, to improve buffering effect, the Buffer Unit includes buffer spring and buffering spacer, the buffering elastic Spring is placed in the blind hole of the clip pedestal, and it stretches out the top of blind hole and fixes buffering spacer.
Further, to improve buffering effect, the buffering spacer is the elastic material with arcuate structure.
Further, precision is installed to improve, there is scale on the substrate, the same position tool on each clip body There is tuning drive gear.
Further, the first lock-bit component includes the fixed ear and fixing bolt for being fixed on clip pedestal both sides, institute Stating the corresponding position on substrate has fixing threaded hole, and fixing bolt is after fixed ear by coordinating clip body with fixing threaded hole It is fixed on substrate.
Further, for ease of identification pointer registration, the tuning drive gear is fixed in the fixed ear.
Further, it is fixed function of the raising clip to pipeline, prevents pipeline shaking displacement occur because holding effect difference tightly, And then lead to pipeline unbalance stress, damage is generated, the snap ring is double-layer structure, including upper snap ring and lower snap ring, the upper card It is equipped with reinforcement assembly between ring and lower snap ring, so that lower snap ring is held pipeline tightly by adjusting the reinforcement assembly.
Further, the reinforcement assembly is one group of bolt regulating part, has on the upper snap ring and reinforces screw hole, reinforces spiral shell Bolt is threaded through in the reinforcing screw hole, and one end that the reinforcing bolt stretches to lower snap ring has ball-shaped end, the phase on lower snap ring Answer position that there is mating spherical groove.
Advantageous effect:(1)Clip provided by the utility model can parallel pipeline be consolidated to being embedded in the multiple tracks of underground It is fixed, it can achieve the effect that precisely to adjust by the scale on substrate and the pointer on clip body, make a plurality of pipeline by this Clip keeps the relationship being preferably mutually parallel after fixing, by the way that arc groove is arranged on clip pedestal, in arc groove Blind hole is arranged in underface, and Buffer Unit is arranged in blind hole, contributes to the external force for assisting buffering pipe to be subject to, and avoids pipeline because receiving The problem that outer force effect causes deformation even damaged assists the service life for improving pipeline;(2)The present apparatus can be with pair of townhouse formula A plurality of parallelpiped is fixed, and overcomes and carries out the fixed opposite position generated one by one using freestanding clip in the prior art Set that control is bad, the problem of pipeline part deformity ensures the normal work of pipeline, helps to improve the service life of pipeline;(3) It is double-layer structure by clasp design by carrying out particularization design to snap ring, and snap ring is adjusted to pipeline by fastening assembly Enclasping force improves the fixed effect of pipeline.
Description of the drawings
Fig. 1 is the overall structure side view of utility model device;
Fig. 2 is the overall structure vertical view of utility model device;
Wherein:1, substrate, 2, sliding rail, 3, clip body, 4, clip pedestal, 41, fixed ear, 42, fixing bolt, 5, snap ring, 51, upper snap ring, 52, lower snap ring, 6, arc groove, 7, blind hole, 8, Buffer Unit, 81, buffer spring, 82, buffering spacer, 9 plus Gu component.
Specific implementation mode
Technical solutions of the utility model are described in detail below by attached drawing, but the scope of protection of the utility model It is not limited to the embodiment.
Embodiment 1:A kind of fixing hoop for the fixed multi-pipeline for being embedded in underground, including substrate 1, the substrate 1 It is equipped with sliding rail 2, four clip bodies 3 are installed on sliding rail 2, the clip body 3 can be slided along sliding rail 2 and be locked by the first lock-bit component Its fixed position on sliding rail;Each clip body 3 includes clip pedestal 4 and snap ring 5, and the snap ring 5 is Ω type structures, One end and one end of clip pedestal 4 are hinged, and the other end is fixed on the other end of clip pedestal 4 by the second lock-bit component;Institute The arc groove 6 for having on clip pedestal 4 and coordinating with pipeline arc is stated, blind hole 7, blind hole 7 are opened up immediately below the arc groove 6 Interior that Buffer Unit 8 is housed, the external force that the Buffer Unit 8 is subject to the pipeline being fixed in snap ring is into row buffering;Buffer Unit 8 Including buffer spring 81 and buffering spacer 82, the buffer spring 81 is placed in the blind hole 7 of the clip pedestal, and its stretching is blind Buffering spacer 82 is fixed on the top in hole 7;Buffering spacer 82 is the rubber material with arcuate structure.First lock-bit component includes solid It is scheduled on the fixed ear 41 and fixing bolt 42 of clip pedestal both sides, the corresponding position on the substrate 1 has fixing threaded hole, fixed Bolt 42 is fixed clip body 3 on substrate 1 by coordinating with fixing threaded hole after passing through fixed ear 41, has scale on substrate 1, Tuning drive gear is fixed in fixed ear 41, the specific location of clip pedestal 3 is indicated;Snap ring 5 is double-layer structure, including upper card Ring 51 and lower snap ring 52 are equipped with reinforcement assembly 9 between the upper snap ring 51 and lower snap ring 52, by adjusting the reinforcement assembly 9 Lower snap ring is set to hold pipeline tightly, reinforcement assembly 9 is one group of bolt regulating part, has on the upper snap ring 51 and reinforces screw hole, reinforces spiral shell Bolt is threaded through in the reinforcing screw hole, described to reinforce one end that bolt stretches to lower snap ring and have ball-shaped end, on lower snap ring 52 Corresponding position has mating spherical groove.
In the specific use process, substrate is fixed on to position to be installed first, then the spacing needed for pipeline The position for adjusting each clip body on substrate, reaches the effect precisely adjusted by the scale on substrate and the pointer on clip body Then pipeline is placed on each clip pedestal by fruit, rotation snap ring simultaneously, pipeline is held tightly in snap ring, last adjustable rooting bolt, So that interior snap ring is tightly encircled on pipeline, improves the holding effect to pipeline.
As described above, although the utility model has been indicated and described with reference to specific preferred embodiment, it must not It is construed to the limitation to the utility model itself.In the spirit and scope for not departing from the utility model that appended claims define Under the premise of, it can various changes can be made in the form and details to it.

Claims (8)

1. a kind of fixing hoop for the fixed multi-pipeline for being embedded in underground, it is characterised in that:Including substrate, on the substrate Equipped with sliding rail, several clip bodies are installed on sliding rail, the clip body can slide along sliding rail and lock it by the first lock-bit component Position on sliding rail;Each clip body includes clip pedestal and snap ring, and the snap ring is Ω type structures, one end with One end of clip pedestal is hinged, and the other end is fixed on the other end of clip pedestal by the second lock-bit component;The clip pedestal It is upper that there is the arc groove coordinated with pipeline arc, blind hole is opened up immediately below the arc groove, and Buffer Unit is housed in blind hole, The external force that the Buffer Unit is subject to the pipeline being fixed in snap ring is into row buffering.
2. the fixing hoop according to claim 1 for the fixed multi-pipeline for being embedded in underground, it is characterised in that:It is described Buffer Unit includes buffer spring and buffering spacer, and the buffer spring is placed in the blind hole of the clip pedestal, and it is stretched out Buffering spacer is fixed on the top of blind hole.
3. the fixing hoop according to claim 2 for the fixed multi-pipeline for being embedded in underground, it is characterised in that:It is described Buffering spacer is the elastic material with arcuate structure.
4. the fixing hoop according to claim 1 for the fixed multi-pipeline for being embedded in underground, it is characterised in that:It is described There is scale, the same position on each clip body has tuning drive gear on substrate.
5. the fixing hoop according to claim 4 for the fixed multi-pipeline for being embedded in underground, it is characterised in that:It is described First lock-bit component includes the fixed ear and fixing bolt for being fixed on clip pedestal both sides, and the corresponding position on the substrate has Clip body is fixed on substrate after passing through fixed ear by coordinating with fixing threaded hole by fixing threaded hole, fixing bolt.
6. the fixing hoop according to claim 5 for the fixed multi-pipeline for being embedded in underground, it is characterised in that:It is described Tuning drive gear is fixed in the fixed ear.
7. the fixing hoop according to claim 1 for the fixed multi-pipeline for being embedded in underground, it is characterised in that:It is described Snap ring is double-layer structure, including upper snap ring and lower snap ring, and reinforcement assembly is equipped between the upper snap ring and lower snap ring, passes through adjusting The reinforcement assembly makes lower snap ring hold pipeline tightly.
8. the fixing hoop according to claim 7 for the fixed multi-pipeline for being embedded in underground, it is characterised in that:It is described Reinforcement assembly is one group of bolt regulating part, has on the upper snap ring and reinforces screw hole, reinforces bolt and is threaded through the reinforcing screw hole Interior, one end that the reinforcing bolt stretches to lower snap ring has ball-shaped end, and the corresponding position on lower snap ring has mating spherical surface Groove.
CN201721867400.8U 2017-12-27 2017-12-27 A kind of fixing hoop for the fixed multi-pipeline for being embedded in underground Expired - Fee Related CN207921480U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721867400.8U CN207921480U (en) 2017-12-27 2017-12-27 A kind of fixing hoop for the fixed multi-pipeline for being embedded in underground

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721867400.8U CN207921480U (en) 2017-12-27 2017-12-27 A kind of fixing hoop for the fixed multi-pipeline for being embedded in underground

Publications (1)

Publication Number Publication Date
CN207921480U true CN207921480U (en) 2018-09-28

Family

ID=63607836

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721867400.8U Expired - Fee Related CN207921480U (en) 2017-12-27 2017-12-27 A kind of fixing hoop for the fixed multi-pipeline for being embedded in underground

Country Status (1)

Country Link
CN (1) CN207921480U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110274090A (en) * 2019-07-01 2019-09-24 黄孚 Compound anti-shearing pipeline
CN110566747A (en) * 2019-08-12 2019-12-13 中广核工程有限公司 Nuclear-grade instrument tube supporting combination structure
CN112032456A (en) * 2020-09-02 2020-12-04 南京工业大学 Spacing antidetonation fixing support that slides of pipeline
CN115450229A (en) * 2022-08-31 2022-12-09 上海城建市政工程(集团)有限公司 Pipeline groove excavation backfill construction method based on in-situ solidification of retaining wall slurry

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110274090A (en) * 2019-07-01 2019-09-24 黄孚 Compound anti-shearing pipeline
CN110566747A (en) * 2019-08-12 2019-12-13 中广核工程有限公司 Nuclear-grade instrument tube supporting combination structure
CN112032456A (en) * 2020-09-02 2020-12-04 南京工业大学 Spacing antidetonation fixing support that slides of pipeline
CN115450229A (en) * 2022-08-31 2022-12-09 上海城建市政工程(集团)有限公司 Pipeline groove excavation backfill construction method based on in-situ solidification of retaining wall slurry

Similar Documents

Publication Publication Date Title
CN207921480U (en) A kind of fixing hoop for the fixed multi-pipeline for being embedded in underground
CN209398936U (en) Para-seismic support for pipeline
CN207921493U (en) A kind of underground multi-pipeline fixing hoop
CN204402146U (en) Multifunctional door handle structure capable of reversing
CN209686548U (en) A kind of drainage pipeline support device
CN203097306U (en) Assembled type building wallboard installation tool
CN205271835U (en) Multi -aperture pipe connection fixing device that adjustable and position rectifies
CN206270831U (en) A kind of multi-functional computer cabinet
CN208119196U (en) A kind of rotary target material moving trolley
CN209325295U (en) A kind of adaptive gas pressure regulator, governor support frame
CN204203009U (en) The test unit of the full-scale four-point bending of a kind of natural gas tube
CN209096861U (en) A kind of caterpillar type robot
CN206393555U (en) A kind of core holding unit plug provision for disengagement
CN204127480U (en) A kind of detachable built-in pipe channel fixing device
CN110145045A (en) A kind of limit energy-dissipation structure and its construction method
CN205190788U (en) Wind butterfly valve is transferred to manual no gear
CN203429835U (en) Positioning device and spherical hinge clamp with same
CN202769052U (en) Pipeline movable cradle
CN209523739U (en) A kind of oil field development water injection well device convenient for protecting water injection pipe
CN209128897U (en) A kind of bridge Construction Support device
CN203751999U (en) Tubular product positioning device
CN207332787U (en) A kind of telescopic anti-drop device
CN107379018A (en) A kind of robot bottom fixing mechanism
CN214096086U (en) Planning auxiliary device for municipal environment design
CN204266595U (en) Prefabricated adjustable suspension column part

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: Room 303, No. 1, Lane 251, Songhua River Road, Yangpu District, Shanghai

Co-patentee after: Shanghai smart building technology Co., Ltd.

Patentee after: Shanghai Sankai Engineering Consulting Co., Ltd.

Address before: Room 303, No. 1, Lane 251, Songhua River Road, Yangpu District, Shanghai

Co-patentee before: Shanghai smart building technology Co., Ltd.

Patentee before: The triumphant implementation management Advisory Co., Ltd in Shanghai three

CP01 Change in the name or title of a patent holder
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180928

Termination date: 20191227

CF01 Termination of patent right due to non-payment of annual fee