CN207918300U - For the cable crane and its lifting trailer system in suspension bridge construction - Google Patents

For the cable crane and its lifting trailer system in suspension bridge construction Download PDF

Info

Publication number
CN207918300U
CN207918300U CN201820207056.8U CN201820207056U CN207918300U CN 207918300 U CN207918300 U CN 207918300U CN 201820207056 U CN201820207056 U CN 201820207056U CN 207918300 U CN207918300 U CN 207918300U
Authority
CN
China
Prior art keywords
lifting
deflecting roller
sport car
bank
pontic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820207056.8U
Other languages
Chinese (zh)
Inventor
白鹏宇
祝长春
梁梦龙
闫文亮
黄晓星
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Road and Bridge International Co Ltd
China Road and Bridge Corp
Original Assignee
Road and Bridge International Co Ltd
China Road and Bridge Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Road and Bridge International Co Ltd, China Road and Bridge Corp filed Critical Road and Bridge International Co Ltd
Priority to CN201820207056.8U priority Critical patent/CN207918300U/en
Application granted granted Critical
Publication of CN207918300U publication Critical patent/CN207918300U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a kind of cable crane and its lifting trailer system in suspension bridge construction, the latter includes at least two groups rack winch for being arranged in the first bank of pontic side, is arranged in the hoisting winding of the first bank of pontic side, and the sport car moved under the traction of the lifting drag-line of the traction cable and hoisting winding of the rack winch;The lifting drag-line of two hoisting windings is under the action of lifting steering mechanism, after being mounted on upper hanger and the lower hanger of the sport car successively, restricts to engagement laterally across the pontic and in the pontic the second bank side;Beam body to be lifted is fixed on the sport car by hoisting tool, and is moved with the sport car.In this way, original system is improved by adding deflecting roller and changing the position of hanger suspension centre deflecting roller, single width traction cable and lifting drag-line are connected, a closed-loop system is formed, by the optimization of winding mode, solves the drawbacks of conventional cable loop wheel machine.

Description

For the cable crane and its lifting trailer system in suspension bridge construction
Technical field
The utility model is related to bridge construction auxiliary mould technical fields, more particularly, to one kind in suspension bridge construction Cable crane lifting trailer system.
Background technology
Suspension bridge is widely used in a variety of applications as Long span bridge type instantly.In the lifting construction of stiffening girder of suspension bridge Equipment usually has two kinds of deck unit erection gantry, cable crane, deck unit erection gantry to be divided into hoist type deck unit erection gantry and hydraulic jack formula cable Carry loop wheel machine.Deck unit erection gantry is big by bridge location landform limiting factor, and limitation is big.Cable crane is economic, practical as one kind, efficiently hangs Install it is standby, modern suspension construction in it is widely used.Cable crane has span ability big, and elevating capacity is strong, overall structure letter The advantage single, speed of application is fast, security risk is small.Substantially it is not limited by bridge location landform, may span across the obstacles such as great rivers, deep valley Object has the characteristics that positioning accuracy is high, movement is flexible, superior especially suitable for the engineering that mountain area and logical river cannot suspend traffic Property is stronger.
Conventional cable hang traction, tackling system as shown in Figure 1, traction rope 200 from 100 rope stretching of rack winch, through anchorage 300, the deflecting roller at pylon 400 and sport car 500 turns to, and tail of rope is anchored on built-in fitting, and respectively setting one is led for single width two sides Draw hoist engine, left and right each two sets of independent trailer systems of width.Hoisting line turns from the hoisting winding rope stretching of a bank through tower top It is turned through the upper and lower hanger of sport car to wheel, is anchored by built-in fitting at another bank anchorage, left and right each a set of independence of width Tackling system.By a bank rack winch rope closing, another bank rack winch Synchronous Radio rope realizes the traction of sport car, lifting The folding and unfolding of hoist engine manipulates the weight lifting on lower hanger.Such winding mode exists as following drawbacks:(1) traction is rolled up The manipulation request for raising machine is relatively high, the phenomenon " to drawing " easily occurs;(2) underaction is controlled to lift heavy object, precision is relatively low;(3) to volume It is relatively high to raise machine natural rate of interest requirement, any hoist engine system that breaks down will be unable to operate.
Utility model content
Above-mentioned at least one to solve the problems, such as, the utility model provides a kind of cable crane in suspension bridge construction The construction method of lifting trailer system and application the lifting trailer system.
In order to solve the above-mentioned technical problem, the utility model provides a kind of lifting trailer system, in suspension bridge construction Cable crane on, including be arranged in at least two groups rack winch of the first bank of pontic side, be arranged in the first bank of the pontic At least two groups hoisting winding of side, and in the traction cable of the rack winch and the lifting drag-line of the hoisting winding Traction under the sport car that moves;
The traction cable of two rack winches under the action of respective first pulls round mechanism, respectively laterally across Pontic and the second side that the sport car is fixed in after pontic the second bank side restricts to engagement, the second side of the sport car are leaned on for it The side of nearly the second bank of pontic side;
The traction cable of two rack winches is under the action of respective second pulls round mechanism, in the pontic One bank side is fixed in the first side of the sport car after restricting to engagement, the first side of the sport car is it close to the first bank of the pontic The side of side;Beam body to be lifted is fixed on the sport car by hoisting tool, and is moved with the sport car.
Described first pull round mechanism include once be set to two of the first bank of pontic side basic deflecting rollers, according to It is secondary be set to traction Sarasota close to the first bank of pontic side two the first Sarasota deflecting rollers, be set in turn in the hauling rope Tower close to the second bank of pontic side six the second Sarasota deflecting rollers, be set in turn in two of the second side of the sport car One sport car deflecting roller, and it is set in turn in three bank side deflecting rollers of the second bank of pontic side;
First leading-out terminal of one of two traction cables bypasses first institute successively from after outlet in its rack winch State basic deflecting roller, first the first Sarasota deflecting roller, first the second Sarasota deflecting roller, first bank side Deflecting roller, second the second Sarasota deflecting roller, first the first sport car deflecting roller and third second Sarasota After deflecting roller, with another traction cable to engaging rope at second bank side deflecting roller;
First leading-out terminal of the other of two traction cables bypasses second successively from after outlet in its rack winch The basis deflecting roller, second the first Sarasota deflecting roller, the 6th the second Sarasota deflecting roller, the third bank Side deflecting roller, the 5th the second Sarasota deflecting roller, second the first sport car deflecting roller and the 4th second rope After tower deflecting roller, with another traction cable to engaging rope at second bank side deflecting roller.
During the lifting construction of the beam bodies such as stiff girder, setting special messenger follows cable crane sport car to assign lifting instruction, behaviour After control room operator receives instruction, joint manipulation is carried out to the lifting trailer system of cable crane by hoist engine control system, To realize vertical lifting and the longitudinal movement of the beam bodies such as stiff girder.Since two width rack winches in the lifting trailer system are complete Portion is arranged in the same side bank, and the longitudinally reciprocal traction of sport car, and every traction volume are realized by the positive and negative rotation of friction type winch It raises machine and draws circuit with complete single width, it is same using another rack winch after wherein a hoist engine breaks down Sample can realize the traction of sport car.Two width hoisting windings are also arranged in same bank, can be accurately right by the retractable rope of hoist engine Hanger suspension centre is manipulated under sport car, and similarly, every hoisting winding all has complete single width lifting loop, when wherein one Platform hoisting winding breaks down, and does not influence the normal operation of entire tackling system;It is integrated simultaneously as each pair hoist engine passes through Control system is manipulated, and ensures that the operation of each pair elevator in the lifting trailer system synchronizes.
In this way, lifting trailer system provided by the utility model is by adding deflecting roller and changing hanger suspension centre deflecting roller Position original system is improved, single width traction cable and lifting drag-line are connected, formed a closed circuit system System, and centralized control is carried out to the entire lifting trailer system of cable crane and solves conventional cable by the optimization of winding mode The drawbacks of rope loop wheel machine, to have easy to operate, safe and reliable, high efficient construction.
Further, the lifting drag-line of two hoisting windings is mounted on successively under the action of lifting steering mechanism After the upper hanger of the sport car and lower hanger, restrict to engagement laterally across the pontic and in the pontic the second bank side.
Further, described second to pull round mechanism include three between being set to two basic deflecting rollers auxiliary Four the first Sarasota assisted diversion wheels for helping basic deflecting roller, being set between two the first Sarasota deflecting rollers, and successively It is set to two the second sport car deflecting rollers of the first side of the sport car;
Second leading-out terminal of one of two traction cables bypasses first institute successively from after outlet in its rack winch State auxiliary foundation deflecting roller, first the first Sarasota assisted diversion wheel, first the second sport car deflecting roller and second After a first Sarasota assisted diversion wheel, with another traction cable to engaging at second auxiliary foundation deflecting roller Rope;
After second leading-out terminal of the other of two traction cables occurs from its rack winch, third is bypassed successively The auxiliary foundation deflecting roller, the 4th the first Sarasota assisted diversion wheel, second sport car deflecting roller and third After the first Sarasota assisted diversion wheel, with another traction cable to engaging rope at second auxiliary foundation deflecting roller.
Further, the lifting steering mechanism includes two the first liftings steering for being set to the first side of pontic bank It takes turns, is set to two the second lifting deflecting rollers of hoisting rope top of tower and close first side bank, is set to the upper extension of the sport car Two group of first lifting deflecting roller group of frame, be set to the sport car lower hanger two group of second lifting deflecting roller group, be set to Two third lifting deflecting rollers of the hoisting rope top of tower and close the second side bank, and it is set to the pontic the second side bank One fourth heavy deflecting roller;
One of two described lifting drag-lines bypass first the first successively from after outlet in its hoisting winding Weight deflecting roller, first the second lifting deflecting roller, the first lifting deflecting roller group described in first group, second described in first group After weight deflecting roller group and first third lifting deflecting roller, at fourth described heavy deflecting roller with another lifting drag-line It restricts to engagement;
The other of two described lifting drag-lines bypass second described first successively from after outlet in its hoisting winding Lifting deflecting roller, second the second lifting deflecting roller, the first lifting deflecting roller group described in second group, second described in second group After lifting deflecting roller group and second third lifting deflecting roller, drawn with another lifting at fourth described heavy deflecting roller Rope restricts to engagement.
Further, the rack winch is friction type winch.
Further, the sport car includes the first sport car and is run by the second of connecting rope and first sport car mounting Vehicle, first sport car form the first side of the sport car close to the side of the first side of pontic bank, and second sport car leans on The side of the nearly pontic the second side bank forms the second side of the sport car.
The utility model also provides a kind of cable crane in suspension bridge construction, including lifting as described above traction System.
Description of the drawings
It, below will be right in order to illustrate more clearly of specific embodiment of the present invention or technical solution in the prior art Specific implementation mode or attached drawing needed to be used in the description of the prior art are briefly described, it should be apparent that, it is described below In attached drawing be that some embodiments of the utility model are not paying creativeness for those of ordinary skill in the art Under the premise of labour, other drawings may also be obtained based on these drawings.
Fig. 1 is the structural schematic diagram of single width trailer system in the prior art;
Fig. 2-Fig. 4 is the structural schematic diagram of traction element in lifting trailer system provided by the utility model;
Fig. 5-Fig. 6 is the structural schematic diagram of lifting part in lifting trailer system provided by the utility model.
Reference sign:
In Fig. 1:
100- rack winches
200- traction ropes
300- anchorages
400- pylons
500- sport cars
In Fig. 2-Fig. 6:
1- rack winches
2- hoisting windings
3- sport cars
Hanger under 31- upper hangers 32-
The bases 41- deflecting roller 42- the first Sarasota deflecting roller 43- the second Sarasota deflecting rollers
44- the first sport car deflecting roller 45- banks side deflecting roller 46- auxiliary foundation deflecting rollers
47- the first Sarasota assisted diversion wheel 48- the second sport car deflecting rollers
51- the first lifting deflecting roller 52- the second lifting deflecting roller 53- the first lifting deflecting roller groups
Fourth heavy deflecting roller of 54- the second lifting deflecting roller group 55- third lifting deflecting roller 56-.
Specific implementation mode
The technical solution of the utility model is clearly and completely described below in conjunction with attached drawing, it is clear that described Embodiment is the utility model a part of the embodiment, instead of all the embodiments.Based on the embodiments of the present invention, originally The every other embodiment that field those of ordinary skill is obtained without making creative work, belongs to this practicality Novel protected range.
- Fig. 6 is please referred to Fig.2, in a specific embodiment, lifting trailer system provided by the utility model is for hanging On cable crane in cable bridge construction, which includes at least two groups traction elevator for being arranged in the first bank of pontic side Machine 1, at least two groups hoisting winding 2 for being arranged in the first bank of pontic side, and the traction cable in the rack winch 1 And the sport car 3 moved under the traction of the lifting drag-line of the hoisting winding 2;Wherein, the traction of two rack winches 1 Drag-line respectively restricts to engagement laterally across pontic and in pontic the second bank side under the action of respective first pulls round mechanism It is fixed in the second side of the sport car 3 afterwards, the second side of the sport car 3 is its side close to the second bank of pontic side;Two The traction cable of the rack winch 1 is under the action of respective second pulls round mechanism, in the first bank of pontic side pair It is fixed in the first side of the sport car 3 after engagement rope, the first side of the sport car 3 is it close to the one of the first bank of pontic side Side;The lifting drag-line of two hoisting windings 2 is mounted on the upper of the sport car 3 successively under the action of lifting steering mechanism After hanger 31 and lower hanger 32, restrict to engagement laterally across the pontic and in the pontic the second bank side;Beam body to be lifted It is fixed on the sport car 3 by hoisting tool, and is moved with the sport car 3.
Specifically, described first pull round mechanism include once be set to the first bank of pontic side two bases turn To two the first Sarasota deflecting rollers 42 taken turns 41, be set in turn in traction Sarasota close the first bank of pontic side, set gradually In it is described traction Sarasota close to the second bank of pontic side six the second Sarasota deflecting rollers 43, be set in turn in the sport car 3 The second side two the first sport car deflecting rollers 44, and be set in turn in three bank side deflecting rollers of the second bank of pontic side 45;Wherein, first leading-out terminal of one of two traction cables bypasses first successively from after outlet in its rack winch 1 Basis the first Sarasota deflecting roller 42, first of deflecting roller 41, first the second Sarasota deflecting roller 43, first The the second Sarasota deflecting roller 43, first of bank side deflecting roller 45, second the first sport car deflecting roller 44 and third After a second Sarasota deflecting roller 43, with another traction cable to engaging rope at second bank side deflecting roller 45; First leading-out terminal of the other of two traction cables bypasses second base successively from after outlet in its rack winch 1 42, the 6th the second Sarasota deflecting rollers 43 of the first Sarasota deflecting roller of plinth deflecting roller 41, second, the third bank Described in side deflecting roller 45, the 5th the second Sarasota deflecting roller 43, second the first sport car deflecting roller 44 and the 4th After second Sarasota deflecting roller 43, with another traction cable to engaging rope at second bank side deflecting roller 45.In this way, leading Draw hoist engine 1 by the way of the installation of single width hauling rope, form a closed circulation trailer system, when one of traction elevator When machine 1 damages, the use of whole system is not interfered with.
Above-mentioned second to pull round mechanism include three auxiliary foundations being set between two basic deflecting rollers 41 Deflecting roller 46, four the first Sarasota assisted diversion wheels 47 being set between two the first Sarasota deflecting rollers 42, and successively It is set to two the second sport car deflecting rollers 48 of the first side of the sport car 3;Second leading-out terminal of one of two traction cables From after outlet in its rack winch 1, first auxiliary foundation deflecting roller, 46, first first Sarasotas are bypassed successively After 47, first, assisted diversion wheel the second sport car deflecting roller 48 and second the first Sarasota assisted diversion wheel 47, With another traction cable to engaging rope at second auxiliary foundation deflecting roller 46;The of the other of two traction cables After two leading-out terminals occur from its rack winch 1, successively around described in the third auxiliary foundation deflecting roller 46, the 4th After first 47, second, the Sarasota assisted diversion wheel sport car deflecting roller and third the first Sarasota assisted diversion wheel 47, With another traction cable to engaging rope at second auxiliary foundation deflecting roller 46.This second pulls round mechanism and is led with first Draw steering mechanism to match, to form the single width trailer system completed.
Further, the lifting steering mechanism includes two the first liftings steering for being set to the first side of pontic bank Wheel 51, is set to the sport car 3 at two the second lifting deflecting rollers 52 for being set to hoisting rope top of tower and close first side bank Two group of second lifting of two group of first lifting deflecting roller group 53 of upper hanger 31, the lower hanger 32 for being set to the sport car 3 turns to Wheel group 54, two third lifting deflecting rollers 55 for being set to the hoisting rope top of tower and close the second side bank, and it is set to institute State one of pontic the second side bank fourth heavy deflecting roller 56;Wherein, one of two described lifting drag-lines are from its lifting elevator In machine 2 after outlet, first the first lifting deflecting roller 51, first the second lifting deflecting roller 52, the are bypassed successively Second lifting deflecting roller group 54 described in 53, first groups of first lifting deflecting roller group described in one group and first third lifting turn To after wheel 55, with another lifting drag-line to engaging rope at fourth described heavy deflecting roller 56;In the two lifting drag-lines Another one bypasses second the first lifting deflecting roller 51, second described the successively from after outlet in its hoisting winding 2 Second lifting deflecting roller group 54 described in 53, second groups of first lifting deflecting roller group described in two 52, second groups of lifting deflecting rollers and After two third lifting deflecting rollers 55, with another lifting drag-line to engaging rope at fourth described heavy deflecting roller 56. In this way, lifting draws hoist engine by the way of the installation of single width hoisting rope, a closed circulation tackling system is formed, when one of them When hoisting winding 2 damages, the use of whole system is not interfered with.
During practice of construction, a set of cable crane system is respectively arranged in the left and right width of full-bridge, single to cover system respectively arrangement two 1, two 15t hoisting winding 2 of 25t rack winches and several deflecting rollers.Traction cable from the 25t hoist engine rope stretchings of a bank, By the multiple steering of two sides deflecting roller, the tail of rope of two traction cables is docked in another bank, forms a closed circuit, The walking of sport car 3 is realized by the linkage of two 25t hoist engines, wherein a hoist engine failure does not influence whole system Traction.Two 15t hoisting windings 2 distinguish rope stretching, after the multiple coiling of 3 upper and lower hanger of sport car, 32 suspension centre, turn in another bank It is docked to anchorage.By the change of winding mode, two 15t hoisting windings 2 can individually carry out corresponding hanger suspension centre Manipulation neatly manipulates lift heavy object, if hoist engine breaks down, another hoist engine can also to the width tackling system into Row control, does not influence the operation of entire tackling system.
Preferably, the rack winch 1 is friction type winch.The sport car 3 is including the first sport car and passes through connection Second sport car of rope and first sport car mounting, first sport car form described close to the side of the first side of pontic bank First side of sport car, second sport car form the second side of the sport car 3 close to the side of the pontic the second side bank.
During the lifting construction of the beam bodies such as stiff girder, setting special messenger follows cable crane sport car to assign lifting instruction, behaviour After control room operator receives instruction, joint manipulation is carried out to the lifting trailer system of cable crane by hoist engine control system, To realize vertical lifting and the longitudinal movement of the beam bodies such as stiff girder.Due to two width rack winches 1 in the lifting trailer system It all is arranged in the same side bank, the longitudinally reciprocal traction of sport car 3, and every traction are realized by the positive and negative rotation of friction type winch There is hoist engine 1 complete single width traction circuit to utilize another rack winch after wherein a hoist engine breaks down The traction of 1 same achievable sport car 3.Two width hoisting windings 2 are also arranged in same bank, can be accurate by the retractable rope of hoist engine Really 32 suspension centre of lower hanger of sport car 3 is manipulated, similarly, every hoisting winding 2 all has complete single width lifting Circuit does not influence the normal operation of entire tackling system when a wherein failure of hoisting winding 2;Simultaneously as each pair Hoist engine is manipulated by integrated control system, ensures that the operation of each pair elevator in the lifting trailer system synchronizes.
In this way, lifting trailer system provided by the utility model is by adding deflecting roller and changing hanger suspension centre deflecting roller Position original system is improved, single width traction cable and lifting drag-line are connected, formed a closed circuit system System, and centralized control is carried out to the entire lifting trailer system of cable crane and solves conventional cable by the optimization of winding mode The drawbacks of rope loop wheel machine, to have easy to operate, safe and reliable, high efficient construction.
In addition to above-mentioned lifting trailer system, the utility model also provides a kind of cable crane including the wherein trailer system Machine, refer to the prior art for other Each parts of the cable crane, and therefore not to repeat here.
Although the embodiments of the present invention have been shown and described above, it is to be understood that above-described embodiment is Illustratively, it should not be understood as limiting the present invention, those skilled in the art are in the scope of the utility model Inside it can make changes, modifications, alterations, and variations to the above described embodiments.

Claims (7)

1. a kind of lifting trailer system, for the cable crane in suspension bridge construction, which is characterized in that including being arranged in pontic At least two groups rack winch of first bank side, at least two groups hoisting winding for being arranged in the first bank of pontic side, and The sport car moved under the traction of the lifting drag-line of the traction cable of the rack winch and the hoisting winding;
The traction cable of two rack winches is under the action of respective first pulls round mechanism, respectively laterally across bridge Body and the second side that the sport car is fixed in after pontic the second bank side restricts to engagement, the second side of the sport car is that its is close The side of the second bank of pontic side;
The traction cable of two rack winches is under the action of respective second pulls round mechanism, in the first bank of the pontic Side is fixed in the first side of the sport car after restricting to engagement, the first side of the sport car is it close to the first bank of pontic side Side;Beam body to be lifted is fixed on the sport car by hoisting tool, and is moved with the sport car;
Described first, which pulls round mechanism, includes two basic deflecting rollers for being once set to the first bank of pontic side, sets successively Be placed in traction Sarasota close to the first bank of pontic side two the first Sarasota deflecting rollers, be set in turn in the traction Sarasota and lean on Six the second Sarasota deflecting rollers of nearly the second bank of pontic side, be set in turn in the sport car the second side two first races Vehicle deflecting roller, and it is set in turn in three bank side deflecting rollers of the second bank of pontic side;
First leading-out terminal of one of two traction cables bypasses first base successively from after outlet in its rack winch Plinth deflecting roller, first the first Sarasota deflecting roller, first the second Sarasota deflecting roller, first bank side turn to Wheel, second the second Sarasota deflecting roller, first the first sport car deflecting roller and third second Sarasota turn to After wheel, with another traction cable to engaging rope at second bank side deflecting roller;
First leading-out terminal of the other of two traction cables is bypassed from after outlet in its rack winch described in second successively Basic deflecting roller, second the first Sarasota deflecting roller, the 6th the second Sarasota deflecting roller, third the bank side turn Turn to wheel, the 5th the second Sarasota deflecting roller, second the first sport car deflecting roller and the 4th second Sarasota To after wheel, with another traction cable to engaging rope at second bank side deflecting roller.
2. lifting trailer system according to claim 1, which is characterized in that the lifting drag-line of two hoisting windings exists Under the action of lifting steering mechanism, after being mounted on upper hanger and the lower hanger of the sport car successively, laterally across the pontic, simultaneously It restricts to engagement in the pontic the second bank side.
3. lifting trailer system according to claim 2, which is characterized in that described second, which pulls round mechanism, includes setting Three auxiliary foundation deflecting rollers between two basic deflecting rollers, between being set to two the first Sarasota deflecting rollers Four the first Sarasota assisted diversion wheels, and be set in turn in two the second sport car deflecting rollers of the first side of the sport car;
Second leading-out terminal of one of two traction cables is described auxiliary around first successively from after outlet in its rack winch Help basic deflecting roller, first the first Sarasota assisted diversion wheel, first the second sport car deflecting roller and second institute After stating the first Sarasota assisted diversion wheel, with another traction cable to engaging rope at second auxiliary foundation deflecting roller;
After second leading-out terminal of the other of two traction cables occurs from its rack winch, it is described that third is bypassed successively Auxiliary foundation deflecting roller, the 4th the first Sarasota assisted diversion wheel, second sport car deflecting roller and third are a described After first Sarasota assisted diversion wheel, with another traction cable to engaging rope at second auxiliary foundation deflecting roller.
4. lifting trailer system according to claim 3, which is characterized in that the lifting steering mechanism includes being set to institute Two the first lifting deflecting rollers of the first side of pontic bank are stated, hoisting rope top of tower is set to and close to two second of the first side bank Lifting deflecting roller, be set to the sport car upper hanger two group of first lifting deflecting roller group, be set to the lower extension of the sport car Two group of second lifting deflecting roller group of frame is set to the hoisting rope top of tower and turns close to two third liftings of the second side bank To wheel, and it is set to one of the pontic the second side bank fourth heavy deflecting roller;
One of two described lifting drag-lines bypass first first lifting and turn successively from after outlet in its hoisting winding Turn to the second lifting described in the first lifting deflecting roller group described in wheel, first the second lifting deflecting roller, first group, first group To after wheel group and first third lifting deflecting roller, docked with another lifting drag-line at fourth described heavy deflecting roller Close rope;
The other of two described lifting drag-lines bypass second first lifting successively from after outlet in its hoisting winding Deflecting roller, second the second lifting deflecting roller, the first lifting deflecting roller group described in second group, the second lifting described in second group After deflecting roller group and second third lifting deflecting roller, at fourth described heavy deflecting roller with another lifting drag-line pair Engagement rope.
5. according to claim 1-4 any one of them lifting trailer systems, which is characterized in that the rack winch is friction Formula hoist engine.
6. according to claim 1-4 any one of them lifting trailer systems, which is characterized in that the sport car includes the first sport car With by connecting rope and first sport car mounting the second sport car, first sport car close to the first side of pontic bank one Side forms the first side of the sport car, and second sport car forms the of the sport car close to the side of the pontic the second side bank Two sides.
7. a kind of cable crane in suspension bridge construction, which is characterized in that including as claimed in any one of claims 1 to 6 Lifting trailer system.
CN201820207056.8U 2018-02-06 2018-02-06 For the cable crane and its lifting trailer system in suspension bridge construction Active CN207918300U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820207056.8U CN207918300U (en) 2018-02-06 2018-02-06 For the cable crane and its lifting trailer system in suspension bridge construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820207056.8U CN207918300U (en) 2018-02-06 2018-02-06 For the cable crane and its lifting trailer system in suspension bridge construction

Publications (1)

Publication Number Publication Date
CN207918300U true CN207918300U (en) 2018-09-28

Family

ID=63603490

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820207056.8U Active CN207918300U (en) 2018-02-06 2018-02-06 For the cable crane and its lifting trailer system in suspension bridge construction

Country Status (1)

Country Link
CN (1) CN207918300U (en)

Similar Documents

Publication Publication Date Title
CN101525865B (en) Extroversive posture adjusting method for steel box arch rib section
CN205369055U (en) Rotatory lifting device of suspension bridge stiffening beam
CN107354873A (en) A kind of cable hoisting and rotator construction system
CN107119567A (en) Suspension bridge steel box-girder deck erection gantry and spreading hoist cable swing shifting construction method
CN105484168B (en) Rotary hoisting equipment for stiffening beam of suspension bridge and erecting method of stiffening beam
CN201485194U (en) 60T walking type full-swing erecting crane
CN107476195B (en) Girder transporting pulley system for transporting stiffening girder by suspension bridge
CN206859061U (en) A kind of running gear of integration of transporting and building deck unit erection gantry
CN108147295A (en) A kind of cable crane and its lifting trailer system in suspension bridge construction
CN110304588A (en) A kind of gate construction method for hanging under narrow working space
CN207419264U (en) A kind of cable hoisting and rotator construction system
CN207918300U (en) For the cable crane and its lifting trailer system in suspension bridge construction
CN113928203A (en) Trade trolley
CN111663448B (en) Integrated method for transporting and erecting prefabricated bridge pier segment blocks
CN110040638B (en) Cable-mounted crane device for mounting stiff beam of suspension bridge and mounting method
CN113235460B (en) Prefabricated segment swinging method for bridge cantilever assembly
CN207632359U (en) Rack slot machine shoulder pole girder deflects in the air turns over transposer
CN216038287U (en) Wisdom roof beam field is with automatic bale lifting machine of unmanned
CN109607384A (en) The turn-over method of super-large-diameter shield machine knife disk
CN108408667A (en) Broken line type girder truss rod piece Quick overturning device and its method for turning
CN108059088B (en) Method and device for deflection turning and transposition of carrying pole Liang Kongzhong of slot erecting machine
CN108018778A (en) The cat road rope in navigable waters does not set up trailer system and cat road rope fast erecting method
CN114572854A (en) Assembled squat silo roof hoisting system and silo roof hoisting method
JP2004115174A (en) Movable carriage for member erection, and bridging member erection method using it
CN207738303U (en) A kind of generator unit stator lifting steering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant