CN207920022U - Building engineering construction scaffold - Google Patents
Building engineering construction scaffold Download PDFInfo
- Publication number
- CN207920022U CN207920022U CN201820277996.4U CN201820277996U CN207920022U CN 207920022 U CN207920022 U CN 207920022U CN 201820277996 U CN201820277996 U CN 201820277996U CN 207920022 U CN207920022 U CN 207920022U
- Authority
- CN
- China
- Prior art keywords
- scaffold
- sleeve
- fixing
- plastic cement
- card slots
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
Building engineering construction scaffold, including scaffold crossbeam, scaffold connector sleeve, No.1 supporting rod, No. two supporting rods, No.1 fixing sleeve, No. two fixing sleeves, ricker, the ricker connects scaffold crossbeam by scaffold connector sleeve, scaffold crossbeam side connects No.1 fixing sleeve, the scaffold crossbeam other side connects No. two fixing sleeves, No.1 fixing sleeve connects No. two fixing sleeves by fixing bolt, No.1 fixing sleeve and No. two fixing sleeves are symmetrical arranged, there are No. three card slots inside No.1 fixing sleeve, No. three card slot lower parts have No.1 card slot, scaffold cross rail outer has No. four card slots, No.1 plastic cement adapter sleeve and No. four card slots are adapted, No. four card slots are connected on the inside of No.1 plastic cement adapter sleeve, No.1 plastic cement adapter sleeve and No. three card slots are adapted, No. three card slots are connected on the outside of No.1 plastic cement adapter sleeve.
Description
Technical field
The utility model is related to scaffold field more particularly to a kind of building engineering construction scaffolds.
Background technology
Building engineering construction scaffold in use, however due to building engineering construction with scaffold overall structure not
Rationally, under the external force either horizontal force of wind, it so that building engineering construction is tilted and collapsed with scaffold and injure work by a crashing object
Personnel cause building engineering construction to fall tumble injury with the staff on scaffold.
Utility model content
The utility model is directed to deficiencies of the prior art, provides a kind of building engineering construction use reasonable for structure
Scaffold.
The purpose of this utility model is to be achieved through the following technical solutions:
A kind of building engineering construction scaffold, including scaffold crossbeam, scaffold connector sleeve, No.1 supporting rod, No. two
Supporting rod, No.1 fixing sleeve, No. two fixing sleeves, rickers, the ricker pass through scaffold connector sleeve connecting pin
Hand cradle crossbeam, scaffold crossbeam side connect No.1 fixing sleeve, and the scaffold crossbeam other side connects No. two fixing sleeves, and No.1 is fixed
Set connects No. two fixing sleeves by fixing bolt, and No.1 fixing sleeve and No. two fixing sleeves are symmetrical arranged, tool inside No.1 fixing sleeve
There are No. three card slots, No. three card slot lower parts that there is No.1 card slot, scaffold cross rail outer to have No. four card slots, No.1 plastic cement tight
Gu set is adapted with No. four card slots, No. four card slots, No.1 plastic cement adapter sleeve and No. three card slots are connected on the inside of No.1 plastic cement adapter sleeve
It is adapted, No. three card slots of connection on the outside of No.1 plastic cement adapter sleeve, No.1 fixing sleeve lower part connection No.1 supporting rod top, described one
There are No. two card slots, No. two plastic cement adapter sleeves to be adapted with No. two card slots, No. two plastic cement adapter sleeves insides connect on the outside of number supporting rod
Connect No. two card slots.
No. two plastic cement adapter sleeves are adapted with No.1 card slot, connection No.1 card slot on the outside of No. two plastic cement adapter sleeves, and one
Number supporting rod both sides connect No. two supporting rod sides, and No. two supporting rods are symmetrical arranged, No. two supporting rod other side connecting pins
Hand cradle column.
Advantageous effect:
Under the action of No.1 plastic cement adapter sleeve, scaffold crossbeam is made to be connect more with No.1 fixing sleeve, No. two fixing sleeves
It is firm, keep overall structure more reasonable, under the action of No. two plastic cement adapter sleeves, make No.1 supporting rod and No.1 fixing sleeve, No. two
Fixing sleeve connection it is more firm, keep overall structure more reasonable, at the same No.1 fixing sleeve, No. two fixing sleeves collective effect under,
The contact area for increasing scaffold crossbeam and No.1 supporting rod makes scaffold crossbeam be connect with No.1 supporting rod more firm,
Keep overall structure more reasonable, while No.1 supporting rod, No. two supporting rods play support to scaffold crossbeam, ricker and make
With, effectively prevent scaffold deformation collapse, keep overall structure more reasonable.
Description of the drawings
Fig. 1 is building engineering construction scaffold partial sectional view described in the utility model.
Fig. 2 is building engineering construction scaffold described in the utility model partial side view.
Fig. 3 is building engineering construction scaffolding structure schematic diagram described in the utility model.
Specific implementation mode
The utility model is described in further detail below according to drawings and examples:
A kind of building engineering construction scaffold, including scaffold crossbeam 01, scaffold connector sleeve 02, No.1 supporting rod
03, No. two supporting rods 04, No.1 fixing sleeve 05, No. two fixing sleeve 13, ricker 14, the ricker 14 pass through foot
Hand cradle connector sleeve 02 connects scaffold crossbeam 01, and 01 side of scaffold crossbeam connects No.1 fixing sleeve 05, and scaffold crossbeam 01 is another
Side connects No. two fixing sleeves 13, and No.1 fixing sleeve 05 connects No. two fixing sleeves 13, No.1 fixing sleeve 05 by fixing bolt 12
It is symmetrical arranged with No. two fixing sleeves 13,05 inside of No.1 fixing sleeve has No. three card slots 10, and 10 lower part of No. three card slots has
There are No. four card slots 11, No.1 plastic cement adapter sleeve 06 and No. four card slots 11 to be adapted for No.1 card slot 08,01 outside of scaffold crossbeam,
06 inside of No.1 plastic cement adapter sleeve connects No. four card slots 11, and No.1 plastic cement adapter sleeve 06 and No. three card slots 10 are adapted, No.1 modeling
06 outside of glue adapter sleeve connects No. three card slots 10, and 05 lower part of No.1 fixing sleeve connects 03 top of No.1 supporting rod, the No.1 branch
There are No. two card slots 09, No. two plastic cement adapter sleeves 07 and No. two card slots 09 to be adapted in strut 03 outside, No. two plastic cement adapter sleeves 07
Inside connects No. two card slots 09.
No. two plastic cement adapter sleeves 07 are adapted with No.1 card slot 08, and No. two 07 outsides of plastic cement adapter sleeve connect No.1 card
Slot 08,03 both sides of No.1 supporting rod connect No. two 04 sides of supporting rod, and No. two supporting rods 04 are symmetrical arranged, No. two supporting rods
04 other side connects ricker 14.
Under the action of No.1 plastic cement adapter sleeve 06, make scaffold crossbeam 01 and 05, No. two fixing sleeve 13 of No.1 fixing sleeve
What is connected is more firm, keeps overall structure more reasonable, under the action of No. two plastic cement adapter sleeves 07, makes No.1 supporting rod 03 and No.1
05, No. two fixing sleeve 13 of fixing sleeve connects more firm, keeps overall structure more reasonable, while solid in No.1 fixing sleeve 05, two
Surely under the collective effect of set 13, the contact area of scaffold crossbeam 01 and No.1 supporting rod 03 is increased, scaffold crossbeam 01 is made
It is connect with No.1 supporting rod 03 more firm, keeps overall structure more reasonable, while 03, No. two supporting rod 04 of No.1 supporting rod is to foot
Hand cradle crossbeam 01, ricker 14 play supporting role, effectively prevent scaffold deformation and collapse, make overall structure more
Rationally.
Claims (2)
1. a kind of building engineering construction scaffold, it is characterized in that:Including scaffold crossbeam, scaffold connector sleeve, No.1 support
Bar, No. two supporting rods, No.1 fixing sleeve, No. two fixing sleeves, rickers, the ricker pass through scaffold connector sleeve
Connection scaffold crossbeam, scaffold crossbeam side connection No.1 fixing sleeve, No. two fixing sleeves of scaffold crossbeam other side connection, one
Number fixing sleeve connects No. two fixing sleeves by fixing bolt, and No.1 fixing sleeve is arranged symmetrically with No. two fixing sleeves, No.1 fixing sleeve
There are No. three card slots, No. three card slot lower parts there is No.1 card slot, scaffold cross rail outer to have No. four card slots, No.1 for inside
Plastic cement adapter sleeve and No. four card slots are adapted, and No. four card slots, No.1 plastic cement adapter sleeve and three are connected on the inside of No.1 plastic cement adapter sleeve
Number card slot is adapted, and No. three card slots are connected on the outside of No.1 plastic cement adapter sleeve, and No.1 fixing sleeve lower part connects No.1 supporting rod top,
There are No. two card slots, No. two plastic cement adapter sleeves and No. two card slots to be adapted, No. two plastic cement adapter sleeves on the outside of the No.1 supporting rod
Inside connects No. two card slots.
2. building engineering construction scaffold according to claim 1, it is characterized in that:No. two plastic cement adapter sleeves with
No.1 card slot is adapted, and No.1 card slot is connected on the outside of No. two plastic cement adapter sleeves, and No.1 supporting rod both sides connect No. two supporting rods one
Side, No. two supporting rods are symmetrical arranged, and No. two supporting rod other sides connect ricker.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820277996.4U CN207920022U (en) | 2018-02-28 | 2018-02-28 | Building engineering construction scaffold |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820277996.4U CN207920022U (en) | 2018-02-28 | 2018-02-28 | Building engineering construction scaffold |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207920022U true CN207920022U (en) | 2018-09-28 |
Family
ID=63601797
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820277996.4U Expired - Fee Related CN207920022U (en) | 2018-02-28 | 2018-02-28 | Building engineering construction scaffold |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207920022U (en) |
-
2018
- 2018-02-28 CN CN201820277996.4U patent/CN207920022U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN210918452U (en) | Folding tent support | |
CN103104092A (en) | Support composite structure of beam and slab | |
CN101736896B (en) | Cross-plate scaffold | |
CN207920022U (en) | Building engineering construction scaffold | |
CN206016335U (en) | A kind of assembled stage | |
CN203257123U (en) | Building supporting frame convenient to fold | |
CN203065052U (en) | Suspension arm of crane | |
CN207469717U (en) | A kind of architectural engineering scaffold bracing means | |
CN203709513U (en) | Table frame | |
CN207646996U (en) | A kind of square set | |
CN205591507U (en) | Scaffold frame of easily dismantling | |
CN205604693U (en) | Folded cascade scaffold frame | |
CN210888758U (en) | Water conservancy is utilized and is overhauld cat ladder | |
CN209353668U (en) | A kind of anti-dumping obforms scaffold | |
CN207776419U (en) | A kind of easy-to-dismount scaffold of civil engineering | |
CN202745407U (en) | Support frame used for building | |
CN203626212U (en) | Pier stud construction operation platform quick to disassemble and assemble | |
CN207582933U (en) | Super High large span outrigger drawknot structure | |
CN207003265U (en) | New road bridge formwork support meanss | |
CN215483942U (en) | Steel bar truss building carrier plate convenient to construction | |
CN107476200B (en) | Full-hall support staggered overlapping structure and method | |
CN206693588U (en) | A kind of quick assembling scaffold | |
CN207829429U (en) | A kind of welded steel structure net frame operating platform | |
CN220267156U (en) | Construction scaffold based on house construction safety | |
CN210508307U (en) | Scaffold for building engineering |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180928 Termination date: 20200228 |