CN207921493U - A kind of underground multi-pipeline fixing hoop - Google Patents

A kind of underground multi-pipeline fixing hoop Download PDF

Info

Publication number
CN207921493U
CN207921493U CN201721867454.4U CN201721867454U CN207921493U CN 207921493 U CN207921493 U CN 207921493U CN 201721867454 U CN201721867454 U CN 201721867454U CN 207921493 U CN207921493 U CN 207921493U
Authority
CN
China
Prior art keywords
clip
snap ring
pipeline
sliding rail
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721867454.4U
Other languages
Chinese (zh)
Inventor
梁军起
樊向阳
吴飞飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Sankai Engineering Consulting Co., Ltd.
Original Assignee
Shanghai Smart Building Technology Co Ltd
Triumphant Implementation Management Advisory Co Ltd In Shanghai Three
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Smart Building Technology Co Ltd, Triumphant Implementation Management Advisory Co Ltd In Shanghai Three filed Critical Shanghai Smart Building Technology Co Ltd
Priority to CN201721867454.4U priority Critical patent/CN207921493U/en
Application granted granted Critical
Publication of CN207921493U publication Critical patent/CN207921493U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a kind of underground multi-pipeline fixing hoop, including substrate, and the substrate is equipped with sliding rail, several clip bodies are installed on sliding rail, and the clip body can slide along sliding rail and lock its position on sliding rail by the first lock-bit component;Each clip body includes clip pedestal and snap ring, and the snap ring is Ω type structures, and one end and one end of clip pedestal are hinged, and the other end is fixed on the other end of clip pedestal by the second lock-bit component.This clip can parallel pipeline be fixed to being embedded in the multiple tracks of underground, precisely adjust, a plurality of pipeline is set to keep the relationship being preferably mutually parallel after the fixation of this clip, it is bad to overcome the relative position control fixed generate one by one using the progress of freestanding clip in the prior art, the problem of pipeline part deformity, the normal work for ensureing pipeline, helps to improve the service life of pipeline.

Description

A kind of underground multi-pipeline fixing hoop
Technical field
The utility model belongs to technical field of building construction, is related to pipeline and fixes, and in particular to one kind being used for underground multitube The fixed clip in road.
Background technology
In construction, many pipeline needs, which are bought, to be located in the ground, such as is supplied water, gas supply pipeline, to ensure that its work is steady It is qualitative, it generally requires and pipeline is fixed using fixing hoop, lock its position.The development of Process of Urbanization Construction at present is increasingly Rapidly, the service of residential block is usually that multiple tracks parallelpiped is arranged, and is needed during construction to these pipelines It fixes one by one, existing fixing hoop is usually independent, and a clip is only capable of fixing a pipeline, on the one hand increases construction Workload, on the other hand because the independence of each clip is fixed, it is easy to cause should pipeline disposed in parallel there is fixed error, Cause pipeline deformity locally occur, with the increase of use time, is susceptible to pipeline and is damaged the problem of even rupturing, influence pipe Road normally supplies operation, it is therefore desirable to is improved for the fixing hoop for a plurality of pipeline for being embedded in underground.
Invention content
Goal of the invention:The utility model aim is in view of the deficiencies of the prior art, to provide a kind of good fixing effect, keep away Exempt from the impaired underground multi-pipeline fixing hoop of pipeline.
Technical solution:A kind of underground multi-pipeline fixing hoop described in the utility model, including substrate, on the substrate Equipped with sliding rail, several clip bodies are installed on sliding rail, the clip body can slide along sliding rail and lock it by the first lock-bit component Position on sliding rail;Each clip body includes clip pedestal and snap ring, and the snap ring is Ω type structures, one end with One end of clip pedestal is hinged, and the other end is fixed on the other end of clip pedestal by the second lock-bit component.
Further, for ease of adjusting the position of every group of fixing hoop front band body, there is scale on the substrate, each Same position on clip body has tuning drive gear.
Further, have the arc coordinated with pipeline arc recessed for the ease of the fixation of pipeline, on the clip pedestal Slot.
Further, the first lock-bit component includes the fixed ear and fixing bolt for being fixed on clip pedestal both sides, institute Stating the corresponding position on substrate has fixing threaded hole, and fixing bolt is after fixed ear by coordinating clip body with fixing threaded hole It is fixed on substrate.
Further, recognize that scale, the tuning drive gear are fixed in the fixed ear for ease of pointer.
Further, it is fixed function of the raising clip to pipeline, prevents pipeline shaking displacement occur because holding effect difference tightly, And then lead to pipeline unbalance stress, damage is generated, the snap ring is double-layer structure, including upper snap ring and lower snap ring, the upper card It is equipped with reinforcement assembly between ring and lower snap ring, so that lower snap ring is held pipeline tightly by adjusting the reinforcement assembly.
Further, the reinforcement assembly is one group of bolt regulating part, has on the upper snap ring and reinforces screw hole, reinforces spiral shell Bolt is threaded through in the reinforcing screw hole, and one end that the reinforcing bolt stretches to lower snap ring has ball-shaped end, the phase on lower snap ring Answer position that there is mating spherical groove.
Advantageous effect:(1)Clip provided by the utility model can parallel pipeline be consolidated to being embedded in the multiple tracks of underground It is fixed, it can achieve the effect that precisely to adjust by the scale on substrate and the pointer on clip body, make a plurality of pipeline by this Clip keeps the relationship being preferably mutually parallel after fixing, and overcomes and is carried out one by one admittedly using freestanding clip in the prior art The relative position control of fixed output quota life is bad, and the problem of pipeline part deformity ensures the normal work of pipeline, helps to improve pipeline Service life;(2)It is double-layer structure by clasp design, and pass through fastening assembly tune by carrying out particularization design to snap ring Snap ring is saved to the enclasping force of pipeline, improves the fixed effect of pipeline.
Description of the drawings
Fig. 1 is the overall structure side view of utility model device;
Fig. 2 is the overall structure vertical view of utility model device;
Wherein:1, substrate, 2, sliding rail, 3, clip body, the 4, first lock-bit component, 41, fixed ear, 42, fixing bolt, 5, card Bind round pedestal, 6, snap ring, 61, upper snap ring, 62, lower snap ring, 63, reinforcement assembly, 7, arc groove.
Specific implementation mode
Technical solutions of the utility model are described in detail below by attached drawing, but the scope of protection of the utility model It is not limited to the embodiment.
Embodiment 1:A kind of underground multi-pipeline fixing hoop, including substrate 1, the substrate 1 is equipped with sliding rail 2, on sliding rail 2 Four clip bodies 3 are installed, the clip body 3 can slide along sliding rail 2 and lock its position on sliding rail 2 by the first lock-bit component 4 It sets;Each clip body 3 includes clip pedestal 5 and snap ring 6, and the snap ring 6 is Ω type structures, one end and clip pedestal 5 one end is hinged, and the other end is fixed on the other end of clip pedestal by the second lock-bit component, has and pipe on clip pedestal 5 The arc groove 7 of road arc cooperation;First lock-bit component 4 includes the fixed ear 41 and fixing bolt for being fixed on clip pedestal both sides 42, the corresponding position on the substrate 1 has a fixing threaded hole, and fixing bolt 42 passes through after fixed ear 41 by matching with fixing threaded hole It closes and fixes clip body 3 on substrate 1, there is scale on substrate 1, tuning drive gear is fixed in fixed ear 41, to the tool of clip body 3 Body position is indicated;Snap ring 6 is double-layer structure, including upper snap ring 61 and lower snap ring 62, the upper snap ring 61 and lower snap ring 62 Between be equipped with reinforcement assembly 63, so that lower snap ring 62 is held pipeline tightly by adjusting the reinforcement assembly 63, reinforcement assembly 63 is one group Bolt regulating part has on the upper snap ring and reinforces screw hole, reinforces bolt and is threaded through in the reinforcing screw hole, the reinforcing bolt The one end for stretching to lower snap ring 62 has ball-shaped end, and the corresponding position on lower snap ring 62 has mating spherical groove.
In the specific use process, substrate is fixed on to position to be installed first, then the spacing needed for pipeline The position for adjusting each clip body on substrate, reaches the effect precisely adjusted by the scale on substrate and the pointer on clip body Then pipeline is placed on each clip pedestal by fruit, rotation snap ring simultaneously, pipeline is held tightly in snap ring, last adjustable rooting bolt, So that interior snap ring is tightly encircled on pipeline, improves the holding effect to pipeline.
As described above, although the utility model has been indicated and described with reference to specific preferred embodiment, it must not It is construed to the limitation to the utility model itself.In the spirit and scope for not departing from the utility model that appended claims define Under the premise of, it can various changes can be made in the form and details to it.

Claims (7)

1. a kind of underground multi-pipeline fixing hoop, it is characterised in that:Including substrate, the substrate is equipped with sliding rail, pacifies on sliding rail Several clip bodies are filled, the clip body can slide along sliding rail and lock its position on sliding rail by the first lock-bit component;Institute The each clip body stated includes clip pedestal and snap ring, and the snap ring is Ω type structures, and one end and one end of clip pedestal are cut with scissors It connects, the other end is fixed on the other end of clip pedestal by the second lock-bit component.
2. multi-pipeline fixing hoop in underground according to claim 1, it is characterised in that:There is scale, often on the substrate Same position on a clip body has tuning drive gear.
3. multi-pipeline fixing hoop in underground according to claim 2, it is characterised in that:Have and pipe on the clip pedestal The arc groove of road arc cooperation.
4. multi-pipeline fixing hoop in underground according to claim 3, it is characterised in that:The first lock-bit component includes solid It is scheduled on the fixed ear and fixing bolt of clip pedestal both sides, the corresponding position on the substrate has fixing threaded hole, fixing bolt Clip body is fixed on substrate by coordinating with fixing threaded hole after fixed ear.
5. multi-pipeline fixing hoop in underground according to claim 4, it is characterised in that:The tuning drive gear is fixed on described In fixed ear.
6. multi-pipeline fixing hoop in underground according to claim 1, it is characterised in that:The snap ring is double-layer structure, packet Snap ring and lower snap ring are included, reinforcement assembly is equipped between the upper snap ring and lower snap ring, under being made by the adjusting reinforcement assembly Snap ring holds pipeline tightly.
7. multi-pipeline fixing hoop in underground according to claim 6, it is characterised in that:The reinforcement assembly is one group of bolt Regulating part has on the upper snap ring and reinforces screw hole, reinforces bolt and is threaded through in the reinforcing screw hole, the reinforcing bolt stretches to One end of lower snap ring has ball-shaped end, and the corresponding position on lower snap ring has mating spherical groove.
CN201721867454.4U 2017-12-27 2017-12-27 A kind of underground multi-pipeline fixing hoop Expired - Fee Related CN207921493U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721867454.4U CN207921493U (en) 2017-12-27 2017-12-27 A kind of underground multi-pipeline fixing hoop

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721867454.4U CN207921493U (en) 2017-12-27 2017-12-27 A kind of underground multi-pipeline fixing hoop

Publications (1)

Publication Number Publication Date
CN207921493U true CN207921493U (en) 2018-09-28

Family

ID=63607878

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721867454.4U Expired - Fee Related CN207921493U (en) 2017-12-27 2017-12-27 A kind of underground multi-pipeline fixing hoop

Country Status (1)

Country Link
CN (1) CN207921493U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110778792A (en) * 2019-09-23 2020-02-11 中国二十冶集团有限公司 Pipeline butt joint device and pipeline butt joint method
CN111203046A (en) * 2020-03-18 2020-05-29 福建工程学院 Double-cylinder positioning buckle

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110778792A (en) * 2019-09-23 2020-02-11 中国二十冶集团有限公司 Pipeline butt joint device and pipeline butt joint method
CN111203046A (en) * 2020-03-18 2020-05-29 福建工程学院 Double-cylinder positioning buckle

Similar Documents

Publication Publication Date Title
CN207921480U (en) A kind of fixing hoop for the fixed multi-pipeline for being embedded in underground
CN207921493U (en) A kind of underground multi-pipeline fixing hoop
CN209398936U (en) Para-seismic support for pipeline
CN208919476U (en) It is a kind of for fixing the support device of bridge pipeline
CN207777667U (en) A kind of flow control valve convenient for adjusting
CN203097306U (en) Assembled type building wallboard installation tool
CN204470058U (en) A kind of vibratory sieve tightening screen cloth fast
CN206819923U (en) A kind of device of alternative switch operation mechanism
CN204711895U (en) A kind of valve bracing ring is without radial clamp
CN207647002U (en) A kind of ceiling combination mounting structure
CN207394124U (en) Blow-off pipe suspended structure
CN205743074U (en) A kind of adjustable for height support for building
CN203751999U (en) Tubular product positioning device
CN108098689A (en) Nut dismounting tool and assembly and disassembly methods
CN204334211U (en) A kind of exciting force adjusting device of vibration motor
CN208816918U (en) A kind of Petroleum Pipehead mounting device
CN208557266U (en) A kind of long tube post-positioning device
CN207093543U (en) A kind of steady type U-bolt of convenient installation
CN207005564U (en) Pipeline mending-leakage specific purpose tool
CN202596190U (en) Adjustable wallboard inclined strut for large-size storage tank
CN208594582U (en) A kind of civil engineering shovel
CN204127488U (en) Easy used clamp
CN205784040U (en) Dispenser component and there is its refrigeration plant
CN109737240A (en) Pipeline fixing device
CN205298823U (en) A pipeline fixer for fixing two crisscross vertical pipe

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: Room 303, No. 1, Lane 251, Songhua River Road, Yangpu District, Shanghai

Co-patentee after: Shanghai smart building technology Co., Ltd.

Patentee after: Shanghai Sankai Engineering Consulting Co., Ltd.

Address before: Room 303, No. 1, Lane 251, Songhua River Road, Yangpu District, Shanghai

Co-patentee before: Shanghai smart building technology Co., Ltd.

Patentee before: The triumphant implementation management Advisory Co., Ltd in Shanghai three

CP01 Change in the name or title of a patent holder
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180928

Termination date: 20191227

CF01 Termination of patent right due to non-payment of annual fee