CN207892084U - 一种装配式钢板剪力墙 - Google Patents

一种装配式钢板剪力墙 Download PDF

Info

Publication number
CN207892084U
CN207892084U CN201820006616.3U CN201820006616U CN207892084U CN 207892084 U CN207892084 U CN 207892084U CN 201820006616 U CN201820006616 U CN 201820006616U CN 207892084 U CN207892084 U CN 207892084U
Authority
CN
China
Prior art keywords
steel plate
bolt box
newel post
steel
box road
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820006616.3U
Other languages
English (en)
Inventor
徐国军
宋生志
杨宇焜
蒋路
邱森
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Green Building Integration Technology Co Ltd
Original Assignee
Zhejiang Green Building Integration Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Green Building Integration Technology Co Ltd filed Critical Zhejiang Green Building Integration Technology Co Ltd
Priority to CN201820006616.3U priority Critical patent/CN207892084U/zh
Application granted granted Critical
Publication of CN207892084U publication Critical patent/CN207892084U/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

本实用新型涉及一种装配式钢板剪力墙,包括:第一钢端柱、第二钢端柱、第一中间钢板、第二中间钢板、第一预制混凝土板及第二预制混凝土板,所述第一预制混凝土板内设有数个第一螺栓预留孔道及第一螺帽预留凹槽,所述第一中间钢板内设有数个第二螺栓预留孔道,所述第二中间钢板内设有数个第三螺栓预留孔道,所述第二预制混凝土板内设有数个第四螺栓预留孔道及第二螺帽预留凹槽,对拉螺栓穿过第一螺栓预留孔道、第二螺栓预留孔道、第三螺栓预留孔道及第四螺栓预留孔道并通过螺帽实现固定,所述第一钢端柱与第二钢端柱内浇注有端部混凝土,所述第一中间钢板与第二中间钢板之间浇注有中间混凝土,从而可实现工业化生产,大大提高了装配效率。

Description

一种装配式钢板剪力墙
【技术领域】
本实用新型涉及建筑领域,尤其涉及一种装配式钢板剪力墙。
【背景技术】
剪力墙又称抗风墙、抗震墙或结构墙。房屋或构筑物中主要承受风荷载或地震作用引起的水平荷载和竖向荷载(重力)的墙体,防止结构剪切(受剪)破坏。又称抗震墙,一般用钢筋混凝土做成。现有技术中,剪力墙一般是由建筑工人现场浇注,经常面临施工周期长、环境污染严重、堆料场地大、施工人员短缺等问题。
因此,有必要提供一种解决上述技术问题的装配式钢板剪力墙。
【实用新型内容】
为解决上述问题,本实用新型的目的在于提供一种抗震性好、装配效率高的装配式钢板剪力墙。
为实现上述目的,本实用新型采取的技术方案为:一种装配式钢板剪力墙,包括:第一钢端柱、第二钢端柱及焊接于第一钢端柱与第二钢端柱之间的第一中间钢板及第二中间钢板,所述第一中间钢板的外侧设有第一预制混凝土板,所述第二中间钢板的外侧设有第二预制混凝土板,所述第一预制混凝土板内设有数个第一螺栓预留孔道,所述第一螺栓预留孔道靠近外侧的自由末端处设有第一螺帽预留凹槽,所述第一中间钢板内设有数个第二螺栓预留孔道,所述第二中间钢板内设有数个第三螺栓预留孔道,所述第二预制混凝土板内设有数个第四螺栓预留孔道,所述第四螺栓预留孔道靠近外侧的自由末端处设有第二螺帽预留凹槽,对拉螺栓穿过第一螺栓预留孔道、第二螺栓预留孔道、第三螺栓预留孔道及第四螺栓预留孔道并通过螺帽实现固定,所述第一钢端柱与第二钢端柱内浇注有端部混凝土,所述第一中间钢板与第二中间钢板之间浇注有中间混凝土。
优选地,本实用新型中的一种装配式钢板剪力墙进一步设置为:所述第一中间钢板与第二中间钢板呈平行设置。
优选地,本实用新型中的一种装配式钢板剪力墙进一步设置为:所述第一中间钢板、第二中间钢板与第一钢端柱、第二钢端柱之间采用对接坡口焊进行焊接。
优选地,本实用新型中的一种装配式钢板剪力墙进一步设置为:所述第一钢端柱及第二钢端柱的横截面均呈H型设置。
优选地,本实用新型中的一种装配式钢板剪力墙进一步设置为:所述第一螺帽预留凹槽及第二螺帽预留凹槽内填充有砂浆。
与现有技术相比,本实用新型具有如下有益效果:相比于传统的混凝土剪力墙,本实用新型中的装配式钢板剪力墙延性好、耗能能力强、抗震性能优越、尺寸和自重都较小,增加了实用性,而且可以工业化生产,装配率高;通过在预制混凝土板上设置螺帽预留凹槽,可使对拉螺栓的头部及螺帽不突出墙面,墙面平整无需二次处理,节省了工序;通过将预制混凝土板设置于中间钢板的外侧,将中间钢板包覆在内,提高了剪力墙的抗火性能。
【附图说明】
图1是本实用新型中装配式钢板剪力墙的主视结构示意图。
图2是本实用新型中装配式钢板剪力墙的剖视结构示意图。
图3是本实用新型中第一预制混凝土板的结构示意图。
图中:1、第一钢端柱,2、第二钢端柱,3、第一中间钢板,30、第二螺栓预留孔道,4、第二中间钢板,40、第三螺栓预留孔道,5、第一预制混凝土板,50、第一螺栓预留孔道,51、第一螺帽预留凹槽,6、第二预制混凝土板,60、第四螺栓预留孔道,61、第二螺帽预留凹槽,7、对拉螺栓,70、71、螺帽,8、端部混凝土,9、中间混凝土。
【具体实施方式】
下面通过具体实施例对本实用新型所述的一种装配式钢板剪力墙作进一步的详细描述。
参图1至图3所示,一种装配式钢板剪力墙,包括:第一钢端柱1、第二钢端柱2、第一中间钢板3及第二中间钢板4,所述第一钢端柱1及第二钢端柱2的横截面均呈H型设置,所述第一中间钢板3的一端与第一钢端柱1通过对接坡口焊进行焊接,所述第一中间钢板3的另一端与第二钢端柱2通过对接坡口焊进行焊接,所述第二中间钢板4的一端与第一钢端柱1通过对接坡口焊进行焊接,所述第二中间钢板4的另一端与第二钢端柱2通过对接坡口焊进行焊接,焊接后第一中间钢板3与第二中间钢板4呈平行设置。
所述第一中间钢板3的外侧设有第一预制混凝土板5,所述第二中间钢板4的外侧设有第二预制混凝土板6,所述第一预制混凝土板5内设有数个均匀排布的第一螺栓预留孔道50,所述第一螺栓预留孔道50靠近外侧的自由末端处设有第一螺帽预留凹槽51,所述第一中间钢板3内设有数个均匀排布的第二螺栓预留孔道30,所述第二中间钢板4内设有数个均匀排布的第三螺栓预留孔道40,所述第二预制混凝土板6内设有数个均匀排布的第四螺栓预留孔道60,所述第四螺栓预留孔道60靠近外侧的自由末端处设有第二螺帽预留凹槽61,对拉螺栓7依次穿过第一螺栓预留孔道50、第二螺栓预留孔道30、第三螺栓预留孔道40及第四螺栓预留孔道60并通过螺帽70、71实现固定,安装后与对拉螺栓7相配合的其中一个螺帽70收容于第一螺帽预留凹槽51内,与对拉螺栓7相配合的另一个螺帽71收容于第二螺帽预留凹槽61内,所述第一螺帽预留凹槽51及第二螺帽预留凹槽61内填充有砂浆,从而可使螺帽不突出墙面,墙面平整无需二次处理,节省了工序,所述第一钢端柱1与第二钢端柱2内浇注有端部混凝土8,所述第一中间钢板3与第二中间钢板4之间浇注有中间混凝土9。
综上所述,本实用新型中的装配式钢板剪力墙延性好、耗能能力强、抗震性能优越、尺寸和自重都较小,增加了实用性,而且可以工业化生产,装配率高;通过在预制混凝土板上设置螺帽预留凹槽,可使对拉螺栓的头部及螺帽不突出墙面,墙面平整无需二次处理,节省了工序;通过将预制混凝土板设置于中间钢板的外侧,将中间钢板包覆在内,提高了剪力墙的抗火性能。
上述的实施例仅例示性说明本实用新型创造的原理及其功效,以及部分运用的实施例,而非用于限制本实用新型;应当指出,对于本领域的普通技术人员来说,在不脱离本实用新型创造构思的前提下,还可以做出若干变形和改进,这些都属于本实用新型的保护范围。

Claims (5)

1.一种装配式钢板剪力墙,其特征在于,包括:第一钢端柱、第二钢端柱及焊接于第一钢端柱与第二钢端柱之间的第一中间钢板及第二中间钢板,所述第一中间钢板的外侧设有第一预制混凝土板,所述第二中间钢板的外侧设有第二预制混凝土板,所述第一预制混凝土板内设有数个第一螺栓预留孔道,所述第一螺栓预留孔道靠近外侧的自由末端处设有第一螺帽预留凹槽,所述第一中间钢板内设有数个第二螺栓预留孔道,所述第二中间钢板内设有数个第三螺栓预留孔道,所述第二预制混凝土板内设有数个第四螺栓预留孔道,所述第四螺栓预留孔道靠近外侧的自由末端处设有第二螺帽预留凹槽,对拉螺栓穿过第一螺栓预留孔道、第二螺栓预留孔道、第三螺栓预留孔道及第四螺栓预留孔道并通过螺帽实现固定,所述第一钢端柱与第二钢端柱内浇注有端部混凝土,所述第一中间钢板与第二中间钢板之间浇注有中间混凝土。
2.如权利要求1所述的一种装配式钢板剪力墙,其特征在于:所述第一中间钢板与第二中间钢板呈平行设置。
3.如权利要求1所述的一种装配式钢板剪力墙,其特征在于:所述第一中间钢板、第二中间钢板与第一钢端柱、第二钢端柱之间采用对接坡口焊进行焊接。
4.如权利要求1所述的一种装配式钢板剪力墙,其特征在于:所述第一钢端柱及第二钢端柱的横截面均呈H型设置。
5.如权利要求1所述的一种装配式钢板剪力墙,其特征在于:所述第一螺帽预留凹槽及第二螺帽预留凹槽内填充有砂浆。
CN201820006616.3U 2018-01-03 2018-01-03 一种装配式钢板剪力墙 Active CN207892084U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820006616.3U CN207892084U (zh) 2018-01-03 2018-01-03 一种装配式钢板剪力墙

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820006616.3U CN207892084U (zh) 2018-01-03 2018-01-03 一种装配式钢板剪力墙

Publications (1)

Publication Number Publication Date
CN207892084U true CN207892084U (zh) 2018-09-21

Family

ID=63551264

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820006616.3U Active CN207892084U (zh) 2018-01-03 2018-01-03 一种装配式钢板剪力墙

Country Status (1)

Country Link
CN (1) CN207892084U (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108005260A (zh) * 2018-01-03 2018-05-08 浙江绿筑集成科技有限公司 一种装配式钢板剪力墙及其制造方法
CN110273544A (zh) * 2019-05-22 2019-09-24 浙江精工钢结构集团有限公司 部分包覆型钢混凝土剪力墙竖向拼接钢化节点的制作方法
CN110565840A (zh) * 2019-09-30 2019-12-13 北京和筑科技有限公司 下凹钢板混凝土组合墙

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108005260A (zh) * 2018-01-03 2018-05-08 浙江绿筑集成科技有限公司 一种装配式钢板剪力墙及其制造方法
CN110273544A (zh) * 2019-05-22 2019-09-24 浙江精工钢结构集团有限公司 部分包覆型钢混凝土剪力墙竖向拼接钢化节点的制作方法
CN110565840A (zh) * 2019-09-30 2019-12-13 北京和筑科技有限公司 下凹钢板混凝土组合墙

Similar Documents

Publication Publication Date Title
CN207892084U (zh) 一种装配式钢板剪力墙
CN103437460B (zh) 内嵌钢框架混凝土防爆墙
CN206512588U (zh) 一种装配式t型钢管约束钢筋混凝土桥墩梁柱连接节点
CN206091045U (zh) 一种波腹芯板预制混凝土装配式复合墙
CN106836492A (zh) 一种组合框架—内嵌式组合墙抗侧力体系
CN106368348B (zh) 一种具有两阶段受力特征的叠合式组合剪力墙
CN106869567A (zh) 一种耗能型冷弯薄壁钢管混凝土抗侧力体系
CN209082693U (zh) 带耗能装置的无粘结预应力装配式节点
CN109235639A (zh) 带耗能装置的无粘结预应力装配式节点及施工方法
CN205875394U (zh) 一种干法连接的抗震混凝土梁柱
CN207525933U (zh) 一种钢板组合剪力墙拼接节点
CN109610685A (zh) 外包承压不受拉混凝土内嵌阻尼夹层的双钢板组合剪力墙
CN204001220U (zh) 一种钢结构节点构件
CN107119800B (zh) 一种多高层装配式模块化自复位钢结构方管柱框架体系
CN219471198U (zh) 一种耗能减震型装配式梁柱连接节点
CN203334423U (zh) 一种预制叠合阳台板与主体的钢筋拉结结构
CN206829372U (zh) 一种基于冷弯薄壁型钢的装配式房屋钢结构
CN203947593U (zh) 一种安全式钢结构节点构件
CN110748076A (zh) 预应力钢管桁架外挂墙板及使用该墙板制作安装的墙体
CN206829370U (zh) 一种基于冷弯薄壁型钢的装配式内墙体与桁架梁节点结构
CN115749059A (zh) 一种防屈曲钢板混凝土组合墙
CN215166851U (zh) 组合剪力墙结构
CN204098355U (zh) 蜂窝状钢腹板-钢管混凝土翼缘h形截面组合柱
CN105178435B (zh) 一种减震式钢结构节点构件
CN108005260A (zh) 一种装配式钢板剪力墙及其制造方法

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Dongyue Green Building Integrated Technology Co.,Ltd.

Assignor: ZHEJIANG GREEN BUILDING INTEGRATION TECHNOLOGIES Co.,Ltd.

Contract record no.: X2019330000016

Denomination of utility model: Connector for connecting assembly type steel plate shearing wall and steel beam

Granted publication date: 20180921

License type: Common License

Record date: 20190917

Assignee: Qinhuangdao Seiko Green Building Integrated Technology Co.,Ltd.

Assignor: ZHEJIANG GREEN BUILDING INTEGRATION TECHNOLOGIES Co.,Ltd.

Contract record no.: X2019330000017

Denomination of utility model: Connector for connecting assembly type steel plate shearing wall and steel beam

Granted publication date: 20180921

License type: Common License

Record date: 20190917

EE01 Entry into force of recordation of patent licensing contract

Assignee: Henan Green Building Technology Development Co.,Ltd.

Assignor: ZHEJIANG GREEN BUILDING INTEGRATION TECHNOLOGIES Co.,Ltd.

Contract record no.: X2019330000015

Denomination of utility model: Connector for connecting assembly type steel plate shearing wall and steel beam

Granted publication date: 20180921

License type: Common License

Record date: 20190919

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Anhui Zhihong Precision Construction Technology Co.,Ltd.

Assignor: ZHEJIANG GREEN BUILDING INTEGRATION TECHNOLOGIES Co.,Ltd.

Contract record no.: X2023990000037

Denomination of utility model: A fabricated steel plate shear wall

Granted publication date: 20180921

License type: Common License

Record date: 20230113

EE01 Entry into force of recordation of patent licensing contract

Assignee: Jiangxi Huahong Jinggong Steel Structure Co.,Ltd.

Assignor: ZHEJIANG GREEN BUILDING INTEGRATION TECHNOLOGIES Co.,Ltd.

Contract record no.: X2023980034645

Denomination of utility model: A prefabricated steel plate shear wall

Granted publication date: 20180921

License type: Common License

Record date: 20230413

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Jiangsu Lvjian Jinggong Technology Co.,Ltd.

Assignor: ZHEJIANG GREEN BUILDING INTEGRATION TECHNOLOGIES Co.,Ltd.

Contract record no.: X2023980034833

Denomination of utility model: A prefabricated steel plate shear wall

Granted publication date: 20180921

License type: Common License

Record date: 20230421

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Weinan Guokong Jinggong Green Building Technology Co.,Ltd.

Assignor: ZHEJIANG GREEN BUILDING INTEGRATION TECHNOLOGIES Co.,Ltd.

Contract record no.: X2024980009941

Denomination of utility model: A prefabricated steel plate shear wall

Granted publication date: 20180921

License type: Common License

Record date: 20240717

EE01 Entry into force of recordation of patent licensing contract

Assignee: Chongqing Kunda Precision Integrated Technology Co.,Ltd.

Assignor: ZHEJIANG GREEN BUILDING INTEGRATION TECHNOLOGIES Co.,Ltd.

Contract record no.: X2024980014873

Denomination of utility model: A prefabricated steel plate shear wall

Granted publication date: 20180921

License type: Common License

Record date: 20240914

EE01 Entry into force of recordation of patent licensing contract

Assignee: Anhui Huiyu Construction Engineering Co.,Ltd.

Assignor: ZHEJIANG GREEN BUILDING INTEGRATION TECHNOLOGIES Co.,Ltd.

Contract record no.: X2024980016463

Denomination of utility model: A prefabricated steel plate shear wall

Granted publication date: 20180921