CN207920022U - Building engineering construction scaffold - Google Patents

Building engineering construction scaffold Download PDF

Info

Publication number
CN207920022U
CN207920022U CN201820277996.4U CN201820277996U CN207920022U CN 207920022 U CN207920022 U CN 207920022U CN 201820277996 U CN201820277996 U CN 201820277996U CN 207920022 U CN207920022 U CN 207920022U
Authority
CN
China
Prior art keywords
scaffold
sleeve
fixing
plastic cement
card slots
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820277996.4U
Other languages
Chinese (zh)
Inventor
任华业
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201820277996.4U priority Critical patent/CN207920022U/en
Application granted granted Critical
Publication of CN207920022U publication Critical patent/CN207920022U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

Building engineering construction scaffold, including scaffold crossbeam, scaffold connector sleeve, No.1 supporting rod, No. two supporting rods, No.1 fixing sleeve, No. two fixing sleeves, ricker, the ricker connects scaffold crossbeam by scaffold connector sleeve, scaffold crossbeam side connects No.1 fixing sleeve, the scaffold crossbeam other side connects No. two fixing sleeves, No.1 fixing sleeve connects No. two fixing sleeves by fixing bolt, No.1 fixing sleeve and No. two fixing sleeves are symmetrical arranged, there are No. three card slots inside No.1 fixing sleeve, No. three card slot lower parts have No.1 card slot, scaffold cross rail outer has No. four card slots, No.1 plastic cement adapter sleeve and No. four card slots are adapted, No. four card slots are connected on the inside of No.1 plastic cement adapter sleeve, No.1 plastic cement adapter sleeve and No. three card slots are adapted, No. three card slots are connected on the outside of No.1 plastic cement adapter sleeve.

Description

Building engineering construction scaffold
Technical field
The utility model is related to scaffold field more particularly to a kind of building engineering construction scaffolds.
Background technology
Building engineering construction scaffold in use, however due to building engineering construction with scaffold overall structure not Rationally, under the external force either horizontal force of wind, it so that building engineering construction is tilted and collapsed with scaffold and injure work by a crashing object Personnel cause building engineering construction to fall tumble injury with the staff on scaffold.
Utility model content
The utility model is directed to deficiencies of the prior art, provides a kind of building engineering construction use reasonable for structure Scaffold.
The purpose of this utility model is to be achieved through the following technical solutions:
A kind of building engineering construction scaffold, including scaffold crossbeam, scaffold connector sleeve, No.1 supporting rod, No. two Supporting rod, No.1 fixing sleeve, No. two fixing sleeves, rickers, the ricker pass through scaffold connector sleeve connecting pin Hand cradle crossbeam, scaffold crossbeam side connect No.1 fixing sleeve, and the scaffold crossbeam other side connects No. two fixing sleeves, and No.1 is fixed Set connects No. two fixing sleeves by fixing bolt, and No.1 fixing sleeve and No. two fixing sleeves are symmetrical arranged, tool inside No.1 fixing sleeve There are No. three card slots, No. three card slot lower parts that there is No.1 card slot, scaffold cross rail outer to have No. four card slots, No.1 plastic cement tight Gu set is adapted with No. four card slots, No. four card slots, No.1 plastic cement adapter sleeve and No. three card slots are connected on the inside of No.1 plastic cement adapter sleeve It is adapted, No. three card slots of connection on the outside of No.1 plastic cement adapter sleeve, No.1 fixing sleeve lower part connection No.1 supporting rod top, described one There are No. two card slots, No. two plastic cement adapter sleeves to be adapted with No. two card slots, No. two plastic cement adapter sleeves insides connect on the outside of number supporting rod Connect No. two card slots.
No. two plastic cement adapter sleeves are adapted with No.1 card slot, connection No.1 card slot on the outside of No. two plastic cement adapter sleeves, and one Number supporting rod both sides connect No. two supporting rod sides, and No. two supporting rods are symmetrical arranged, No. two supporting rod other side connecting pins Hand cradle column.
Advantageous effect:
Under the action of No.1 plastic cement adapter sleeve, scaffold crossbeam is made to be connect more with No.1 fixing sleeve, No. two fixing sleeves It is firm, keep overall structure more reasonable, under the action of No. two plastic cement adapter sleeves, make No.1 supporting rod and No.1 fixing sleeve, No. two Fixing sleeve connection it is more firm, keep overall structure more reasonable, at the same No.1 fixing sleeve, No. two fixing sleeves collective effect under, The contact area for increasing scaffold crossbeam and No.1 supporting rod makes scaffold crossbeam be connect with No.1 supporting rod more firm, Keep overall structure more reasonable, while No.1 supporting rod, No. two supporting rods play support to scaffold crossbeam, ricker and make With, effectively prevent scaffold deformation collapse, keep overall structure more reasonable.
Description of the drawings
Fig. 1 is building engineering construction scaffold partial sectional view described in the utility model.
Fig. 2 is building engineering construction scaffold described in the utility model partial side view.
Fig. 3 is building engineering construction scaffolding structure schematic diagram described in the utility model.
Specific implementation mode
The utility model is described in further detail below according to drawings and examples:
A kind of building engineering construction scaffold, including scaffold crossbeam 01, scaffold connector sleeve 02, No.1 supporting rod 03, No. two supporting rods 04, No.1 fixing sleeve 05, No. two fixing sleeve 13, ricker 14, the ricker 14 pass through foot Hand cradle connector sleeve 02 connects scaffold crossbeam 01, and 01 side of scaffold crossbeam connects No.1 fixing sleeve 05, and scaffold crossbeam 01 is another Side connects No. two fixing sleeves 13, and No.1 fixing sleeve 05 connects No. two fixing sleeves 13, No.1 fixing sleeve 05 by fixing bolt 12 It is symmetrical arranged with No. two fixing sleeves 13,05 inside of No.1 fixing sleeve has No. three card slots 10, and 10 lower part of No. three card slots has There are No. four card slots 11, No.1 plastic cement adapter sleeve 06 and No. four card slots 11 to be adapted for No.1 card slot 08,01 outside of scaffold crossbeam, 06 inside of No.1 plastic cement adapter sleeve connects No. four card slots 11, and No.1 plastic cement adapter sleeve 06 and No. three card slots 10 are adapted, No.1 modeling 06 outside of glue adapter sleeve connects No. three card slots 10, and 05 lower part of No.1 fixing sleeve connects 03 top of No.1 supporting rod, the No.1 branch There are No. two card slots 09, No. two plastic cement adapter sleeves 07 and No. two card slots 09 to be adapted in strut 03 outside, No. two plastic cement adapter sleeves 07 Inside connects No. two card slots 09.
No. two plastic cement adapter sleeves 07 are adapted with No.1 card slot 08, and No. two 07 outsides of plastic cement adapter sleeve connect No.1 card Slot 08,03 both sides of No.1 supporting rod connect No. two 04 sides of supporting rod, and No. two supporting rods 04 are symmetrical arranged, No. two supporting rods 04 other side connects ricker 14.
Under the action of No.1 plastic cement adapter sleeve 06, make scaffold crossbeam 01 and 05, No. two fixing sleeve 13 of No.1 fixing sleeve What is connected is more firm, keeps overall structure more reasonable, under the action of No. two plastic cement adapter sleeves 07, makes No.1 supporting rod 03 and No.1 05, No. two fixing sleeve 13 of fixing sleeve connects more firm, keeps overall structure more reasonable, while solid in No.1 fixing sleeve 05, two Surely under the collective effect of set 13, the contact area of scaffold crossbeam 01 and No.1 supporting rod 03 is increased, scaffold crossbeam 01 is made It is connect with No.1 supporting rod 03 more firm, keeps overall structure more reasonable, while 03, No. two supporting rod 04 of No.1 supporting rod is to foot Hand cradle crossbeam 01, ricker 14 play supporting role, effectively prevent scaffold deformation and collapse, make overall structure more Rationally.

Claims (2)

1. a kind of building engineering construction scaffold, it is characterized in that:Including scaffold crossbeam, scaffold connector sleeve, No.1 support Bar, No. two supporting rods, No.1 fixing sleeve, No. two fixing sleeves, rickers, the ricker pass through scaffold connector sleeve Connection scaffold crossbeam, scaffold crossbeam side connection No.1 fixing sleeve, No. two fixing sleeves of scaffold crossbeam other side connection, one Number fixing sleeve connects No. two fixing sleeves by fixing bolt, and No.1 fixing sleeve is arranged symmetrically with No. two fixing sleeves, No.1 fixing sleeve There are No. three card slots, No. three card slot lower parts there is No.1 card slot, scaffold cross rail outer to have No. four card slots, No.1 for inside Plastic cement adapter sleeve and No. four card slots are adapted, and No. four card slots, No.1 plastic cement adapter sleeve and three are connected on the inside of No.1 plastic cement adapter sleeve Number card slot is adapted, and No. three card slots are connected on the outside of No.1 plastic cement adapter sleeve, and No.1 fixing sleeve lower part connects No.1 supporting rod top, There are No. two card slots, No. two plastic cement adapter sleeves and No. two card slots to be adapted, No. two plastic cement adapter sleeves on the outside of the No.1 supporting rod Inside connects No. two card slots.
2. building engineering construction scaffold according to claim 1, it is characterized in that:No. two plastic cement adapter sleeves with No.1 card slot is adapted, and No.1 card slot is connected on the outside of No. two plastic cement adapter sleeves, and No.1 supporting rod both sides connect No. two supporting rods one Side, No. two supporting rods are symmetrical arranged, and No. two supporting rod other sides connect ricker.
CN201820277996.4U 2018-02-28 2018-02-28 Building engineering construction scaffold Expired - Fee Related CN207920022U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820277996.4U CN207920022U (en) 2018-02-28 2018-02-28 Building engineering construction scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820277996.4U CN207920022U (en) 2018-02-28 2018-02-28 Building engineering construction scaffold

Publications (1)

Publication Number Publication Date
CN207920022U true CN207920022U (en) 2018-09-28

Family

ID=63601797

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820277996.4U Expired - Fee Related CN207920022U (en) 2018-02-28 2018-02-28 Building engineering construction scaffold

Country Status (1)

Country Link
CN (1) CN207920022U (en)

Similar Documents

Publication Publication Date Title
CN210918452U (en) Folding tent support
CN103104092A (en) Support composite structure of beam and slab
CN101736896B (en) Cross-plate scaffold
CN207920022U (en) Building engineering construction scaffold
CN206016335U (en) A kind of assembled stage
CN203257123U (en) Building supporting frame convenient to fold
CN203065052U (en) Suspension arm of crane
CN207469717U (en) A kind of architectural engineering scaffold bracing means
CN203709513U (en) Table frame
CN207646996U (en) A kind of square set
CN205591507U (en) Scaffold frame of easily dismantling
CN205604693U (en) Folded cascade scaffold frame
CN210888758U (en) Water conservancy is utilized and is overhauld cat ladder
CN209353668U (en) A kind of anti-dumping obforms scaffold
CN207776419U (en) A kind of easy-to-dismount scaffold of civil engineering
CN202745407U (en) Support frame used for building
CN203626212U (en) Pier stud construction operation platform quick to disassemble and assemble
CN207582933U (en) Super High large span outrigger drawknot structure
CN207003265U (en) New road bridge formwork support meanss
CN215483942U (en) Steel bar truss building carrier plate convenient to construction
CN107476200B (en) Full-hall support staggered overlapping structure and method
CN206693588U (en) A kind of quick assembling scaffold
CN207829429U (en) A kind of welded steel structure net frame operating platform
CN220267156U (en) Construction scaffold based on house construction safety
CN210508307U (en) Scaffold for building engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180928

Termination date: 20200228