CN207878477U - A kind of discarded underground piping plugging structure - Google Patents
A kind of discarded underground piping plugging structure Download PDFInfo
- Publication number
- CN207878477U CN207878477U CN201721847116.4U CN201721847116U CN207878477U CN 207878477 U CN207878477 U CN 207878477U CN 201721847116 U CN201721847116 U CN 201721847116U CN 207878477 U CN207878477 U CN 207878477U
- Authority
- CN
- China
- Prior art keywords
- segment pipe
- underground piping
- block wall
- pipeline
- plugging structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000007569 slipcasting Methods 0.000 claims abstract description 19
- 230000000903 blocking effect Effects 0.000 claims abstract description 11
- 239000011449 brick Substances 0.000 claims abstract description 10
- 239000004568 cement Substances 0.000 claims description 3
- 239000000463 material Substances 0.000 claims description 3
- 238000010276 construction Methods 0.000 abstract description 8
- 238000007596 consolidation process Methods 0.000 description 2
- 239000013049 sediment Substances 0.000 description 2
- 238000004062 sedimentation Methods 0.000 description 2
- 230000007797 corrosion Effects 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 231100001261 hazardous Toxicity 0.000 description 1
Abstract
The utility model discloses a kind of discarded underground piping plugging structures, belong to urban construction field.The utility model includes pipeline, and the pipeline is equipped with multiple closure segment pipes, and the inside for blocking segment pipe left end builds the first block wall by laying bricks or stones, and the interior of segment pipe right end that block builds the second block wall by laying bricks or stones;Active well is equipped at the top of pipeline at left and right sides of the closure segment pipe;The top of second block wall is equipped with discharge opening along vault;It is uniformly provided with multiple slip casting through-holes from left to right at the top of the closure segment pipe;Mud is filled in the closure segment pipe and slip casting through-hole.Discarded underground piping plugging structure described in the utility model eliminates the security risk of surface collapse, simple in structure, and construction efficiency is high, convenient and efficient, securely and reliably.
Description
Technical field
The utility model is related to urban construction field more particularly to a kind of discarded underground piping plugging structures.
Background technology
Old subdrainage pipe network in city, since former design standard is relatively low, pipe network structure is weak, by for many years
After use, the corrosion of pipeline is very serious, and the pipeline for being unable to normal use will be discarded,.Large-scale discarded pipe is embedded in
Underground, extremely hazardous, there are the security risks such as surface collapse and the stability for influencing superstructure.In order to eliminate discarded pipe
Security risk, the utility model provide a kind of plugging structure of discarded underground piping.
Invention content
Above-mentioned in order to solve the problems, such as, the utility model aim is to propose that a kind of discarded underground piping blocks knot
Structure, the discarded underground piping plugging structure eliminate the security risk of surface collapse, and simple in structure, construction efficiency is high, convenient fast
Victory, securely and reliably.
To achieve the goals above, the utility model uses following scheme, including pipeline, the pipeline to be equipped with multiple closure
Segment pipe, the inside for blocking segment pipe left end build the first block wall by laying bricks or stones, and the interior of segment pipe right end that block builds second by laying bricks or stones
Block wall;Active well is equipped at the top of pipeline at left and right sides of the closure segment pipe;The top of second block wall is along vault
Equipped with discharge opening;It is uniformly provided with multiple slip casting through-holes from left to right at the top of the closure segment pipe;The closure segment pipe and
Mud is filled in slip casting through-hole.
Preferably, the length for blocking segment pipe is less than 20m.
Preferably, the thickness of first block wall and the second block wall is not less than 200m.
Preferably, the material on first block wall top is micro-expansion cement.
Preferably, the discharge opening is in a quarter ring.
Preferably, the number of the slip casting through-hole is four.
When construction, pipeline is first divided into multiple closure segment pipes, active well is opened at left and right sides of segment pipe blocking;Work
Personnel build the first block wall and the second block wall by laying bricks or stones through active well in block section pipe ends;It is reserved on the top of the second block wall
Discharge opening;Slip casting through-hole there are four uniformly being opened from left to right at the top of closure segment pipe;Grouting equipment is by slip casting through-hole to envelope
Stifled segment pipe carries out slip casting, until slip casting through-hole and closure segment pipe fill up;It blocks after the completion of being filled in segment pipe and stands four
By five days, mud sediment and consolidation in segment pipe are blocked, carries out second of mud filling;It is right again after the completion to block segment pipe filling
Active well carries out mud filling.
Discarded underground piping plugging structure described in the utility model eliminates the security risk of surface collapse, simple in structure,
Construction efficiency is high, convenient and efficient, securely and reliably.
Description of the drawings
Fig. 1 is the schematic cross-sectional view of discarded underground piping plugging structure described in the utility model.
Specific implementation mode
The utility model is described in further detail below in conjunction with the accompanying drawings, so that those skilled in the art can be more
Add and be apparent from, as shown in Figure 1, the utility model uses following scheme, including pipeline, the pipeline to be equipped with multiple block sections
Pipeline 1, the inside for blocking 1 left end of segment pipe build the first block wall 5 by laying bricks or stones, it is described block 1 right end of segment pipe in build the by laying bricks or stones
Two block walls 7;It is equipped with active well 4 at the top of the pipeline for blocking 1 left and right sides of segment pipe;The top of second block wall 7
It is equipped with discharge opening 8 along vault;1 top of the closure segment pipe is uniformly provided with multiple slip casting through-holes 3 from left to right;The block section
Mud 6 is filled in pipeline 1 and slip casting through-hole 3.
The length for blocking segment pipe 1 is less than 20m.The thickness of first block wall, 5 and second block wall 7 is not less than
200m.The material on 5 top of the first block wall is micro-expansion cement.The discharge opening 8 is in a quarter ring.The slip casting is logical
The number in hole 3 is four.
When construction, pipeline is first divided into multiple closure segment pipes 1, active well 4 is opened in the left and right sides for blocking segment pipe 1;
Staff builds the first block wall 5 and the second block wall 7 by laying bricks or stones through active well 4 at 1 both ends of closure segment pipe;In the second block wall 7
Top reserve discharge opening 8;Slip casting through-hole 3 there are four uniformly being opened from left to right at 1 top of closure segment pipe;Grouting equipment passes through
Slip casting through-hole 3 carries out slip casting to blocking segment pipe 1, until slip casting through-hole 3 and closure segment pipe 1 fill up;It blocks and is filled out in segment pipe 1
After the completion of filling and four to five days are stood, blocks mud sediment and consolidation in segment pipe 1, carries out second of mud filling;Block section
Mud filling is carried out to active well again after the completion of the filling of pipeline 1.
Discarded underground piping plugging structure described in the utility model eliminates the security risk of surface collapse, simple in structure,
Construction efficiency is high, convenient and efficient, securely and reliably.
Claims (6)
1. a kind of discarded underground piping plugging structure, including ground (2) and pipeline, it is characterised in that:The pipeline is equipped with multiple
Segment pipe (1) is blocked, the inside for blocking segment pipe (1) left end builds the first block wall (5), the closure segment pipe (1) by laying bricks or stones
The second block wall (7) is built by laying bricks or stones in right end;It is equipped with active well (4) at the top of the pipeline blocked at left and right sides of segment pipe (1);Institute
The top for stating the second block wall (7) is equipped with discharge opening (8) along vault;It is uniformly opened from left to right at the top of the closure segment pipe (1)
There are multiple slip casting through-holes (3);Mud (6) is filled in the closure segment pipe (1) and slip casting through-hole (3).
2. discarding underground piping plugging structure according to claim 1, it is characterised in that:The length for blocking segment pipe (1)
Degree is less than 20m.
3. discarding underground piping plugging structure according to claim 1, it is characterised in that:First block wall (5) and
The thickness of two block walls (7) is not less than 200m.
4. discarding underground piping plugging structure according to claim 1, it is characterised in that:First block wall (5) top
Material be micro-expansion cement.
5. discarding underground piping plugging structure according to claim 1, it is characterised in that:The discharge opening (8) in four/
One ring.
6. discarding underground piping plugging structure according to claim 1, it is characterised in that:The number of the slip casting through-hole (3)
It is four.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721847116.4U CN207878477U (en) | 2017-12-26 | 2017-12-26 | A kind of discarded underground piping plugging structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721847116.4U CN207878477U (en) | 2017-12-26 | 2017-12-26 | A kind of discarded underground piping plugging structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207878477U true CN207878477U (en) | 2018-09-18 |
Family
ID=63504011
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721847116.4U Expired - Fee Related CN207878477U (en) | 2017-12-26 | 2017-12-26 | A kind of discarded underground piping plugging structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207878477U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110560467A (en) * | 2019-10-12 | 2019-12-13 | 中石化第十建设有限公司 | Harmless treatment method for waste and old pipelines |
CN110701421A (en) * | 2019-08-29 | 2020-01-17 | 中国二冶集团有限公司 | Method for plugging water source of large-diameter pipeline |
-
2017
- 2017-12-26 CN CN201721847116.4U patent/CN207878477U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110701421A (en) * | 2019-08-29 | 2020-01-17 | 中国二冶集团有限公司 | Method for plugging water source of large-diameter pipeline |
CN110560467A (en) * | 2019-10-12 | 2019-12-13 | 中石化第十建设有限公司 | Harmless treatment method for waste and old pipelines |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203742623U (en) | Water-pressure-resistant composite structure for tunnel | |
CN105178285B (en) | A kind of method for expanding ground grouting and reinforcing and antiseepage extent of congestion | |
CN207878477U (en) | A kind of discarded underground piping plugging structure | |
CN108386198A (en) | A kind of novel tunnel inverted arch basement weak country rock processing method | |
CN103821114B (en) | A kind of reservoir culvert method for blocking discarded under seepage pressure effect | |
CN106894428A (en) | A kind of multi layer waterproof method for blocking of mass raft foundation dewatering well | |
CN104790982B (en) | A kind of bored tunnel superdeep holes grouting sleeve shell material | |
CN106522248A (en) | Method for reinforcing soil slope and slope reinforcing device | |
CN208280969U (en) | Shield tunnel gravity type sealing plugging structure | |
CN104499500B (en) | A kind of wind power foundation post-grouting reinforcement waterproofing system | |
CN104452751A (en) | Secondary pouring pile forming device and pile forming method for bored piles | |
CN108915705B (en) | A kind of baffle grouting construction method blocked for shield export & import leak | |
CN105804203A (en) | Plugging method of deep-buried large-diameter waste water pipeline | |
CN105696543A (en) | Dam front drainage method for sub-dam building in red mud stacking area | |
CN204370426U (en) | A kind of retaining wall construction equipment based on multilayer template | |
CN207362833U (en) | A kind of karst cave treatment structure of diaphram wall | |
CN207512999U (en) | A kind of wear-resisting building corner brick of tenon joint type | |
CN208251118U (en) | Slope reinforcement device | |
CN202450511U (en) | Grouting device | |
CN204898688U (en) | Protective structure is backfilled to earth source heat pump pipeline foundation ditch sand | |
CN206971236U (en) | A kind of barricade for preventing landslide | |
CN205329715U (en) | Highway slabstone superfluidity concrete retaining wall structure | |
CN211038518U (en) | Novel non-excavation drill bit | |
CN105545324B (en) | A kind of permeable hydraulic tunnel lining cutting and manufacturing method | |
CN204326065U (en) | Drilled pile secondary pouring pile making device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180918 |